200 x200 mm concreate beam

X
in slab cover to S.E details
4,000
over flow pipe outlet 400x 250 concreate beam to
S.E details

Y10 @ 200c/c 100mm reinforced concrete

2500
both ways walling

2300
1,850
1750
150mm thick stone wall
sump hole beded with 1:3cement/sand and
100mm reinforced
1packet water proofing cement
SUMP concrete wall motar

400
HOLE
4,000 250 x250 mm masonary
4,000

1,850
2,000
block pier
FOUNDATION SPECIFICATION pier
150 mm masonary 200mm r.c slab mix 1:2:4 to S.E details on
block walling A142 B.R.C mesh wire on 1 layer of 1000g
polythene sheeting(DPM). on 75mm
800 x 200 mm concrete strip
sand blinding on 300mm well compacted approved
foundation (mix 1:2:4) on 75mm
hardcore on firm ground free from black cotton soil.
200mm reinforced weak concrete blinding
concrete slab After Excavation back fill water and compact
approprite/approved materials in layers of 150mm.

BUILDING SECTION X - X
X

scale 1:75
FLOOR PLAN
scale 1:75

200 x200 mm concreate beam


in slab cover to S.E details
1,000

tank inspection
opening
1,000

100mm dia 100mm dia


bend pipe breather bend pipe breather

Y10 @200 both ways


TANK ELEVATION
scale 1:75

200 x200 mm concreate beam


in slab cover to S.E details

SLAB COVER
scale 1:75
2Y12-26
400

nY8-200-25
DRAWING
2Y16-24 TITTLE: PROPOOSED WATER WATER TANK.
250

SECTION THRO'
RING BEAM
SCALE 1:20

3D MODEL.