HCPT (TE) Project Quality Standard V1.5


Code Description Category Score EPMS Input
General hardware quality standard installation of Rack
1.1.001 Waterproof and anticorrosive measures must be adopted for outdoor equipment. MAJ 4 000000E
The rack (cabinet) must be installed firmly and anti-shock must be accord with the engineering design
1.1.002 MAJ 2 000000G
document request.
Support parts of rack must be installed correctly and firmly, all of the bolts must be fixed according with
1.1.003 criterion. If have insulation parts must be also installed and assure insulation result. The support made by MED 1.5 000000H
customer must be installed according to customer’s request.
1.1.004 Configuration inclosure of rack must be installed correctly and firmly. all of the bolt must be installed firmly. MED 1.5 000000H
1.1.006 The racks shall have all the input/output cable holes blocked. MED 1 000000I
1.1.008 The rack (cabinet) must be placed according to the engineering design document. MED 0.5 000000J
The sundries of redundant cable ties and screws and other things must not exist inside, or at the bottom, or
1.1.009 MED 0.5 000000J
on the top of the rack.
1.1.010 The rack surfaces in a row must be completely in a plane. MIN 0.2 000000L
1.1.011 The antistatic wrist strap is inserted into the antistatic installation hole in the rack. MIN 0.2 000000L
1.1.012 All of false boards and panels must be installed according to requirements. MIN 0.2 000000L
1.1.013* No paint shedding or damage is allowed in any part on the rack, otherwise must add paint or clean. MED 1 000000I
1.1.014* Each row of rack of the main walkway must be aligned. The installation error must be less than 5 mm. MED 0.5 000000J
1.1.015* The vertical errors of rack must be less than 3mm. MED 0.5 000000J
General hardware quality standard Installation of Terminals and so on
2.1.002 MDF, DDF, battery, alarm box and so on alarm system should work normal. MAJ 2 000000G
The work station, alarm box, inverter equipments an so on must be placed according to engineering design
2.1.012 MED 0.5 000000J
document, the plug connected properly and firmly.
Base Station
The BBU or RRU module must be groungded close to the working box, lightning protection box or
2.2.002 MAJ 4 000000E
grounding bar.
2.2.006 Cable ladder fixing (Indoor and outdoor) MED 1 000000I
PVC troughs must be installed on the wall for power and signal cables of alarm box. Redundant power and
2.2.010 MED 0.5 000000J
signal cables must be put under the floor or on the cabling ladder of alarm box side.
The gap between the front panel and back panel of the sun-proof cover in a micro base station must be less
2.2.013 MIN 0.2 000000L
than 1 mm. The plastic shell of DBS3800 product must be firmly and securely installed.
Equipment Grounding Cable Common:
General hardware quality standard Power and Grouding
3.2.004 Power cables and grounding cables must be connected correctly and firmly. MAJ 3 000000F
When copper lugs are made at two ends of power cord and grounding wire, they must be welded or
3.2.005 MAJ 3 000000F
pressed firmly.
The protection grounding cable of MDF and DDF must be connected firmly. Those between adjacent frame
3.2.007 MAJ 2 000000G
must be interconnected and then connected to the nearest protection ground bar of customer
The power cable and grounding cable must be made from an intact section of copper core materials without
3.2.017 MED 1 000000I
any tie-in.
The extra part of grounding cable and power cable must be cut off instead of being coiled. But the extra part
3.2.018 of the power cable connecting lightning protection box and equipment is not suitable to be cut but allowed to MED 1 000000I
be coiled.
3.2.019 The signal cable must be tied separately from power cable. MED 1 000000I
Power cable and grounding cable arrangement must accord with engineering design document. Easy to
3.2.025 MED 0.5 000000J
expansion or maintenance.
No copper wire is naked in the plugs of power cable and grounding cable. Cable plugs must be installed
3.2.026 MED 0.5 000000J
according to specification.
Power cables and grounding cables arrangement must be in straight running and firm bundling. Cable
3.2.027 length must be somewhat longer than necessary at bending point. Protective measures must be taken MED 0.5 000000J
when signaling cables are fixed to mechanical parts with edges and corners.
When two or more cables are connected to a wire pole, the cross or back-to-back installation method is
3.2.031 generally adopted. When lugs are overlapped, they must be bent at an angle of 45 or 90 degrees, the MED 0.5 000000J
bigger one must be put on the bottom and smaller one must be put on the top.
The grounding cable and power cable of equipment must be connected correctly. Their flat washers, spring
3.2.049* MAJ 2 000000G
washers and nuts must be installed in a right order. The nuts must be tightened properly.
The outside grounding bar must be wiped off rust and cleaned dirt before they are connected, in order to
ensure their reliable connection. The outside grounding bar must be anticorrosion and antirust processed by
3.2.050* using self-spray paint or other protection materials after they are connected in order to ensure their long- MED 1 000000I
term good contact. Each connecting terminal must be installed correctly and firmly together with flat
washers and spring washers.
The diameter of the power cable, ground cable or equipotential cable between cabinets must meet the
3.2.051* MED 0.5 000000J
power distribution requirement.
General hardware quality standard Base Station
3.2.041 The part of peeling of the cable made on-site must be covered with protection tube or insulating tape. MED 0.5 000000J
The power cables, transmission cables and antennal feeder cables must not cross each other. It must fit for
3.2.044 the design requirement if they are distributed in a parallel way, the spacing between them must be more MED 0.5 000000J
than 3 cm.
When power cables and transmission cables are distributed on the wall, they must be fixed with clips. When
they pass a cable ladder or metal pole, they must be tied. The transmission cables must be covered with
3.2.045 MED 0.5 000000J
protection tubes. When they are installed outdoor, waterproof measures must be taken to avoid water in the
protection tubes.
General hardware quality standard Installation of Signal Cables
4.1.001 No damage, rupture or connector in signal cable. MAJ 2 000000G
Plugs of signal cable must be installed, connected or machininged correctly and firmly. Cable must have
4.1.002 MAJ 2 000000G
passed conductivity test.

04/24/2018 华为机密,未经许可不得扩散 第3页,共33页


385175546.xls 文档密级:

Never distribute the signal cable on the heat radiation mesh on the top of cabinet, which effect heat
4.1.003 MAJ 2 000000G
radiation and reduce cable’s life.
The trunk cable connector must be firmly fixed. The cable connector made on-site must be according to
4.1.005 MAJ 2 000000G
special specifications. Its connector needs to be fixed firmly with a perfect appearance.
The signal cable must be arranged according to engineering design document. Convenient to maintenance
4.1.008 MED 0.5 000000J
and expansion.
4.1.009 Cable routing of the signal cable inside cabinet must be correct. MED 0.5 000000J
Distribution of cables outside cabinet:
1. The cable must be distributed without any cross and bending.
2. Put the cable in the cable trough without binding, and the cable cannot overflow the trough.
3. When cable ladder is adopted, the cable must be fixuped and tied in order at the beam of cable ladder.
4.1.010 When the spacing between the cable ladder and the top of the cabinet is more than 0.8 m, a cable ladder MED 0.5 000000J
must be added on the top of cabinet to reduce stress caused by weight of the cable.
4. When several layers of cables are distributed under the floor in an overlapped way, their height cannot be
higher than 3/4 of the height of the space below the antistatic floor.
5. The cable must be tied in order in case of no cable trough.
The bending position of signal cable must be smooth. It is suggested that necessary protective measures
4.1.011 MED 0.5 000000J
must be taken when signaling cables are fixed to mechanical parts with edges and corners.
Cables must be tied with uniform spacing and appropriate tightness. Cable ties must be arranged in a tidy
4.1.014 way. Their redundant parts must be cut from their bottom after they are tied so that any sharp edges do not MED 0.5 000000J
exist.
4.1.015 The signal cable route must be straight but its bending position must be smooth. MED 0.5 000000J
4.1.020 The unused fiber ends or optical ports of board should be covered with protection caps. MED 0.3 000000K
Signal cables must be arranged straight,flatly and neatly without crossing (cables are allowed to be crossed
4.1.024 MIN 0.2 000000L
within 1m outside cabinet), there is somewhat longer than necessary at the bending point.
Fibers: Common
5.1.001 When the tail fiber is led out of the cabinet, it must be protected. MAJ 3 000000F
The connection point of tail fiber must be clean without any dust. The unused optical fiber head and board
5.1.002 optical port must be covered with protection caps (plugs). They can be cleaned according to the company MAJ 2 000000G
specifications.
Distribution of tail fibers:
1. When tail fibers are distributed at bending positions, they must not be too tight and cross there. A pair of
5.1.003 tail fibers must be tied neatly with moderate tightness. MAJ 2 000000G
2. Tail fibers can be drawn freely from the ring of cable tie. They cannot be bent into a right angle.
3. After tail fibers are distributed, other cables or things cannot be put on them.
5.1.004 The protection tube must enter into the cabinet with a length of less than 10 cm, and be tied firmly. MED 0.5 000000J
The cut of protection tube for tail fiber must be smooth. Otherwise, the insulating tape must be used to avoid
5.1.005 MED 0.5 000000J
hurting anyone.
Labels
The labels of cable are filled in and stuck correctly and reliably. They must be tidy position and same
7.1.005 direction. They must be stuck on a position 2 cm away from their connectors. They can be made in a MED 0.5 000000J
uniform way according to customer requirement.
The labels of power cable and ground cable are filled in and stuck correctly and reliably. They must be in a
tidy position and the same direction. They must be stuck on a position about 2cm away from their
7.1.006 MED 0.3 000000K
connectors. They can be made in a uniform way according to customer requirements, including the label for
power distribution switch.
7.1.011 The labels of rack shall be placed neat and clean. MIN 0.2 000000L
The row and column labels of the cabinet must be stuck in a clear and tidy way. If there has a dashed box
7.1.012 on the cabinet, MIN 0.2 000000L
labels must be stuck within it.
Base station product installation of rack
When a micro base station is put up on the wall or is put on its support, its installation must be firm without
8.1.001 MAJ 3 000000F
any loose connection.
8.1.002 Setting of DIP switches & jumpers are properly set in BTS MAJ 1 000000I
The rigid cables must not be cross inside the cabinet. They cannot be pulled too tightly. Some redundancy
8.1.008 MED 0.5 000000J
must be reserved at their bend place. They also need to be bent in a tidy and consistent way.
The fan must be tightened with screws so that its installation is firm. Its switch, rotation and alarm work
8.1.011 MED 0.5 000000J
normally.
8.1.022* The rack must be firmly fixed on its base (bracket) after it is installed. MAJ 3 000000F
8.1.023* The parts of the rack must not be distorted. Which may be affect the equipment appearance. MED 1 000000I
The cabinet or its base (bracket) is firmly fixed on the ground with expansion bolts. All of insulation washers,
8.1.024* MED 1 000000I
flat washers, spring washers, bolts and nuts are installed in a correct order.
8.1.025* The movable accessories of the cabinet work normally. MED 0.5 000000J
Antenna and Feeder Installation
The connection of the lightning-proof arrester connector in the cabinet is reliable. When there is a reliable
grounding point outside the room, the feeder cable must be earthed outside the room. Water-proof
9.1.001 MAJ 5 000000D
measures must be made for the feeder cable ground. The feeder inside the room should be earthed the
operation room main protection grounding before the feeder connect with equipment.
9.1.002 Antennas must be in the 45-degree protected area of lightning rod. MAJ 4 000000E
9.1.003 The feeder cables must not have obvious bending and twisting and bare copper appearance. MAJ 4 000000E
9.1.004 The connector of feeder cable is made in a standard way without any loose connection. MAJ 4 000000E

04/24/2018 华为机密,未经许可不得扩散 第4页,共33页


385175546.xls 文档密级:

Antenna and feeder check:


1. The azimuth and tilt angle of the installed antenna must accord with design specifications.
2. The antenna connection and sector relationship are correct without reverse connection and
misconnection.
3. The result after have calibration test and sensitive test must obey standard.
First we should check the cable. Then we should compare the PN value, get from Debug windows of mobile
9.1.005 with idle status and distance with 50 meters away from mail transmission direction of each cell, with the MAJ 4 000000E
value in Engineering Parameter Guide.
If it is disaccord, that means the connection with main diversity antenna cable is in wrong position. After
finish this check, we should montior the TX power, get from Debug windows of mobile with active status.
Whether the TX power value exceed 0dBm. If it exceed that, we should chect physical connection between
cable with antenna. Whether the diversity antenna cable connect to other cell. If the connection is correct,
then we should tighten the connection etc.
9.1.006 Waterproof measures must be taken before the feeder cable is led in a room. 1 FEP for 1 feeder MAJ 4 000000E
The connection between antenna support and tower must be reliable and firm. The connection between
9.1.007 MAJ 3 000000F
antenna and its support must also be reliable and firm.
9.1.010 check feeder cable VSWR MAJ 1 000000I
The azimuth error of the directional antenna must not be more than ± 5 degrees. Its tilt angle error must not
9.1.012 MED 1 000000I
be more than ± 0.5 degrees.
When a feeder window is installed on the top of building to lead the feeder cable into the room, it must be
9.1.014 sealed well. The antenna jumper and the feeder cable before the feeder winder must have waterproof MED 1 000000I
bends.The jumper must be no redundancy
The feeder grounding clip is directly fixed on the steel sheet of the tower perfectly. The installation of this
9.1.022 clip must accord with the standard requirement. The antirust, anticorrosive and waterproof measures are MED 1 000000I
adopted for the grounding clip and reliable connection.
The space between feeder clamps must be even and their direction must be same after installed. They must
9.1.023 MED 0.5 000000J
also be fixed firmly without any loose connection.
The feeder cables can not cross after distributed. In the room they must be neat and straight with same
9.1.024 MED 0.5 000000J
bend.
9.1.036 When the tower is more than 60m, a grounding clip must be added to the feeder in the middle of the tower. MED 0.5 000000J
If the length of feeder cable from the tower to the room on the roof (or cabling ladder) is more than 20m, a
9.1.037 MED 0.5 000000J
lightning-proof protection grounding clip must be added on the roof (or cabling rack).
The feeder cable must be earthed with three points at least between the top of tower and the equipment
room (within 1m away from the platform on the top of tower, within 1m between the tower body and the
9.1.038 MED 0.5 000000J
outdoor cabling ladder, and within 1m between the feeder cable and the feeder window). The feeder cable
is tied firmly at the grounding points and has perfect waterproof treatments.
9.1.039 The feeder cable goes into the room along the wall. If a cable ladder is used, it must be earthed. MED 0.5 000000J
The grounding cable of feeder clips must extend from up to down. The angle between the grounding cable
9.1.040 MED 0.5 000000J
and the feeder cable must not be more than 15 degrees.
Outdoor cable tie must use black type and some redundance 3~5mm must be reserved when cutting all of
9.1.041 MIN 0.5 000000J
cable ties of outdoor.
9.1.045 The bending radius of coaxial cable must not be less than 4 cm. MIN 0.2 000000L
Waterproof and sealed measures for all outdoor jumpers and feeder cables must be correctly adopted
9.1.046* MAJ 4 000000E
according to specifications.
Site Clean
The signal cables for future capacity expansion must be tied to or inserted into the reserved position inside
19.1.002 MED 0.2 000000L
an expansion cabinet. For easy to maintenance and expansion and avoid to lose.
The equipment room should be neatness and tidy. Discarded packing materials should be cleaned. Spare
19.1.005 MIN 0.2 000000L
parts should be arranged in a tidy way after installation.

04/24/2018 华为机密,未经许可不得扩散 第5页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


General hardware quality standard installation of Rack
◆ 1.1.001 Waterproof and anticorrosive measures must be adopted for outdoor equipment. MAJ 4 000000E
The rack (cabinet) must be installed firmly and anti-shock must be accord with the engineering design
◆ 1.1.002 MAJ 2 000000G
document request.
Support parts of rack must be installed correctly and firmly, all of the bolts must be fixed according with
◆ 1.1.003 criterion. If have insulation parts must be also installed and assure insulation result. The support made by MED 1.5 000000H
customer must be installed according to customer’s request.
◆ 1.1.004 Configuration inclosure of rack must be installed correctly and firmly. all of the bolt must be installed firmly. MED 1.5 000000H
◇ 1.1.005 Active inclosure of rack must be installed correctly and firmly. MED 1 000000I
◆ 1.1.006 The racks shall have all the input/output cable holes blocked. MED 1 000000I
◇ 1.1.007 All of the input/output cable holes of the rack (except N68E) must be blocked out. MED 1 000000I
◆ 1.1.008 The rack (cabinet) must be placed according to the engineering design document. MED 0.5 000000J
The sundries of redundant cable ties and screws and other things must not exist inside, or at the bottom, or
◆ 1.1.009 MED 0.5 000000J
on the top of the rack.
◆ 1.1.010 The rack surfaces in a row must be completely in a plane. MIN 0.2 000000L
◆ 1.1.011 The antistatic wrist strap is inserted into the antistatic installation hole in the rack. MIN 0.2 000000L
◆ 1.1.012 All of false boards and panels must be installed according to requirements. MIN 0.2 000000L
◇ 1.1.013
◇ 1.1.014
◇ 1.1.015
◇ 1.1.016
◇ 1.1.017
◇ 1.1.018
◇ 1.1.019
◇ 1.1.020
◇ 1.1.021
◇ 1.1.022
◇ 1.1.023
◇ 1.1.024
◇ 1.1.025
◇ 1.1.026
◇ 1.1.027

04/24/2018 华为机密,未经许可不得扩散 第6页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


