This report shall discuss on the seminar held on 10 February 2018 to introduce 4 topics on new
technologies in the construction industry.
Mixed reality is also called augmented reality (AR). This technology involves placing virtual objects
into real-life physical world. One example given is the widely used platform, Apple’s ARkit.
This presentation introduced mixed reality technologies in construction and introduced several such
platforms like Microsoft Hololens and Trimble.
The Microsoft Hololens not only perform basics AR functions. It also allowed remote collaboration
between various stakeholders of the project at the same time within the AR “world”. This can
improve construction coordination as any discrepancies or intent can be conveyed more accurately
to the desired party.
The next improvement by mixed reality technology to construction process is the aid to the process
of aligning HVAC in buildings. Besides that, given that virtual elements (ie. BIM model) can be
superimposed into real physical environment, the AR technology can also help to inspect installed
HVAC components. This can be a vast improvement to conventional process whereby one would
have to cross check with 2D drawings including significant on-site measurement/ surveying for
verification.
The mixed reality technology can also be used for aiding reinforcement bars installation and
inspection process. Similar to its usage for activities related to HVAC, this technology can help to
speed up and simplify the processes involved.
From the presentation one would realise that both technologies would somewhat require wearable
tools to utilize the technology. For instance, the user would be required to don a special goggle in
order to perform reinforcement inspection using the Consolis application under the Hololens
platform. Although such technologies can expedite and improve reinforcement bars installation and
inspection works on site, there will be additional cost and resources incurred to purchase and
Page 1 of 3
CE5805
Industry Seminar Report
Name: LIM CHIA YONG JOHNNY
Matric: A0042596Y
maintain the additional hardware. Nevertheless, with timely software updates and continuity in its
usage, such devices and its technology can bring on time and monetary savings in long run.
The third presentation was touching on Prefabricated Prefinished Volumetric Construction (PPVC). It
was presented by the representative from Integrated Precast System. This company is a subsidiary of
Teambuild Construction which the latter uses the PPVC produced by the former for their
construction projects. It was also mentioned that this technology is currently at its 4th generation
developmental stage.
One of the main advantages for this technology was the significant reduction of “wet work” on site.
These activities are diverted to the off-site during PPVC production instead where they could be
done in a mechanised and more productive manner. Secondly, the quality of these works can be
more properly controlled in the factory like setting.
The presenter shared on an insight of their design philosophy to keep their PPVC units within 3.6m.
This is because any components with width wider than the earlier mentioned figure would require
auxiliary police escort during transportation. This can amount to additional cost and duration to the
transportation from PPVC production plant to site. This information allowed one to learn that
transportation for PPVC element is a vital part of PPVC construction.
This presentation gave some experience sharing on subject company’s first PPVC project for HDB’s
West Terra project in Bukit Batok. An interesting lesson learnt was regarding the stricter
construction tolerance for PPVC. As high/ poor construction tolerances would likely cause poor
continuity for services and undesirable aesthetics, abortive correctional work would need to be done
which can results to work delay and additional cost. This lesson learnt from their first PPVC project
had prompted the company to invest more money to improve the construction tolerances in their
finished PPVC components.
The last presentation was given on innovative construction methods and technologies employed by
local contractor, Tiong Seng.
One example quoted on improvements to productivity was the omission of BBS (Bar Bending
Schedule) by using Tiong Seng’s in-house application. It allows for reinforcements to be ordered
directly to the reinforcement suppliers without the subcontractors having to produce BBS. This help
to allow subcontractors to focus more of their resources on site work itself. Secondly, the application
can help to track and accurately details the reinforcement used or will be used. The paperless
feature also improves documenting as compared to the traditional hardcopy process.