ite Test Report
|_ ote, 66/11kV PSS-4 Substation
Consultant | Energoprojekt ENTEL 66 kV Cable Pre commissioning Test
‘National Contracting -
Contractor | Company Limited INCC) Power Transformer- BA T-1
Electrical | ARAR Utility and Trading WL | Feeder/Bay No. :B11_| Page 1 of 12
Contractor Temperature: 28°C | Date 017
Cable Route | 66KV GIS to 66/11kV Transformer Cable | Redimtr) | Yellow (mtr) | Blue(mtr)
Cable Type | 66kV, 1X500 Sqmm, Cu, XLPE | Length 33.0 32.05 31.35
66/11kV PSS-4 Substation
Power Transformer- BA T-1
66 kV Cable Pre Commissioning Test Reports
Test - Report
Test Name iol
Reference No.
01 Sheath Continuity Verification R11-01
02 Outer Sheath Integrity R11-02
03 | Insulation Resistance of Link box R11-03
| 0a | Phasing Verification through Conductor R11-04
05 ‘Conductor Insulation Resistance Measurement R11-05
06 Capacitance Measurement R11-06
o7 Conductor DC Resistance R11-07
08 Positive & Negative Sequence Impedance Measurement R11-08
09 Zero Sequence Impedance Measurement R11-09
10 | Link-Box Contact Resistance R11-10
uv High Voltage AC Resonant Test Ri1-11
I Tested by, Witnessed by, Witnessed/Verified by,
Signature (en! yw?
Name CMalicharan Farid Ahmad M. Abdul Rahman
Date Qn) aha 23103 / 2A ESite Test Report _
manna! aan sUler_p Gy salts: ol) Ta
cho eats Cee Gener Bercy A Wane Corporation| uberation
Consultant | Energoprojekt ENTEL m= {66 kV Cable Pre commissioning Test
‘National Contracting Ge® - L
Contractor | "SompanyLinited (NCC) Power Transformer- BA T-1
Electrical | ARAR Utility and Trading WLL Feeder/Bay No. :B11 | Page 2 of 12
Contractor Temperature: 28°C | Date : 23-03-2017
Cable Route | 66KV GIS to 66/11KV Transformer Cable | Red(mtr) | Yellow (mtr) | Blue(mtr)
Cable Type | 66kV, 1X500 Samm, Cu, XLPE Length | 33.0 32.05 31.35
Report No- 11-01
1. Sheath Continuity Verification
Equipment used/Serial No ‘Megger MIT 525 Sno,: 101459059 ]
Calibration due date [12-12-2017 |
Phasing corresponds end to end i.e. Local Measurement to match Remote
Criteria
Settings
Phase Remote End Settings Local End Measurement
Red | earthed Red Shorted
Red Yellow Open Yellow Open
Blue Open Blue ‘Open
Red Open Red Open
Yellow Yellow Earthed Yellow Shorted
{
Blue Open Blue ‘Open
Red Open Red ‘Open
Blue Yellow Open Yellow Open
Blue Earthed Blue Shorted
Remarks
[ Tested by, Witnessed by, Witnessed/Verified by,
| A A ee
Signature
| | het ya
Name cs ¥glicharan Farid Ahmad M, Abdul Rahman
Date aa ahi AUS Lae=
Co - a : i Site Test Report
venera) rean Uo Sys oto —
(Eh et Qatar General ccc aes Coxporation oi Se
Consultant | Energoprojekt ENTEL n= 66 KV Cable Pre commissioning Test
‘National Contracting Gee
Contractor | "Smnpany Limited (NCC) Ct Power Transformer- BA T-1 ah
Electrical | ARAR Utility and Trading WLL Feeder/Bay No.:B11_| Page 3 of 12
Contractor Temperature :28°C | Date : 23-03-2017
Cable Route | 66kV GIS to 66/11kV Transformer Cable | Red (mtr) | Yellow (mtr) | Blue(mtr)
Cable Type | 66kV, 1X500 Sqmm, Cu, XLPE Length | 33.0 32.05 3135
Report No -R11-02
2. Outer Sheath integrity Test
Equipment used/Serial No _| HVA 28 TD, Sno.GH521213C002
Calibration due date _| 05/08/2017 -
{Criteria _[ No insulation breakdown within 1 minute. ]
Red Yellow Blue
IR Before at 5kV/1min. 22.96 17.84G0 24.360
Duration Amin 1min Imin
Voltage (DC) 12kV 12kV 12kV
Measured Current 2.0pA Lipa 3.2 yA
IR After at SkV/1min 35.4GQ 20.360 21960
Result Passed Passed Passed
: —s
Remarks
Tested by, Witnessed by, Witnessed/Verified by,
Signat ) Ure
ignature het Are lk
[Name ‘CS Kalicharan | Farid Ahmad I M. Abdul Rahman
Date B31 ehiae 231031 2A? | =|