Project Cycle ===> data rata-rata

Periode Jan '18 s.d Maret '18 (3 bulan terakhir)

Category NameXTof PM Indirect


No. Project Name Direct Customer Customer

1 ITC Romi Syafrin Huawei Tsel Huawei Telkomsel


2 ITC Romi Syafrin XL U900 Huawei XL
3 Survey Romi Syafrin Seahawak Huawei XL
4 ITC Romi Syafrin Tinem_Sumbagteng EID Telkomsel
4
193 25.8 12.9 19.6 23.5 31.8
Durasi ( hari ) per milestone
MOS to OA to SMQC / OA to ATP Doc ATP Doc Approved - ESAR
Total Site Survey Done OA SIR Approved Approved Approved ( 100% )

23 23 23 20 16
10 10 8 8 8
30 15 13 10 10 6
130 130 106 106 55
15.7 49.00
e
ESAR Approved - Inv MOS-Inv Date (
date ( Inv 100% ) 100% )

16
8
6
49 49
Data team on site
Periode Jan '18 s.d Maret'18 (3 bulan terakhir)

wajib wajib wajib wajib opsional

No Nama PM Homebase Position Project Name Remarks 1

1 Romi Syafrin Riau Huawei Tsel


2 Romi Syafrin Riau Huawei XL
3 Romi Syafrin Riau Huawei HCPT
4 Romi Syafrin Riau EID Tsel Tinem Sumbagut
opsional 0 111 123 11
Remarks 2 Team Identification Jan'18 Feb'18 Maret'18

3 3 3
2 2 3
0 0 0
5 5 5
Data Resources Pilihan Non-Internal :
- Outsourcing via PT.Trigamila,
Saat ini (cut off) : 31-Maret-2018 - Subcon Monthly Base via xxxx,
- Subcon Site Base via xxxx,
- Freelance individual.

533 533 528

Nama Line Manager - Employeement Group


No. (INTERNAL / NON- Keterangan NON-INTERNAL
PEMILIK RESOURCES INTERNAL)

