You are on page 1of 5

Asphaltic Concrete Mix Design 1

BWC layer - 14.04.2018

‫شركة النيل العامة للطرق الصحراوية‬


) ‫مشروع الطريق الدائرى األقليمى ( القطاع الثالث‬

Asphaltic Concrete Mix Design

Project :- Doubling of Safaga/Quseir/Marsa Alam Roads Date :- 14.04.2018


Pavment Layer:- Bituminous Surface Wearing Course ( 4G )

1- Objective

Perform a Marshall Mix Design per the Asphalt Institute MS-2 Manual and AASHTO test
methods conforming to the Special specification of The National Project for Roads .

2- Materials

Material Description Source Received


3/4" Crushed Basalt Quality Quarry, Quseir 05.04.2018
3/8" Crushed Basalt Quality Quarry, Quseir 05.04.2019
Crushed Sand Quality Quarry, Quseir 05.04.2020

3-Materials Validity Tests Results

Results
Tested Property Test Specs. Project Limit
Agg. 2 Bin I Agg. 1 Bin II C. S Bin III
Sieve Analysis AASHTO T-27 See Enclosed Grading Results
Specific Gravity & Bulk Oven Dry 2.592 2.592 2.563
Absorption of AASHTO T-84 & Bulk SSD
Coarse & Fine T 85 Apparent S.G
Agg. Absorption %
Abrasion ( L. A )
Flat Particles
Elongated Particles
Fractured Face
Liquid Limit &
Placticity Index
Asphaltic Concrete Mix Design 2
BWC layer - 14.04.2018

‫شركة النيل العامة للطرق الصحراوية‬


) ‫مشروع الطريق الدائرى األقليمى ( القطاع الثالث‬

Asphaltic Concrete Mix Design

Project :- Doubling of Safaga/Quseir/Marsa Alam Roads Date :- 14.04.2018


Pavment Layer:- Bituminous Surface Wearing Course ( 4G )

4- Sieve analysis for Coarse & Fine Aggregate , AASHTO T - 27

Sample No.: Hot Bin No. I Hot Bin No.II Hot Bin No.III
Aggregate Size 3/4 3/8 Crushed Sand
Oven Dry Wt. 8430.0 4191.0 675.0

Sieve Size
Cum.Ret, Cum.Pass. Cum.Ret, Cum.Pass. Cum.Ret, Cum.Pa
Sieve Size %Passing %Passing %Passing
Wt. Wt. Wt. Wt. Wt. ss. Wt.
1" 25.00 0 8430.0 100.00% 0 4191.0 100.00% 0 675.0 100.00%
3/4" 19.00 736.0 7694.0 91.27% 0.0 4191.0 100.00% 0.0 675.0 100.00%
3/8" 9.50 8027.0 403.0 4.78% 904.0 3287.0 78.43% 0.0 675.0 100.00%
No.4 4.75 8385.0 45.0 0.53% 3261.0 930.0 22.19% 0.0 675.0 100.00%
No.8 2.36 8430.0 0.0 0.00% 4035.0 156.0 3.72% 73.0 602.0 89.19%
No.30 0.60 8430.0 0.0 0.00% 4191.0 0.0 0.00% 289.0 386.0 57.19%
No.50 0.30 8430.0 0.0 0.00% 4191.0 0.0 0.00% 374.0 301.0 44.59%
No.100 0.15 8430.0 0.0 0.00% 4191.0 0.0 0.00% 472.0 203.0 30.07%
No.200 0.075 8430.0 0.0 0.00% 4191.0 0.0 0.00% 564.0 111.0 16.44%
PAN 0.0 20.0 20.0
TOTAL 8385.0 4211.0 584.0

5- Job Mix Formula For Average Sieve Analysis of Aggregate

Sample Type Hot Bin No. I Hot Bin No.II Hot Bin No.III
Specefication
Batching % 25% 32% 43%
Job Mix
Aggregate Size 3/4 3/8 Crushed Sand
Bottom Top
Sieve Size Original Blendig Original Blendig Original Blendig
1" 25.00 100.0% 25.0% 100.0% 32.0% 100.0% 43.0% 100.0% 100% 100%
3/4" 19.00 91.3% 22.8% 100.0% 32.0% 100.0% 43.0% 97.8% 80% 100%
3/8" 9.50 4.8% 1.2% 78.4% 25.1% 100.0% 43.0% 69.3% 60% 80%
No.4 4.75 0.5% 0.1% 22.2% 7.1% 100.0% 43.0% 50.2% 48% 65%
No.8 2.36 0.0% 0.0% 3.7% 1.2% 89.2% 38.3% 39.5% 35% 50%
No.30 0.60 0.0% 0.0% 0.0% 0.0% 57.2% 24.6% 24.6% 19% 30%
No.50 0.30 0.0% 0.0% 0.0% 0.0% 44.6% 19.2% 19.2% 13% 23%
No.100 0.15 0.0% 0.0% 0.0% 0.0% 30.1% 12.9% 12.9% 7% 15%
No.200 0.075 0.0% 0.0% 0.0% 0.0% 16.4% 7.1% 7.1% 3% 8%

