You are on page 1of 18
ite Test Report |_ ote, 66/11kV PSS-4 Substation Consultant | Energoprojekt ENTEL 66 kV Cable Pre commissioning Test ‘National Contracting - Contractor | Company Limited INCC) Power Transformer- BA T-1 Electrical | ARAR Utility and Trading WL | Feeder/Bay No. :B11_| Page 1 of 12 Contractor Temperature: 28°C | Date 017 Cable Route | 66KV GIS to 66/11kV Transformer Cable | Redimtr) | Yellow (mtr) | Blue(mtr) Cable Type | 66kV, 1X500 Sqmm, Cu, XLPE | Length 33.0 32.05 31.35 66/11kV PSS-4 Substation Power Transformer- BA T-1 66 kV Cable Pre Commissioning Test Reports Test - Report Test Name iol Reference No. 01 Sheath Continuity Verification R11-01 02 Outer Sheath Integrity R11-02 03 | Insulation Resistance of Link box R11-03 | 0a | Phasing Verification through Conductor R11-04 05 ‘Conductor Insulation Resistance Measurement R11-05 06 Capacitance Measurement R11-06 o7 Conductor DC Resistance R11-07 08 Positive & Negative Sequence Impedance Measurement R11-08 09 Zero Sequence Impedance Measurement R11-09 10 | Link-Box Contact Resistance R11-10 uv High Voltage AC Resonant Test Ri1-11 I Tested by, Witnessed by, Witnessed/Verified by, Signature (en! yw? Name CMalicharan Farid Ahmad M. Abdul Rahman Date Qn) aha 23103 / 2A E Site Test Report _ manna! aan sUler_p Gy salts: ol) Ta cho eats Cee Gener Bercy A Wane Corporation| uberation Consultant | Energoprojekt ENTEL m= {66 kV Cable Pre commissioning Test ‘National Contracting Ge® - L Contractor | "SompanyLinited (NCC) Power Transformer- BA T-1 Electrical | ARAR Utility and Trading WLL Feeder/Bay No. :B11 | Page 2 of 12 Contractor Temperature: 28°C | Date : 23-03-2017 Cable Route | 66KV GIS to 66/11KV Transformer Cable | Red(mtr) | Yellow (mtr) | Blue(mtr) Cable Type | 66kV, 1X500 Samm, Cu, XLPE Length | 33.0 32.05 31.35 Report No- 11-01 1. Sheath Continuity Verification Equipment used/Serial No ‘Megger MIT 525 Sno,: 101459059 ] Calibration due date [12-12-2017 | Phasing corresponds end to end i.e. Local Measurement to match Remote Criteria Settings Phase Remote End Settings Local End Measurement Red | earthed Red Shorted Red Yellow Open Yellow Open Blue Open Blue ‘Open Red Open Red Open Yellow Yellow Earthed Yellow Shorted { Blue Open Blue ‘Open Red Open Red ‘Open Blue Yellow Open Yellow Open Blue Earthed Blue Shorted Remarks [ Tested by, Witnessed by, Witnessed/Verified by, | A A ee Signature | | het ya Name cs ¥glicharan Farid Ahmad M, Abdul Rahman Date aa ahi AUS Lae = Co - a : i Site Test Report venera) rean Uo Sys oto — (Eh et Qatar General ccc aes Coxporation oi Se Consultant | Energoprojekt ENTEL n= 66 KV Cable Pre commissioning Test ‘National Contracting Gee Contractor | "Smnpany Limited (NCC) Ct Power Transformer- BA T-1 ah Electrical | ARAR Utility and Trading WLL Feeder/Bay No.:B11_| Page 3 of 12 Contractor Temperature :28°C | Date : 23-03-2017 Cable Route | 66kV GIS to 66/11kV Transformer Cable | Red (mtr) | Yellow (mtr) | Blue(mtr) Cable Type | 66kV, 1X500 Sqmm, Cu, XLPE Length | 33.0 32.05 3135 Report No -R11-02 2. Outer Sheath integrity Test Equipment used/Serial No _| HVA 28 TD, Sno.GH521213C002 Calibration due date _| 05/08/2017 - {Criteria _[ No insulation breakdown within 1 minute. ] Red Yellow Blue IR Before at 5kV/1min. 22.96 17.84G0 24.360 Duration Amin 1min Imin Voltage (DC) 12kV 12kV 12kV Measured Current 2.0pA Lipa 3.2 yA IR After at SkV/1min 35.4GQ 20.360 21960 Result Passed Passed Passed : —s Remarks Tested by, Witnessed by, Witnessed/Verified by, Signat ) Ure ignature het Are lk [Name ‘CS Kalicharan | Farid Ahmad I M. Abdul Rahman Date B31 ehiae 231031 2A? | =|

You might also like