2010 ENERGY CONSUMPTION BY SECTOR

AFF
1%

INDUSTRY
26% BUILDINGS
36%

TRANSPORT Buildings account


37% for 36% of the
national energy
consumption
2010 DOE Key Energy Statistics Philippines

Energy Use Profile in the Philippines 3


SITUATIONER
Data from IFC Philippine
Green Building Code Study
2012-2015

53-70% of a
building’s
energy
consumption is
due to cooling

4
MITIGATION IMPERATIVE

Climate Vulnerability
…. pursuing
climate change
mitigation as a
Resource efficiency function of
and security adaptation

…. improve
Shared Responsibility bottomline
Why GO green
Green Building provides a window of opportunity to
prevent being locked in a high carbon economy.
Economics

Urbaniation

Climate Change
Green
Building?

What?

Why?

How?
…the State has adopted the Philippine Agenda
21 framework which espouses sustainable
development, to fulfill human needs while
maintaining the quality of the natural environment for
current and future generations.

IECLEI - Ar Emelito C Punsalan, PGBI, Dec. 9, 2016


- SECTION 2 RA 9729
Green Buildings
Practice of increasing efficiency
with which buildings use resources
such as energy, water and
materials

While also reducing the buildings’


impact on human health and the
environment
Efficient Use
Efficient Equipt Bonus! More Greens
& Sys Cooler Environ
Less Heat Gain Site Feasible Location
Natural Cooling Protection of
Energy Daylight Biodiversity

Recycled Efficient Fixtures


Re-used Rainwater Collect
Renewable Re-use

Materials Water

Local & Regional Wastewater


Waste Segregation Daylight treatment
Indoor Outdoor Connect
Envi Thermal Comfort Fresh air supply
Quality Lesser Indoor
pollution
Referral Code
PHILIPPINE of the NBC;
mandatory
GREEN BUILDING
Signed in June
CODE 2015, effective
January 2016
GREEN BUILDING
CODE DEVELOPMENT
Building Trends & Baselines

Market Analysis

Sensitivity Analysis

Green Building
Recommendations
• Energy
16
Efficiency

• Water Efficiency 3

• Material

BUILDING TECHNOLOGIES & PRACTICES (SHDA) – Ar Emelito C Punsalan, PGBI, Sept. 17, 2015
Sustainability
1

• Solid Waste 1
Management

• Site 2
Sustainability

• Indoor
Environmental 2
Quality
25 GB Measures
COVERAGE AND APPLICATION
Minimum Total Gross Floor Area (TGFA) coverage
USE / OCCUPANCY TGFA
Hotel 10,000 sqm
Mall 15,000 sqm
Office 10,000 sqm

UILDING TECHNOLOGIES & PRACTICES (SHDA) – Ar Emelito C Punsalan, PGBI, Sept. 17, 2015
Residential Condominium 20,000 sqm
School 10,000 sqm
Hospital 10,000 sqm
Mixed Occupancy 10,000 sqm

GB Code is for new construction only


Applicable to additions, alterations, conversion or renovations with
TGFA as stated in the table
Mixed use – if more than one (1) building use.
ENERGY EFFICIENCY
BUILDING ENVELOPE

1. Air Tightness and Moisture Protection


- reducing air inflitration and exfiltration
- preventing outside air moisture infiltration.

2. Window-to-Wall Ratio (WWR)


- Solar Heat Gain Coefficient (SHGC) and WWR
- Windows withouts sunbreakers or overhangs
- Windows with sunbreakers

3. Natural Ventilation
- Use of operable windows

4. Building Envelope Color


- High solar reflectance of building envelope
surface

5. Roof insulation
- Reduction of heat transfer through the roof
ENERGY EFFICIENCY
EFFICIENCY OF MECHANICAL SYSTEMS

1. Efficiency of Air-conditioning Equipment


- PSVARE Standard for Energy Efficient Buildings
minimum efficiency requirements

2. Energy Efficient Water Heating System


- PSVARE Standard, minimum performance
requirements

3. Variable Speed Drives and High Efficiency Motors


- devices that regulate mechanical sys
operations based on actual demand

4. Enthalphy Recovery of Exhaust Air


- Fresh air supply with energy efficienct
system
ENERGY EFFICIENCY
EFFICIENCY OF ELECTRICAL SYSTEMS

1. Daylighting Provision
- Harvest natural daylighting

2. Daylight Controlled Lighting System


- Controlled use of artificial
lighting due to daylighting

3. Lighting Power Density


- Regulated power consumption
due to lighting

4. Occupancy Sensors
- Controlled use of artificial
lighting due to demand
ENERGY EFFICIENCY
EFFICIENCY OF ELECTRICAL SYSTEMS

5. Lifts & Escalators Efficiency


- Use of energy-efficient
conveyance systems

6. Transformers
- Use of highly-efficient
transformers

7. Overhead or Elevated Water Storage


- Water distribution system that
utilize reduced pump
requirements
WATER EFFICIENCY
EFFICIENT WATER FIXTURES
Effectively modulates use of
potable water

WASTE WATER MANAGEMENT

1. Rainwater Harvesting
- Re-use of rainwater reduces use of
potable water and slows down
stormwater surface run-off

2. Water Recycling
- Resulting water from sewage treatment
plants (STP) can be re-used
- Cooling Tower / Irrigation
MATERIAL SUSTAINABILITY

NON-TOXIC MATERIALS
Material resource with least impact
to the environment and
to human beings
SOLID WASTE MANAGEMENT