Specs. Min Limit Specs. Max Limit Job Mix

100%
Percent Passing

80%
60%
40%
20%
0%
0.01 0.10 1.00 10.00 100.00
Sieve Size, mm
Asphaltic Concrete Mix Design 3
BWC layer - 14.04.2018

‫شركة النيل العامة للطرق الصحراوية‬


) ‫مشروع الطريق الدائرى األقليمى ( القطاع الثالث‬

Asphaltic Concrete Mix Design

Project :- Doubling of Safaga/Quseir/Marsa Alam Roads Date :- 14.04.2018


Pavment Layer:- Bituminous Surface Wearing Course ( 4G )

6-Properties of Asphalt Mixture at Different Trials Bitumen Contents

Sample No. 1A 1B 1C 2A 2B 2C 3A 3B 3C

Trial Pb % 4.0% 4.0% 4.0% 4.5% 4.5% 4.5% 5.0% 5.0% 5.0%

Dry Weight 1197.7 1199.6 1198.9 1201.8 1198.1 1202.2 1198 1198 1200

Sub. Weight 694.5 695.7 695.1 696.8 695.7 696.3 697.1 695 695.3

SSD Weight 1206.1 1208 1208.6 1207.5 1206.1 1207.7 1202.4 1201 1203.2

Gmb 2.341 2.342 2.335 2.353 2.347 2.351 2.371 2.368 2.363

Average Gmb 2.339 2.350 2.367

Gsb 2.579

Gmm 2.431 2.413 2.396


Volumetric
analysis

Va 3.77% 2.61% 1.21%

VMA 12.94 12.98 12.81

VFA 99.71% 99.80% 99.91%

Dp 1.77 1.57 1.41

Stability, kg 3968 4068 4006 3966 3977 3960 3571 3441 3552

Average Stab. 4014 3968 3521

Volume, cm3 511.6 512.3 513.5 510.7 510.4 511.4 505.3 505.9 507.9

Average Volume 512 511 506

1 1 1.04
Correction Factor

4014 3968 3662


Correction Stability

Flow, mm 9 10 10 11 12 12 14 14 15
Average Flow 9.7 11.7 14.3

7- Marshal Design Curves

Mix Unit Weight Va


2.370 4.00%
3.50%
2.365
3.00%
2.360
% Air Voids
Unit Weight

2.50%
2.355
Asphaltic Concrete Mix Design 4
BWC layer - 14.04.2018

‫شركة النيل العامة للطرق الصحراوية‬


) ‫مشروع الطريق الدائرى األقليمى ( القطاع الثالث‬

Asphaltic Concrete Mix Design

Project :- Doubling of Safaga/Quseir/Marsa Alam Roads Date :- 14.04.2018


Pavment Layer:- Bituminous Surface Wearing Course (2.50%
4G )

% Air Voids
Unit Weight

2.355
2.00%
2.350 1.50%
2.345 1.00%
2.340 0.50%

2.335 0.00%
0 1 2 3 4 5 6 0 2 4 6
% Asphalt Binder % Asphalt Binder

% VMA % VFA
13.00 99.95%

99.90%
12.95
99.85%
% VFA
VMA

12.90 99.80%

99.75%
12.85
99.70%

12.80 99.65%
0 1 2 3 4 5 6 0 2 4 6
% Asphalt Binder % Asphalt Binder

Stability Flow
4050 16.0
4000 14.0
3950 12.0
3900 10.0
Stability

Flow

3850 8.0
3800
6.0
3750
4.0
3700
3650 2.0
3600 0.0
0 1 2 3 4 5 6 0 2 4 6
% Asphalt Binder % Asphalt Binder
Asphaltic Concrete Mix Design 5
BWC layer - 14.04.2018

‫شركة النيل العامة للطرق الصحراوية‬


) ‫مشروع الطريق الدائرى األقليمى ( القطاع الثالث‬

Asphaltic Concrete Mix Design

Project :- Doubling of Safaga/Quseir/Marsa Alam Roads Date :- 14.04.2018


Pavment Layer:- Bituminous Surface Wearing Course ( 4G )

Dp
2.00

1.50
Dp

1.00

0.50

0.00
0 1 2 3 4 5 6
% Asphalt Binder

8- Results & Recommendation

The mix design was optimized using four asphalt contents (4.0, 4.5, 5.0, 5.5% AC). The table
below lists the mix properties at the optimum asphalt content chosen (4.8% AC ).
The mixing temperature is 150°C and the compaction temperature range for unmodification binder
is 140 to 90°C. As with any mix, compaction and compaction temperatures should be determined by
roller test patterns and density measurements. These test results apply only to the laboratory
samples as received. Adjustments may be necessary in the plant/field due to raw material
variation, conditions in the plant/field, etc. Mix design tables and graphs are on pages 1 – 5.

Mix Proportion & Properties

Coarse Agg. Bin I Coarse Agg. Bin II Fine Agg. Bin III
25% 32% 43%

Property Chosen Mix Properties Project Specification


Optimum AC Content (%)
Bulk Gravity of Mix (Gmb)
% Air Voids
% VMA
% VFA
Dust Proportion ( DP )
Stability 1200
Flow 3
Stiffines 400.00 300 - 500