General hardware quality standard Installation of Terminals and so on
◇ 2.1.001 A serial port isolator must be added between the terminal and the serial port cable. MAJ 5 000000D
◆ 2.1.002 MDF, DDF, battery, alarm box and so on alarm system should work normal. MAJ 2 000000G
The contact between the connector of terminal or NM cable and the socket must be reliable. The screws are
◇ 2.1.003 MAJ 2 000000G
tightened without any loose connection.
The installation of alarm indicator cable in the cabinet or serial port cable of remote alarm is correct and
◇ 2.1.004 MAJ 2 000000G
reliable.
◇ 2.1.005 The box must be water-tight and is capable of maintaining the temperature when it becomes cold MED 2 000000G
After the batteries are put into the box, the spacing between the batteries and the four sides and top of the
◇ 2.1.006 MED 2 000000G
box must be no less than 5cm
◇ 2.1.007 ACDB and wiring conditions: ACDBs are properly and reliably wired; air switches are clearly and completely labeled. MED 1 000000I
◇ 2.1.008 ACDB’s electric characteristics: ACDB is properly installed and wired; input and output voltages are normal. MED 1 000000I
Lightning protection box and wiring conditions: The lighting protection box is properly installed and connected; the
◇ 2.1.009 lightning protection module is free of degradation. MED 1 000000I
AVR: The AVR output voltage falls within the specified range; the chain transmission system of the pillar auto-
◇ 2.1.010 transformer works properly; carbon brush and carbon brush shelf function properly. MED 1 000000I
◇ 2.1.011 Cabling groove: The cabling groove cover is in good condition; the power line and signal line are not coupled. MED 1 000000I
The work station, alarm box, inverter equipments an so on must be placed according to engineering design
◆ 2.1.012 MED 0.5 000000J
document, the plug connected properly and firmly.
The front cover of the alarm box must be opened and closed smoothly. The control function of its keyboard
◇ 2.1.013 MED 0.5 000000J
lock is effective. The paint on its panel is perfect without any damage.
PVC troughs must be installed on the wall for power cable and signal cable of alarm box. Redundant power
◇ 2.1.014 MED 0.5 000000J
cable and signal cable must be put under the floor or the cabling ladder at alarm box side.
The row and column alarm indicator must be installed correctly on the top cover and side door of cabinet
◇ 2.1.015 MED 0.5 000000J
according to specifications. Its connection line must be correct.
The configuration of the terminal equipment is installed correctly according to design requirements, the
◇ 2.1.016 MED 0.5 000000J
labels must be have.
◇ 2.1.017 The NM software is saved completely. MED 0.5 000000J
◇ 2.1.018 The attached software of delivery, instructions and accessories is saved completely. MED 0.5 000000J
◇ 2.1.019 HDU servers and disk arrays are consistent with those in the packing list. MED 0.5 000000J
The power supply of each HDU server and disk array is provided as required. Each power cable or
◇ 2.1.020 MED 0.5 000000J
grounding cable must be connected to a DC distribution frame or box.
◇ 2.1.021
◇ 2.1.022
◇ 2.1.023
◇ 2.1.024
◇ 2.1.025
◇ 2.1.026
◇ 2.1.027
◇ 2.1.028
◇ 2.1.029
◇ 2.1.030
◇ 2.1.031
◇ 2.1.032
◇ 2.1.033
◇ 2.1.034
◇ 2.1.035
Base Station
The grounding cable on the shell of a micro base station must be connected to the grounding bar on the
shell of an integrated working box, 40kA lightning protection box, or 100kA lightning protection box. It must
◇ 2.2.001 MAJ 4 000000E
be connected to the deliveried grounding bar of the micro base station if the integrated working box, 40kA
lightning protection box, or 100kA lightning protection box does not exist.
The BBU or RRU module must be groungded close to the working box, lightning protection box or
◆ 2.2.002 MAJ 4 000000E
grounding bar.
The 220V AC mains must be directly connected to an AC lightning protection box or integrated working box.
◇ 2.2.003 MAJ 4 000000E
BBU3806 must be firmly installed in AFB,APM or other 19,23inch cabinet.
The external lightning-proof arrester of cabinet must be installed according to its design requirements. Its
◇ 2.2.004 MAJ 1.5 000000H
connection must be firm.
The lead-in and lead-out cables of an AC lightning protection box or integrated working box must not be tied
◇ 2.2.005 MED 1 000000I
together with other power cables.
◆ 2.2.006 Cable ladder fixing (Indoor and outdoor) MED 1 000000I
◇ 2.2.007 Ladder alignment (Vertical & Horizontal & Up at room end) MED 1 000000I
◇ 2.2.008 Ladder Position & Clamps MED 1 000000I
◇ 2.2.009 Ladder support (no.) and foundation MED 1 000000I
PVC troughs must be installed on the wall for power and signal cables of alarm box. Redundant power and
◆ 2.2.010 MED 0.5 000000J
signal cables must be put under the floor or on the cabling ladder of alarm box side.
The front, back and top cover panels of the sun-proof in the micro base station , and the plastic shell about
the outdoor equipment of the DBS distributed site, need to be installed. When BBU3806 is openly installed
◇ 2.2.011 MED 0.5 000000J
indoor,such as in a rack or on the wall, the air filter need to be installed. Other accessories must be installed
according to specifications.
When a micro base station is installed in an outdoor platform, the vertical position fall of the lightning
◇ 2.2.012 MED 0.5 000000J
protection box, UPS and micro base station must not be less than 2 meters.
The gap between the front panel and back panel of the sun-proof cover in a micro base station must be less
◆ 2.2.013 MIN 0.2 000000L
than 1 mm. The plastic shell of DBS3800 product must be firmly and securely installed.
When a outdoor micro base station is installed, a sun-proof cover must be used to avoid directly shining as
◇ 2.2.014 MIN 0.2 000000L
much as possible.
When the equipment operates normally, the indicators on the door of its AC lightning protection box must be
◇ 2.2.015 MIN 0.2 000000L
light. Generally, the door must be locked.
◇ 2.2.016 The retracted space between the bottom of sun-proof cover and the top of base station must be 5–10 cm. MIN 0.2 000000L
◇ 2.2.017
◇ 2.2.018
◇ 2.2.019
◇ 2.2.020
◇ 2.2.021
◇ 2.2.022
◇ 2.2.023
◇ 2.2.024
◇ 2.2.025
◇ 2.2.026
◇ 2.2.027
◇ 2.2.028
◇ 2.2.029
◇ 2.2.030
◇ 2.2.031

04/24/2018 华为机密,未经许可不得扩散 第7页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Equipment Grounding Cable Common:

The shell of maintenance terminal must be connected to the protection ground:


1. when the network interface between the maintenance terminal and major equipment uses a RJ45
connector, The electric isolation between them is realized. Thus it does not need to have the same ground
with the major equipment.
2. when the network interface between the maintenance terminal and major equipment does not use a
RJ45 connector. It needs to have the same ground with the major equipment.
◇ 3.1.001 MED 0.5 000000J
(a). When connecting to the DC protection ground of the major equipment or the nearby DC protection
ground bar, you must cut off the AC PE cable.
(b). If there is no DC protection ground bar nearby, the AC PE cable can be connected but it must be
earthed firmly.
(c). The connection method of many equipment in serial can be adopted or directly earthed by socket, but
the socket must be earthed firmly.

Grounding of alarm box:


1. The power of DC alarm box must be connected to the –48V and GND busbar of switching equipment. In
◇ 3.1.002 this way, the DC alarm box shares a common ground with the switching equipment. MED 0.5 000000J
2. The shell of the AC alarm box must be connected to the nearest protection ground bar in the equipment
room.
The ground of box-shape equipment:
1. Its protection ground must be connected to the DC protection ground bar if it exists.
◇ 3.1.003 2. It can be earthed through the PE cable of AC power supply when the DC protection ground bar does not MED 0.5 000000J
exist and the grounding body is not allowed to bury in the ground. The PE cable must be earthed in a
reliable way.
The ground of box-shape or integrated working box equipment:
1. Its protection ground must be connected to the DC protection ground bar if it exists.
◇ 3.1.004 2. It can be earthed through the PE cable of AC power supply when the DC protection ground bar does not MED 0.5 000000J
exist and the grounding body is not allowed to bury in the ground. The PE cable must be earthed in a
reliable way
The protection ground of AC power supply must be connected to the AC protection ground bar in a reliable
way, The DC protection ground of DC power supply must be connected to the DC protection ground bar.
◇ 3.1.005 Finally, the GND and PGND ground bars provided by customers must be connected to the same grounding MIN 0.2 000000L
body.
General hardware quality standard Power and Grouding
◇ 3.2.001 The specifications, models and quantity of the batteries must meet the design requirements MAJ 6 000000C
For the one way power supply equipement within the AC power supply rack, when the active and standby
equipments are in the same rack, the power cables come from the output ports of two different power
◇ 3.2.002 MAJ 5 000000D
resources; when the active and standby equipments are not in the same rack, the power cables must come
from the two different UPS AC power supply rack.
The lightning-proof protection box delivered by Huawei must be installed correctly. From 5 to 10m AC power
◇ 3.2.003 cable between lightning-proof protection box and equipment must be reserved. The redundant cable can be MAJ 5 000000D
coiled.
◆ 3.2.004 Power cables and grounding cables must be connected correctly and firmly. MAJ 3 000000F
When copper lugs are made at two ends of power cord and grounding wire, they must be welded or
◆ 3.2.005 MAJ 3 000000F
pressed firmly.
◇ 3.2.006 The locations and connection methods of the batteries must meet the design requirements MAJ 3 000000F
The protection grounding cable of MDF and DDF must be connected firmly. Those between adjacent frame
◆ 3.2.007 MAJ 2 000000G
must be interconnected and then connected to the nearest protection ground bar of customer
Grounding lead of the feeder cable can be extended. The extended cable must be fixed firmly by screw and
◇ 3.2.008 MAJ 2 000000G
the connection place must be airproofed.
A sleeve screwdriver must be used to tighten the wire posts at the SS03/04PBS cable distribution box and
◇ 3.2.009 MAJ 2 000000G
the protection ground cable of SS06PBS (PGND).
◇ 3.2.010 AC power cable of network cabinet must be shielded. MAJ 2 000000G
◇ 3.2.011 Each AC power supply rack has 2 phase inputs from the power cables of the customers' two UPS MAJ 2 000000G
systems。
The power cable of the AC power supply rack applied the 1+1 power supply mode, coming from the output
◇ 3.2.012 MAJ 2 000000G
ports of two different power resources.
◇ 3.2.013 Battery should work normal. MAJ 2 000000G
Red (positive) and blue (negative) signs must be available respectively at the positive and negative ends of
◇ 3.2.014 MED 2 000000G
the power feeder. The place where the cable is cut must be wrapped with adhesive tapes and sheath
◇ 3.2.015 The specifications and models of the connecting wires for the batteries must meet the design requirements MED 2 000000G
◇ 3.2.016 The gauge of power cables and grounding cables must accord with power requirements of the equipments. MED 1 000000I
◆ 3.2.017 The power cable and grounding cable must be made from an intact section of copper core materials without MED 1 000000I
any tie-in.
The extra part of grounding cable and power cable must be cut off instead of being coiled. But the extra part
◆ 3.2.018 of the power cable connecting lightning protection box and equipment is not suitable to be cut but allowed to MED 1 000000I
be coiled.
◆ 3.2.019 The signal cable must be tied separately from power cable. MED 1 000000I
All kinds of equipment with a complete or part of metal shell of rack and chassis must be connected to the
◇ 3.2.020 MED 1 000000I
protection ground in a correct and reliable way.
◇ 3.2.021 Nuts & bolts for battery terminal and grounding MED 1 000000I
◇ 3.2.022 Marking for all power cable MED 1 000000I
◇ 3.2.023 Marking of all DC power cable with proper sequence MED 1 000000I
PDF cabinet, power cable distribution box, battery, lightning protection box and so on must be installed
◇ 3.2.024 MED 0.5 000000J
according to engineering design document.
◆ 3.2.025 Power cable and grounding cable arrangement must accord with engineering design document. Easy to MED 0.5 000000J
expansion or maintenance.
No copper wire is naked in the plugs of power cable and grounding cable. Cable plugs must be installed
◆ 3.2.026 MED 0.5 000000J
according to specification.
Power cables and grounding cables arrangement must be in straight running and firm bundling. Cable
◆ 3.2.027 length must be somewhat longer than necessary at bending point. Protective measures must be taken MED 0.5 000000J
when signaling cables are fixed to mechanical parts with edges and corners.
The color of distributed power cables and ground cables must conform to the shipment, or satisfy the
◇ 3.2.028 MED 0.5 000000J
requirements of customer.
◇ 3.2.029 Gauge of protection ground cable between DDFand interlinkage wire is not less than 6mm 2. MED 0.5 000000J
◇ 3.2.030 The ground cable of cabinet door must be connected in a correct and reliable way. MED 0.5 000000J
When two or more cables are connected to a wire pole, the cross or back-to-back installation method is
◆ 3.2.031 generally adopted. When lugs are overlapped, they must be bent at an angle of 45 or 90 degrees, the MED 0.5 000000J
bigger one must be put on the bottom and smaller one must be put on the top.
The MDF ground cable: The gauge of multiple-core copper wire is not less than 50mm 2. For ground cables
3.2.032 of external distribution frame with remote module and ONU, the gauge is not less than 16mm .
2
◇ MED 0.5 000000J
The DDF ground cable: The gauge of multiple-core copper wire is not less than 6mm 2.
The power cable and grounding cable between an integrated working box (lightning-proof protection box)
◇ 3.2.033 MED 0.5 000000J
and the UPS/BTS must be covered with a corrugated tube.
The color of power cables and ground cables delivered by our company is: The –48V power cable is blue,
◇ 3.2.034 MED 0.5 000000J
the GND (BGND) ground cable is black (red), and the PGND protection cable is yellowish green or yellow.
◇ 3.2.035 The power supply must be provided as required. The plug of power supply must provide three metal prongs. MED 0.5 000000J
The cable of AC mains must not be led in the air for a long distance. If the led distance is more than 50
◇ 3.2.036 meters, the cable must be buried in the ground, or lightning-proof protection measures must be adopted if MIN 0.2 000000L
the led distance is within 50 meters.
The cable to make equipotential arranged among cabinets must be connected firmly and correctly if there is
◇ 3.2.037 MIN 0.2 000000L
an request.
General hardware quality standard Base Station
For DBS3800 site, when the length between AC BBU or RRU and AFB is more than 5m, or AC BBU or RRU
directly connects the AC power which is no reliable lightning protection, the lightning protection box -SPD
◇ 3.2.038 must be configured. If the AC power has reliable lightning protection, the length between AC BBU or RRU MAJ 3 000000F
and AC power is more than 5m, the SPD must be configured. At the same time, the length between AC BBU
or RRU and SPD is less than 5m.
The PGND of main and slave cabinets must be interconnected by a copper wire when combining cabinets,
the connection cable must be a yellow-green plastic insulating copper wire with a diameter of more than
◇ 3.2.039 10mm2, or using the short-circuit sheet metal to connect the metal shells of the two cabinets. The PGND of MED 1 000000I
main and slave cabinets must be connected to the grounding bar in the equipment room respectively. When
using the equipotential cable, its length must be less than 2m.
The connection of power cable must be correct when a UPS or storage battery is installed so that the micro
◇ 3.2.040 MED 1 000000I
base station can operate normally depending on the storage battery once the AC mains is powered off.
◆ 3.2.041 The part of peeling of the cable made on-site must be covered with protection tube or insulating tape. MED 0.5 000000J
The live line (brown) or neutral line (blue) of the micro base station must be correctly connected to that of
◇ 3.2.042 MED 0.5 000000J
the AC power supply or the lightning protection box.
◇ 3.2.043 The live line, neutral line and earth line of power cable in the working case must be connected correctly. MED 0.5 000000J
The power cables, transmission cables and antennal feeder cables must not cross each other. It must fit for
◆ 3.2.044 the design requirement if they are distributed in a parallel way, the spacing between them must be more MED 0.5 000000J
than 3 cm.
When power cables and transmission cables are distributed on the wall, they must be fixed with clips. When
they pass a cable ladder or metal pole, they must be tied. The transmission cables must be covered with
◆ 3.2.045 MED 0.5 000000J
protection tubes. When they are installed outdoor, waterproof measures must be taken to avoid water in the
protection tubes.
The marks at two end of a power cable or grounding cable must be clear according to specifications. The
◇ 3.2.046 MED 0.5 000000J
soft jumper near the feeder cable port of micro base station must be labeled.
◇ 3.2.047 The connection position of cable connector must reserve some redundance. MIN 0.2 000000L
When a base station is installed on the tower, the AC cable must be use an armoured cable on the tower,
◇ 3.2.048 MIN 0.2 000000L
and it also must be connected to a protection ground.
◇ 3.2.049
◇ 3.2.050
◇ 3.2.051
◇ 3.2.052
◇ 3.2.053
◇ 3.2.054
◇ 3.2.055
◇ 3.2.056
◇ 3.2.057
◇ 3.2.058
◇ 3.2.059
◇ 3.2.060
◇ 3.2.061
◇ 3.2.062
◇ 3.2.063

04/24/2018 华为机密,未经许可不得扩散 第8页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


General hardware quality standard Installation of Signal Cables
◆ 4.1.001 No damage, rupture or connector in signal cable. MAJ 2 000000G
Plugs of signal cable must be installed, connected or machininged correctly and firmly. Cable must have
◆ 4.1.002 MAJ 2 000000G
passed conductivity test.
Never distribute the signal cable on the heat radiation mesh on the top of cabinet, which effect heat
◆ 4.1.003 MAJ 2 000000G
radiation and reduce cable’s life.
◇ 4.1.004 Each signal cable must have passed the continuity test. MAJ 2 000000G
The trunk cable connector must be firmly fixed. The cable connector made on-site must be according to
◆ 4.1.005 MAJ 2 000000G
special specifications. Its connector needs to be fixed firmly with a perfect appearance.
For all kinds of cable connectors, they must be clean before installation. If necessary, they must be cleaned
◇ 4.1.006 MAJ 2 000000G
according to specification.
All the signal cables and network cables must be connected correctly. All the network cables that are
◇ 4.1.007 connected to the LANSwitches must be connected according to the division of VLANs. The cabling routes MAJ 1 000000I
must be consistent with the designed routes.
The signal cable must be arranged according to engineering design document. Convenient to maintenance
◆ 4.1.008 MED 0.5 000000J
and expansion.
◆ 4.1.009 Cable routing of the signal cable inside cabinet must be correct. MED 0.5 000000J
Distribution of cables outside cabinet:
1. The cable must be distributed without any cross and bending.
2. Put the cable in the cable trough without binding, and the cable cannot overflow the trough.
3. When cable ladder is adopted, the cable must be fixuped and tied in order at the beam of cable ladder.
◆ 4.1.010 When the spacing between the cable ladder and the top of the cabinet is more than 0.8 m, a cable ladder MED 0.5 000000J
must be added on the top of cabinet to reduce stress caused by weight of the cable.
4. When several layers of cables are distributed under the floor in an overlapped way, their height cannot be
higher than 3/4 of the height of the space below the antistatic floor.
5. The cable must be tied in order in case of no cable trough.