MATERIAL RECOVERY FACILITY


Efficient at source waste management
and segregation
SITE SUSTAINABILITY

SITE PREPARATION & EARTHWORKS


Reducing impact of construction activities
due to erosion and sedimentation

OPEN SPACE UTILIZATION


Providing green and permeable
areas to help the re-charging of ground
water reservoir, control of storm
water surface run-off and cooler
Building outside environment
INDOOR ENVIRONMENTAL QUALITY

MINIMUM FRESH AIR RATES


Maintaining good indoor air quality
By following PSVARE standards
for the benefit of occupants

DESIGNATED SMOKING AREA


Restricting tobacco smoke to specified
areas to maintain good indoor air
quality
POTENTIAL

POTENTIAL IMPACT (2030)

UILDING TECHNOLOGIES & PRACTICES (SHDA) – Ar Emelito C Punsalan, PGBI, Sept. 17, 2015
USD 864 Million Costs expected to be
avoided

1.87 Million Reduction in CO2e


Metric tons emissions

3.9 Million KWH Energy use


avoided

25
Green Building Voluntary
Code Rating Systems
Number of buildings

Standards LEED, BREEAM,


BERDE, GREEEN

Lower end Business as Usual Green Buildings

26
The evaluation of Bldg
Permit Docs
Including the GB Code
measures under the
appropriate disciplines

GB Measures
embedded in
Technical Drawings
& Specifications

Receiving will use


Checklist to check
completeness of
Permit application
docs
BUILDING PERMIT PROCESS
• Application form from the Office of the Local
Application Building Official

• Building Official evaluates and ensure plans


Processing conform with approved standard
and requirements Receipt & Check of GB Docs
Evaluation

• Upon conformity the Building Official shall


approve building permit application
Approval Review of GB Docs

• Upon approval, applicant shall pay the


Payment prescribed building permit fees
of Fees

• Building Permit shall be issued


Issuance
BUILDING PERMIT PROCESS
Ref Code / Sanitary /
LGU / Zone Architectural Civil/Structural Electrical Electronics Mechanical Fire Code BP 344
Clearance Plumbing
Tourism Ch 4 NSCP Electrical Electronics Mechanical Sanitation Fire PWD
Regulation Regulation
DENR Ch 5 Ch 6 Regulation Regulation Regulations Ch 13
s s
Water
DPWH Ch 7 Ch 12 Ch 13 Ch 13 Ch 13 Ch 12
Efficiency
Daylight
controlled Air
Lighting Power Overhead
Ch 8 Ch 19 Lighting Sys Conditioning
Density Tank
(Control Device Sys
Functions)
Occupancy
Sensors Water Heating
Ch 10 Ch 15 Transformer
(Control Device Sys
Functions)
Daylight Elevators,
controlled Escalators,
Site / Ground Enthalpy
Lighting Sys Moving Ramps
Ch 12 Preparation & Recovery of
(Control devices & Walkways
Earthworks within the Exhaust Air
(Control Device
Lighting syst) Functions)
Occupancy Elevators,
Sensors (Control
Building Escalators,
devices within
Envelope the Lighting
Moving Ramps
syst) & Walkways
Daylight
Provision
VSD and Hi-Eff
Motors
GB Code measures
Material Indoor Envi distributed under
Sustain Quality
Solid Waste relevant disciplines
Management
Open Space
Utilization
BUILDING PERMIT PROCESS
10 ENERGY EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required
Item Applicability Design Value Document
Requirement value Documentation needed Design Specification Docume
Provided?
Building Envelope Yes/No Yes/No Remarks

10.1.1 Air Tightness & Moisture Protection Required? Complied?

Ocula
a Sealed window and door assemblies Bay wall sections
Ve
Enlarged details of
building envelope
b Sealed utility services Applies to all building occupancies showing required air Pro
except building and spaces without air- tightness & moisture
conditioning system protection elements
Building elevations &
c Sealed walls Brochu
sections

d Sealed roofing Technical specifications Sho


of required air tightness
e Sealed ceiling & moisture protection
elements As-bu
f Sealed flooring
Use SHGC Documentation Document Doc
10.1.2 Glass Properties Calculator
Design Value Design Specification
needed Provided?
Architectural floor plans,
Ocula
a Solar Heat Gain Coefficient (SHGC) Building elevations &
Ve
Applies to all building occupancies sections
b Visual Light Transmittance (VLT) without exceptions Window Schedule Pro
WWR Computa ti on Ta bl e Brochu
Window Glass
Sho
specifications
As-bu
Operable
Applies to all building occupancies Documentation Document Doc
10.1.3 Natural Ventilation Window Design Value Design Specification
without exceptions Calculator
needed Provided?
Architectural floor plans,
Operable windows or balcony doors at Ocula
a Applies to regularly occupied spaces Building elevations &
least 10% of room space floor area Ve
sections
b Operable window with safety features Window Schedule Pro
Operable Window
Brochu
Computation Table
Window Details on
Sho
operation & safety
As-bu
Required? Complied? Documentation Document Doc
10.1.4 Building Envelope Color Design Specification
Yes/No Yes/No needed Provided?
Applies to all building occupancies
Building metal roof surface color white or Ocula
a without exceptions Roof plan
with min. SRI of 70 Ve
Technical specs of roof Pro
Brochu

GB Code Checklist under Architectural Sho


As-bu
Thermal
Documentation Document Doc
10.1.5 Roof Insulation Resistance Design Value Design Specification
Calculator
needed Provided?
BUILDING PERMIT PROCESS
10 ENERGY EFFICIENCY GB Code Developer Regulator
Design Compliance
Philippine Green Building Code Required Design
Item Applicability Documentation
Requirement value Value Documentation needed Design Specification Docu
Provided?

