You are on page 1of 1

DIAMETRO

A
COTA COTA PRESION Y TIPO
ESTACION
T.N.(m) PIEZ.(m) (m) DE
TUBERIA

2034.00 1,079.32 1,091.15 11.83

2020.00 1,078.94 1,091.19 12.25


2+034.00

2000.00 1,077.51 1,091.23 13.72

1980.00 1,074.39 1,091.28 16.89

A Ta
1960.00 1,069.97 1,091.32 21.35

nque
1940.00 1,065.34 1,091.36 26.02

Cal
1920.00 1,060.71 1,091.41 30.70

ichal
1900.00 1,055.86 1,091.45 35.59

1880.00 1,050.78 1,091.50 40.72

1860.00 1,045.43 1,091.54 46.11

1840.00 1,040.33 1,091.59 51.26

1820.00 1,035.21 1,091.63 56.42

1,030.12 1,091.67

AS
1800.00 61.55

DEN

CADENAMIENTO
1780.00 1,025.25 1,091.72 66.47

CAR
R. A
1760.00 1,020.56 1,091.76 71.20

CAR

2+034.00
1740.00 1,015.56 1,091.81 76.25

1,010.63 1,091.85

L = 367 Mts. TEBERIA DE PROYECTO


1720.00 81.22

A
1700.00 1,007.25 1,091.90 84.65

1680.00 1,005.38 1,091.94 86.56

1660.00 1,004.94 1,091.96 87.02


1666.94 1,004.75 1,091.98 87.23

1640.00 1,004.38 1,092.03 87.65

b.
a.
1620.00 1,004.61 1,092.07 87.46

atraque.

TIPO XII
1,004.71 1,092.12 87.41

dejarse un
1600.00

NOTAS PARTICULARES
1580.00 1,004.65 1,092.16 87.51

luz medidos del firme de CV al lomo


de 25 cm de

c. Se dejara un banco soporte en la Tee


formando una sola pieza con el
1560.00 1,004.83 1,092.21 87.38

1540.00 1,005.00 1,092.25 87.25

E
A
1520.00 1,005.05 1,092.29 87.24
.0 0
1+300
1500.00 1,004.78 1,092.34 87.56

1480.00 1,004.65 1,092.38 87.73

1460.00 1,004.81 1,092.43 87.62

1440.00 1,004.97 1,092.47 87.50

1420.00 1,005.12 1,092.52 87.40

CADENAMIENTO
0
1+200.0
1400.00 1,005.46 1,092.56 87.10

1380.00 1,005.65 1,092.60 86.95

1+666.94
1360.00 1,005.69 1,092.65 86.96

C
1340.00 1,005.74 1,092.69 86.95

1320.00 1,005.78 1,092.74 86.96

1300.00 1,016.06 1,092.78 76.72

1280.00 1,006.50 1,092.83 86.33

1260.00 1,006.87 1,092.87 86.00

B
1240.00 1,007.15 1,092.91 85.76

C
1220.00 1,007.34 1,092.96 85.62

1200.00 1,007.51 1,093.00 85.49

1180.00 1,007.68 1,093.05 85.37

CADENAMIENTO
1160.00 1,007.82 1,093.09 85.27

1140.00 1,007.96 1,093.14 85.18

arena fina
Arena Fina

Plantilla de
banco
producto de

Acostillado con
con material
seleccionado

con material de
1,008.10 1,093.18

Relleno compactado
1120.00 85.08

Relleno compactado
1100.00 1,008.24 1,093.22 84.98

1+666.94 AL 2+034.00
1080.00 1,008.37 1,093.27 84.90

1060.00 1,008.55 1,093.31 84.76

1040.00 1,008.80 1,093.36 84.56

1020.00 1,009.01 1,093.40 84.39

1000.00 1,009.20 1,093.45 84.25

980.00 1,009.40 1,093.49 84.09

960.00 1,009.64 1,093.53 83.89

940.00 1,009.95 1,093.58 83.63 CA


RR
920.00 1,010.25 1,093.62 83.37
.A
VA
900.00 1,010.62 1,093.67 83.05
LLE
S
880.00 1,011.00 1,093.71 82.71
CU
L = 1,666.94

