NO DESCRIPTION UNIT
No Uraian Satuan
I FOUNDATION WORK
1 Piling Works
1.1 Concrete Spun Pile (CSP Ø=600mm; t=100mm L=30m)
- Supply Concrete Spun Pile (CSP Ø=600mm; t=100mm L=15m) - Bottom metre
- Supply Concrete Spun Pile (CSP Ø=600mm; t=100mm L=15m) - Middle metre
- Stake out & Positioning metre
- Drive Piles metre
- Pile joint nr
- Pile cut off nr
- Preboring m'
Note : Preborring 10 m from ground level
- Cover Plate t= 10 for Infill Concrete kg
2 Reinforced Concrete K.430
2.1 Infill Concrete cu.m
SUB-TOTAL I Err:509
TOTAL Err:509
Cost Estimate
( Rencana Anggaran Biaya )
PROJECT TITLE
Nama Proyek
ALT. CSP Ø600 + PREBORING USE HYDROULICHAMMER
PT. INDOCEMENT TUNGGAL PRAKARSA. Tbk.
LAMPUNG CEMENT TERMINAL
NO DESCRIPTION UNIT
No Uraian Satuan
I FOUNDATION WORK
1 Piling Works
1.1 Concrete Spun Pile (CSP Ø=600mm; t=100mm L=30m)
- Supply Concrete Spun Pile (CSP Ø=600mm; t=100mm L=15m) - Bottom metre
- Supply Concrete Spun Pile (CSP Ø=600mm; t=100mm L=15m) - Middle metre
- Stake out & Positioning metre
- Drive Piles metre
- Pile joint nr
- Pile cut off nr
- Preboring m'
Note : Preborring 10 m from ground level
- Cover Plate t= 10 for Infill Concrete kg
2 Reinforced Concrete K.430
2.1 Infill Concrete cu.m
SUB-TOTAL I Err:509
TOTAL Err:509
Cost Estimate
( Rencana Anggaran Biaya )
PROJECT TITLE
Nama Proyek
ALT. CSP Ø600 + PREBORING USE JACKINGPILE
PT. INDOCEMENT TUNGGAL PRAKARSA. Tbk.
LAMPUNG CEMENT TERMINAL
NO DESCRIPTION UNIT
No Uraian Satuan
I FOUNDATION WORK
1 Piling Works
1.1 Concrete Spun Pile (CSP Ø=600mm; t=100mm L=30m)
- Supply Concrete Spun Pile (CSP Ø=600mm; t=100mm L=15m) - Bottom metre
- Supply Concrete Spun Pile (CSP Ø=600mm; t=100mm L=15m) - Middle metre
- Stake out & Positioning metre
- Drive Piles metre
- Pile joint nr
- Pile cut off nr
- Preboring m'
Note : Preborring 10 m from ground level
- Cover Plate t= 10 for Infill Concrete kg
2 Reinforced Concrete K.430
2.1 Infill Concrete cu.m
SUB-TOTAL I Err:509
TOTAL Err:509
Cost Estimate
( Rencana Anggaran Biaya )
PROJECT TITLE
Nama Proyek
ALT. CSP Ø800 WITH PREBORING
PT. INDOCEMENT TUNGGAL PRAKARSA. Tbk.
LAMPUNG CEMENT TERMINAL
NO DESCRIPTION UNIT
No Uraian Satuan
I FOUNDATION WORK
1 Piling Works
1.1 Concrete Spun Pile (CSP Ø=800mm; t=120mm L=30m)
- Supply Concrete Spun Pile (CSP Ø=800mm; t=120mm L=15m) - Bottom metre
- Supply Concrete Spun Pile (CSP Ø=800mm; t=120mm L=15m) - Middle metre
- Stake out & Positioning metre
- Drive Piles metre
- Pile joint nr
- Pile cut off nr
- Preboring m'
Note : Preborring 10 m from ground level
- Cover Plate t= 10 for Infill Concrete kg
2 Reinforced Concrete K.430
2.1 Infill Concrete cu.m
SUB-TOTAL I Err:509
TOTAL Err:509
Cost Estimate
( Rencana Anggaran Biaya )
PROJECT TITLE
Nama Proyek
ALT. CSP Ø800 + PREBORING USE HYDROULICHAMMER
PT. INDOCEMENT TUNGGAL PRAKARSA. Tbk.
LAMPUNG CEMENT TERMINAL
NO DESCRIPTION UNIT
No Uraian Satuan
I FOUNDATION WORK
1 Piling Works
1.1 Concrete Spun Pile (CSP Ø=800mm; t=120mm L=30m)
- Supply Concrete Spun Pile (CSP Ø=800mm; t=120mm L=15m) - Bottom metre
- Supply Concrete Spun Pile (CSP Ø=800mm; t=120mm L=15m) - Middle metre
- Stake out & Positioning metre
- Drive Piles metre
- Pile joint nr
- Pile cut off nr
- Preboring m'
Note : Preborring 10 m from ground level
- Cover Plate t= 10 for Infill Concrete kg
2 Reinforced Concrete K.430
2.1 Infill Concrete cu.m
SUB-TOTAL I Err:509
TOTAL Err:509
Cost Estimate
( Rencana Anggaran Biaya )
PROJECT TITLE
Nama Proyek
ALT. CSP Ø800 + PREBORING USE JACKINGPILE
PT. INDOCEMENT TUNGGAL PRAKARSA. Tbk.
