You are on page 1of 1

Noczim

Job Petrotrade
Survey Proposed sewer
Date 5-17-2017 15:27

Back Sight Intermdiate Sight Fore Sight HPC Reduced Level Comments
1.295 - - 101.295 100 GL Septic Tank
- 1.734 - 101.295 99.561 Pipe soffit
- 1.505 - 101.295 99.79 Proposed MH1
- 1.602 - 101.295 99.693 Durawall corner
- 1.602 - 101.295 99.693 Durawall corner
- - 1.585 101.295 99.71 Durawall post 2
- - 1.585 101.295 99.71 Durawall post 2
1.505 - - 101.215 99.71 Durawall post2
- 1.588 - 101.215 99.627 Durawall corner 2
- 1.588 - 101.215 99.627 Durawall corner 2
- 1.824 - 101.215 99.391 Exist MH GL
- - 3.134 101.215 98.081 Exist MH IL

Difference in
elevations
between the IL
of drain and Exist
MH (m) 1.38
Chainage 143.08

Gradient 1 in 104

You might also like