1 ANDRI MULIA INTERNAL N/A


2 ANDRI MULIA INTERNAL N/A
3 ANDRI MULIA INTERNAL N/A
4 ANDRI MULIA INTERNAL N/A
5 ANDRI MULIA INTERNAL N/A
6 ANDRI MULIA INTERNAL N/A
7 ANDRI MULIA INTERNAL N/A
8 ANDRI MULIA INTERNAL N/A
9 ANDRI MULIA INTERNAL N/A
10 ANDRI MULIA INTERNAL N/A
11 ANDRI MULIA INTERNAL N/A
12 ANDRI MULIA INTERNAL N/A
13 ANDRI MULIA INTERNAL N/A
14 ANDRI MULIA INTERNAL N/A
15 ANDRI MULIA INTERNAL N/A
16 ANDRI MULIA INTERNAL N/A
17 ANDRI MULIA INTERNAL N/A
18 ANDRI MULIA INTERNAL N/A
19 ANDRI MULIA INTERNAL N/A
20 ANDRI MULIA INTERNAL N/A
21 ANDRI MULIA INTERNAL N/A
22 ANDRI MULIA INTERNAL N/A
23 ANDRI MULIA INTERNAL N/A
24 ANDRI MULIA INTERNAL N/A
25 ANDRI MULIA INTERNAL N/A
26 ANDRI MULIA INTERNAL N/A
27 ANDRI MULIA INTERNAL N/A
28 ANDRI MULIA INTERNAL N/A
29 ANDRI MULIA INTERNAL N/A
30 ANDRI MULIA INTERNAL N/A
31 ANDRI MULIA INTERNAL N/A
32 ANDRI MULIA INTERNAL N/A
33 ANDRI MULIA INTERNAL N/A
34 ANDRI MULIA INTERNAL N/A
35 ANDRI MULIA INTERNAL N/A
36 ANDRI MULIA INTERNAL N/A
37 ANDRI MULIA INTERNAL N/A
38 ANDRI MULIA INTERNAL N/A
39 ANDRI MULIA INTERNAL N/A
40 ANDRI MULIA INTERNAL N/A
41 ANDRI MULIA INTERNAL N/A
42 ANDRI MULIA INTERNAL N/A
43 ANDRI MULIA INTERNAL N/A
44 ANDRI MULIA INTERNAL N/A
45 ANDRI MULIA INTERNAL N/A
46 ANDRI MULIA INTERNAL N/A
47 ANDRI MULIA INTERNAL N/A
48 ANDRI MULIA INTERNAL N/A
49 ANDRI MULIA NON-INTERNAL Outsourcing via PT.Trigamila
50 ANDRI MULIA NON-INTERNAL Outsourcing via PT.Trigamila
51 ANDRI MULIA NON-INTERNAL Subcon Monthly base via RICO
52 ANDRI MULIA NON-INTERNAL Subcon Monthly base via RICO
53 ANDRI MULIA NON-INTERNAL Subcon Monthly base via RICO
54 ANDRI MULIA NON-INTERNAL Subcon Monthly base via RICO
55 ANDRI MULIA NON-INTERNAL Subcon Monthly base via RICO
56 ANDRI MULIA NON-INTERNAL Subcon Site-Base via EPA
57 ANDRI MULIA NON-INTERNAL Subcon Site-Base via EPA
58 ANDRI MULIA NON-INTERNAL Subcon Site-Base via EPA
59 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
60 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
61 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
62 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
63 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
64 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
65 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
66 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
67 ANDRI MULIA NON-INTERNAL Subcon Site-Base via GOLDEN
68 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
69 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
70 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
71 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
72 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
73 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
74 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
75 ANDRI MULIA NON-INTERNAL Subcon Site-Base via MAKMUN
76 ANDRI MULIA NON-INTERNAL Subcon Site-Base via TARSONO
77 ANDRI MULIA NON-INTERNAL Subcon Site-Base via TARSONO
78 ANDRI MULIA NON-INTERNAL Subcon Site-Base via TARSONO
79 ANDRI MULIA NON-INTERNAL Subcon Site-Base via TARSONO
80 Sigit Pramono INTERNAL N/A
81 Sigit Pramono INTERNAL N/A
82 Sigit Pramono INTERNAL N/A
83 Sigit Pramono INTERNAL N/A
84 Sigit Pramono INTERNAL N/A
85 Sigit Pramono INTERNAL N/A
86 Sigit Pramono INTERNAL N/A
87 Sigit Pramono INTERNAL N/A
88 Sigit Pramono INTERNAL N/A
89 Sigit Pramono INTERNAL N/A
90 Sigit Pramono INTERNAL N/A
91 Sigit Pramono INTERNAL N/A
92 Sigit Pramono INTERNAL N/A
93 Sigit Pramono INTERNAL N/A
94 Sigit Pramono INTERNAL N/A
95 Sigit Pramono INTERNAL N/A
96 Sigit Pramono INTERNAL N/A
97 Sigit Pramono INTERNAL N/A
98 Sigit Pramono INTERNAL N/A
99 Sigit Pramono INTERNAL N/A
100 Sigit Pramono INTERNAL N/A
101 Sigit Pramono INTERNAL N/A
102 Sigit Pramono INTERNAL N/A
103 Sigit Pramono INTERNAL N/A
104 Sigit Pramono INTERNAL N/A
105 Sigit Pramono INTERNAL N/A
106 Sigit Pramono INTERNAL N/A
107 Sigit Pramono INTERNAL N/A
108 Sigit Pramono INTERNAL N/A
109 Sigit Pramono INTERNAL N/A
110 Sigit Pramono INTERNAL N/A
111 Sigit Pramono INTERNAL N/A
112 Sigit Pramono INTERNAL N/A