The bending position of signal cable must be smooth. It is suggested that necessary protective measures
◆ 4.1.011 MED 0.5 000000J
must be taken when signaling cables are fixed to mechanical parts with edges and corners.
◇ 4.1.012 Cables must be tied in a tidy way and do not affect the distribution and future expansion of other cables. MED 0.5 000000J
When multiple-core trunk cables and subscriber cables are distributed inside the cabinet, they must be tied
◇ 4.1.013 in a rectangle at the beam beside the pole without any cross and bending and arranged clearly. Single-core MED 0.5 000000J
trunk cables must be distributed in an orderly way without any cross and bending.
Cables must be tied with uniform spacing and appropriate tightness. Cable ties must be arranged in a tidy
◆ 4.1.014 way. Their redundant parts must be cut from their bottom after they are tied so that any sharp edges do not MED 0.5 000000J
exist.
◆ 4.1.015 The signal cable route must be straight but its bending position must be smooth. MED 0.5 000000J
The auxiliary cables for terminals, operators and alarm boxes must be distributed and tied in an orderly way.
◇ 4.1.016 MED 0.5 000000J
The redundant cable ties must be cut from their bottom so that any sharp edges do not exist.
PVC troughs must be installed on the wall for power cable and signal cable of alarm box. Redundant power
◇ 4.1.017 MED 0.3 000000K
cable and signal cable must be put under the floor or the cabling ladder at alarm box side.
◇ 4.1.018 For upward or downward cabling, cables must be bent at the top or bottom of the rack, redundant length MED 0.3 000000K
must be reserved, and the marks at both ends must be clear.
When trunk cables are bound between frames, a cable tie must be used to bind each trunk cable on the
◇ 4.1.019 MED 0.3 000000K
cable support.
◆ 4.1.020 The unused fiber ends or optical ports of board should be covered with protection caps. MED 0.3 000000K
◇ 4.1.021 Cables must be peeled off tidily at output cable holes of the sub-rack in case of peeling off is required. MIN 0.2 000000L
◇ 4.1.022 The bending radius of coaxial cable must not be less than 4cm. MIN 0.2 000000L
◇ 4.1.023 The peeled place of subscriber cable at the MDF should be covered with the adhesive tape or heat-shrinkable MIN 0.2 000000L
Signal cables must be arranged straight,flatly and neatly without crossing (cables are allowed to be crossed
◆ 4.1.024 MIN 0.2 000000L
within 1m outside cabinet), there is somewhat longer than necessary at the bending point.
Arrange the cables in an orderly and good-looking way, the cables must be bundled with evenly distributed
◇ 4.1.025 MIN 0.2 000000L
space and proper tightness.
◇ 4.1.026
◇ 4.1.027
◇ 4.1.028
◇ 4.1.029
◇ 4.1.030
◇ 4.1.031
◇ 4.1.032
◇ 4.1.033
◇ 4.1.034
◇ 4.1.035
◇ 4.1.036
◇ 4.1.037
◇ 4.1.038
◇ 4.1.039
◇ 4.1.040

04/24/2018 华为机密,未经许可不得扩散 第9页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Fibers: Common
◆ 5.1.001 When the tail fiber is led out of the cabinet, it must be protected. MAJ 3 000000F
The connection point of tail fiber must be clean without any dust. The unused optical fiber head and board
◆ 5.1.002 optical port must be covered with protection caps (plugs). They can be cleaned according to the company MAJ 2 000000G
specifications.
Distribution of tail fibers:
1. When tail fibers are distributed at bending positions, they must not be too tight and cross there. A pair of
◆ 5.1.003 tail fibers must be tied neatly with moderate tightness. MAJ 2 000000G
2. Tail fibers can be drawn freely from the ring of cable tie. They cannot be bent into a right angle.
3. After tail fibers are distributed, other cables or things cannot be put on them.
◆ 5.1.004 The protection tube must enter into the cabinet with a length of less than 10 cm, and be tied firmly. MED 0.5 000000J
The cut of protection tube for tail fiber must be smooth. Otherwise, the insulating tape must be used to avoid
◆ 5.1.005 MED 0.5 000000J
hurting anyone.
◇ 5.1.006 The flange of tail fiber must be fixed. If a fixing bracket exists, it must be installed on the fixing bracket. MED 0.5 000000J
When the tail fibers are distributed in the same row of 32-module equipment, they must be distributed from
◇ 5.1.007 outlet ring within the AM/CM cabinet and be connected to other modules from the lower beam of the second MED 0.5 000000J
shelf in each cabinet.
The over long tail fiber inside a cabinet must be coiled in the box or coiled into a circle with dia. more than 8
◇ 5.1.008 MIN 0.2 000000L
cm before it is fixed.
◇ 5.1.009
◇ 5.1.010
◇ 5.1.011
◇ 5.1.012
◇ 5.1.013
◇ 5.1.014
◇ 5.1.015
◇ 5.1.016
◇ 5.1.017
◇ 5.1.018
◇ 5.1.019
◇ 5.1.020
◇ 5.1.021
◇ 5.1.022
◇ 5.1.023

04/24/2018 华为机密,未经许可不得扩散 第10页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Terrestrial network and grounding system installation
◇ 6.1.001 The dimensions of the effusion plate meets the design requirements and the burying depth must be ≥1.2m MAJ 6 000000C
◇ 6.1.002 The range and structure of the terrestrial network must meet the design requirements MAJ 6 000000C
The horizontal grounding conductor of the terrestrial network, the specifications of the lead-out wire of the
◇ 6.1.003 MAJ 6 000000C
terrestrial network (40*4mm) and installation conform to the design requirements
The specifications and installation of the vertical grounding condcutor must conform to the design
◇ 6.1.004 requirements. The installation depth from the top of the vertical grounding conductor to the surface of the MAJ 6 000000C
ground must be larger than 0.7 meter
The soldering points between horizontal and vertical grounding conductors and lead-out wires must conform
◇ 6.1.005 MAJ 6 000000C
to the design requirements and must not be loose or come off
Strict corrosion prevention measures must be taken for the soldering points between horizontal and vertical
◇ 6.1.006 MAJ 6 000000C
grounding conductors and lead-out wires
◇ 6.1.007 Grounding resistance ≤5Ω MAJ 6 000000C
The foot of tower and lead-out wire of the terrestrial network must be welded properly, and the soldering
◇ 6.1.008 MED 3 000000F
point must not be loose and come off
Corrosion prevention measures with asphaltum have been taken for the soldering point between the foot of
◇ 6.1.009 MED 3 000000F
tower and the lead-out wire of the terrestrial network
The down lead of the lightning arrester and lead-out wire of the terrestrial network must be welded properly,
◇ 6.1.010 MED 3 000000F
and the soldering point must not be loose and come off; Connected properly with the lightning arrester
Corrosion prevention measures have been taken for the connection between the down lead of the lightning
◇ 6.1.011 MED 3 000000F
arrester and the lead-out wire of the terrestrial network and the lightning arrester
Two 40*4mm galvanized flat steel must be used to connect the terrestrial network of the tower to other
◇ 6.1.012 terrestrial networks (such as equipment room and transformer) by soldering. The soldering point must not MED 3 000000F
be loose and come off. Corrosion prevention measures with asphaltum have been taken for the point.
When the power is supplied from the equipment room, the metal sheath of the power feeder for the flight
◇ 6.1.013 restriction indicator must be grounded at the first platform of the tower, where it leaves the tower and where MED 3 000000F
it enters the equipment room (in the same way as the feeder is grounded)
◇ 6.1.014 Material and parts MED 1 000000I
◇ 6.1.015 Locating of earth electrode MED 1 000000I
◇ 6.1.016 For roof-top: Grounding resistance of original building. MED 1 000000I
◇ 6.1.017 For roof-top: Laying ground wire MED 1 000000I
When the power distribution transformer is in a mobile communication station, the grounding network of the
◇ 6.1.018 MIN 0.2 000000L
equipment room must be combined with that of the power distribution transformer.
◇ 6.1.019 The grounding network of tower in a mobile communication station must be combined with that of the MIN 0.2 000000L
equipment room.
◇ 6.1.020 In a mobile communication station, the working grounding cable, protection grounding cable, and lightning- MIN 0.2 000000L
proof protection grounding cable must be joined to one earth bar together.
◇ 6.1.021 When they are installed outdoor, the protection grounding, tower and cement pole of a micro base station MIN 0.2 000000L
and
The its auxiliary
outdoor parts must
grounding be combined
copper with a group
bar is connected of lightning-proof
to the protection
grounding network grounding
through bodies.
a special and reliable
◇ 6.1.022 MIN 0.2 000000L
channel. The grounding cable must comply with the design specification.
◇ 6.1.023
◇ 6.1.024
◇ 6.1.025
◇ 6.1.026
◇ 6.1.027
◇ 6.1.028
◇ 6.1.029
◇ 6.1.030
◇ 6.1.031
◇ 6.1.032
◇ 6.1.033
◇ 6.1.034
◇ 6.1.035
◇ 6.1.036
◇ 6.1.037

04/24/2018 华为机密,未经许可不得扩散 第11页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Labels
There are 4 color wheel labels at the distance 200mm on feeders. Which are just above or below from the
◇ 7.1.001 MAJ 1 000000I
connector and feeder.
There are color wheel lables at distance 1m from feeders leaving tower platform and feeders cross throuth
◇ 7.1.002 MAJ 1 000000I
the feeder window.
When the customers have special lables request, feeder lables must be pasted according to customer's
◇ 7.1.003 MAJ 1 000000I
request. And Huawei color wheel lables are as auxiliary.
Engineering construction must be according to the color wheel specification, and engineering supervisor
◇ 7.1.004 MAJ 1 000000I
must check the feeders according to installation manual.
The labels of cable are filled in and stuck correctly and reliably. They must be tidy position and same
◆ 7.1.005 direction. They must be stuck on a position 2 cm away from their connectors. They can be made in a MED 0.5 000000J
uniform way according to customer requirement.
The labels of power cable and ground cable are filled in and stuck correctly and reliably. They must be in a
tidy position and the same direction. They must be stuck on a position about 2cm away from their
◆ 7.1.006 MED 0.3 000000K
connectors. They can be made in a uniform way according to customer requirements, including the label for
power distribution switch.
◇ 7.1.007 Labels must be stuck on the alarm box according to specifications, easy to maintenance. MED 0.3 000000K
◇ 7.1.008 On the DDF, trunk cable labels must be easily viewed for going to problem location. MED 0.3 000000K
◇ 7.1.009 Network cables, power cables, and SCSI cables must be properly labeled. MED 0.3 000000K
◇ 7.1.010 Labels of WS and network management system and so on must be placed neatly and firmly. MED 0.2 000000L
◆ 7.1.011 The labels of rack shall be placed neat and clean. MIN 0.2 000000L
The row and column labels of the cabinet must be stuck in a clear and tidy way. If there has a dashed box
◆ 7.1.012 on the cabinet, MIN 0.2 000000L
labels must be stuck within it.
◇ 7.1.013
◇ 7.1.014
◇ 7.1.015
◇ 7.1.016
◇ 7.1.017
◇ 7.1.018
◇ 7.1.019
◇ 7.1.020
◇ 7.1.021
◇ 7.1.022
◇ 7.1.023
◇ 7.1.024
◇ 7.1.025
◇ 7.1.026
◇ 7.1.027

04/24/2018 华为机密,未经许可不得扩散 第12页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Base station product installation of rack
When a micro base station is put up on the wall or is put on its support, its installation must be firm without
◆ 8.1.001 MAJ 3 000000F
any loose connection.
◆ 8.1.002 Setting of DIP switches & jumpers are properly set in BTS MAJ 1 000000I
◇ 8.1.003 Proper connection at BTS & Rectifier end MAJ 1 000000I
◇ 8.1.004 Master & Slave Cabinet DIP switch is configured properly MAJ 1 000000I
◇ 8.1.005 Site is constructed as per site survey report. MAJ 1 000000I
◇ 8.1.006 Waterproof measures must be adopted for unused transmission cable connectors for installation of outdoor. MED 1 000000I
◇ 8.1.007 The door of maintenance cavity in a micro base station must be locked to avoid being destroyed. MED 1 000000I
The rigid cables must not be cross inside the cabinet. They cannot be pulled too tightly. Some redundancy
◆ 8.1.008 MED 0.5 000000J
must be reserved at their bend place. They also need to be bent in a tidy and consistent way.
When installing cables inside the rack, the cables of the horizontal direction must be tied to inside of
◇ 8.1.009 MED 0.5 000000J
corresponding crossbars, the cables of the vertical direction must be tied to two sides of cabinet.
Route and connect the inter-rack cables properly, ensuring that no cross connection takes place. Lead a
signal cable onto a cabling rack or into a cable-through hole that seats between cabinets. Lead a RF cable
◇ 8.1.010 MED 0.5 000000J
of a combined cabinet into the input/output cable hole that is reserved for RF cables of a combined cabinet
or into the cable-through hole that seat between cabinets.
The fan must be tightened with screws so that its installation is firm. Its switch, rotation and alarm work
◆ 8.1.011 MED 0.5 000000J
normally.
While you connect the RFFM, combiners, splitters and CDUs, for example. Unused ports of the combiners,
◇ 8.1.012 splitters and CDUs must be covered with protection cover to protect these ports from dusts and other MED 0.5 000000J
sundries.
Inside the cabinet unused ports of the combiners, splitters and CDUs must be covered with protection cover MED
◇ 8.1.013 0.5 000000J
to protect these ports from dusts and other sundries.
The connection cable from combiner, splitter or CDU to the top of the cabinet must go through the gaps of MED 0.5
◇ 8.1.014 000000J
its two sides.
The cables inside the working case are distributed in an orderly way. Watermark cannot exist in the box
◇ 8.1.015 MED 0.5 000000J
when it is installed outside a room.
for example) with the connection cables on the top of a cabinet or with the RF cables of a combined cabinet,
◇ 8.1.016 feed these cables through the open area at both sides of a cabinet. This ensures that you can insert or MIN 0.2 000000L
remove a board without obstructions.
◇ 8.1.017 All of false boards and panels must be installed according to requirements. MIN 0.2 000000L
◇ 8.1.018 Jumpers are laid according to layers and sectors. MIN 0.2 000000L
◇ 8.1.019 breakages occur on the rack lifting lug, repair activities must be done with spray paint. MIN 0.2 000000L
After a micro base station is installed, there must be some spacing between its bottom and its operation
◇ 8.1.020 desk or the ground. The spacing between its side and the wall or barrier must be more than 20 cm (you MIN 0.2 000000L
must take future operation and maintenance into consideration when installing a micro base station).
The distribution of indoor cables must be easy to maintenance and future expansion. The jumpers of
◇ 8.1.021 MIN 0.2 000000L
multiple micro base stations must be distributed according to layer and sites.
◇ 8.1.022
◇ 8.1.023
◇ 8.1.024
◇ 8.1.025
◇ 8.1.026
◇ 8.1.027
◇ 8.1.028
◇ 8.1.029
◇ 8.1.030
◇ 8.1.031
◇ 8.1.032
◇ 8.1.033
◇ 8.1.034
◇ 8.1.035
◇ 8.1.036