Electrical Systems Yes/No Yes/No Remarks


Applies to all regularly occupied spaces
of all building occupancies except Required? Complied?
10.6.2 Daylight Controlled Lighting System
building spaces where daylight access Yes/No Yes/No
hinders intended functions
Daylight sensor or photoelectic sensor in For residential condominiums, this
Architectural Reflected
a lighting system - for use within lighting applies only to common indoor areas
Ceiling Plan Ocu
control systems in day-lit zones with access to daylight
ver
Installed lighting fixtures within day-lit
la
zones are exempt from using Electrical lighting and
na
photoelectric sensor if this hinders its switching circuitry layout
sho
intended functions, with justification
Lighting control diagram
Technical specifications

10.6.3 Lighting Power Density (LPD) LPD Calculator Design Value

Architectural Reflected
a Building LPD within maximum LPD W/m2 W/m2 Ceiling Plan w/ LEGEND
requirements Box
Electrical Lighting Layout
a.1 Residential Dwelling 10.8
w/ LEGEND Box
Building Lighting Power
a.2 Hotel/Resort 10.8
Density Table
Ocu
a.3 Educational: School Applies to all building occupancies 12.9 ver
a.4 Institutional: Hospital without exceptions 12.9 la
a.5 Business: Office 10.8 na
a.6 Mercantile:Mall (excl accent lighting) 16.1 sho
a.7 Exterior facade 2.15 Technical specifications
a.8 Active entrance (pedestrian conveyance) 98.4 of light fixtures
Inactive entrance (normally
a.9 65.6
locked/inactive)
a.10 Covered Parking 3.2
a.11 Open Parking 1.6
Applies to all building occupancies Required? Complied?
10.6.4 Occupancy Sensors
except hospitals and malls Yes/No Yes/No
Provisions for emergency and security Architectural Reflected
a Occupancy sensors in lighting system
lighting are exempted Ceiling Plan
Ocu
Occupancy sensors in covered parking ver
b Electrical Lighting layout
lighting system - at least 60% of lighting la
Occupancy Sensing na
System Confirmation sho

GB Code Checklist under EE & ECE


Table
Technical specifications
BUILDING PERMIT PROCESS
10 ENERGY EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required
Item Applicability Design Value Documentation
Requirement value Documentation needed Design Specification Docum
Provided?
Mechanical Systems Yes/No Yes/No Remarks
Applies to all building occupancies
EER or COP or EER or COP or
10.5.1 Air Conditioning Equipment except building and spaces without air- kW/Ton kW/Ton
conditioning system
a Efficient air-conditioning equipment (Equipment 1) Equipment Schedule

Air-conditioning &
(Equipment 2)
Ventilation Layout Ocul
Technical Specifications verifi
(Equipment 3) of the various AC lab
(Equipment 4) nam
(Equipment 5) shopd
b
(Equipment 6)
(Equipment 7)
(Equipment 8)
Applies to all building occupancies
Required
except building with no water heating Efficiency
10.5.2 Water Heating System Efficiency
Factor
system and buildings using solar water Factor
heating and/or heat pump for water
a Efficient water heater (Equipment 1) Equipment Schedule
Plumbing & Electrical Ocul
(Equipment 2) verifi
power layout
lab
Technical Specifications nam
(Equipment 3)
of Water Heating system shopd
(Equipment 4) b
(Equipment 5)
Applies to all building occupancies.
Non-centralized air-conditioning
Variable Speed Drives and High Efficiency systems in buildings are not required to Efficiency Efficiency
10.5.3 Factor Factor
Motors employ variable speed controllers;
and kitchen ventilation fans are exempt
from this requirement.

VSD and High Efficiency motors for


a (Equipment 1) Equipment Schedule
mechanical equipment more than 5kW
Plumbing & Electrical
(Equipment 2) power layout and
schematic diagram
Ocul
Technical specifications
(Equipment 3) verifi
of motors and VSD/VFD
lab
VSD and High Efficiency motors for cooling nam
b (Equipment 1)
towers shopd
(Equipment 2) b
(Equipment 3)
High Efficiency motors for domestic
c (Equipment 1)
pumps
(Equipment 2) GB Code Checklist under Mechanical
(Equipment 3)
Applies to all building occupancies
Efficiency Efficiency
10.5.4 Enthalpy Recovery of Exhaust Air except those without centralized cooling
Factor Factor
BUILDING PERMIT PROCESS
10 ENERGY EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required Design
Item Applicability Value Value Documentation
Requirement Documentation needed Design Specification Docum
Provided?
Plumbing Systems Yes/No Yes/No Remarks
Required? Complied?
10.6.7 Overhead Water Storage
Yes / No Yes / No
Overhead water storage tank on top of Water Distribution
a Ocula
building at least 10 stories high Layout plan
Applies to all building occupancies verifi
except buildings below 10 storeys high Single Line or Schematic lab
Diagram nam
Water Tank Details shopd
b
Technical Specifications
11 WATER EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required Design
Item Applicability Documentation
Requirement value Value Documentation needed Design Specification Docum
Provided?
Plumbing Systems Yes/No Yes/No Remarks

