You are on page 1of 5

PAVIMENTO SARDINELES

CALLES/PSJES A INTERVENIR TIPO I TIPO II PERALTADO


(M2) (M2) (ML)

PASAJE 01 993.46
Mz A 93.103
PASAJE 02 1022.61
Mz B 127.475
PASAJE 03 577.12
Mz C 143.645
PASAJE 04 312.28
Mz D 77.713
PASAJE 05 566.25
Mz E 127.617
Mz F 231.820
CALLE 01 977.10
Mz G 196.902
Mz H 156.877
CALLE 03 1942.98
Mz I 29.302
CALLE 03 (ESTACIONAMIENTOS) 340.52
Mz J 149.875
CALLE 04 1943.98
Mz K 82.533

Mz L 80.917
CALLE 05 1207.14
Mz LL 75.647

Mz M 139.509
CALLE 06 1652.66
Mz N 58.260
Mz Ñ 31.547
Mz O 28.474
MZ O - A.H. RAMAL PLAYA
MZ Ñ - A.H. RAMAL PLAYA
MZ N - A.H. RAMAL PLAYA
RAMPAS

Mz P 52.162
CALLE 06 (ESTACIONAMIENTOS) 765.57
CALLE 07 736.07

JR. MOQUEGUA 2570.50 102.01


Mz Q 123.113
Mz R 89.369

PISTA SECUNDARIA IZQUIERDO 4586.08

INTERSECCION/ JR. MOQUEGUA - CALLE 9


AV. MOQUEGUA - PISTA SECUNDARIA IZQ.
ENTRE BERMA 01 - 02

BERMA 01 250.93
BERMA 02 274.89
BERMA 03 352.64
BERMA 04 362.59
BERMA 05 443.86
RAMPAS

15,608.24 4,586.08 3,882.77


SARDINELES VEREDAS OTROS
SEÑALIZACION
HORIZONTAL
AREAS
SUMERGIDO VEREDAS LINEAS
SIMBOLOS Y VERDES
(ML) (M2) CONTINUAS Y
LETRAS (M2)
DISCONTINUAS
(M2) (ML)

36.53 361.50
249.45 153.66
36.53 356.74
375.71 174.23
23.88 218.36
423.73 164.32
23.37 119.20
256.07 107.20
4.65 31.59 267.86
267.17 180.72
416.38 328.43
36.26 370.30
377.07 286.90
239.00 249.01
83.58 749.10
275.20 29.30

259.02 246.25
83.85 743.48
176.06 131.10

239.53 157.39
6.00 105.60 510.00
341.68 102.36

516.45 138.58
6.60 128.74 581.56
216.42 56.75
124.99 28.75
218.72 34.40
37.66
38.39
101.57
68.00

348.13 68.41
6.10 59.66 287.02

12.20 84.62 563.32 96.52


122.24 437.23 218.69
293.58 188.66

226.48 1220.92

37.64
11.78
60.20

394.40
376.31
423.38
417.92
552.07
155.60

267.41 8,616.90 960.69 6,349.36 3,141.62


SNIP 6,116,252.00 7,339,502.40

II ETAPA 6,440,213.26
I ETAPA 1,250,862.43
7,691,075.69

You might also like