04/24/2018 华为机密,未经许可不得扩散 第13页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Antenna and Feeder Installation
The connection of the lightning-proof arrester connector in the cabinet is reliable. When there is a reliable
grounding point outside the room, the feeder cable must be earthed outside the room. Water-proof
◆ 9.1.001 measures must be made for the feeder cable ground. The feeder inside the room should be earthed the MAJ 5 000000D
operation room main protection grounding before the feeder connect with equipment.
◆ 9.1.002 Antennas must be in the 45-degree protected area of lightning rod. MAJ 4 000000E
◆ 9.1.003 The feeder cables must not have obvious bending and twisting and bare copper appearance. MAJ 4 000000E
◆ 9.1.004 The connector of feeder cable is made in a standard way without any loose connection. MAJ 4 000000E
Antenna and feeder check:
1. The azimuth and tilt angle of the installed antenna must accord with design specifications.
2. The antenna connection and sector relationship are correct without reverse connection and
misconnection.
3. The result after have calibration test and sensitive test must obey standard.
First we should check the cable. Then we should compare the PN value, get from Debug windows of mobile
◆ 9.1.005 with idle status and distance with 50 meters away from mail transmission direction of each cell, with the MAJ 4 000000E
value in Engineering Parameter Guide.
If it is disaccord, that means the connection with main diversity antenna cable is in wrong position. After
finish this check, we should montior the TX power, get from Debug windows of mobile with active status.
Whether the TX power value exceed 0dBm. If it exceed that, we should chect physical connection between
cable with antenna. Whether the diversity antenna cable connect to other cell. If the connection is correct,
then we should tighten the connection etc.
◆ 9.1.006 Waterproof measures must be taken before the feeder cable is led in a room. MAJ 4 000000E
The connection between antenna support and tower must be reliable and firm. The connection between
◆ 9.1.007 MAJ 3 000000F
antenna and its support must also be reliable and firm.
The RF cable connector needs to be installed perfectly to avoid the situation that the virtual connection
◇ 9.1.008 MAJ 2 000000G
would cause an abnormal VSWR and thus the normal system operation would be affected.
◇ 9.1.009 Antenna Type MAJ 1 000000I
◆ 9.1.010 check feeder cable VSWR MAJ 1 000000I
◇ 9.1.011 The omni antenna must be vertical. Its error must be less than ± 2 degrees. MED 1 000000I
The azimuth error of the directional antenna must not be more than ± 5 degrees. Its tilt angle error must not
◆ 9.1.012 MED 1 000000I
be more than ± 0.5 degrees.
The antenna feeder lightning-proof arrester of GPS/GLONASS must be installed correctly and firmly. Its
◇ 9.1.013 MED 1 000000I
protected port must face the base station (check when the GPS/GLONASS antenna exists).
When a feeder window is installed on the top of building to lead the feeder cable into the room, it must be
◆ 9.1.014 sealed well. The antenna jumper and the feeder cable before the feeder winder must have waterproof MED 1 000000I
bends.
The lightning-proof arrester must be earthed according to specification for GSM macro base station
◇ 9.1.015 BTS30/BTS312. All ground cables are connected to the outdoor protection ground bar of equipment room MED 1 000000I
after collecting.
There is no barrier above the GPS or double star antenna, the antenna must have a broad look angle. The
◇ 9.1.016 MED 1 000000I
scale of eyeable sky of the whole sky is more than 50%.
◇ 9.1.017 The spacing between two antenna systems must be more than 2 meters. MED 1 000000I
The height of the GPS or double star antenna must be lower than the effective lightning-proof protection
◇ 9.1.018 MED 1 000000I
bodies nearby such as building, tower, and lightning rod.
◇ 9.1.019 When a feeder cable is distributed, protection measures must be taken for its part bearing a weight. An MED 1 000000I
outdoor feeder cable must be bundled firmly when it is distributed vertically.
The feeder cable must be covered with a tube when it is led in a room or crosses a wall. When the feeder
◇ 9.1.020 cable is bent on the top of a building and then extended downward along the wall, the tube must be used for MED 1 000000I
contact protection at the corner or the fixture for contact protection at the corner.
The feeder cable of GPS/GLONASS must have a reliable grounding point. The indoor lightning-proof
arrester of GPS/GLONASS is directly connected to the GPS/GLONASS signal input port of the cabinet and
◇ 9.1.021 MED 1 000000I
does not need to earthed. The grounding of lightning-proof protection can be adopted close the
GPS/GLONASS antenna of outdoor. (check when the GPS/GLONASS antenna exists).
The feeder grounding clip is directly fixed on the steel sheet of the tower perfectly. The installation of this
◆ 9.1.022 clip must accord with the standard requirement. The antirust, anticorrosive and waterproof measures are MED 1 000000I
adopted for the grounding clip and reliable connection.
The space between feeder clamps must be even and their direction must be same after installed. They must
◆ 9.1.023 MED 0.5 000000J
also be fixed firmly without any loose connection.
◆ 9.1.024 The feeder cables can not cross after distributed. In the room they must be neat and straight with same bend. MED 0.5 000000J
◇ 9.1.025 The installation position of antenna must be accorded with the design document. MED 0.5 000000J
The distance between an omni antenna and the tower body must be no less than 1.5m, and that between a
◇ 9.1.026 MED 0.5 000000J
directional antenna and the tower body must not be less than 1m.
The horizontal space between master and diversity antennas of an omni antenna must not be less than 4m
◇ 9.1.027 MED 0.5 000000J
for M900 or 2m for M1800.
The horizontal space between master and diversity antennas of a single-pole directional antenna must not
◇ 9.1.028 MED 0.5 000000J
be less than 4m for M900 or 2m for M1800.
The vertical space between two directional antennas installed on the same support must not be less than
◇ 9.1.029 MED 0.5 000000J
0.5m.
◇ 9.1.030 The top of an omni antenna jacket must be level of or higher than the antenna support. MED 0.5 000000J
When installing the tower amplification module, the side of connecting the antenna must be upward, and the
◇ 9.1.031 other side of connecting the feeder cable must be downward. The installation position of tower amplification MED 0.5 000000J
module must be close to the antenna.
The labels of communication cables, feeder cables and jumper must be stuck and tied according to
◇ 9.1.032 MED 0.5 000000J
specifications. The labels must be arranged in an orderly way with same direction.
The support of the GPS/GLONASS antenna is fixed firmly. In the area of its 90-degree vertical angle there
◇ 9.1.033 MED 0.5 000000J
is no barrier (check when the GPS/GLONASS antenna exist).
The signal cable route bending position must be smooth. Necessary protective measures must be taken
◇ 9.1.034 MED 0.5 000000J
when signaling cables are fixed to mechanical parts with edges and corners.
◇ 9.1.035 The minimum bending radius of a feeder cable must not be less than 20 times of its diameter (check when MED 0.5 000000J
the GPS or double star antenna exists).
◆ 9.1.036 When the tower is more than 60m, a grounding clip must be added to the feeder in the middle of the tower. MED 0.5 000000J
If the length of feeder cable from the tower to the room on the roof (or cabling ladder) is more than 20m, a
◆ 9.1.037 MED 0.5 000000J
lightning-proof protection grounding clip must be added on the roof (or cabling rack).
The feeder cable must be earthed with three points at least between the top of tower and the equipment
room (within 1m away from the platform on the top of tower, within 1m between the tower body and the
◆ 9.1.038 MED 0.5 000000J
outdoor cabling ladder, and within 1m between the feeder cable and the feeder window). The feeder cable
is tied firmly at the grounding points and has perfect waterproof treatments.
◆ 9.1.039 The feeder cable goes into the room along the wall. If a cable ladder is used, it must be earthed. MED 0.5 000000J
The grounding cable of feeder clips must extend from up to down. The angle between the grounding cable
◆ 9.1.040 MED 0.5 000000J
and the feeder cable must not be more than 15 degrees.
Outdoor cable tie must use black type and some redundance 3~5mm must be reserved when cutting all of
◆ 9.1.041 MIN 0.5 000000J
cable ties of outdoor.
◇ 9.1.042 When installing the omni antenna on a roof, the blind zones must be avoided as much as possible. MIN 0.2 000000L
◇ 9.1.043 The jumper of the antenna must be tied along the rail of the support to the steel frame of the power. MIN 0.2 000000L
When the front of cabinet is parallel to the feeder cable inside the room or the back of cabinet faces it, a
◇ 9.1.044 sector is in line and the order of each line must be same. When the front of cabinet is vertical to the feeder MIN 0.2 000000L
cable inside the room, a sector is in column and the order of each colum must be same.
◆ 9.1.045 The bending radius of coaxial cable must not be less than 4 cm. MIN 0.2 000000L
◇ 9.1.046
◇ 9.1.047
◇ 9.1.048
◇ 9.1.049
◇ 9.1.050
◇ 9.1.051
◇ 9.1.052
◇ 9.1.053
◇ 9.1.054
◇ 9.1.055
◇ 9.1.056
◇ 9.1.057
◇ 9.1.058
◇ 9.1.059
◇ 9.1.060

04/24/2018 华为机密,未经许可不得扩散 第14页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Optical Cable Packing
◇ 10.1.001 Certificate of qualification and test record:The certificate of qualification for delivery and test record of the opt MAJ 3 000000F
Labels of the optical cable drum
1.Labels are complete and clear
2.Optical cables are placed in order on the drum without being extruded and damaged.
◇ 10.1.002 MIN 1 000000I
3.The optical cable ends are well sealed.
4.The sheath is not extruded and damaged
5.The labels such as manufacturer, type and meter mark length, etc. are complete with the brilliant color.
Indices for Rechecking
◇ 10.1.003 Optical cable type:Meet the design requirements MAJ 3 000000F
◇ 10.1.004 Length of the optical cable of each drum:Meet the contract requirements, with the negative deviation at zero, a MAJ 3 000000F
◇ 10.1.005 Length of the optical fiber of each drum:The same as the length of the ordered fiber cable drum. MAJ 3 000000F
◇ 10.1.006 Attenuation of the optical fiber:Meet the design requirements. MAJ 3 000000F
◇ 10.1.007
◇ 10.1.008
◇ 10.1.009
◇ 10.1.010
◇ 10.1.011
◇ 10.1.012
◇ 10.1.013
◇ 10.1.014
◇ 10.1.015
◇ 10.1.016
◇ 10.1.017
◇ 10.1.018
◇ 10.1.019
◇ 10.1.020
◇ 10.1.021
Pole Erecting
◇ 10.2.001 Deviation of the pole location:The lateral deviation between the central line of the pole and that of the route MAJ 3 000000F
◇ 10.2.002 Pole height and hole depth:Meet the design requirements MAJ 3 000000F
◇ 10.2.003 Specifications and quality of the cement poles:No crack or damage is allowed on the surface of a pole MAJ 3 000000F
◇ 10.2.004 Verticality of an pole:The pole itself should be vertical MAJ 3 000000F
◇ 10.2.005 Location of the corner pole:Determine the location of the corner pole through route designing MAJ 3 000000F
◇ 10.2.006 Stay wire formation:Adopt the galvanized stranded wire, the specifications and types meeting the 7/2.2 or 7/3 MAJ 3 000000F
◇ 10.2.007 Stay wire azimuth:Meet the requirements for equilibrium tension MAJ 3 000000F
◇ 10.2.008 Stay wire installation:Meet the specifications. MIN 1 000000I
◇ 10.2.009 Distance-height ratio of the stay wire:General requirement is 1:1. MIN 1 000000I
◇ 10.2.010 Anchor block quality:Meet the specifications, types and quality requirements MAJ 3 000000F
◇ 10.2.011 Depth of the anchor block pit:Unless otherwise designed, the depth of the anchor block pit should usually follo MAJ 3 000000F
◇ 10.2.012 Specifications and quality of the stay bar:The specifications and type should meet the design requirements, and MAJ 3 000000F
◇ 10.2.013 Distance-height ratio:0.6 is appropriate, no less than 0.5 MIN 1 000000I
◇ 10.2.014 Depth of the stay bar hole:No less than 0.6m MIN 1 000000I
◇ 10.2.015 Quality of the joint between the stay bar and pole:At the joint between the stay bar and pole, the end of the st MAJ 3 000000F
Suspension Wire Installation
◇ 10.2.016 Specifications of the suspension wire:Galvanized stranded wire should be used, with the specifications and typ MAJ 3 000000F
◇ 10.2.017 Specifications and quality of the suspension wire jointing:Meet the specifications. MAJ 3 000000F
◇ 10.2.018 Sag:Meet the design requirements MIN 1 000000I
◇ 10.2.019 Fixing of suspension wires (interlock between a suspension wire and staple bolt ):Meet the design requiremen MAJ 3 000000F
Others
◇ 10.2.020 Pole marking:Meet the design requirements, the last character the lower edge of the plate should be 2.5m awa MAJ 3 000000F
◇ 10.2.021 The lightning conductor installation:Meet the design requirements MAJ 3 000000F
Aerial Optical Cable Installation
◇ 10.2.022 Hooker spacing:50±2cm MIN 1 000000I
◇ 10.2.023 Installation quality:The traction tension shall be no more than 85% of the cable deadweight. The radius of curvature
MAJshould 3
follow the
000000F
stipulations in the attached appendix-D table-2
◇ 10.2.024 Quality of optical cable joint:Meet the specifications of optical cable joint. MAJ 3 000000F
◇ 10.2.025 Average attenuation of optical fiber splicing:Meet the design requirements; the average bidirectional loss sho MAJ 3 000000F
◇ 10.2.026 Length of the reserved optical cable:Meet the specifications for optical cable construction MAJ 3 000000F
◇ 10.2.027 Cable coiling quality and curvature of the reserved optical cable:Follow the stipulations in the attached appen MIN 1 000000I
◇ 10.2.028 Spacing with other facilities:Follow the stipulations in the attached appendix-E table 5 MIN 1 000000I
◇ 10.2.029 Protection measures for crossover the power line:Apply insulating bushing for isolation in case of cross over. MIN 1 000000I
◇ 10.2.030 Earthing Resistance of lightning protection:Meet the design requirements MIN 1 000000I
◇ 10.2.031
◇ 10.2.032
◇ 10.2.033
◇ 10.2.034
◇ 10.2.035
◇ 10.2.036
◇ 10.2.037
◇ 10.2.038
◇ 10.2.039
◇ 10.2.040
◇ 10.2.041
◇ 10.2.042
◇ 10.2.043
◇ 10.2.044
◇ 10.2.045
Duct Engineering
◇ 10.3.001 Trench route:The central line of the trench should match that of the designed route, with the deviation no mo MAJ 3 000000F
◇ 10.3.002 Trench depth:Meet the design requirements MAJ 3 000000F
◇ 10.3.003 Bedding cushion on the trench bottom:The grade of the cement and the mix of the mortar for the foundation MIN 1 000000I
Quality of Duct Laying
◇ 10.3.004 Duct specifications:check the certificate of qualification for duct delivery. Meet the design requirements MAJ 3 000000F
◇ 10.3.005 Quality of duct jointing:Reliably connected, with good tightness against water, and enwrapped with concrete f MAJ 3 000000F
◇ 10.3.006 Smooth pass test for ducting:The test should succeed;Test the continuity and smooth with a standard pull-rod MAJ 3 000000F
◇ 10.3.007 Air sealing tightness of the orifice:The duct orifice should be sealed tightly after laying. MIN 1 000000I
◇ 10.3.008 Backfill tamped:On the fields in the suburb, it is allowed to be 150mm higher than field surface or so, but on MIN 1 000000I
Bricklaying Channel
◇ 10.3.009 Specifications of bricks and stones:The specifications and types of bricks and stones should meet the design MAJ 3 000000F
◇ 10.3.010 Mortar proportioning:Meet the design requirements MAJ 3 000000F
◇ 10.3.011 Status of masonry:Dimension of the bricklaying channel should meet the design requirements. MAJ 3 000000F
◇ 10.3.012 Specifications and dimension of the form board:The specifications and dimension of the template for the chan MAJ 3 000000F
◇ 10.3.013 The mix of concrete:The mixture proportion of water, cement and sand in the concrete should meet the design MAJ 3 000000F
◇ 10.3.014 Concrete curing:The curing of the cover slabs of the concrete should meet the design requirements and the conc MIN 1 000000I
Manhole
◇ 10.3.015 Spacing of the manholes:The position of the manhole depends on the geographic conditions and the project requirements.
MAJ The
3 requirements
000000F for the space between two adjacent manholes are as follows: foe cement duct: no greater than 150m
◇ 10.3.016 Manhole Pit depth:Meet the design requirements MAJ 3 000000F
◇ 10.3.017 Grades of the concreter for the foundation:Meet the design requirements MAJ 3 000000F
◇ 10.3.018 Mix of mortar:The mixture of mortar should meet the design requirements MAJ 3 000000F
◇ 10.3.019 Embedded iron part:The specifications and the embedding position of an iron part in the manhole should meet MAJ 3 000000F
◇ 10.3.020 Handling of duct orifice:The ingress of the duct in the manhole should be plastered flatly with cement mortar, MAJ 3 000000F
◇ 10.3.021 Quality of the masonry:The dimension and height of the brick wall of the manhole should meet the design requ MAJ 3 000000F
◇ 10.3.022 Mixture of the mortar:The materials and mix of the mortar should meet the design requirements MAJ 3 000000F
◇ 10.3.023 Quality of the overlay cover slab appearance:No obvious defect on the cover slab appearance. MAJ 3 000000F
◇ 10.3.024 Appearance and height of cover collar:Meet the design requirements. MIN 1 000000I
Duct Optical Cable Installation
◇ 10.3.025 Specifications, quality and laying length of the plastic sub-ducts:The specifications of the plastic ducts sh MAJ 3 000000F
◇ 10.3.026 The duct occupied by sub-ducts:Meet the design requirements. MAJ 3 000000F
◇ 10.3.027 Sub-ducts plugging:There should be no joint of a sub-duct in the pipe, and the orifice of the subduct should be MIN 1 000000I
◇ 10.3.028 Protection at the duct orifice:At the pipe orifice, it should be protected by a “bell mouth” to prevent the sheath MIN 1 000000I
◇ 10.3.029 Quality of optical cable jointing:Meet the specifications for optical cable jointing MIN 1 000000I
◇ 10.3.030 Average attenuation of optical fiber splice:Meet the design requirements. MIN 1 000000I
◇ 10.3.031 Length of the reserved optical cable:Meet the specification requirements , with 50cm of cable redundant re MIN 1 000000I
◇ 10.3.032 Bending of the optical cable after it is led out of the ducts orifice:The optical cable should not bend within 15cm MIN 1 000000I
◇ 10.3.033 Appearance of the optical cable in the manhole:The direction, settings and labels of the optical cable in th MIN 1 000000I
◇ 10.3.034 The position for laying the splice closure of the optical cable:The box splice closure of the optical cable shoul MIN 1 000000I
◇ 10.3.035 The position and curvature of the reserved cable of each joint:The reserved cable at each cable joint should cli MIN 1 000000I
◇ 10.3.036
◇ 10.3.037
◇ 10.3.038
◇ 10.3.039
◇ 10.3.040
◇ 10.3.041
◇ 10.3.042
◇ 10.3.043
◇ 10.3.044
◇ 10.3.045
◇ 10.3.046
◇ 10.3.047
◇ 10.3.048
◇ 10.3.049
◇ 10.3.050
Direct Buried
◇ 10.4.001 Route of the cable trench:The central line of the trench should match that of the designed route, with the de MAJ 3 000000F
◇ 10.4.002 Dimension of the cable trench:The cable trench should be straight, and the trench depth should meet the requ MAJ 3 000000F
Cable Laying
◇ 10.4.003 Integrity of the cable sheath:Do not let the cables touch the ground when carrying them, and prevent the ca MAJ 3 000000F
◇ 10.4.004 Drawing tension:Less than 85% of the deadweight of the cable MAJ 3 000000F
Curvature radius:Dynamic state : no less than 20 times of external diameter of the cable.
◇ 10.4.005 Static state: no less than 10 times of external diameter of the cable.The curvature radius should meet the MAJ 3 000000F
requirement of the attached appendix-D table2
◇ 10.4.006 Laying behaviour:No back-buckle, no kink MAJ 3 000000F
Cable Protection
◇ 10.4.007 Traversing protection 1 (when a cable traverses a rail, a busy road or excavation-limited road) :Use the steel MAJ 3 000000F
◇ 10.4.008 Traversing protection 2 (when a cable traverses an excavation-permitted road) :Use the steel ducts or plastic d MAJ 3 000000F
◇ 10.4.009 Traversing protection 3 (when a cable traverses a village or town where ground-breaking is likely to occur) :Use MIN 1 000000I
◇ 10.4.010 Over bridge protection:Take into account the influences of mechanical damage, vibration and ambient temper MIN 1 000000I
◇ 10.4.011 Ditch and ridge reinforcement:As required by design, use tabia for reinforcement or build a stone protection b MIN 1 000000I
◇ 10.4.012 Slope protection (1):S-type layout is suitable for an inclined area with the grade of slope greater than 20 deg MIN 1 000000I
◇ 10.4.013 Slope protection (2) :For the seriously washed out steep slope, the cable trench should be concret coated on MIN 1 000000I
◇ 10.4.014 Build a slope protection:Meet the design requirements MIN 1 000000I
◇ 10.4.015 River-crossing protection (when crossing a small river):Use the PVC bushing. In case of a sand riverbed, bui MIN 1 000000I
◇ 10.4.016 Lightning protection:Meet the design requirements MAJ 3 000000F
Cable Trench Backfill
◇ 10.4.017 Backfill sequence:Backfill 10cm-thick soil after all the cables are laid MIN 1 000000I
◇ 10.4.018 Backfill in the cable trench:After the cable trench is backfilled, the road surface should be recovered immediat MIN 1 000000I
◇ 10.4.019 Mark stone installation:Meet the design requirements. MAJ 3 000000F
Underwater Optical Cable Laying
◇ 10.4.020 Specifications:The selection of the optical cable specifications should meet the design requirements and the fo MAJ 3 000000F
◇ 10.4.021 Positions of the optical cable joints:No joint is allowed in the water. MAJ 3 000000F
◇ 10.4.022 Whether the standby underwater optical cable is needed:For a giant river, standby underwater optical cables sh MIN 1 000000I
◇ 10.4.023 Sign board for underwater cable:The permanent sign board should be set up at where it should be needed. MAJ 3 000000F
◇ 10.4.024
◇ 10.4.025
◇ 10.4.026
◇ 10.4.027
◇ 10.4.028
◇ 10.4.029
◇ 10.4.030

