You are on page 1of 20

EFFECTIVE USE OF SPACE TECHNOLOGY BASED TOOLS

Effective use of Space Technology Based Tools in Public Works Department(R&B)

PUBLIC WORKS DEPARTMENT


(ROADS AND BRIDGES)

April 2016
Jointly Prepared by
PUBLIC WORKS DEPARTMENT
(Roads and Bridges)
and
Nagaland GIS & Remote Sensing Centre
Planning and Coordination Department
Government of Nagaland
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
Page 0|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

In consultation with NESAC/ ISRO

DOCUMENT PREPARED BY

Team NGISRSC
1. Er. Mhathung Kithan
2. Mr Chubawati

Team PWD (R&B)Department, Govt. of Nagaland


1. Er. J.Talimeren Aier, Chief Engineer.
2. Er. Toba Angami,E.E( Design)
3. Er. Ruopfükhrielie Rhi, J.E.

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


Page 1|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

In consultation with NESAC/ ISRO Department of Space, Govt. of India

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


Page 2|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

MORE EFFECTIVE USE OF SPACE TECHNOLOGY TOOLS IN


PWD(R&B)Department
1.0 Introduction about the PWD (R&B) Department.
Nagaland PWD (Roads & Bridges) is headed by Chief Engineer and assisted by
3(Three) zones which are control by Additional Chief Engineer with Headquarter of
Tuensang,Mokokchung and Kohima respectively. Under zones there are 7(Seven)
Circles of Superintendent Engineer’s. The works are carried out by 23(Twenty Three)
Divisions and one Traffic cell in the State .
Under the Department 12108.00Km (Road statistics 2013) stretch of length
is been maintained. Where, there are ongoing projects from various schemes and new
road construction have been proposed during 2015-16.

2.0 Space Based Applications (carried out in the past)


 The Department is using GPS for taking the existing alignment and recording
the location of vital road datas. Its been used for recording the index maps of
the new roads while surveying.

3.0 Space Based Applications (Ongoing)


 As stated in Sl. No.2.0

4.0 Benefits accrued to the Department through Space Based Applications


 The exact existing alignment of the road could be taken and locations of the
vital road data were recorded. Its easier and take very less time and less
human power

5.0 Brief details of the meeting with the Department and its outcome
(NGISRSC to fill this column)
 On 1/3/16 meeting held under the Chairmanship of Chief Secretary was very
encouraging.As per the advancement of technology the needs for application
of Space Technology and Identifying the key areas was discovered. The
Department were asked to identify the key areas for effective application of
the technology.

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


Page 3|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

6.0 Future Space Based Application


 Preparation of DPR for all the new roads. Recording of road datas and
managing road maintenance.

7.0 Likely benefits to the Department through new proposals


 Preparation of DPR for all the new roads will be much easier with less
human power and less cost. The road alignment will be better and estimate
will be more accurate. Managing of road maintenance will be regulated as
per the utility and interval.

8.0 Capacity Building


 Since it’s a new technology all the technocrates will be trained by NGISRSC
and subsequently the subordinate staff can be trained by the technocrates.

9.0 Review Mechanism


The expert directions and suggestions of the scientist from NESAC,
delegates from ISRO will be of vital importance towards the project's successful
completion. Once the Concept areas are approved and rolled-off, project review
meetings and external quality check will be held at regular intervals depending on the
project requirements (most likely quartely or half yearly), apart from the internal quality
checks. Internal quality check team will be established comprising of officials from
Police Department and Nagaland GIS & Remote Sensing Centre. External Quality
check team will comprise of the experts from NESAC and ISRO.

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


Page 4|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

List of space based projects

Name of the Project Activity and Brief Category Annexure


Objective No.
Digitisation and
Large Scale Road Mapping
capturing of spatial
including Bridges, Culverts for
data of all roads, III-A
creating comprehensive Road bridges, culverts,
Database of the State. pavement and other
road assets of the State

To investigate sub-
Investigation and survey of
surface conditions and
Geotechnical for the
materials III-B
construction of new roads.

To generate large scale


Road Sector Analysis using GIS
geographically
Technology.
referenced road
network indicating the
different type/classes of III-C
road and create
attributes table of the
village locations with
demographic indicators

The objective to
Managing Road Maintenance
explore the potential of
Using Geographic Information
GIS in capturing,
System Application. storing, updating, III-D
retrieving, displaying
and printing data to
facilitate road database
management on road
maintenance.