11.1 Water Fixtures Max. Flowrate Flowrate

Specified water fixture compliant with Water Distribution


a maximum flow rate requirements as per Layout plan with LEGEND
Table 20 box
=<6 full Water Distribution
a.1 Dual Flush Water Closet 3 low Isometries with LEGEND
(liters/flush) box
4.9 Water Efficient Fixtures
a.2 Single Flush Water Closet
(liters/flush) Use Confirmation Table
=<9 (80 psi)
a.3 Shower liters/min at Ocula
551.6 kPa verifi
Applies to all building occupancies =<1 liter /
a.4 Urinal lab
flush nam
=<4.8 (60 shopd
psi) b
a.5 Lavatory tap
liters/min at
Technical Specifications
417.7 kPa
of plumbing fixtures
=<4.8 (60
psi)
a.6 Kitchen Faucet
liters/min at
417.7 kPa
=<4.8 (60
psi)
a.7
Handheld bidet spray
liters/min at
417.7 kPa
GB Code Checklist under Sanitary
Rainwater
Designed
Harvesting
11.2.1 Rainwater Harvesting Tank Calculator
volume
BUILDING PERMIT PROCESS
Air Tightness & Moisture Protection

• Unwanted air infiltration and humidity ingress into the


spaces can cause additional load on the air conditioning
system and a detrimental impact on air quality.

• Buildings must be planned, designed, specified and


constructed with enough detail and quality to ensure air
tightness is maximized.

• Vapor barrier prevents the entry of moisture through the


walls.

Building Envelope
BUILDING PERMIT PROCESS
Applicability
This measure applies to all building occupancies as
indicated in Table 1. of the GB Code

Exceptions
Buildings and spaces without provisions for air conditioning
systems are exempt.

Building Envelope
BUILDING PERMIT PROCESS
Design Application & Documentation
Design Documents needed are the following:

1. Bay Wall Sections, showing details or air leakage control & water barrier
at roof joints; roof/gutter joints; roof/wall joints; ceiling/wall joints;
window/wall joints, door/wall joints, and wall/floor joints;
2. Enlarged details, showing flashing & counter-flashing; membrane; sealant &
tape applications; fenestration (window & door) weatherstripping, gaskets
and door bottom sweeps;
3. Building Elevations & Sections with call-outs specifying moisture
protection material;
4. Technical Specifications of moisture protection (moisture barrier for walls,
waterproofing membrane, flashings), sealants, gaskets, weatherstripping to
be used

Building Envelope
BUILDING PERMIT PROCESS
Air Tightness & Moisture Protection

Building Envelope
OCCUPANCY CLEARANCE PROCESS
• Application form from the Office of the Local
Application Building Official

• Building Official inspects completed


Processing building and evaluates submitted
and documents Receipt & Compliance Check
Evaluation

• Upon conformity the Building Official shall


approve occupancy application Review of
Approval GB Docs

• Upon approval, applicant shall pay the


Payment prescribed occupancy clearance fees
of Fees

• Occupancy clearance shall be


Issuance issued
OCCUPANCY CLEARANCE PROCESS
Construction Application & Documentation
Actions needed are the following:

1. Ocular inspection of the completed building envelope system with reference


to the building permit plans.

2. Presentation of product labels, brochures and technical specifications


from manufacturers for airtight/ vapor barrier products.

3. Shop drawings and as-built drawings of the actual completed system.

Building Envelope
OCCUPANCY CLEARANCE PROCESS
Construction Application & Documentation

Building Envelope
OCCUPANCY CLEARANCE PROCESS
Construction Application & Documentation
Shopdrawings & As-built plans

Product label, brochures & catalogs

Building Envelope
OCCUPANCY CLEARANCE PROCESS
Air-Conditioning Equipment

• The cooling equipment shall meet or exceed the minimum


efficiency requirement of the 2010 PSVARE Standards for
Energy Efficient Buildings as indicated in Tables 12 and
Table 13.
OCCUPANCY CLEARANCE PROCESS
Applicability
This measure applies to all building occupancies as
indicated in Table 1. of the GB Code

Exceptions
No exceptions

Mechanical Systems
OCCUPANCY CLEARANCE PROCESS
Design Application & Documentation
Design Documents needed are the following:

1. Equipment Schedule – showing the different properties of the cooling


equipment, including the efficiency rating, represented by EER, kW/ton or
COP

2. Air-conditioning and Ventilation Layout – schematic diagrams showing


the location of the cooling equipment with their equipment ID tag

3. Technical Specifications – details the technical make-up or specification of


the cooling equipment to be used, including expected efficiency rating.
OCCUPANCY CLEARANCE PROCESS
Air-Conditioning Equipment
Equipment Schedule

Mechanical Systems
OCCUPANCY CLEARANCE PROCESS
Air-Conditioning Equipment
AC & Ventilation Layout

Mechanical Systems
OCCUPANCY CLEARANCE PROCESS
Construction Application & Documentation
Actions needed are the following:

1. Ocular inspection of the completed building envelope system with reference


to the building permit plans including the Equipment Schedule showing
efficiency ratings

2. Presentation of product labels, brochures and technical specifications


from manufacturer of air-conditioning equipment.