04/24/2018 华为机密,未经许可不得扩散 第15页,共33页


385175546.xls 文档密级

◇ 10.4.031
◇ 10.4.032
◇ 10.4.033
◇ 10.4.034
◇ 10.4.035
◇ 10.4.036
◇ 10.4.037
◇ 10.4.038
Repeater Test
◇ 10.5.001 Total attenuation from A to B and from B to A :Meet the design requirements MAJ 3 000000F
◇ 10.5.002 The total section loss of A - B or B – A:Meet the design requirements MAJ 3 000000F
◇ 10.5.003 The optical signal backscatter trace of A - B or B – A:Meet the design requirements MAJ 3 000000F
◇ 10.5.004
◇ 10.5.005
◇ 10.5.006
◇ 10.5.007
◇ 10.5.008
◇ 10.5.009
◇ 10.5.010
◇ 10.5.011
◇ 10.5.012
◇ 10.5.013
◇ 10.5.014
◇ 10.5.015
◇ 10.5.016
◇ 10.5.017
◇ 10.5.018

04/24/2018 华为机密,未经许可不得扩散 第16页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Tower installation (General Part)
◇ 11.1.001 The location of the tower meets the design requirements MAJ 6 000000C
◇ 11.1.002 The height of the tower meets the design requirements MAJ 6 000000C
◇ 11.1.003 The overall verticality of the tower (the gradient is smaller than 1/1500 of the height of the tower) MAJ 6 000000C
Upon completion of tower installation, at least three screws must be exposed among the anchor bolts for
◇ 11.1.004 MED 6 000000C
fastening the nuts. Burglary and corrosion prevention measures must be taken for them.
Check the evenness of hot galvanizing for the materials of the tower: The surface of the galvanized parts is
◇ 11.1.005 MED 3 000000F
smooth, without any score, dropping tumor, agglomeration or iron exposure.
Check the adhesiveness of hot galvanizing for the materials of the tower: They are combined tightly.
◇ 11.1.006 Knocked with a hammer, the zinc layer is not peeled off or raised (Knocking with a hammer will not remove MED 3 000000F
the zinc layer )
Check the adhesive quantity of hot-galvanized materials of the tower and the thickness of zinc layer: When
◇ 11.1.007 the thickness of the tower component is less than 5mm, the adhesive quantity must be ≥460g/m2, that is MED 3 000000F
thickness ≥65um; When the thickness of the to
◇ 11.1.008 All the components of the tower are not bent or worn out obviously MED 3 000000F
Check the installation of poles of the tower: The main material, separation plate and tilted pole must be
◇ 11.1.009 MED 3 000000F
mounted properly without any error or omission
The bolts for the poles of the tower are installed in the same direction (the nuts are located on the outer of
◇ 11.1.010 MED 3 000000F
the tower) and are tightened. Spot-check whether the torque are proper.
The specifications, dimensions and relative height of the maintenance platform meet the design
◇ 11.1.011 requirementsWidth of platform ≥1m, area ≥ 2 square meters; Height of fence ≥ 1.1m, the bottom edge of MED 3 000000F
the antenna is 0.3m higher than the fence of the platform
The quantity and installation azimuth of the antenna supports conform to the design requirements; They are
◇ 11.1.012 MED 3 000000F
secured.
A platform must be available every 20~30m of the tower ladder for the staff to take a break. The distance
◇ 11.1.013 between two adjacent stirrups must be no more than 300mm. The width of the ladder must be no less than MED 3 000000F
400mm. The ladder is secured, the crosspieces
The cabling ladder is installed in compliance with the design requirements. Moreover, it is secured and the
◇ 11.1.014 MED 3 000000F
crosspieces are distributed evenly
◇ 11.1.015 Penetration welding must be used for the crosspieces of the ladder MED 3 000000F
◇ 11.1.016 The location of the no access indicator meets the design requirements MED 3 000000F
◇ 11.1.017 The paint does not come off and gets rusted and no place is left unpainted MED 3 000000F
No large area is left unpainted, or has excessive paint or crinkled paint; In the obvious part, no small area is
◇ 11.1.018 MED 3 000000F
left unpainted, or has excessive paint or crinkled paint
◇ 11.1.019
◇ 11.1.020
◇ 11.1.021
◇ 11.1.022
◇ 11.1.023
◇ 11.1.024
◇ 11.1.025
◇ 11.1.026
◇ 11.1.027
◇ 11.1.028
◇ 11.1.029
◇ 11.1.030
◇ 11.1.031
◇ 11.1.032
◇ 11.1.033
Green field Tower Erection
◇ 11.2.001 Diagonal distance between anchor bolt in columns: ≤ L/1500 and < 10 mm (L - diagonal distance) MED 3 000000F
◇ 11.2.002 Distance between anchor bolts in neighboring columns: ≤ b/1500 and < 10 (b - column foot span) MED 3 000000F
◇ 11.2.003 Outside length of anchor bolt: >a, <a+10 mm (a - designed bolt extension elongation) MED 3 000000F
◇ 11.2.004 Density of grouting concrete MED 3 000000F
◇ 11.2.005 Tower plumbness: Less than H/1500 (H is tower height.) MED 3 000000F
◇ 11.2.006 Flange connection: More than 75%, jointed without gaps in line and biggest gap less than 1.5 mm. MED 3 000000F
◇ 11.2.007 Bolt tightness: In compliance with design requirements; more than 80% in pieces acceptable MED 3 000000F
◇ 11.2.008 Altitude of antenna support: In compliance with design requirements MED 3 000000F
◇ 11.2.009 Outdoor feed rack (ladder): Fix well and end near feeder window in 100mm lower than feeder window MED 3 000000F
◇ 11.2.010 Climbing ladder: Connected .installed and support well. MED 3 000000F
Galvanization thickness inspection: When item Thickness ≤ 3 mm, 55 mm; 3 mm < thickness < 6 mm, 70 um;
◇ 11.2.011 thickness ≥ 6 mm, 85 mm MED 3 000000F
◇ 11.2.012 Galvanized layer adhesion: No separation or swell MED 3 000000F
◇ 11.2.013 Paint type: In compliance with design requirements; epoxy primer and polyurethane top coat are recommended. MED 3 000000F
◇ 11.2.014 Paint visual examination: No peeling, brush leakage or rust; no large area of flow fall and wrinkling MED 3 000000F
◇ 11.2.015
◇ 11.2.016
◇ 11.2.017
◇ 11.2.018
◇ 11.2.019
◇ 11.2.020
◇ 11.2.021
◇ 11.2.022
◇ 11.2.023
◇ 11.2.024
◇ 11.2.025
◇ 11.2.026
◇ 11.2.027
◇ 11.2.028
◇ 11.2.029
◇ 11.2.030
Guyed Tower Erection
◇ 11.3.001 Level of concrete columns: Level allowance is 2 mm, and levelness allowance is 1/1000 MED 3 000000F
◇ 11.3.002 Anchor bolts position: In compliance with design requirements MED 3 000000F
◇ 11.3.003 Tower components: No deformation, burr, folds, scab, inclusion and lap; dimension conforms to drawings MED 3 000000F
◇ 11.3.004 Galvanized layer: When item thickness ≤ 3 mm, 55 mm; 3 mm < thickness < 6 mm, 70um; thickness ≥ 6 mm, 85 mm MED 3 000000F
Deviation of horizontal distance between anchor block and the center of tower: B/100 (B is the horizontal distance
◇ 11.3.005 between guy cable anchor block and the center of pole.) MED 3 000000F
◇ 11.3.006 Azimuth of guy cable: ≤5° MED 3 000000F
◇ 11.3.007 Elevation angle deviation of guy cable: ≤5° MED 3 000000F
◇ 11.3.008 Tower plumbness: Totally ≤ H/1500,for sections, ≤ h/750 MED 3 000000F
Bolt tightness: Conforms to the design; nuts must be installed outside of the tower body,and more than 80% in pieces
◇ 11.3.009 acceptable
MED 3 000000F
◇ 11.3.010 Outdoor feed rack (ladder): Fixed welland end near feeder window is 100mm lower than the feeder window. MED 3 000000F
◇ 11.3.011 Flange connection: more than 75% jointed without gap in line,and biggest gap less than 1.5 mm MED 3 000000F
◇ 11.3.012 Altituded,azimuth and quantity of antenna support: In compliance with design requirements; firmly connected MED 3 000000F
◇ 11.3.013 Paint: Without peeling, brush leakage, and rust; without large area of flow fall and wrinkling MED 3 000000F
◇ 11.3.014 lightning rod: In compliance with design requirements; reliably connected MED 3 000000F
◇ 11.3.015 Fasteners of guys: not less than 3 pieces ,with equal space 6d to 25d MED 3 000000F
◇ 11.3.016 Tension force of guys: In compliance with design requirements MED 3 000000F
◇ 11.3.017
◇ 11.3.018
◇ 11.3.019
◇ 11.3.020
◇ 11.3.021
◇ 11.3.022
◇ 11.3.023
◇ 11.3.024
◇ 11.3.025
◇ 11.3.026
◇ 11.3.027
◇ 11.3.028
◇ 11.3.029
◇ 11.3.030
◇ 11.3.031

04/24/2018 华为机密,未经许可不得扩散 第17页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Foundation
The pit (ditch) examination records for the groundwork are complete and correct.
1. Pit dimensions;
2. Pit bottom level;
◇ 12.1.001 MAJ 6 000000C
3. Pit soil condition;
4. Pit axis displancement;
5. Side slope stability.

The reinforced bar binding records are complete and correct .


1. Type, specification, and quality of rebar;
2. Overlap length;
3. Lapping position;
◇ 12.1.002 4. Spacing of steel reinforcement; MAJ 6 000000C
5. Concrete cover;
6. Level of built-in parts;
7. Anchor bolt perpendicularity;
8. Misalignment of built-in fittings.
◇ 12.1.003 The channel steel is installed securely at the correct position and is connected to the terrestrial network MAJ 6 000000C
◇ 12.1.004 The area of the diesel generator room conforms to the design requirements. MAJ 6 000000C
Diesel generator foundation: Compared with the length and width of the assembling unit, the dimensions of
◇ 12.1.005 MAJ 6 000000C
the platform increase about 200mm.
The template records are complete and correct
1. Rigidity, strength and stability;
2. Maximum crack;
3. Axis displacement;
◇ 12.1.006 MAJ 6 000000C
4. Top level of form board top ;
5. Dimension of foundation;
6. Dimension of Beam column ;
7. Surface smoothness.

The concrete records are complete and correct


1. Cement and additive: Factory certificate or test report is available.;
2. Cement appearance: Without stiff blocks;
3. Water: Salt water is forbidden;
4. Sand and stone: Without foreign matter or weathered stone;
5. Mix ratio: In compliance with design requirements;
6. Axis displancement of foundation: less than 10 mm;
7. Axis displacement of wall beam and columns: less than 8mm;
◇ 12.1.007 MAJ 6 000000C
8. Level: ±10mm;
9. Dimension of foundation: +15/-10mm;
10. Dimension of wall beam and columns: +8/-5mm;
11. Surface plainness: less than 5 mm;
12. Displacement of built-in parts: less than 2 mm;
13. Outside length of anchor bolt: 0/+10mm;
14. Honeycomb cavities: not allowed;
15. Exposed rebar: not allowed.

◇ 12.1.008 The dimensions of base section must meet the design requirements, and the deviation must be +15/-10mm MAJ 6 000000C
The base backfill records are complete and correct
1. Soil appearance: no rubbish, organics or humus allowed;
2. Soil moisture: No rubber soil or airborne dust allowed;
◇ 12.1.009 MED 3 000000F
3. layer thickness: 300 mm (mechanical);
4. Density: In compliance with design requirements or not less than 90%;
5. Top level: Tolerance: 20 mm;
◇ 12.1.010 Check the smoothness of the base surface. The deviation must be ≤5mm MED 3 000000F
Check the appearance of the base: No concave, spongy surface, crack (crack on the surface ≤1mm),
◇ 12.1.011 MED 3 000000F
defects of appearance, and so on
The intensity of the concrete must meet the design requirements. The intensity after 28-day maintenance
◇ 12.1.012 MED 3 000000F
must not be less than C20.
The antistatic plate is pressed to make it flat at the four sides of the square compartment by using the hold-
◇ 12.1.013 MED 3 000000F
down strip of the plate and clinch bolts, and a conductor is formed.
The equipment room is installed properly and securely on its base, and the structure is kept intact without
◇ 12.1.014 MED 3 000000F
distortion
For the cement base on the floor: The distance to the floor, the intensity of the base and the levelness
◇ 12.1.015 deviation must conform to the design requirements. The levelness deviation of the base must be no more MED 3 000000F
than 3mm/m; For the overhead cement base:  Check
◇ 12.1.016 Grounding cables have been buried in advance as designed, and the records are complete. MED 3 000000F
Diesel generator foundation: The thickness is 3~4 times of the diameter of the cylinder of the diesel
◇ 12.1.017 MED 3 000000F
generator.
Diesel generator foundation: A sloping ground for cleaning must be available directly under the oil sump
◇ 12.1.018 tank on the central line of the crankshaft. In addition, there must be a ditch to discharge to the main MED 3 000000F
pollution discharge ditch.
Diesel generator foundation: The base must be surrounded by the cable ditch of diesel generator, oil and
◇ 12.1.019 MED 3 000000F
fuel pipe ditch (for the purpose of vibration isolation, antivibration and pollution discharge).
◇ 12.1.020 Diesel generator foundation: The base is flat and solid, and in good condition. MED 3 000000F
◇ 12.1.021 Soil or grass turfing as per requirement MED 3 000000F
◇ 12.1.022 Geologic survey report MED 3 000000F
◇ 12.1.023 Structural mechanical analysis report (applicable to roof site) MED 3 000000F
◇ 12.1.024 Backfill compactness inspection report MED 3 000000F
◇ 12.1.025 Raw material certificate and test report MED 3 000000F
◇ 12.1.026
◇ 12.1.027
◇ 12.1.028
◇ 12.1.029
◇ 12.1.030
◇ 12.1.031
◇ 12.1.032
◇ 12.1.033
◇ 12.1.034
◇ 12.1.035
◇ 12.1.036
◇ 12.1.037
◇ 12.1.038
◇ 12.1.039
◇ 12.1.040
Roof Site Foundation Work
◇ 12.2.001 Joint surface between new structure and old structure: Rough, clean, wet MED 3 000000F
◇ 12.2.002 Foundation position: In compliance with design requirements MED 3 000000F
◇ 12.2.003 Waterproof of roof: No leakage MED 3 000000F
◇ 12.2.004 Tensile strength of anchor bolt: In compliance with design requirements MED 3 000000F
◇ 12.2.005 Structure restoration: Complete and without trash MED 3 000000F
◇ 12.2.006 Foundation dimension: 10mm MED 3 000000F
◇ 12.2.007 Foundation level: 10mm MED 3 000000F
◇ 12.2.008
◇ 12.2.009
◇ 12.2.010
◇ 12.2.011
◇ 12.2.012
◇ 12.2.013
◇ 12.2.014
◇ 12.2.015
◇ 12.2.016
◇ 12.2.017
◇ 12.2.018
◇ 12.2.019
◇ 12.2.020
◇ 12.2.021
◇ 12.2.022
Site Final Surface
◇ 12.3.001 Material Specifications: In compliance with design requirements MED 3 000000F
◇ 12.3.002 Slope and level of base course: In compliance with design requirements MED 3 000000F
◇ 12.3.003 Top layer thickness: In compliance with design requirements MED 3 000000F
◇ 12.3.004 Surface plainness: In compliance with design requirements MED 3 000000F
◇ 12.3.005 Expansion joint: In compliance with design requirements MED 3 000000F
◇ 12.3.006 Overall appearance: Tidy and clean MED 3 000000F
◇ 12.3.007
◇ 12.3.008
◇ 12.3.009
◇ 12.3.010
◇ 12.3.011
◇ 12.3.012
◇ 12.3.013
◇ 12.3.014
◇ 12.3.015
◇ 12.3.016
◇ 12.3.017
◇ 12.3.018
◇ 12.3.019
◇ 12.3.020
◇ 12.3.021
Civil Work
◇ 12.4.001 Brick laying records MAJ 6 000000C
◇ 12.4.002 Check that the dimensions and azimuth of the equipment room meet the design requirements MAJ 6 000000C
◇ 12.4.003 Check the verticality of each wall. The allowable deviation is 10mm MAJ 6 000000C
◇ 12.4.004 Check that the location of the grounding copper busbar meet the design requirements MAJ 6 000000C
Smoothness of the surface (the allowable deviation for the cement mortar is 4mm; the allowable deviation
◇ 12.4.005 MED 3 000000F
for the terrazzo is 3mm; and the allowable deviation for the ground tile is 2mm)
The locations where the steel doors and windows and the direction towards which they are opened meet
◇ 12.4.006 MED 3 000000F
the design requirements
The levelness of the frames of doors and windows meet the design requirements (the allowable deviation is
◇ 12.4.007 MED 3 000000F
3mm)
◇ 12.4.008 Deviation of the two diagonals of the door and window frames (the allowable deviation is 5mm) MED 3 000000F
◇ 12.4.009 The walls of the equipment room is water resistant MED 3 000000F
The cabling rack is mounted securely and uprightly at the correct position and meets the design
◇ 12.4.010 MED 3 000000F
requirements
◇ 12.4.011 The fluorescent lamps and the switches are working MED 3 000000F
◇ 12.4.012 The period of validity of the portable extinguisher does not expire MED 3 000000F
◇ 12.4.013 The equipment room is clean and free of dust and sundries MED 3 000000F
Check the walls of the equipment room. The seam must be covered properly without holes or cracks. The
◇ 12.4.014 MED 3 000000F
paint for the inner wall must not be too dense and smooth
Some porous materials, such as cement, lime paste and wood dust, must be added in the painting material
◇ 12.4.015 MED 3 000000F
to absorb noise.
◇ 12.4.016 Sound isolation materials must be used as the ceiling board MED 3 000000F
Ventilation and cooling measures have been taken for the equipment room:  The location, dimensions and
◇ 12.4.017 installation technologies of each incoming air pipe and outgoing air pipe must conform to the design MED 3 000000F
drawings
◇ 12.4.018
◇ 12.4.019
◇ 12.4.020
◇ 12.4.021
◇ 12.4.022
◇ 12.4.023
◇ 12.4.024
◇ 12.4.025
◇ 12.4.026
◇ 12.4.027