OT
A
860.00 1,011.33 1,093.76 82.43

840.00 1,011.64 1,093.80 82.16

820.00 1,011.42 1,093.84 82.42

800.00 1,010.82 1,093.89 83.07

780.00 1,010.62 1,093.93 83.31

760.00 1,010.83 1,093.98 83.15

740.00 1,011.07 1,094.02 82.95

1,011.32 1,094.07
CARR

720.00 82.75
TUBERIA EXISTENTE
.A

700.00 1,011.56 1,094.11 82.55


C A

680.00 1,011.81 1,094.15 82.34


R

660.00 1,011.96 1,094.20 82.24

640.00 1,012.07 1,094.24 82.17


DENA
S

620.00 1,012.20 1,094.29 82.09


Se hace

600.00 1,012.39 1,094.33 81.94


Operador la

580.00 1,012.58 1,094.38 81.80


que

560.00 1,012.85 1,094.42 81.57

540.00 1,013.18 1,094.46 81.28

520.00 1,013.58 1,094.51 80.93

500.00 1,014.01 1,094.55 80.54

480.00 1,014.47 1,094.60 80.13

460.00 1,014.43 1,094.64 80.21


este proyecto por lo que el equipo es nuevo.

440.00 1,014.41 1,094.69 80.28


que el 2 de Marzo del 2017 se

420.00 1,014.72 1,094.73 80.01

400.00 1,015.03 1,094.77 79.74


del equipo de conjunto motor
a

bomba (KOR10-R300-16 marca ALTAMIRA) de la


cabo por el Ayuntamiento a solicitud del Organismo

el sector Calichal motivo de

JUNIO 2017

380.00 1,015.32 1,094.82 79.50

360.00 1,015.59 1,094.86 79.27


PROYECTO Y TOPOGRAFIA:

340.00 1,015.85 1,094.91 79.06


INDICADAS

320.00 1,015.98 1,094.95 78.97

300.00 1,016.06 1,095.00 78.94

280.00 1,016.18 1,095.04 78.86


METROS
DIRECTOR DEL OOAPASR

260.00 1,016.53 1,095.08 78.55

240.00 1,016.86 1,095.13 78.27


ING. FRANCISCO JAVIER ARVIZU GARAY

220.00 1,016.94 1,095.17 78.23


2 DE 7

200.00 1,017.08 1,095.22 78.14

180.00 1,017.36 1,095.26 77.90

160.00 1,017.76 1,095.31 77.55


PLANO (1/1):

140.00 1,017.68 1,095.35 77.67


PROYECTO :

120.00 1,017.55 1,095.39 77.84

100.00 1,017.62 1,095.44 77.82

80.00 1,017.42 1,095.48 78.06


ESCALA VERTICAL 1 : 250

POR EL AYUNTAMIENTO DE RAYON S.L.P.:

60.00 1,017.55 1,095.53 77.98


ESCALA HORIZONTAL 1 : 1000

40.00 1,017.54 1,095.57 78.03


PERFIL DE BOMBEO POZO 4 - TANQUE EL CHABACANO

20.00 1,017.84 1,095.62 77.78


PRESIDENTE MUNICIPAL

COORDINADOR DE DESARROLLO SOCIAL

0.00 1,018.15 1095.66 77.51


CALICHAL EN AGEB 0231 Y 0316

C. HERIBERTO PAITA MENDEZ


C. GENARO GUILLEN GODINEZ
POTABLE, ALCANTARILLADO Y

POTABLE PARA ABASTECER A EL BARRIO

Derivacion a Sector Chabacano


ORGANISMO OPERADOR DE AGUA

You might also like