Road alignment and


Study of Road Alignment and
road gradient to
Gradients.
consider when planning
and constructing roads
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
Page 5|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

as road alignment and


gradient is one of the Roads III-E
most important factors
which influence the
frequency of road
maintenance, increases
road maintenance
costs, reduce truck
speed and safety, and
in extreme cases,
demands rebuilding the
whole road.

Development of Real time Road Real time monitoring


monitoring on progress of work of any construction
work (Roads,
building, bridges etc.)
in the state UAV Roads III-F
system or Satellite
based technology for
monitoring and
effective
management of work.

Annexure III-A

1. Title of the Project / Activity:


Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
Page 6|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

Large Scale Road Mapping including Bridges, Culverts for creating


comprehensive Road Database of the State.

1.1 Definition of activities (project background; objectives):


 Digitisation and capturing of spatial data of all roads, bridges, culverts, pavement
and other road assets of the State.
 Creating a road database on the different attributes such as Road Type, Road
Name, Road Quality, Road Status, Road Scheme, date of completion etc.
 Collection and authentication of non-spatial data.
 To developed a system to assist in monitoring and management of road network
information.

1.2 Area of Activity (location of project/ area of operation):


All Districts of Nagaland.

1.3 Roles & Responsibilities of NESAC, NGISRSC & PWD (R&B)Department


NESAC/ ISRO Role: Advisory; project execution; coordination.
NGISRSC Role: Technical assistance and, infrastructure, geospatial database
and facility support, as per objectives requirements.
Department Role: To generate large scale maps and road networks with
demography indicators in various location.

1.4 Scope of Space Based Inputs:


High resolution Satellite imagery.

1.5 Ancillary Data / Information from Department:-

Classifications of road in Nagaland (in Km)

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


Page 7|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3

1.6 Deliverables :
 Replacing existing map by a more detailed road map.
 To establish a database of roads and bridges for planning, prioritizing works for up-
gradation/ maintenance.
 Generation of detailed road map for use in planning and developmental purpose.
 To carry out analysis of road network system in the State.
 Road Information to be made available at Central location for easy access of
information when needed.
 To leverage the advances in IT for developing better management solutions for road
network.

1.7 Timeline and manpower:


 Timeline: 2 years.
 Manpower: 2 Project Scientist and 5 project Assistant.

1.8 Budgetary Estimates

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


Page 8|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

SN Budget head Amount


( in Rs. Lakhs)
1. Data cost and data analysis 8 lakhs

2. Research scientist and JRFs 30 lakhs

3. Survey and field work 14 lakhs

4. Capacity building 3 lakhs

5. GPS handheld 0.8 lakhs

6. Miscellaneous 10 lakhs

Total 65.8 lakhs

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


Page 9|5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

Annexure III-B
2. Title of the Project / Activity:
Investigation and survey of Geotechnical for the construction of new
roads.

2.1 Definition of activities (project background; objectives):


 To investigate sub-surface conditions and materials.
 To check stability of natural slopes.
 Design of earthworks and structural foundation.
 To monitor site conditions.
 It has various application in military, potential mining areas, petroleum and other
engineering disciplines.
 It also concerns the construction occurring on the surface or within the ground.

2.2 Area of Activity (location of project/ area of operation):


All Districts of Nagaland.

2.3 Roles & Responsibilities of NESAC, NGISRSC & PWD (R&B)Department


NESAC/ ISRO Role: Advisory; project execution; coordination
NGISRSC Role: Technical assistance and, infrastructure, geospatial database
and facility support, as per objectives requirements.
Department Role: To generate large scale maps for construction of new roads.

2.4 Scope of Space Based Inputs:


Satellite imagery

2.5 Ancillary Data / Information from Department:-

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


P a g e 10 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

Classifications of road in Nagaland (in Km)

Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3

2.6 Deliverables:
 It will have less hazardous impact on the environment.
 The investigation will locate nearby quarries for material supply.
 Prevention of landslides by providing protective structures.

2.7 Timeline and manpower:


 Timeline: 1 -1. 1/2 years.
 Manpower: 2 Project Scientist and 6 project Assistant.