04/24/2018 华为机密,未经许可不得扩散 第18页,共33页


385175546.xls 文档密级

◇ 12.4.028
◇ 12.4.029
◇ 12.4.030
◇ 12.4.031
◇ 12.4.032
Fence Installation
◇ 12.5.001 The specifications, dimensions and styles conform to the design requirements MAJ 6 000000C
◇ 12.5.002 It is vertical, flat and fastened MAJ 6 000000C
◇ 12.5.003 The coating of the Fence component complies with the design and specifications requirements MAJ 6 000000C
◇ 12.5.004 The spray paint of the Fence component complies with the design and specifications requirements MAJ 6 000000C
◇ 12.5.005 The doors and locks accord with requirements and works normally MAJ 3 000000F
◇ 12.5.006 Material: In compliance with design requirements MED 3 000000F
◇ 12.5.007 Gate: Can operate and be locked well MED 3 000000F
◇ 12.5.008 Fence installation: Reliably installed MED 3 000000F
◇ 12.5.009 Fence appearance: Tidy and clean MED 3 000000F
◇ 12.5.010 Construction of concrete foundation: In compliance with design requirements MED 3 000000F
◇ 12.5.011 Constructional Column: In compliance with design requirements MED 3 000000F
◇ 12.5.012
◇ 12.5.013
◇ 12.5.014
◇ 12.5.015
◇ 12.5.016
◇ 12.5.017
◇ 12.5.018
◇ 12.5.019
◇ 12.5.020
◇ 12.5.021
◇ 12.5.022
◇ 12.5.023
◇ 12.5.024
◇ 12.5.025
◇ 12.5.026

04/24/2018 华为机密,未经许可不得扩散 第19页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Shelter Room
Deviation of the outer dimensions of the box (length * width * height). Typically, the allowable deviation is +/-
◇ 13.1.001 MED 3 000000F
5mm
Deviation of the inner dimensions of the box (length * width * height). Typically, the allowable deviation is +/-
◇ 13.1.002 MED 3 000000F
10mm
◇ 13.1.003 The levelness of the equipment room meets the design requirements MED 3 000000F
◇ 13.1.004 The verticality of the equipment room meets the design requirements MED 3 000000F
Tongue and groove joint must be used for the joint between walls of the equipment room; the hold-down
◇ 13.1.005 strip is installed on the convex part on the top of the compartment, and all the seams are sealed with fluid MED 3 000000F
sealant. heads of split rivets are sealed with silica gel.
◇ 13.1.006 The walls of the equipment room is water resistant MED 3 000000F
◇ 13.1.007 The indoor conductive floor is flat; the rivet connection is secure, and there is no loose rivet, rust or crack MED 3 000000F
◇ 13.1.008 Door closers must be capable of closing the doors automatically MED 3 000000F
The locks is burglary-resistant and stainless. All doors and door locks are mounted, clear of deformation.
◇ 13.1.009 MED 3 000000F
The doors and locks function properly.
◇ 13.1.010 The cable fixing bracket for fixing outdoor optical cables and other accessories must be fastened MED 3 000000F
◇ 13.1.011 The period of validity of the portable extinguisher does not expire MED 3 000000F
◇ 13.1.012 The location of the feeder window meets the design requirements MED 3 000000F
◇ 13.1.013 The feeder window must be sealed to avoid water leakage MED 3 000000F
◇ 13.1.014 The fluorescent lamps and the switches are working MED 3 000000F
◇ 13.1.015 Obvious marks must be available in the monitoring box to avoid misoperation MED 3 000000F
The cabling rack is mounted securely and uprightly at the correct position and meets the design
◇ 13.1.016 MED 3 000000F
requirements
The cable trough is mounted securely and uprightly at the correct position and meets the design
◇ 13.1.017 requirements (wide cable troughs are mainly used for air-conditioner power cable, and narrow cable troughs MED 3 000000F
are used for cabling for the lighting system, ventil
◇ 13.1.018 The emergency lamps work normally MED 3 000000F
◇ 13.1.019 Check that the location of the grounding copper busbar meet the design requirements MED 3 000000F
The required model of the power distribution box is installed securely, and its location conforms to the
◇ 13.1.020 MED 3 000000F
design requirements
◇ 13.1.021 The related instructions and technical documentation are complete MED 3 000000F
◇ 13.1.022 No scratch, damage or rust on the appearance and inner wall of the equipment room MED 3 000000F
◇ 13.1.023 The equipment room is clean, free of dust and sundries MED 3 000000F
Installation of steel structure base
(1) The steel structure base in the equipment room is firmly fixed to the floor;
◇ 13.1.024 (2) The acceptability of installation of the steel structure base in the equipment room; MED 3 000000F
(3) The connecting bolts of the steel structure base in the equipment room are complete and tightened;
The steel structure base in the equipment room is firmly grounded.

Installation of wall structure


(1) The steel structure base in the equipment room is firmly fixed to the floor;
(2) The acceptability of installation of the steel structure base in the equipment room;
(3) The connecting bolts of the steel structure base in the equipment room are complete and tightened;
◇ 13.1.025 The steel structure base in the equipment room is firmly grounded. MED 3 000000F
(1) The wall structure must be installed vertically, clear of notable deformation, bump marks, and clean inside and
outside; the primary structure of the equipment room is complete, and clear of notable scratches, stains and cracks;
(2) The angle aluminum and connecting parts of the external corner angle are firmly and completely mounted to the wall.

Installation of roof plate


◇ 13.1.026 (1) The exposed parts of the roof plate are fully symmetrical, and clear of notable deformation; MED 3 000000F
(2) The roof plate is properly wrapped, with its water leading edge free from deformation.

Installation of indoor and outdoor cabling racks


(1) The indoor and outdoor cabling racks are properly installed and fixed, without notable distortion or deformation.
These racks are placed at appropriate heights above the ground and properly connected with the grounding copper
◇ 13.1.027 bars; MED 3 000000F
(2) The wiring grooves are properly mounted at a height as required by project specifications. Wires are properly
arranged and bundled.

Lamps, sockets and switches are firmly and properly fixed; sockets and lighting equipment are correctly
◇ 13.1.028 MED 3 000000F
installed; switches function properly.
◇ 13.1.029 Cabling holes of air-conditioner: All cabling holes are watertight. MED 3 000000F
◇ 13.1.030 ITS overall appearance: Overall appearance of the equipment room is in good condition. MED 3 000000F
◇ 13.1.031
◇ 13.1.032
◇ 13.1.033
◇ 13.1.034
◇ 13.1.035
◇ 13.1.036
◇ 13.1.037
◇ 13.1.038
◇ 13.1.039
◇ 13.1.040
◇ 13.1.041
◇ 13.1.042
◇ 13.1.043
◇ 13.1.044
◇ 13.1.045

04/24/2018 华为机密,未经许可不得扩散 第20页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Microwave Installation
◇ 14.1.001 Check Antenna(s) Polarization according to the Plant documentation MAJ 2 000000G
◇ 14.1.002 Check ODU(s) and pole mounting position according to the plant documentation MAJ 2 000000G
◇ 14.1.003 The fixation of antenna is reliable and accords with windproof requirements of the engineering design MAJ 2 000000G
document.
◇ 14.1.004 Check IDU/ODU Cable(s) Grounding MAJ 1 000000I
◇ 14.1.005 Check ODU RF Coupler Grounding MAJ 1 000000I
◇ 14.1.006 The installation position of antenna accords with the engineering design document. MED 1 000000I
All connecting bolts in the rack and antenna are installed correctly and firmly. Flat washers and spring
◇ 14.1.007 MED 1 000000I
washers are installed in a correct order.
◇ 14.1.008 The parts of the rack and antenna must not be distorted. Which may affect the equipment appearance. MED 1 000000I
◇ 14.1.009 Structure for the support of the ODU and antenna correctly installed and oriented to the required direction. MED 1 000000I
The connector between feeder and antenna, ODU and IF cable must be connected reliably and the water-
◇ 14.1.010 MED 1 000000I
proof treatment must be well.
◇ 14.1.011 The direction up or down of antenna must be correctly installed. MED 1 000000I
◇ 14.1.012 The direction up or down of antenna’s logo must be correctly installed. MED 1 000000I
◇ 14.1.013 The installation position of rack accords with the engineering design document. MED 0.5 000000J
◇ 14.1.014 The mechanical accessories of rack and antenna must be installed correctly. MED 0.5 000000J
The matter that is paint break off and scratch and smear can not appear on rack and antenna. Which may
◇ 14.1.015 MIN 0.2 000000L
affect the equipment appearance. Otherwise the equipment must be repainting and cleaned.
◇ 14.1.016
◇ 14.1.017
◇ 14.1.018
◇ 14.1.019
◇ 14.1.020
◇ 14.1.021
◇ 14.1.022
◇ 14.1.023
◇ 14.1.024
◇ 14.1.025
◇ 14.1.026
◇ 14.1.027
◇ 14.1.028
◇ 14.1.029
◇ 14.1.030

04/24/2018 华为机密,未经许可不得扩散 第21页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Warning system
Access control switch (Hall switch): When the door is open, the access control switch gives a signal, and the
◇ 15.1.001 MAJ 6 000000C
system generates an access control alarm.
A smoke sensor is installed firmly at the proper position. When it detects smoke, the system generates a
◇ 15.1.002 MAJ 6 000000C
smoke alarm and the ventilation system begins to work
A temperature sensor is installed firmly at the proper position. Two temperature sensors are installed in the
◇ 15.1.003 square compartment to detect the temperatures at two points in the square compartment and take the MAJ 6 000000C
average of two values as the temperature input
◇ 15.1.004 A water sensor is installed firmly at the proper position. MAJ 6 000000C
◇ 15.1.005 An anti-theft infrared sensor is installed firmly at the proper position. MAJ 6 000000C
Operating conditions of the environment monitor: Check parameter settings and operating conditions. The
◇ 15.1.006 MED 3 000000F
environment monitor and air-conditioning controllers are functional.
◇ 15.1.007 The warning cables are arranged neatly in compliance with the technical requirements MED 3 000000F
◇ 15.1.008 The cable tags are complete, satisfying the requirement from customers and attached properly MED 3 000000F
◇ 15.1.009 The related instructions and technical documentation are complete MED 3 000000F
The alarm monitoring system delivered by the company, including storage battery, row and column alarm
◇ 15.1.010 MED 3 000000F
and so on, is connected in a reliable way and works normally.
Installation of environment monitor: The environment monitor is installed to specific project requirements; the monitor is
◇ 15.1.011 properly connected and clearly labeled. MED 3 000000F
◇ 15.1.012 Sensor installation and wiring conditions: All sensors are properly installed, wired and clearly labeled. MED 3 000000F
◇ 15.1.013
◇ 15.1.014
◇ 15.1.015
◇ 15.1.016
◇ 15.1.017
◇ 15.1.018
◇ 15.1.019
◇ 15.1.020
◇ 15.1.021
◇ 15.1.022
◇ 15.1.023
◇ 15.1.024
◇ 15.1.025
◇ 15.1.026
◇ 15.1.027

04/24/2018 华为机密,未经许可不得扩散 第22页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Solar Energy Installation
◇ 16.1.001 Rust prevention measures must be taken for the used metal materials MED 3 000000F
The levelness deviation of the rack base must be no more than 3mm/m. Iron gaskets must be used to level
◇ 16.1.002 MED 3 000000F
the base if necessary
During installation of components, washers must be added to all the bolts on the rack and the bolts must be
◇ 16.1.003 MED 3 000000F
tightened
◇ 16.1.004 After the rack has been installed, the area with damaged paint film must be painted again MED 3 000000F
The adjustment mechanism of the tilt angle-adjustable rack can be rotated flexibly, and butter must be
◇ 16.1.005 MED 3 000000F
added to the hinges
◇ 16.1.006 The rack is grounded properly and a lightning-proof device is installed MED 3 000000F
◇ 16.1.007 After components have been installed, the glasses on the surface must not suffer scratch or damage MED 3 000000F
All the screws that attach the components to the rack must be tightened, and anti-loosing measure must be
◇ 16.1.008 MED 3 000000F
taken as designed
◇ 16.1.009 The components must be installed on the flat surface on the rack MED 3 000000F
◇ 16.1.010 The distance between sub-arrays on the battery board must be no less than 30cm MED 3 000000F
The duct spacing between components on the rack and the spacing between racks must be ≥8mm or
◇ 16.1.011 MED 3 000000F
conform to the requirement specified by the manufacturer
The wire from the outlet of the junction box of the component must bent downwards, so that no water flows
◇ 16.1.012 MED 3 000000F
into the junction box
The connecting wires for the components and cables from the square matrix must be fastened or bound on
◇ 16.1.013 MED 3 000000F
the rack using fixing clips
Upon completion of square matrix cabling and detection, the covers on all the junction boxes must be
◇ 16.1.014 MED 3 000000F
closed and locked
◇ 16.1.015 There is no obstacle before the square matrix MIN 1 000000I
The azimuth and the tilt angle of the square matrix rack must meet the design requirements. If there are no
◇ 16.1.016 such requirements, the north semisphere must be placed southward (the south semisphere placed MIN 1 000000I
northward), the angle ranges 33-46.5 degrees, and the
◇ 16.1.017
◇ 16.1.018
◇ 16.1.019
◇ 16.1.020
◇ 16.1.021
◇ 16.1.022
◇ 16.1.023
◇ 16.1.024
◇ 16.1.025
◇ 16.1.026
◇ 16.1.027
◇ 16.1.028
◇ 16.1.029
◇ 16.1.030
◇ 16.1.031

04/24/2018 华为机密,未经许可不得扩散 第23页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Air conditioner
◇ 17.1.001 The location of the air conditioner meets the design requirements. MAJ 6 000000C
◇ 17.1.002 After power-on, the air conditioner is working without any stray noise. MAJ 6 000000C
Check various parts of the air conditioner with eyes. The surfaces of plastic parts must be smooth, and their
◇ 17.1.003 MED 3 000000F
colors are uniform.
Check various parts of the air conditioner with eyes. The surfaces of electroplated parts must be smooth
◇ 17.1.004 MED 3 000000F
without any such defects as paint peel-off, exposed paint base or scratches.
Check various parts of the air conditioner with eyes. The surfaces of spray-coated parts must be free of
◇ 17.1.005 MED 3 000000F
bubble, trace of paint flow, unpainted area, exposed paint base, concave or convex areas.
Select a refrigerant pipe that matches the equipment, and take thermal retardation measures using
◇ 17.1.006 MED 3 000000F
insulating sleeves which stand high temperatures.
The joint between the refrigerant pipe and the outdoor equipment must be tightened and do not suffer water
◇ 17.1.007 MED 3 000000F
leakage.
After the power cable and refrigerant pipe have been connected, they must be wrapped with insulation strap
◇ 17.1.008 MED 3 000000F
in the spiral manner evenly, without any breakage.
The pipe and cables for the air conditioner must be inserted into a sleeve when passing through walls, and
◇ 17.1.009 MED 3 000000F
must be insulated and supported properly. The connecting pipe must not be bent.
◇ 17.1.010 The surface that will hold the outdoor equipment must be firm enough. MED 3 000000F
The outdoor equipment must be placed in a protection bracket that prevents the equipment from being
◇ 17.1.011 MED 3 000000F
stolen.
There must be certain spacing between the four sides of the outdoor equipment and the nearest objects,
◇ 17.1.012 MED 3 000000F
and no obstacles at the air discharge mouth of the outdoor equipment.
◇ 17.1.013 The related instructions and technical documentation are complete. MED 3 000000F
Installation of air-conditioning controller: The air-conditioner controller is installed to specific project requirements; the
◇ 17.1.014 controller is properly connected and clearly labeled. MED 3 000000F
◇ 17.1.015 Air-conditioning test: The air-conditioner is functional; the parameters are correctly configured. MED 3 000000F
Start and shutdown of an air-conditioner: The air-conditioner starts and stops running when the temperature reaches its
◇ 17.1.016 starting point and shutdown point. MED 3 000000F
◇ 17.1.017 Air-conditioner power-on test: The air-conditioner restarts automatically and keeps running. MED 3 000000F
◇ 17.1.018 Switch of air-conditioner: The air-conditioner switches properly. MED 3 000000F
Operation of two air-conditioners: The two air-conditioners operate at the same time and the environment monitor
◇ 17.1.019 displays a high temperature alarm message. MED 3 000000F
Installation of ventilation unit and wiring conditions: The unit is installed in position in compliance with the design and
◇ 17.1.020 project requirements; the unit is firmly installed and connected properly and reliably. MED 3 000000F
◇ 17.1.021 Ventilation unit: The ventilation unit functions properly; the parameters are configured correctly. MED 3 000000F
Start and shutdown of the temperature controlled ventilation unit: When the temperature rises to its starting point, the
ventilation unit starts; when the temperature drops to its shutdown point, the ventilation unit stops working; when the
◇ 17.1.022 temperature drops below its shutdown point, the ventilation unit still operates; when the temperature drops below its MED 3 000000F
starting point, the ventilation unit stops working.
◇ 17.1.023
◇ 17.1.024
◇ 17.1.025
◇ 17.1.026
◇ 17.1.027
◇ 17.1.028
◇ 17.1.029
◇ 17.1.030
◇ 17.1.031
◇ 17.1.032
◇ 17.1.033
◇ 17.1.034
◇ 17.1.035
◇ 17.1.036
◇ 17.1.037