3. Equipment name plate rating

Building Envelope
OCCUPANCY CLEARANCE PROCESS
Construction Application & Documentation
Ocular Inspection

Mechanical Systems
OCCUPANCY CLEARANCE PROCESS
Construction Application & Documentation
Product labels & nameplate rating Brochures & catalogs

Mechaical Systems
BUILDING PERMIT PROCESS

GB Code User Guide GB Code Checklists with


Calculators
EVALUATION SIMULATION NO. 1
PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST
10 ENERGY EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required
Item Applicability Design Value Document
Requirement value Documentation needed Design Specification Relevant
Provided?
Building Envelope Yes/No Yes/No Remarks

10.1.1 Air Tightness & Moisture Protection Required? Complied?

a Sealed window and door assemblies Requi red Compl i ed Bay wall sections Yes Yes

Applies to all Enlarged details of


building building envelope
No submission of
b Sealed utility services occupancies except Requi red Compl i ed showing required air No No
details and specs
building and tightness & moisture
spaces without air- protection elements
conditioning Building elevations &
c Sealed walls Requi red Compl i ed Yes Yes
system sections

d Sealed roofing Requi red Not Compl i ed Technical specifications


of required air tightness No specifications
Yes No
e Sealed ceiling Requi red Not Compl i ed & moisture protection provided
f Sealed flooring Requi red Not Compl i ed elements
Use SHGC Documentation Document
10.1.2 Glass Properties Calculator
Design Value Design Specification Relevant
needed Provided?
Architectural floor plans,
a Solar Heat Gain Coefficient (SHGC) Applies to all 0.24 0.7 Building elevations & Yes Yes
building sections
b Visual Light Transmittance (VLT) occupancies 0.35 0.35 Window Schedule Yes Yes
without exceptions WWR Computation Ta bl e Yes
Window Glass
Yes Yes
specifications
EVALUATION SIMULATION NO. 1
PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST
10 ENERGY EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required
Item Applicability Design Value Document
Requirement value Documentation needed Design Specification Relevant
Provided?
Building Envelope Yes/No Yes/No Remarks

10.1.1 Air Tightness & Moisture Protection Required? Complied?

a Sealed window and door assemblies Requi red Compl i ed Bay wall sections Yes Yes

Applies to all Enlarged details of


building building envelope
No submission of
b Sealed utility services occupancies except Requi red Not Compl i ed showing required air No No
details and specs
building and tightness & moisture
spaces without air- protection elements
conditioning Building elevations &
c Sealed walls Requi red Compl i ed Yes Yes
system sections

d Sealed roofing Requi red Not Compl i ed Technical specifications


of required air tightness No specifications
Yes No
e Sealed ceiling Requi red Not Compl i ed & moisture protection provided
f Sealed flooring Requi red Not Compl i ed elements
Use SHGC Documentation Document
10.1.2 Glass Properties Calculator
Design Value Design Specification Relevant
needed Provided?
Architectural floor plans,
a Solar Heat Gain Coefficient (SHGC) Applies to all 0.24 0.7 Building elevations & Yes Yes
building sections
b Visual Light Transmittance (VLT) occupancies 0.35 0.35 Window Schedule Yes Yes
without exceptions WWR Computation Ta bl e Yes
Window Glass
Yes Yes
specifications
EVALUATION SIMULATION NO. 2
Philippine Green Building Code Required Design Design Compliance
Item Applicability Documentat
Requirement value Value Documentation needed Design Specification Relevant
ion
MRF floor area
13.1 Material Recovery Facility (MRF) Calculator
Yes/No Yes/No Remarks

MRF with minimum floor area as per Table Architectural floor plans
a 19.29 25.00
15 & site development plan Yes Yes
b MRF fully enclosed & easily accessible Applies to all Required Complied showing location of MRF
building
Solid waste containers for 4 types of
occupancies MRF Floor Area
c waste; compostable; non-recyclable; without exceptions Required
Complied Yes Yes
Computation Table
recyclable; special
For hospitals, isolated bins for hazardous Technical specifications
d Not RequiredNot Applicable
wastes for the MRF

14 SITE SUSTAINABILITY GB Code Developer Regulator


Design Compliance
Philippine Green Building Code Required Design Documentat
Item Applicability
Requirement value Value Documentation needed ion Design Specification Relevant
Provided?
14.1 Site / Ground Preparation and Earthworks Required? Complied? Yes/No Yes/No Remarks

a Building site and erosion control Applies to all


Required Complied Site Erosion and
Pollution mitigation and construction building Sedimentation Control Yes Yes
b Required Complied Plan
safety per Rule XI of the NBC occupancies
without exceptions
Technical specifications
c Storm water collection management plan Required Complied
in support of the erosion Yes Yes
d Storm water collection facilities Required Complied & control plan

14.2 Open Space Utilization USA Calculator Design Value


Applies to all
Minimum 50% of the required Unpaved building
a 50% Compl i ed Site Development Plan Yes Yes
Surface Area (USA) shall be vegetated occupancies
without exceptions Technical specifications Yes Yes
USA Computation Table Yes
EVALUATION SIMULATION NO. 2
Philippine Green Building Code Required Design Design Compliance
Item Applicability Documentat
Requirement value Value Documentation needed Design Specification Relevant
ion
MRF floor area
13.1 Material Recovery Facility (MRF) Calculator
Yes/No Yes/No Remarks

MRF with minimum floor area as per Table Architectural floor plans
a 19.29 25.00
15 & site development plan Yes Yes
b MRF fully enclosed & easily accessible Applies to all Required Complied showing location of MRF
building
Solid waste containers for 4 types of
occupancies MRF Floor Area
c waste; compostable; non-recyclable; without exceptions Required
Complied Yes Yes
Computation Table
recyclable; special
For hospitals, isolated bins for hazardous Technical specifications
d Not RequiredNot Applicable
wastes for the MRF