2.8 Budgetary Estimates


SN Budget head Amount
( in Rs. Lakhs)
1. Data cost and data analysis 6 lakhs
2. Research scientist and JRFs 25.2 lakhs
3. Survey and field work 16 lakhs
4. Capacity building 2 lakhs
5. Miscellaneous 6 lakhs
Total 55.2 lakhs

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


P a g e 11 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

Annexure III-C

3. Title of the Project / Activity:


Road Sector Analysis using GIS Technology.

3.1 Definition of activities (project background; objectives):


 To generate large scale geographically referenced road network indicating the
different type/classes of road and creating village locations with demographic
indicators.
 To study and compute for each village the distance to the nearest road of any type
in the road network.

3.2 Area of Activity (location of project/ area of operation):


All Districts of Nagaland.

3.3 Roles & Responsibilities of NESAC, NGISRSC & PWD (R&B)Department


NESAC/ ISRO Role: Advisory; project execution; coordination
NGISRSC Role: Technical assistance and, infrastructure, geospatial database
and facility support, as per objectives requirements.
Department Role: To generate proper road connectivity throughout the state.

3.4 Scope of Space Based Inputs: Inputs of road components were able
identified as per their locations.

3.5 Ancillary Data / Information from Department:

Classifications of road in Nagaland (in Km)


Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 12 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3

3.6 Deliverables :
 Identify major gaps in the road network.
 Estimate alternative route accessibility.
 Determine the distance of each village from various types of roads/access to road.

3.7 Timeline and manpower:-


 Timeline: 2 years.
 Manpower: 3 Project Scientist, 1 UAV Technical Engineer and 4 project
Assistant.

3.8 Budgetary Estimates


SN Budget head Amount
( in Rs. Lakhs)
1. Data cost and data analysis 7.5 lakhs
2. Research scientist and JRFs 30.8 lakhs
3. Survey and field work 15 lakhs
4. GPS/ UAV equipment 2 lakhs
5. Capacity building 2.5 lakhs
6. Miscellaneous 10 lakhs
Total 67.8 lakhs

Annexure III-D
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 13 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

4. Title of the Project / Activity:


Managing Road Maintenance Using Geographic Information System
Application.

4.1 Definition of activities (project background; objectives):


 The objective to explore the potential of GIS in capturing, storing, updating,
retrieving, displaying and printing data to facilitate road database management on
road maintenance.
 Generation of spatial data on the different types of roads and other road assets,
such as bridges, culverts, kilometer posts and signage.
 Linking of attribute data to the spatial data of each road segment which consist of
construction of road centre lines, kilometer posts, signage, bridges and culverts.

4.2 Area of Activity (location of project/ area of operation):


All Districts of Nagaland.

4.3 Roles & Responsibilities of NESAC, NGISRSC & PWD (R&B)Department


NESAC/ ISRO Role: Advisory; project execution; coordination
NGISRSC Role: Technical assistance and, infrastructure, geospatial database
and facility support, as per objectives requirements.
Department Role: To generate large scale maps of road networks with
demography indicators in various location.

4.4 Scope of Space Based Inputs:


Satellite imagery

4.5 Ancillary Data / Information from Department: -

Classifications of road in Nagaland (in Km)

Total Total
Category Total un-surface
surfaced length
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 14 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

NH 830 0.00 830


SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3

4.6 Deliverables :
 Generation of Road maintenance indicator map on the basis of priority and needs
 Enable fast data access of road database with higher data accuracy and
consistency of data maintained.
 Promoting data sharing to other end-users and generation of map ensuring secure
and better organized roads.

4.7 Timeline and manpower:


 Timeline: 1year.
 Manpower: 3 Project Scientist, 2 JRF's and 5 project Assistant.

4.8 Budgetary Estimates


SN Budget head Amount
( in Rs. Lakhs)
1. Data cost and data analysis 8 lakhs
2. Research scientist and JRFs 24 lakhs
3. Survey and field work 20 lakhs
4. GPS handheld 1 lakh
5. Consultancy/Capacity building 3.5 lakhs
6. Miscellaneous 6 lakhs
Total 62.5 lakhs

Annexure III-E
5. Title of the Project / Activity:

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


P a g e 15 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

Study of Road Alignment and Gradients.