04/24/2018 华为机密,未经许可不得扩散 第24页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Diesel Generatior Common
Vibration isolation measures have been taken for the diesel generator unit: For the wind cooling unit, rubber
damping rings and washers are respectively added to the joint between the foot of the diesel generator and
◇ 18.1.001 the base and the joint between the foot of the electric generator and the base. For the water cooling unit, MED 3 000000F
10mm-thick oil-proof rubber sheets are placed under the water tank only. However, no shock absorbers are
added between the diesel generator and the base and between the electric generator and the base
The spacing between various sides (except the side of the water tank) diesel generator and the walls of the
◇ 18.1.002 MED 3 000000F
equipment room or other equipment must be ≥1.5m
The distance between the top of the diesel generator unit and the ceiling of the equipment room must be
◇ 18.1.003 MED 3 000000F
≥1.5m
◇ 18.1.004 The unit must have a clean surface MED 3 000000F
◇ 18.1.005 No nut or screw comes loose MED 3 000000F
◇ 18.1.006 There is no oil leakage in the oil pipe and connector and no water leakage at the connector of water pipe. MED 3 000000F
◇ 18.1.007 When you press at the middle of the driving belt, the belt must go down 10~15mm MED 3 000000F
◇ 18.1.008 Each electric wire is connected securely and the wiring points are not oxidized or dirty. MED 3 000000F
The oil tank is installed and fixed, the grounding system is working, and the quantity of injected fuel
◇ 18.1.009 MED 3 000000F
complies with the requirements
◇ 18.1.010 Each component of the diesel engine is in good condition. MED 3 000000F
◇ 18.1.011 Auxiliary equipment such as the oil tank, ATS, and ACDB are in good condition. MED 3 000000F
◇ 18.1.012 The diesel engine is firmly fixed on the base and properly grounded. MED 3 000000F
◇ 18.1.013 The oil tank, ATS, ACDB are firmly installed and properly grounded. MED 3 000000F
◇ 18.1.014
◇ 18.1.015
◇ 18.1.016
◇ 18.1.017
◇ 18.1.018
◇ 18.1.019
◇ 18.1.020
◇ 18.1.021
◇ 18.1.022
◇ 18.1.023
◇ 18.1.024
◇ 18.1.025
◇ 18.1.026
◇ 18.1.027
◇ 18.1.028
Check the installation of AC generator:
The copper connector is attached firmly to the busbar and various busbars are fastened (spacing ≤
◇ 18.2.001 MAJ 6 000000C
0.05mm), and the spacing between conducting wires is ≥10mm
◇ 18.2.002 The air filter must be clean MED 3 000000F
◇ 18.2.003 A temperature sensor must be installed properly on the stator winding near the air outlet MED 3 000000F
◇ 18.2.004 A condensation prevention heater must be installed properly in the groove of the rib inside the stator frame MED 3 000000F
◇ 18.2.005 Cables and oil pipes are properly arranged. MED 3 000000F
◇ 18.2.006
◇ 18.2.007
◇ 18.2.008
◇ 18.2.009
◇ 18.2.010
◇ 18.2.011
◇ 18.2.012
◇ 18.2.013
◇ 18.2.014
◇ 18.2.015
◇ 18.2.016
◇ 18.2.017
◇ 18.2.018
◇ 18.2.019
◇ 18.2.020
Check the AC control panel (when the diesel generator is shut down): 
Various switches and buttons are working well and have good appearance. The pointer is set to zero. Each
◇ 18.3.001 MED 3 000000F
device is installed firmly and the correct models are used.
The wire connection for the primary and secondary circuits of the control panel are correct and reliable, not
◇ 18.3.002 disconnected or shortcircuited. The numbers at both ends of the wire for the secondary circuit must match MED 3 000000F
the scheme of wiring.
The plugs and terminals of the master control panel and the slave control panel, the unit, and the self-
◇ 18.3.003 MED 3 000000F
control board that must be connected are connected firmly and reliably
◇ 18.3.004 All power cables are firmly connected and clearly labeled. MED 3 000000F
◇ 18.3.005
◇ 18.3.006
◇ 18.3.007
◇ 18.3.008
◇ 18.3.009
◇ 18.3.010
◇ 18.3.011
◇ 18.3.012
◇ 18.3.013
◇ 18.3.014
◇ 18.3.015
◇ 18.3.016
◇ 18.3.017
◇ 18.3.018
◇ 18.3.019
Check the operation of the electric generating set:
◇ 18.4.001 The diesel generator can be started manually and runs at the full speed MED 3 000000F
When the main is cut, the diesel generator can operate automatically; When the main is supplied again, the
◇ 18.4.002 MED 3 000000F
diesel generator must run at the idling speed immediately and shut down automatically 3 minutes later
◇ 18.4.003 The warning circuit can drive the warning bell properly MED 3 000000F
When the control switch is set to "Trial" status on the AC control panel, the diesel generator can start to
◇ 18.4.004 work immediately; When it is set to "Emergency" status, it must run at the idling speed immediately and shut MED 3 000000F
down 3 minutes later
When the unit automatically starts to generate electricity, if the electric generator is overloaded and the
overcurrent switch is off, the diesel generator must run at the idling speed automatically and give audible
◇ 18.4.005 MED 3 000000F
and visual alarms. If the fault is eliminated within 3 minutes, it supplies the power automatically. Otherwise,
it shuts down automatically
◇ 18.4.006 The related instructions and technical documentation are complete MED 3 000000F
◇ 18.4.007 The 3-phase output voltage, frequency, rotation, water temperature and oil pressure are all normal. MED 3 000000F
◇ 18.4.008 The emergency stop button functions properly. MED 3 000000F
◇ 18.4.009 The site where the diesel engine is located is tidy and clean. MED 3 000000F
◇ 18.4.010
◇ 18.4.011
◇ 18.4.012
◇ 18.4.013
◇ 18.4.014
◇ 18.4.015
◇ 18.4.016
◇ 18.4.017
◇ 18.4.018
◇ 18.4.019
◇ 18.4.020
◇ 18.4.021
◇ 18.4.022
◇ 18.4.023
◇ 18.4.024

04/24/2018 华为机密,未经许可不得扩散 第25页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Site Clean
Retain the additional engineering material for future use. There couldn’t waste or throw away the
◇ 19.1.001 MAJ 2 000000G
engineering material optionally.
The signal cables for future capacity expansion must be tied to or inserted into the reserved position inside
◆ 19.1.002 MED 0.2 000000L
an expansion cabinet. For easy to maintenance and expansion and avoid to lose.
◇ 19.1.003 The connectors have not been used must be protected with protection cap. MED 0.2 000000L
The floor gaps around the rack should be blocked up. Discarded cable ties, screws and other sundries
◇ 19.1.004 MIN 0.2 000000L
should not be found under the floor.
The equipment room should be neatness and tidy. Discarded packing materials should be cleaned. Spare
◆ 19.1.005 MIN 0.2 000000L
parts should be arranged in a tidy way after installation.
◇ 19.1.006
◇ 19.1.007
◇ 19.1.008
◇ 19.1.009
◇ 19.1.010
◇ 19.1.011
◇ 19.1.012
◇ 19.1.013
◇ 19.1.014
◇ 19.1.015
◇ 19.1.016
◇ 19.1.017
◇ 19.1.018
◇ 19.1.019
◇ 19.1.020

04/24/2018 华为机密,未经许可不得扩散 第26页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Final Inspection
The self-inspection report is archived. The engineering supervisor must hand in the self-inspection report of
◇ 20.1.001 MAJ 4 000000E
engineering hardware quality.
◇ 20.1.002 Extra points will be deducted for each class-A problem found during the spot check. MAJ 2 000000G
The project should be implemented in compliance with related standards of construction behaviors, safety in
◇ 20.1.003 MAJ 2 000000G
production, power supply operations and equipment room of the customer.
◇ 20.1.004 The engineering supervisor must upload the completion photographs for the BTS along with Hardware Self- MAJ 2 000000G
Check Report to the EPMS system.
◇ 20.1.005 Lock rack door MED 1 000000I
◇ 20.1.006 Lock site door MED 1 000000I
◇ 20.1.007 Equipment missing MED 1 000000I
◇ 20.1.008 Equipment damaged MED 1 000000I
The items to be evaluated but not to be mentioned in this table:
1. According to the engineering design document
◇ 20.1.009 2. Referring to the installation manual MED 0.5 000000J
3. The requirements to be negotiated with customers before installation.
◇ 20.1.010 The alarm monitoring system is normal in test. It should not has any alarm when it runs normally. MED 0.5 000000J
◇ 20.1.011 The power-on hardware test of equipment is normal. MED 0.5 000000J
◇ 20.1.012 Fire safety system installation: Fire safety signs are clear, and hand extinguishers are firmly fixed. MED 0.5 000000J
◇ 20.1.013
◇ 20.1.014
◇ 20.1.015
◇ 20.1.016
◇ 20.1.017
◇ 20.1.018
◇ 20.1.019
◇ 20.1.020
◇ 20.1.021
◇ 20.1.022
◇ 20.1.023
◇ 20.1.024
◇ 20.1.025
◇ 20.1.026
◇ 20.1.027

04/24/2018 华为机密,未经许可不得扩散 第27页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Equipment Working Enviorment
◇ 21.1.001 Parameter of power in the equipment room can assure equipments running safety for long time. MIN 0.2 000000L
The cable distribution frame must be grounded firmly. The shielding layer of subscriber external cable must
◇ 21.1.002 MIN 0.2 000000L
be grounded.
Protection grounding cable must be connected firmly, grounding mode for equipment room must be selected
◇ 21.1.003 MIN 0.2 000000L
jointed gronding.
◇ 21.1.004 The joint grounding resistance value must be satisfied the design requirements. Generally, it must be less MIN 0.2 000000L
than 10 ohm,
The radius and power supply mode of PGND cable, GND cable of primary power and -48V power cable that
◇ 21.1.005 connected to PDF or distribution power box are according to engineering design document. They can MIN 0.2 000000L
assure equipment running safely and expansion request.
◇ 21.1.006 PDF and primary power output current-limiting fuse must be as specified. MIN 0.2 000000L
◇ 21.1.007 Power cable arrangement outside must avoid impracticable into equipment room and must be protected MIN 0.2 000000L
lightning.
◇ 21.1.008 Condition of equipment room can assure equipments running safety for long time. MIN 0.2 000000L
The ODF must be connected to the protection ground. The wire used to increase the strength of an optical
◇ 21.1.009 MIN 0.2 000000L
cable must also be connected to the protection ground.
◇ 21.1.010 Fireproof measures must be adopted in the equipment room. MIN 0.2 000000L
◇ 21.1.011 Corresponding antistatic measures must be adopted in the equipment room. MIN 0.2 000000L
The earthquake-proof, lightning-proof protection and bearing measures of equipment room must meet the
◇ 21.1.012 MIN 0.2 000000L
requirements of construction and long-term safe operation.
◇ 21.1.013 The equipment room must be far away from any strong electric field, intense magnetic field, powerful MIN 0.2 000000L
electric wave, and high heat source. It also needs to meet the electromagnetic requirements.
◇ 21.1.014 The phase of AC power supply must accord with safety requirement of equipment operation. MIN 0.2 000000L
◇ 21.1.015 The cascade connection is prohibited for the AC socket. MIN 0.2 000000L
The related parameters of AC power supply must accord with the requirements of long-term safe operation.
◇ 21.1.016 The AC power supply system in the equipment room must contain a lightning-proof protection unit that is MIN 0.2 000000L
earthed firmly.
The temperature and humidity of the equipment room must meet the requirements of long-term safe
◇ 21.1.017 MIN 0.2 000000L
operation.
◇ 21.1.018 The cleanliness of the equipment room must meet the requirements of long-term safe operation. MIN 0.2 000000L
The DC voltage and capacity provided by the equipment room must meet the requirements of long-term
◇ 21.1.019 MIN 0.2 000000L
safe operation.
Wireless Base Station Environment
Generally, the grounding resistance value of base station must be less than 5 ohm. However, in the areas
◇ 21.1.020 where thunderstorm days the grounding resistance value of base station must be less than 20, the MIN 0.2 000000L
grounding resistance value of base station must be less than 10 ohm.
The E1 cable of base station must not be overhead. If the E1 cable is overhead, protection measures must
◇ 21.1.021 MIN 0.2 000000L
be adopted.
◇ 21.1.022 The low-voltage electric power cable of base station must be buried in the ground. MIN 0.2 000000L
◇ 21.1.023 When transmission equipment uses an HDSL built in a working box, a lightning-proof protection arrester MIN 0.2 000000L
must be installed correctly before a cable is led out or in from this equipment.
When installing a wire pole, the platform beam and the grounding flat iron of lightning rod must be soldered
◇ 21.1.024 MIN 0.2 000000L
together.
The site must not be established in the circumstances in which temperature is high, atmospheric pressure is
◇ 21.1.025 low, there is harmful gas, and inflammable and explosive materials exist nearby. It must not established in MIN 0.2 000000L
the places where strong shock or high noise often happens, or a substation exists.
When the grounding body of a mobile base station is installed indoor, its equipotential connection must
◇ 21.1.026 comply with Lightning-proof Protection Grounding Specifications of Mobile Base Stations of Ministry of MIN 0.2 000000L
Information Industry.
◇ 21.1.027
◇ 21.1.028
◇ 21.1.029
◇ 21.1.030
◇ 21.1.031
◇ 21.1.032
◇ 21.1.033
◇ 21.1.034
◇ 21.1.035
◇ 21.1.036
◇ 21.1.037
◇ 21.1.038
◇ 21.1.039
◇ 21.1.040
◇ 21.1.041

04/24/2018 华为机密,未经许可不得扩散 第28页,共33页


1 Implementing Rules:
Installation completion reports signed by customers for the sale of equipment that normally require
installation should contain all of the following elements so as to meet the conditions for income verification,
otherwise, they would be deemed as nonconforming ones:
A. Contract Number:
Contract number refers to the original number of contract signed with the customer that complies with the
rules of 14-digit code for contracts of Huawei. When the original contract is a goods loan contract or agency
contract: 385175546.xls 文档密级
If the installation reports are signed before the Sales from Converted Loan Goods, it is required to fill in the
number of the goods loan contract;
Select Code If the installation reports are signed after the Sales from Converted Loan Goods, it is required to fill in the
Standard Category Sore EPMS Input
number of the sales contract and the number of the goods loan contract corresponding to the sales
Landmark documents for projects refer to installation completion reports, preliminary acceptance test (PAT)
contract;
reports
In case and
of anfinal
agencyacceptance
contracttest (FAT)
signed reports
with signedit by
the agent, customers
is required in the
to fill process
in the number of of
delivery of projects.
the agency
Rules for Standardization
contract.
Installation
B. Name of the Completion
Customer: Reports
It refers to the full name of the customer provided in the contract signed with Huawei.
C. Information about Independent Commercial Stations or Projects Whose Installation Has Been
Completed:
Such information refers to information about equipment configuration for completed stations or projects
mentioned in the installation completion reports. Specific requirements are as follows:
a) Information about equipment configuration includes particulars of corresponding products, configuration
units, quantity, etc.
b) Information about equipment configuration should be in accord with information in the EPMS system.
◇ 22.1.001 MAJ 2 000000G
Remarks:
① Partial completion: Information about equipment configuration in the installation completion report should
be in accord with information about equipment configuration in the completion order recorded in the EPMS
system.
② Total completion: Information about equipment configuration in the installation completion report should
be in accord with information about equipment configuration for the project recorded in the EPMS system.
D. Signature or Stamped Signature of the Customer:
a) Installation completion reports of sub-regional divisions in China should be provided with both the
signature of the specific operator authorized by the customer and the official seal of the customer;
2 Requirements
installation completionfor Time Limit
reports for EPMS:
of other sub-regional divisions should be provided with the signature of the
Recording of completion
specific operator authorized progress:
by the Itcustomer;
is required to record the actual completion date in the EPMS within five
days
b) Theafter the customer
customer that signssignsthethe installation
report should be completion
the directreport,
ownerand it is forbidden
or relevant to record
supervisor of theinformation
project among
about
customerscompletion
that have in EPMS
signedincontracts
advancewith before the customer signs the installation completion report.
Huawei.
Uploading
Remarks: of completion reports: It is required to upload the installation completion reports to EPMS within
three daysDept
The Audit aftershall
the actual
audit thecompletion
authenticitydates of are
the recorded.
signature of the customer irregularly.
◇ 22.1.002 Checking
E. Date onand filingthe
Which of documents:
Installationfiling documents
Completion in EPMS
Report and CEAS within 30 days after the actual
Is Signed: MAJ 2 000000G
completion.
It refers to the date when the customer signs the installation completion report. The actual completion date
Access
recordedtoinStandard
EPMS should Templates of Installation
be in accord with the date Completion
when theReports:
installation completion report is signed.
A. In EPMS, there are standard document templates for download that are made for the project and comply
F. Others:
with the elements of income verification. Users can modify and print the documents
In case that there are special opinions given by the customer in the installation completion report which according to the actual
conditions
influences of thecompletion.
judgment of whether the installation of projects has been completed, the installation
B. There arereport
completion standard shallblank templates
be deemed for download onAs
as nonconforming. thea Support
result, thewebsite.
document cannot pass the
examination and verification, the income cannot be verified and the installation completion report should be
re-signed.
3 Relevant Owners:
Owner: head of Delivery Service Dept of sub-regional divisions
Owners of different links:
Authors of installation completion reports: engineers (including those of Huawei and Cooperation
Partners) and clerks
Signers of installation completion reports: owners of projects (including those of Huawei and
◇ 22.1.003 Cooperation Partners) MAJ 2 000000G
Recording of completion progress in EPMS: engineers (including those of Huawei and Cooperation
Partners)
1 and clerks
Implementing Rules:
Uploading of
Preliminary scanned test
acceptance copyreports
of installation
signed bycompletion
the customer reports
shouldto EPMS:allengineers
contain (including
of the following those so
elements of
Huawei
as andthe
to meet Cooperation
conditions Partners)
for invoicing, andpayment
clerks or income verification:
Examination
A. and verification of installation completion reports in EPMS: documentation controllers of
Contract Number:
sub-regional
a) divisions
If the customer approves the internal contract number of Huawei, it is required to provide the internal
contract number of Huawei and contract number / PO number of the customer. If it is impossible to list all
Rules forofStandardization
numbers PO in the preliminary acceptance test reports due to the great number of the customer’s PO, it
is required to give explanations in attachment; Preliminary Acceptance Test (PAT) Reports
b) If the customer does not approve the internal contract number of Huawei, it is allowed to provide the
contract number (or PO number) of the customer only, but required to indicate the internal contract number
of Huawei in the copy of the preliminary acceptance test reports.
B. Name of the Customer:
It refers to the full name of the customer provided in the contract signed with Huawei.
C. Contract Name:
It refers to the full name of the contract provided in the contract signed with Huawei.
D. Date of Actual Acceptance Test:
◇ 22.1.004 The date when the project actually passes the acceptance test should be listed in the main body of the MAJ 2 000000G
preliminary acceptance test report and the actual date of PAT recorded in EPMS should be in accord with
the date of actual passed acceptance test in the report.
E. Signature or Stamped Signature of the Customer:
a) PAT reports of sub-regional divisions in China should be provided with both the signature of the specific
operator authorized by the customer and the official seal of the customer; PAT reports of other sub-regional
divisions should be provided with the signature of the specific operator authorized by the customer;
b) The customer that signs the report should be the direct owner or relevant supervisor of the project among
customers that have signed contracts with Huawei.
Remarks:
2
TheRequirements
Audit Dept shall for audit
Timethe Limit for EPMS:
authenticity of the signature of the customer irregularly.
Recording
F. Date When of PAT
the progress:
PAT Report It isIsrequired
Signed:to record the date when the customer signs for the PAT in the
EPMS
It referswithin
to thefive
date days
whenafter
thethe customer
customer signs
signs thethe
PAT PAT report,
report. and
The dateit iswhen
forbidden to recordsigns
the customer information
for the PAT
about
recorded completion
in EPMSofshould PAT inbe EPMS in advance
in accord with thebefore the customer
date when signs signs
the customer the PAT
thereport.
PAT report.
Uploading
G. Others: of PAT reports: It is required to upload PAT reports to EPMS within three days after the date
◇ 22.1.005 when the customer
It is required to provide signs the PAT isabout
information recorded.
stations corresponding to the report in attachment for the MAJ 2 000000G
Access
acceptance to Standard Templatebut
test of substations of not
PATforReports:
the acceptance test for the whole contract.
A. In EPMS, there are standard document templates for download that are made for the project and comply
with the financial elements. Users can modify and print the documents according to the actual conditions of
completion;
B. There are standard blank templates for download on the Support website.
3 Owners
Owner: head of Delivery Business Dept of sub-regional divisions
1 Implementing
Owners Rules:
of different links:
Final
Authors acceptance test reports
of PAT reports: signed (including
engineers by the customer should
those of Huaweicontain all of the following
and Cooperation elements
Partners) so as to
and clerks
meet
Signers the of
conditions for invoicing,
PAT reports: owners payment
of projectsor(including
income verification:
those of Huawei and Cooperation Partners)
◇ 22.1.006 A. Contract Number: MAJ 2 000000G
Recording of PAT progress in EPMS: engineers (including those of Huawei and Cooperation Partners)
a)
andInclerks
case of acceptance test for the whole contract, it is required to provide both the number of contract (or
PO) signed of
Uploading with the customer
scanned copy of and internal
PAT reportscontract number
to EPMS: of Huawei
engineers at the same
(including thosetime;
of Huawei and
b) In case of Partners)
Cooperation acceptance test
and of PO provided in the contract, it is required to provide the internal contract
clerks
number of Huawei and indicate the number of the customer’s PO in the FAT report (If it is impossible to give
clear indication of all numbers of PO in the FAT reports due to the great number of the customer’s PO, it is
Rules For Standardization
required to list them in attachment);
Final Acceptance Certificate
c) If the customer does not approve the internal contract number of Huawei and refuses to sign, it is allowed
to provide the contract number (or PO number) of the customer only, but required to indicate the internal
contract number of Huawei in the copy of the FAT reports.
B. Name of the Customer:
It refers to the full name of the customer provided in the contract signed with Huawei.
C. Date of Actual Acceptance Test:
◇ 22.1.007 The date when the project actually passes the acceptance test should be listed in the main body of the FAT MAJ 2 000000G
report. The actual date of FAT recorded in EPMS should be in accord with the date of actual passed
acceptance test.
D. Signature or Stamped Signature of the Customer:
a) FAT reports of sub-regional divisions in China should be provided with both the signature and the official
seal of the customer; FAT reports of other sub-regional divisions should be provided with the signature of
the customer;
b)Requirements
2 The customer that signs Limit
for Time the report should be the direct owner or relevant supervisor of the project among
for EPMS:
customers of
Recording that
FAThave signed Itcontracts
progress: is requiredwithtoHuawei.
record the date when the customer signs the FAT in the EPMS
Remarks:
within five days after the FAT report is signed.
The Audit Dept
Uploading of FATshall audit Itthe
reports: is authenticity of the signature
required to upload FAT reportsof the customer
to EPMS withinirregularly.
three days after the date when
E. Date
the Whensigns
customer the FAT Report
the FAT Is Signed:
is recorded.
◇ 22.1.008 It refers to the date when the customer signs the FAT report. The date when the customer signs for the FAT MAJ 2 000000G
Access to Standard Template of FAT Report:
recorded
A. In EPMS, in EPMS should
there are be in accord
standard document withtemplates
the date when the customer
for download signs
that are made thefor
FATthereport.
project and comply
F. Others:
with the financial elements. Users can modify and print the documents according to the actual conditions of
It is required to provide information about stations corresponding to the report in attachment for the
completion;
acceptance
B. There aretest of substations
standard but not for
blank templates for the acceptance
download on thetest for thewebsite.
Support whole contract.