14 SITE SUSTAINABILITY GB Code Developer Regulator


Design Compliance
Philippine Green Building Code Required Design Documentat
Item Applicability
Requirement value Value Documentation needed ion Design Specification Relevant
Provided?
14.1 Site / Ground Preparation and Earthworks Required? Complied? Yes/No Yes/No Remarks

a Building site and erosion control Applies to all


Required Complied Site Erosion and
Pollution mitigation and construction building Sedimentation Control Yes Yes
b Required Complied Plan
safety per Rule XI of the NBC occupancies
without exceptions
Technical specifications
c Storm water collection management plan Required Complied
in support of the erosion Yes Yes
d Storm water collection facilities Required Complied & control plan

14.2 Open Space Utilization USA Calculator Design Value


Applies to all
Minimum 50% of the required Unpaved building
a 50% Compl i ed Site Development Plan Yes Yes
Surface Area (USA) shall be vegetated occupancies
without exceptions Technical specifications Yes Yes
USA Computation Table Yes
EVALUATION SIMULATION NO. 3
Design Compliance
Philippine Green Building Code Required Design
Item Applicability Document
Requirement value Value Documentation needed Design Specification Relevant
Provided?

Electrical Systems Yes/No Yes/No Remarks


Applies to all regularly occupied spaces
of all building occupancies except
10.6.2 Daylight Controlled Lighting System Required? Complied?
building spaces where daylight access
hinders intended functions
Daylight sensor or photoelectic sensor in For residential condominiums, this
Architectural Reflected
a lighting system - for use within lighting applies only to common indoor areas Yes Yes
Ceiling Plan
control systems in day-lit zones with access to daylight Required Complied
Installed lighting fixtures within day-lit
zones are exempt from using Electrical lighting and
Yes Yes
photoelectric sensor if this hinders its switching circuitry layout
intended functions, with justification
Lighting control diagram Yes Yes
Technical Specifications Yes Yes

Document
10.6.3 Lighting Power Density (LPD) LPD Calculator Design Value Documentation needed Design Specification Relevant
Provided?
Architectural Reflected
a Building LPD within maximum LPD W/m2 W/m2 Ceiling Plan w/ LEGEND Yes Yes
requirements Box
Electrical Lighting Layout
a.1 Residential Dwelling 10.8 2.25 Yes Yes
w/ LEGEND Box
Building Lighting Power
a.2 Hotel/Resort 10.8 0.00 Yes Yes
Density Table
a.3 Educational: School Applies to all building occupancies 12.9 0.00
a.4 Institutional: Hospital without exceptions 12.9 0.00
a.5 Business: Office 10.8 0.00
a.6 Mercantile:Mall (excl accent lighting) 16.1 0.00 Technical specifications of
lights is different from lamp
a.7 Exterior facade 2.15 0.00 Technical specifications
Yes No fixtures indicated in LEGEND
a.8 Active entrance (pedestrian conveyance) 98.4 0.00 of light fixtures
BOX of Electrical Lighting
Inactive entrance (normally Layout
a.9 65.6 0.00
locked/inactive)
a.10 Covered Parking 3.2 0.00
a.11 Open Parking 1.6 0.00
EVALUATION SIMULATION NO. 3
Design Compliance
Philippine Green Building Code Required Design
Item Applicability Document
Requirement value Value Documentation needed Design Specification Relevant
Provided?

Electrical Systems Yes/No Yes/No Remarks


Applies to all regularly occupied spaces
of all building occupancies except
10.6.2 Daylight Controlled Lighting System Required? Complied?
building spaces where daylight access
hinders intended functions
Daylight sensor or photoelectic sensor in For residential condominiums, this
Architectural Reflected
a lighting system - for use within lighting applies only to common indoor areas Yes Yes
Ceiling Plan
control systems in day-lit zones with access to daylight Required Complied
Installed lighting fixtures within day-lit
zones are exempt from using Electrical lighting and
Yes Yes
photoelectric sensor if this hinders its switching circuitry layout
intended functions, with justification
Lighting control diagram Yes Yes
Technical Specifications Yes Yes

Document
10.6.3 Lighting Power Density (LPD) LPD Calculator Design Value Documentation needed Design Specification Relevant
Provided?
Architectural Reflected
a Building LPD within maximum LPD W/m2 W/m2 Ceiling Plan w/ LEGEND Yes Yes
requirements Box
Electrical Lighting Layout
a.1 Residential Dwelling 10.8 2.25 Yes Yes
w/ LEGEND Box
Building Lighting Power
a.2 Hotel/Resort 10.8 0.00 Yes Yes
Density Table
a.3 Educational: School Applies to all building occupancies 12.9 0.00
a.4 Institutional: Hospital without exceptions 12.9 0.00
a.5 Business: Office 10.8 0.00
a.6 Mercantile:Mall (excl accent lighting) 16.1 0.00 Technical specifications of
lights is different from lamp
a.7 Exterior facade 2.15 0.00 Technical specifications
Yes No fixtures indicated in LEGEND
a.8 Active entrance (pedestrian conveyance) 98.4 0.00 of light fixtures
BOX of Electrical Lighting
Inactive entrance (normally Layout
a.9 65.6 0.00
locked/inactive)
a.10 Covered Parking 3.2 0.00
a.11 Open Parking 1.6 0.00
EVALUATION SIMULATION NO. 4
PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST
10 ENERGY EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required
Item Applicability Design Value Document
Requirement value Documentation needed Design Specification Relevant
Provided?
Mechanical Systems Yes/No Yes/No Remarks