5.1 Definition of activities (project background; objectives):


 Road alignment and road gradient to consider when planning and constructing
roads as road alignment and gradient is one of the most important factors which
influence the frequency of road maintenance, increases road maintenance costs,
reduce truck speed and safety, and in extreme cases, demands rebuilding the
whole road.
 Selection of the study site along the road so that a good number of curves road
sections of different grades could be included.
 GPS to verify the existing road alignments or to add new alignments.

5.2 Area of Activity (location of project/ area of operation):


All Districts of Nagaland

5.3 Roles & Responsibilities of NESAC, NGISRSC & PWD (R&B)Department


NESAC/ ISRO Role: Advisory; project execution; coordination
NGISRSC Role: Technical assistance and, infrastructure, geospatial database
and facility support, as per objectives requirements.
Department Role: To generate maps showing proper road alignment.

5.4 Scope of Space Based Inputs:


Satellite imagery.

5.6 Ancillary Data / Information from Department:-

Classifications of road in Nagaland (in Km)

Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 16 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

MDR 1447 288.9 1735.9


ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3

5.6 Deliverables:
 Generation of map of road re-alignment of all existing roads and future road plans
 To ensure roads are properly planned, constructed and maintained in order for easy
access, smooth transport, safety, comfort and economy on vehicle operations
 To construct proper drainage system.
 Access to roads with minimum number of sharp curves and as far as possible and
steeper gradients.

5.7 Timeline and manpower:
 Timeline: 2 year.
 Manpower: 2 Project Scientist and 6 project Assistant.

5.8 Budgetary Estimates


SN Budget head Amount
( in Rs. Lakhs)
1. Data cost and data analysis 7.5 lakhs
2. Research scientist and JRFs 33.6 lakhs
3. Survey and field work 17 lakhs
4. GPS handheld 0.56 lakhs
5. Capacity building 3 lakhs
6. Miscellaneous 10 lakhs
Total 71.66 lakhs

Annexure III-F
6. Title of the Project / Activity:
Development of Real time Road monitoring on progress of work.
Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre
P a g e 17 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

6.1 Definition of activities (project background; objectives):


 Real time monitoring of any construction work (Roads, building, bridges etc.) in the
state UAV system or Satellite based technology for monitoring and effective
management of work.
 Real time access to the status/progress of work; also detecting the quality of work.

6.2 Area of Activity (location of project/ area of operation):


All Districts of Nagaland.

6.3 Roles & Responsibilities of NESAC, NGISRSC & PWD (R&B)Department


NESAC/ ISRO Role: Advisory; project execution; coordination
NGISRSC Role: Technical assistance and, infrastructure, geospatial database
and facility support, as per objectives requirements.
Department Role: To generate real time road monitoring system.

6.4 Scope of Space Based Inputs:


Satellite imagery.

6.5 Ancillary Data / Information from Department:-


Classifications of road in Nagaland (in Km)

Total Total
Category Total un-surface
surfaced length
NH 830 0.00 830
SH 1207 0.00 1207
MDR 1447 288.9 1735.9
ODR 1791 1957 3748
UR 398.5 60.8 459.3
TR 466 469.8 935.8
VR 1385 3107 4492
DDR 67.5 901.8 969.3
Total length 7592 6785.3 14377.3

Public Works Department(R&B)and Nagaland GIS & Remote Sensing Centre


P a g e 18 | 5
Effective use of Space Technology Based Tools in Public Works Department(R&B)

6.6 Deliverables :
 Generation of High-quality spatial and non-spatial data of the road (either stretches,
junctions or roundabouts, or a combination of them all).
 Evolve a system to enhance traffic flow, incident detection, incident prevention
systems and increase in road safety.

6.7 Timeline and manpower:


 Timeline: 2 year.
 Manpower: 2 Project Scientist, 1 UAV Technical Engineer and 4 project
Assistant

6.8 Budgetary Estimates


SN Budget head Amount
( in Rs. Lakhs)
1. Data cost and data analysis 7.5 lakhs
2. Research scientist and JRFs 34.8 lakhs
3. Survey and field work 7 lakhs
4. UAV equipment 20 lakhs
5. Consultancy/ Capacity building 4 lakhs
6. Miscellaneous 9 lakhs
Total 82.3 lakhs