3 Owners
Owner: head of Delivery Business Dept of sub-regional divisions
Owners of different links:
Authors of FAT reports: engineers (including those of Huawei and Cooperation Partners) and clerks
Signers of FAT reports: owners of projects (including those of Huawei and Cooperation Partners)
◇ 22.1.009 MAJ 2 000000G
Recording of FAT progress in EPMS: engineers (including those of Huawei and Cooperation Partners)
and clerks
Uploading of scanned copy of FAT reports to EPMS: engineers (including those of Huawei and
Cooperation Partners) and clerks

Business Bascal Documents


◇ 22.1.010 Put in effective Site Quality Report and the photographs of sites evry weekly MAJ 1 000000I
◇ 22.1.011 Put in project quality weekly report MAJ 1 000000I
◇ 22.1.012 Put in monthly quality report of the region, representative and project MAJ 1 000000I
◇ 22.1.013 Put in training report of the region, represdentive and project monthly MAJ 1 000000I
◇ 22.1.014 Put in the regional engineering auditing report monthly MAJ 1 000000I
◇ 22.1.015 put in regional regular quality meeting report monthly MAJ 1 000000I
◇ 22.1.016 Whether have network plane MAJ 1 000000I
◇ 22.1.017 Whether have enginerring design MAJ 1 000000I
◇ 22.1.018 Whether have equipment room design MAJ 1 000000I
◇ 22.1.019 Whether have site survey report MAJ 1 000000I
◇ 22.1.020 Whether have land or building using certificate MAJ 1 000000I
◇ 22.1.021 Whether have power supply license MAJ 1 000000I
◇ 22.1.022 Whether have Factory Acceptance Report(tower, equipment etc.) MAJ 1 000000I
◇ 22.1.023 Green land site road certificate(main road to site) MAJ 1 000000I
◇ 22.1.024
◇ 22.1.025
◇ 22.1.026
◇ 22.1.027
◇ 22.1.028
◇ 22.1.029
◇ 22.1.030
◇ 22.1.031
◇ 22.1.032
◇ 22.1.033
◇ 22.1.034
◇ 22.1.035
◇ 22.1.036
◇ 22.1.037
◇ 22.1.038

04/24/2018 华为机密,未经许可不得扩散 第29页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Quality Managements
◇ 23.1.001 The engineering supervisor must hand in the self-inspection report of engineering hardware quality. MAJ 2 000000G
Self-inspection specifications: When the inspection score by the company or regional office is lower than or
◇ 23.1.002 MAJ 2 000000G
higher than 2 scores by self-inspection, the quality score must be deducted another.
◇ 23.1.003 QC of the partner must perform quality management regulation of partner ,and must inspect sites quality; MAJ 2 000000G
◇ 23.1.004 The sites quality defects must be modified ,and quality report (after modified) must be submitted. MAJ 2 000000G
◇ 23.1.005 The Engineer of partner must install Equipments by installation manual. MAJ 2 000000G
◇ 23.1.006 Issue quality defects regular and implement correlative action according to award and punishment rules. MAJ 1 000000I
◇ 23.1.007 The supervisor of huawei must audit site quality,and must supervise defects to be modified by the partner. MED 0.5 000000J
◇ 23.1.008 The QA of representative must audit site quality. MED 0.5 000000J
◇ 23.1.009
◇ 23.1.010
◇ 23.1.011
◇ 23.1.012
◇ 23.1.013
◇ 23.1.014
◇ 23.1.015
◇ 23.1.016
◇ 23.1.017
◇ 23.1.018
◇ 23.1.019
◇ 23.1.020
◇ 23.1.021
◇ 23.1.022
◇ 23.1.023

04/24/2018 华为机密,未经许可不得扩散 第30页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Health & Safety
◇ 24.1.001 Whether the room installed Huawei's devices is secure? MAJ 2 000000G
◇ 24.1.002 Is all staff aware of the safety production responsibility system and safety management objective system? MED 0.5 000000J
◇ 24.1.003 Is engineer clear about the process of security accidents? MED 0.5 000000J
◇ 24.1.004 Is the work site kept tidy, fire exits kept clear & combustible materials removed on a daily basis? MED 0.5 000000J
◇ 24.1.005 Has security measures been taken for air welding? MED 0.5 000000J
◇ 24.1.006 If the work requires deploying safety signs, are they used and are the correctly positioned? MED 0.5 000000J
◇ 24.1.007 Are Permits to Work required and being correctly applied? MED 0.5 000000J
Is the intensity of scaffolding, scissiors-truss support and unloading platform in compliance with safety
◇ 24.1.008 MED 0.5 000000J
requirements?
◇ 24.1.009 Construction electricity is in compliance with safety requirements. MED 0.5 000000J
The subsidiary devices of crane is consistent with the requirements, and the safe distance from the
◇ 24.1.010 MED 0.5 000000J
surrounding facilities is met.
◇ 24.1.011 The main materials (steel and cement) are provided with quality documents. MED 0.5 000000J
◇ 24.1.012 Do engineers understand correlated security logo set for users on project site? MED 0.5 000000J
◇ 24.1.013 Is there insurance for protential safety problems? If so, is the insurance documents available? MED 0.5 000000J
◇ 24.1.014 Have all staff/visitors been given safety induction? MED 0.5 000000J
◇ 24.1.015 Are fire and safe exit routes clearly defined? MED 0.5 000000J
Are chemical substances, flammable liquids and/or gases required to be stored on site? If so, are they
◇ 24.1.016 MED 0.5 000000J
being stored safely?
◇ 24.1.017 Are tools and accessories securely used by engineers obviously provided with related logo? MED 0.5 000000J
◇ 24.1.018 Are all project sites installations provided with relevant applications? MED 0.5 000000J
◇ 24.1.019 Are the security of tools and apparatus checked? Are their performance status good? MED 0.5 000000J
◇ 24.1.020 Are emergency safeguard measures taken at the scene and their availability guaranteed? MED 0.5 000000J
◇ 24.1.021 Does forbidden zone set at the construction scene? MED 0.5 000000J
◇ 24.1.022 Are there any temporary safeguards? If so, are they in consistent with safety requirements of construction? MED 0.5 000000J
◇ 24.1.023 Does staff have access to the safe working practices for the tasks being undertaken? MED 0.5 000000J
◇ 24.1.024 Are the construction site surrounded and warning signs set up? MED 0.5 000000J
◇ 24.1.025 Is uphilled staff equipped with all necessary Personal Protective Equipment? MED 0.5 000000J
◇ 24.1.026 Is the construction site divided into work area and living area? MED 0.5 000000J
◇ 24.1.027 Are fire equipments and charing staff in correct position? MED 0.5 000000J
◇ 24.1.028 Is transport solution for super-long equipments available? MED 0.5 000000J
◇ 24.1.029 Whether ensure that a specWhetheric note shall link H&S to all subcontractors contract [termination clause]? MED 0.5 000000J
Whether all relevant roll-out personnel and sub-contractors shall be inducted on EMF training and customer
◇ 24.1.030 MED 0.5 000000J
management EMF approach?
Whether site safety passport must be ready prior to the delivery of the EHS induction training. This is a
◇ 24.1.031 deliverable of the Huawei and sub-contractor EHS awareness. They must sign to acknowledge receipt and MED 0.5 000000J
responsibility for carrying out their work in line with the minimum requirements?
Whether review the H&S risk assessment document to ensure that the ‘controls’ do not contradict the Safety
◇ 24.1.032 MED 0.5 000000J
Plan and that the scoring is correct?
◇ 24.1.033 Whether EMF Training to be reviewed prior to delivery to employees and/or sub-contractors? MED 0.5 000000J
Whether EHS induction training be modWhetheried to reflect the H&S plan, customer minimum
◇ 24.1.034 requirements and local legislation. The training must highlight cusatomer and subcontractor management MED 0.5 000000J
commitment and the consequences of non compliance?
Whether ensure that Whether ANY electrical related operations are to be conducted by engineers within the
◇ 24.1.035 warehouse facility that all ESD process’s are put in place and adhered to. Including ESD training (in MED 0.5 000000J
appropriate language) for all involved and provision of clear signage in the area.
◇ 24.1.036 Whether update Radio Network Plan and distribute to all? MED 0.5 000000J
◇ 24.1.037 Whether product department to advise on green credentials of the chosen hardware? MED 0.5 000000J
Whether review and confirm to customer the situation with respect to site designs being compliant with the
◇ 24.1.038 customer H&S policies/standards and working practices on all other radio projects as a priority within 30 MED 0.5 000000J
days?
Whether review GTS ‘guide to safe site construction’ documentation in terms of contradiction to the Health
◇ 24.1.039 MED 0.5 000000J
and Safety plan and advise Whether it should be used at all?
Whether provide the evidence that all sub-contractors have been processed through the supplier
◇ 24.1.040 MED 0.5 000000J
qualWhetherication?
Towers– identWhetheried 4 suppliers, currently unacceptable tower designs in terms of Health and Safety.
◇ 24.1.041 MED 0.5 000000J
to ensure that ALL towers have acceptable fall arrest mechanisms PRIOR to deployment.
Ultimately review ALL designs against policies,and legislative requirements. Review of ALL designs and site
◇ 24.1.042 MED 0.5 000000J
to be communicated to customer.
Whether shall seek internal expertise to ensure all site designs are reviewed for compliance(customer and
◇ 24.1.043 MED 0.5 000000J
local legislation)
◇ 24.1.044 Whether ensure Health and Safety plan is delivered throughout the roll-out? MED 0.5 000000J
Review and create a list (based on task and risk) of all PPE required and for which tasks by the employees
◇ 24.1.045 involved in the network roll-out. IdentWhethery which PPE is currently available and what will be ordered MED 0.5 000000J
and deployed and when available for use.
◇ 24.1.046 Project structure to be issued with full contact details MED 0.5 000000J
Spreadsheet required to show all chosen and ‘contingency’ suppliers that are approved and the status of
◇ 24.1.047 MED 0.5 000000J
their contract (signed/not signed to revised requirements) including Quality & Health and safety Status.
Whether develop an ongoing advisory on the status of employees Visa status to ensure that
◇ 24.1.048 employee/knowledge continuity is maintained. In addition Whether ensure that a two week handover is MED 0.5 000000J
carried out for all ‘signWhethericant’ role changes. With visibility provided to customer
Product planning must take into consideration any reconfiguration of the CAPEX due to the changes within
◇ 24.1.049 the network profile. SpecWhetherically the knock on effect to the allocated project timing. Common risk MED 0.5 000000J
register to be developed and actions made visible to VF where CAPEX/OPEX or in service date / license
Logistic subcontractors involved in transportation of equipment within Qatarto be nominated and the vehicle
◇ 24.1.050 MED 0.5 000000J
types defined.
Whether project organization to be issued to VF identWhetherying, names, contact numbers and Whether
◇ 24.1.051 MED 0.5 000000J
the employee’s role is full time or temporary?
Awareness and action chart to be updated and include ‘traffic lights’ and action dates. This should be sent
◇ 24.1.052 MED 0.5 000000J
weekly to the team.
Whether create a matrix identWhetherying Whether the sub-contractors have their own Health and Safety
◇ 24.1.053 MED 0.5 000000J
plans and Whether these are suitable, or Whether the sub-contractor has signed up to the H&S plan?
◇ 24.1.054 Whether other languages be used appropriately as required by the audience? MED 0.5 000000J
Whether develop a process that shall demonstrate that the sub-contractors are passing on the Health and
◇ 24.1.055 MED 0.5 000000J
Safety requirements down through to their sub-contractors?
Review and communicate to the team the risks associated with the transport of the electronic equipment
◇ 24.1.056 (after primary packaging has been removed), in and out of the new warehouse (this is due to the poor MED 0.5 000000J
condition of the main roads leading to the warehouse).
Whether identWhethery at least one supplier who can locally recycle the packaging materials at both the
◇ 24.1.057 MED 0.5 000000J
warehouse and on construction site?
Whether create a training matrix for all employees involved in the network roll-out? Whether The matrix
◇ 24.1.058 MED 0.5 000000J
indicate what is required, for what activity and the status of the training?
◇ 24.1.059 Whether merge emergency and first aid specWhetheric document into the H&S plan? MED 0.5 000000J
Whether review and confirm to the situation with respect to CEP flow down to all subcontractors engaged on
◇ 24.1.060 MED 0.5 000000J
ALL projects within 30 days?
◇ 24.1.061
◇ 24.1.062
◇ 24.1.063
◇ 24.1.064
◇ 24.1.065
◇ 24.1.066
◇ 24.1.067
◇ 24.1.068
◇ 24.1.069
◇ 24.1.070
◇ 24.1.071
◇ 24.1.072
◇ 24.1.073
◇ 24.1.074
◇ 24.1.075

04/24/2018 华为机密,未经许可不得扩散 第31页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Procedure
◇ 25.1.001 Ensure engineering installation meeting stage with Customer MAJ 5 000000D
◇ 25.1.002 Ensure correctly make the project installation plans MAJ 5 000000D
◇ 25.1.003 Whether correctly check and accept cargos with customer by packing list MAJ 5 000000D
◇ 25.1.004 The engineering cut over solution correctly signed up to the correct stage. MAJ 5 000000D
◇ 25.1.005 Ensure sites test recorded and saved. MED 2 000000G
◇ 25.1.006 Ensure sites installation weekly report and monthly report issued MED 2 000000G
◇ 25.1.007 Ensure sites installation methods and standards correct used MED 2 000000G
The correct process for engineering changes to the contract installation or commissioning requirements or
◇ 25.1.008 MED 2 000000G
Customer issued documentation has been followed and appropriately recorded
◇ 25.1.009
◇ 25.1.010
◇ 25.1.011
◇ 25.1.012
◇ 25.1.013
◇ 25.1.014
◇ 25.1.015
◇ 25.1.016
◇ 25.1.017
◇ 25.1.018
◇ 25.1.019
◇ 25.1.020
◇ 25.1.021
◇ 25.1.022
◇ 25.1.023

04/24/2018 华为机密,未经许可不得扩散 第32页,共33页


385175546.xls 文档密级

Select Code Description Category Sore EPMS Input


Customer Attention
◇ 26.1.001 Whether the huawei engineer's demeanour fits the Customer's requirements MAJ 2 000000G
◇ 26.1.002 Whether the huawei engineer's capabilities of handling problems and attitude fit the Customer's requirements. MAJ 2 000000G
◇ 26.1.003 Whether the huawei engineer's dress and attitude are professional and stand for huawei corporator image. (w MED 0.5 000000J
◇ 26.1.004 Whether documentation of engineering is handed over correctly. MED 0.5 000000J
◇ 26.1.005 Whether training of engineering is hold on sites MED 0.5 000000J
◇ 26.1.006
◇ 26.1.007
◇ 26.1.008
◇ 26.1.009
◇ 26.1.010
◇ 26.1.011
◇ 26.1.012
◇ 26.1.013
◇ 26.1.014
◇ 26.1.015
◇ 26.1.016
◇ 26.1.017
◇ 26.1.018
◇ 26.1.019
◇ 26.1.020

04/24/2018 华为机密,未经许可不得扩散 第33页,共33页