You are on page 1of 1

A B C D

A B C D TOP OF BEAM

BOT. OF BEAM

W-1 W-1
STAGE FCL

1
SHAFT ROOM
STAGE
W-2
PIPE STORAGE DECORATIVE WALL
PANEL
STAGE DECORATIVE WALL
PANEL

2 CR(MALE)
STAGE FFL
CR(FEMALE)

5TH FLOOR FFL

2 ELEVATION 1
1
W-3 43 DN
UP

DISPLAY RACK
FUNCTION H A L L TOP OF BEAM

LAV
SLIDING DOOR
150 SQ.M D-4
FIRE EXIT

100 PAX-120 PAX MAX BOT. OF BEAM BOT. OF BEAM


FF1-HT
W-4
LOBBY FCL
BAR FCL

STORAGE
CEO / COO

OPEN

4 D-3
LOBBY BAR
D-1 D-3 D-3
BAR D-2

W-5 W-5
STA
RO RAG
STO
OM E

IRS

D-2
ELE

2
67

5TH FLOOR FFL


66
65
64
63

LEGEND
C

62

LOBBY
61
60
59

FF1-HT FF1-HT 800x800 HOMOGENOUS TILES


3 ELEVATION 2
68
69
70

DN
71
72

1
UP
73

2
74

3
75

TOP OF BEAM

BOT. OF BEAM

STAGE FCL
1 FLOOR PLAN

DECORATIVE WALL DECORATIVE WALL DECORATIVE WALL DECORATIVE WALL DECORATIVE WALL

STAGE PANEL PANEL PANEL PANEL PANEL


LOBBY

STAGE FFL

5TH FLOOR FFL

4 ELEVATION 3

PROPOSED:
AR. ARVIN KEITH NAÑO 1
AS SHOWN A
ARCHITECT UAP MULTI-PURPOSE HALL
2
THIS DRAWING AS AN INSTRUMENT OF SERVICE IS THE PROPERTY OF THE ARCHITECT. IT IS UNLAWFUL FOR
ANY PERSON TO COPY OR RECOPY WITHOUT SPECIFIC PERMISSION FROM THE OFFICE. (RA 9266)