LAMPUNG CEMENT TERMINAL
NO DESCRIPTION UNIT
No Uraian Satuan
I FOUNDATION WORK
1 Piling Works
1.1 Concrete Spun Pile (CSP Ø=800mm; t=120mm L=30m)
- Supply Concrete Spun Pile (CSP Ø=800mm; t=120mm L=15m) - Bottom metre
- Supply Concrete Spun Pile (CSP Ø=800mm; t=120mm L=15m) - Middle metre
- Stake out & Positioning metre
- Drive Piles metre
- Pile joint nr
- Pile cut off nr
- Preboring m'
Note : Preborring 10 m from ground level
- Cover Plate t= 10 for Infill Concrete kg
2 Reinforced Concrete K.430
2.1 Infill Concrete cu.m
SUB-TOTAL I Err:509
TOTAL Err:509
SUMMARY UNIT PRICE ANALYSIS
ANS. 13 Concrete Cast In Situ F'c 35 MPa - Box Culvert Drainase m3 5,015,246.00
2 Safety Equipment
1.00 ls Safety shoes, helmet, and raincoat 36,000,000.00 36,000,000.00
1.00 ls Rainy Tent 10,000,000.00 10,000,000.00
1.00 ls First Aid Kit 25,000,000.00 25,000,000.00
TOTAL 688,542,000.00
14
UNIT PRICE ANALYSIS
UNIT PRICE
CODE MATERIAL UNIT
(Rp)
16
II. WAGE PRICE LIST
UNIT PRICE
CODE MATERIAL UNIT
(Rp)
Upah
Workers Day 82,500.00
Hammersmith/ concrete / carpenter Day 104,500.00
Head Worker Day 110,000.00
Foreman Day 121,000.00
Welder Day 164,703.00
Operator Day 121,000.00
Ass. Operator Day 82,500.00
Mechanic Day 99,746.04
Surveyor Day 188,908.50
Driven/Stake Operator Day 168,571.12
Driven/Stake Rigger Day 126,500.00
Driven/Stake Crew Day 115,500.00
17
III. TOOLS HIRE PRICE LIST
UNIT PRICE
CODE MATERIAL UNIT
(Rp)
18
LAMPUNG CEMENT TERMINAL
On Land Buildings and Structures- Drawing List As On 29-1
Status D
No Drg No. Title
Rev 0 Rev 1 Rev 2 Rev 3
1.1.1 LCT-OL-SC-AR-101
1.1.2 LCT-OL-SC-AR-102
1.1.3 LCT-OL-SC-AR-103
1.1.4 LCT-OL-SC-AR-104
1.2 RC Drawings
1.2.1 LCT-OL-SC-RC-101
1.2.2 LCT-OL-SC-RC-102
1.3.1 LCT-OL-SC-SS-101
1.3.2 LCT-OL-SC-SS-102
1.3.3
2 Packing Plant
2.1.1 LCT-OL-PP-AR-101
2.2 RC Drawings
2.2.1 LCT-OL-PP-RC-101
2.3.1 LCT-OL-PP-SS-101
Cement Transport Pipe
3
Support Structure
3.1 Architectural Drawings
3.1.1 LCT-OL-SC-AR-101
3.2 RC Drawings
3.2.1 LCT-OL-SC-RC-101
3.3.1 LCT-OL-SC-SS-101
4 PLN Room
4.1.1 LCT-OL-SC-AR-101
4.2 RC Drawings
4.2.1 LCT-OL-SC-RC-101
4.3.1 LCT-OL-SC-SS-101
Weigh Bridge
5 Foundation and Control
Room
5.1 Architectural Drawings
5.1.1 LCT-OL-SC-AR-101
5.2 RC Drawings
5.2.1 LCT-OL-SC-RC-101
5.3.1 LCT-OL-SC-SS-101
6 Guard Room
6.1.1 LCT-OL-SC-AR-101
6.2 RC Drawings
6.2.1 LCT-OL-SC-RC-101
6.3.1 LCT-OL-SC-SS-101
7 Administration Building
7.1.1 LCT-OL-SC-AR-101
7.2 RC Drawings
7.2.1 LCT-OL-SC-RC-101
7 LCT-OL-SC-SS-101
8.1.1 LCT-OL-SC-AR-101
8.2 RC Drawings
8.2.1 LCT-OL-SC-RC-101
8.3.1 LCT-OL-SC-SS-101
Roads, Drain and
9
Boundary Fence
9.1 Architectural Drawings
9.1.1 LCT-OL-SC-AR-101
9.2 RC Drawings
9.2.1 LCT-OL-SC-RC-101
9.3.1 LCT-OL-SC-SS-101
NAL
List As On 29-12-2017
Status C