Applies to all building occupancies except building EER or COP or EER or COP or
10.5.1 Air Conditioning Equipment kW/Ton kW/Ton
and spaces without air-conditioning system

a Efficient air-conditioning equipment Air-cooled, split systems <68,585 KJ/H 12.0 EER 13
Equipment Schedule Yes Yes
Water cooled, Electrically operated, centrifugal Air-conditioning &
0.57 Kw/ton 0.55 Ventilation Layout
Yes Yes
≥600 tons
Technical Specifications
Through-the-wall, air-cooled, single packaged
12.0 SEER of the various AC Yes Yes
<31,655 KJ/H
10.9 equipment

Applies to all building occupancies except building Required


Efficiency Document
10.5.2 Water Heating System with no water heating system and buildings using Efficiency
Factor
Documentation needed Design Specification Relevant
Factor
Provided?
solar water heating and/or heat pump for water

a Efficient water heater none Equipment Schedule

Plumbing & Electrical


(Equipment 2)
power layout
Technical Specifications
(Equipment 3)
of Water Heating system
(Equipment 4)
(Equipment 5)
EVALUATION SIMULATION NO. 4
PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST
10 ENERGY EFFICIENCY GB Code Developer Regulator
Philippine Green Building Code Design Compliance
Required
Item Applicability Design Value Document
Requirement value Documentation needed Design Specification Relevant
Provided?
Mechanical Systems Yes/No Yes/No Remarks

Applies to all building occupancies except building EER or COP or EER or COP or
10.5.1 Air Conditioning Equipment kW/Ton kW/Ton
and spaces without air-conditioning system

a Efficient air-conditioning equipment Air-cooled, split systems <68,585 KJ/H 12.0 EER 13
Equipment Schedule Yes Yes
Water cooled, Electrically operated, centrifugal Air-conditioning &
0.57 Kw/ton 0.55 Ventilation Layout
Yes Yes
≥600 tons
Technical Specifications
Through-the-wall, air-cooled, single packaged
12.0 SEER of the various AC Yes Yes
<31,655 KJ/H
10.9 equipment

Applies to all building occupancies except building Required


Efficiency Document
10.5.2 Water Heating System with no water heating system and buildings using Efficiency
Factor
Documentation needed Design Specification Relevant
Factor
Provided?
solar water heating and/or heat pump for water

a Efficient water heater none Equipment Schedule

Plumbing & Electrical


(Equipment 2)
power layout
Technical Specifications
(Equipment 3)
of Water Heating system
(Equipment 4)
(Equipment 5)
EVALUATION SIMULATION NO. 5
Rainwater
Designed
Harvesting Document
11.2.1 Rainwater Harvesting Tank Calculator
volume Documentation needed Design Specification Relevant
(Cu M)
Provided?
(Cu M)
Rainwater harvesting tank with minimum Stormwater drainage
a 20.00 22.00 Yes Yes
required volume capacity layout plan
Provision of rainwater collection and No distribution to
Stormwater drainage
b distribution system for toilet flushing, Applies to all building occupancies. Yes Yes Cooling Tower as there is
Isometries
irrigation and cooling tower make-up use Required Complied no such system installed
Rainwater harvesting
Yes Yes
tank details
Rainwater harvesting
Storage Tank Yes
Computation Table
Technical Specifications Yes Yes
Document
11.2.2 Water Recycling Required? Complied? Documentation needed Design Specification Relevant
Provided?
Provision of a separate recycled water
(sourced from STP) filtration and Sewage system plan
a distribution system for non-potable showing filtration and
purposes such as toilet flushing, irrigation Not Not distribution system
and cooling tower make-up use. Required Applicable
Sewage system
Applies to all building occupancies with
Isometries showing
sewage treatment plant (STP)
filtration and
distribution system
STP & Filtration details
Technical Specifications
of STP with narrative on
treatment and recycling
oeprations
EVALUATION SIMULATION NO. 5
Rainwater
Designed
Harvesting Document
11.2.1 Rainwater Harvesting Tank Calculator
volume Documentation needed Design Specification Relevant
(Cu M)
Provided?
(Cu M)
Rainwater harvesting tank with minimum Stormwater drainage
a 20.00 22.00 Yes Yes
required volume capacity layout plan
Provision of rainwater collection and No distribution to
Stormwater drainage
b distribution system for toilet flushing, Applies to all building occupancies. Yes Yes Cooling Tower as there is
Isometries
irrigation and cooling tower make-up use Required Complied no such system installed
Rainwater harvesting
Yes Yes
tank details
Rainwater harvesting
Storage Tank Yes
Computation Table
Technical Specifications Yes Yes
Document
11.2.2 Water Recycling Required? Complied? Documentation needed Design Specification Relevant
Provided?
Provision of a separate recycled water
(sourced from STP) filtration and Sewage system plan
a distribution system for non-potable showing filtration and
purposes such as toilet flushing, irrigation Not Not distribution system
and cooling tower make-up use. Required Applicable
Sewage system
Applies to all building occupancies with
Isometries showing
sewage treatment plant (STP)
filtration and
distribution system
STP & Filtration details
Technical Specifications
of STP with narrative on
treatment and recycling
oeprations
EVALUATION SIMULATION NO. 6
PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST
10 ENERGY EFFICIENCY GB Code Developer Regulator Regulator
Philippine Green Building Code Design Compliance Construction Compliance
Required Design
Item Applicability Value Value Document Document
Requirement Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
Provided? Provided?
Plumbing Systems Yes/No Yes/No Remarks Yes/No Yes/No Remarks

10.6.7 Overhead Water Storage Required? Complied?

Overhead water storage tank on top of Water Distribution Ocular Inspection &
a Yes Yes Yes Yes
building at least 10 stories high Required Complied Layout plan Verification

