Professional Documents
Culture Documents
A
COTA COTA PRESION Y TIPO
ESTACION
T.N.(m) PIEZ.(m) (m) DE
TUBERIA
A Ta
1960.00 1,069.97 1,091.32 21.35
nque
1940.00 1,065.34 1,091.36 26.02
Cal
1920.00 1,060.71 1,091.41 30.70
ichal
1900.00 1,055.86 1,091.45 35.59
1,030.12 1,091.67
AS
1800.00 61.55
DEN
CADENAMIENTO
1780.00 1,025.25 1,091.72 66.47
CAR
R. A
1760.00 1,020.56 1,091.76 71.20
CAR
2+034.00
1740.00 1,015.56 1,091.81 76.25
1,010.63 1,091.85
A
1700.00 1,007.25 1,091.90 84.65
b.
a.
1620.00 1,004.61 1,092.07 87.46
atraque.
TIPO XII
1,004.71 1,092.12 87.41
dejarse un
1600.00
NOTAS PARTICULARES
1580.00 1,004.65 1,092.16 87.51
E
A
1520.00 1,005.05 1,092.29 87.24
.0 0
1+300
1500.00 1,004.78 1,092.34 87.56
CADENAMIENTO
0
1+200.0
1400.00 1,005.46 1,092.56 87.10
1+666.94
1360.00 1,005.69 1,092.65 86.96
C
1340.00 1,005.74 1,092.69 86.95
B
1240.00 1,007.15 1,092.91 85.76
C
1220.00 1,007.34 1,092.96 85.62
CADENAMIENTO
1160.00 1,007.82 1,093.09 85.27
arena fina
Arena Fina
Plantilla de
banco
producto de
Acostillado con
con material
seleccionado
con material de
1,008.10 1,093.18
Relleno compactado
1120.00 85.08
Relleno compactado
1100.00 1,008.24 1,093.22 84.98
1+666.94 AL 2+034.00
1080.00 1,008.37 1,093.27 84.90
OT
A
860.00 1,011.33 1,093.76 82.43
1,011.32 1,094.07
CARR
720.00 82.75
TUBERIA EXISTENTE
.A
JUNIO 2017