Applies to all building occupancies Single Line or Schematic Product Labels and/or Capacity indicated on the
Yes Yes Yes Yes
except buildings below 10 storeys high Diagram namepate rating tank

Water Tank Details Yes Yes Brochures & Catalogues No No Tank is site fabricated

Technical Specifications Yes Yes Shopdrawings Yes Yes


As-built Drawings Yes Yes
11 WATER EFFICIENCY GB Code Developer Regulator Regulator
Philippine Green Building Code Design Compliance Construction Compliance
Required Design
Item Applicability Document Document
Requirement value Value Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
ation ation
Plumbing Systems Yes/No Yes/No Remarks Yes/No Yes/No Remarks

11.1 Water Fixtures Max. Flowrate Flowrate

Specified water fixture compliant with Water Distribution


Ocular Inspection &
a maximum flow rate requirements as per Layout plan with LEGEND Yes Yes Yes Yes
Verification
Table 20 box
=<6 full Water Distribution no serial or model number of
Product Labels and/or
a.1 Dual Flush Water Closet 3 low 6 full and 3 low Isometries with LEGEND Yes Yes No No lavatory faucet and shower head
namepate rating
(liters/flush) box installed for reference
4.9 Water Efficient Fixtures
a.2 Single Flush Water Closet 4,9 Yes Yes Brochures & Catalogues Yes Yes
(liters/flush) Use Confirmation Table
=<9 (80 psi)
a.3 Shower liters/min at 7.2 Shopdrawings No No
551.6 kPa
Applies to all building occupancies =<1 liter /
a.4 Urinal 1 As-built Drawings Yes Yes
flush
=<4.8 (60
psi)
a.5 Lavatory tap 4
liters/min at
Technical Specifications
417.7 kPa
of plumbing fixtures
=<4.8 (60
psi)
a.6 Kitchen Faucet 4
liters/min at
417.7 kPa
=<4.8 (60
psi)
a.7 Handheld bidet spray 3.9
liters/min at
417.7 kPa Yes Yes
EVALUATION SIMULATION NO. 6
PHILIPPINE GREEN BUILDING CODE COMPLIANCE CHECKLIST
10 ENERGY EFFICIENCY GB Code Developer Regulator Regulator
Philippine Green Building Code Design Compliance Construction Compliance
Required Design
Item Applicability Value Value Document Document
Requirement Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
Provided? Provided?
Plumbing Systems Yes/No Yes/No Remarks Yes/No Yes/No Remarks

10.6.7 Overhead Water Storage Required? Complied?

Overhead water storage tank on top of Water Distribution Ocular Inspection &
a Yes Yes Yes Yes
building at least 10 stories high Required Complied Layout plan Verification

Applies to all building occupancies Single Line or Schematic Product Labels and/or Capacity indicated on the
Yes Yes Yes Yes
except buildings below 10 storeys high Diagram namepate rating tank

Water Tank Details Yes Yes Brochures & Catalogues No No Tank is site fabricated

Technical Specifications Yes Yes Shopdrawings Yes Yes


As-built Drawings Yes Yes
11 WATER EFFICIENCY GB Code Developer Regulator Regulator
Philippine Green Building Code Design Compliance Construction Compliance
Required Design
Item Applicability Document Document
Requirement value Value Documentation needed Design Specification Relevant Documentation needed GB Measure Applied
ation ation
Plumbing Systems Yes/No Yes/No Remarks Yes/No Yes/No Remarks

11.1 Water Fixtures Max. Flowrate Flowrate

Specified water fixture compliant with Water Distribution


Ocular Inspection &
a maximum flow rate requirements as per Layout plan with LEGEND Yes Yes Yes Yes
Verification
Table 20 box
=<6 full Water Distribution no serial or model number of
Product Labels and/or
a.1 Dual Flush Water Closet 3 low 6 full and 3 low Isometries with LEGEND Yes Yes No No lavatory faucet and shower head
namepate rating
(liters/flush) box installed for reference
4.9 Water Efficient Fixtures
a.2 Single Flush Water Closet 4,9 Yes Yes Brochures & Catalogues Yes Yes
(liters/flush) Use Confirmation Table
=<9 (80 psi)
a.3 Shower liters/min at 7.2 Shopdrawings No No
551.6 kPa
Applies to all building occupancies =<1 liter /
a.4 Urinal 1 As-built Drawings Yes Yes
flush
=<4.8 (60
psi)
a.5 Lavatory tap 4
liters/min at
Technical Specifications
417.7 kPa
of plumbing fixtures
=<4.8 (60
psi)
a.6 Kitchen Faucet 4
liters/min at
417.7 kPa
=<4.8 (60
psi)
a.7 Handheld bidet spray 3.9
liters/min at
417.7 kPa Yes Yes
GREEN BUILDING IN THE
PHILIPPINES
Mandatory
GB Code

Other Codes
& Laws

IECLEI - Ar Emelito C Punsalan, PGBI, Dec. 9, 2016


Voluntary

63
GREEN BUILDINGS
FOR A SMARTER WORLD

www.edgebuildings.com
THE SOLUTION IS EDGE: A SOFTWARE, A STANDARD,
AND A GREEN BUILDING CERTIFICATION SYSTEM.
________

20%
Green Building Voluntary
Code Rating Systems
Number of buildings

Standards LEED, BREEAM,


BERDE, GREEEN

Lower end Business as Usual Green Buildings

66
PHILIPPINE
GREEN BUILDING CODE

You might also like