113 Sigit Pramono INTERNAL N/A
114 Sigit Pramono INTERNAL N/A
115 Sigit Pramono INTERNAL N/A
116 Sigit Pramono INTERNAL N/A
117 Sigit Pramono INTERNAL N/A
118 Sigit Pramono INTERNAL N/A
119 CHOIRUL HADI INTERNAL N/A
120 CHOIRUL HADI INTERNAL N/A
121 CHOIRUL HADI INTERNAL N/A
122 CHOIRUL HADI INTERNAL N/A
123 CHOIRUL HADI INTERNAL N/A
124 CHOIRUL HADI INTERNAL N/A
125 CHOIRUL HADI INTERNAL N/A
126 CHOIRUL HADI INTERNAL N/A
127 CHOIRUL HADI INTERNAL N/A
128 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
129 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
130 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
131 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
132 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
133 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
134 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
135 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
136 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
137 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
138 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
139 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
140 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
141 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
142 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
143 CHOIRUL HADI NON-INTERNAL Subcon Monthly-Base via Rico
144 ZULHERMAN INTERNAL N/A
145 ZULHERMAN INTERNAL N/A
146 ZULHERMAN INTERNAL N/A
147 ZULHERMAN INTERNAL N/A
148 ZULHERMAN INTERNAL N/A
149 ZULHERMAN INTERNAL N/A
150 ZULHERMAN INTERNAL N/A
151 ZULHERMAN INTERNAL N/A
152 ZULHERMAN INTERNAL N/A
153 ZULHERMAN INTERNAL N/A
154 ZULHERMAN INTERNAL N/A
155 ZULHERMAN INTERNAL N/A
156 ZULHERMAN INTERNAL N/A
157 ZULHERMAN INTERNAL N/A
158 ZULHERMAN INTERNAL N/A
159 ZULHERMAN INTERNAL N/A
160 ZULHERMAN INTERNAL N/A
161 ZULHERMAN INTERNAL N/A
162 ZULHERMAN INTERNAL N/A
163 ZULHERMAN INTERNAL N/A
164 ZULHERMAN INTERNAL N/A
165 ZULHERMAN INTERNAL N/A
166 ZULHERMAN INTERNAL N/A
167 ZULHERMAN INTERNAL N/A
168 ZULHERMAN INTERNAL N/A
169 ZULHERMAN INTERNAL N/A
170 ZULHERMAN INTERNAL N/A
171 ZULHERMAN INTERNAL N/A
172 ZULHERMAN INTERNAL N/A
173 ZULHERMAN INTERNAL N/A
174 ZULHERMAN INTERNAL N/A
175 ZULHERMAN INTERNAL N/A
176 ZULHERMAN INTERNAL N/A
177 ZULHERMAN INTERNAL N/A
178 ZULHERMAN INTERNAL N/A
179 ZULHERMAN INTERNAL N/A
180 ZULHERMAN INTERNAL N/A
181 ZULHERMAN NON-INTERNAL Outsourcing via PT.Trigamila
182 ZULHERMAN NON-INTERNAL Outsourcing via PT.Trigamila
183 ZULHERMAN NON-INTERNAL Outsourcing via PT.Trigamila
184 ZULHERMAN NON-INTERNAL Outsourcing via PT.Trigamila
185 ZULHERMAN NON-INTERNAL Outsourcing via PT.Trigamila
186 Alamsyah Tari INTERNAL N/A
187 Alamsyah Tari INTERNAL N/A
188 Alamsyah Tari INTERNAL N/A
189 Alamsyah Tari INTERNAL N/A
190 Alamsyah Tari INTERNAL N/A
191 Alamsyah Tari INTERNAL N/A
192 Alamsyah Tari INTERNAL N/A
193 Alamsyah Tari INTERNAL N/A
194 Alamsyah Tari INTERNAL N/A
195 Alamsyah Tari INTERNAL N/A
196 Alamsyah Tari INTERNAL N/A
197 Alamsyah Tari INTERNAL N/A
198 Alamsyah Tari INTERNAL N/A
199 Alamsyah Tari INTERNAL N/A
200 Alamsyah Tari INTERNAL N/A
201 Alamsyah Tari INTERNAL N/A
202 Alamsyah Tari INTERNAL N/A
203 Alamsyah Tari INTERNAL N/A
204 Alamsyah Tari INTERNAL N/A
205 Alamsyah Tari INTERNAL N/A
206 Alamsyah Tari INTERNAL N/A
207 Alamsyah Tari NON-INTERNAL Trigamila
208 Alamsyah Tari NON-INTERNAL Trigamila
209 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
210 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
211 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
212 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
213 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
214 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
215 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
216 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
217 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
218 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
219 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
220 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
221 BIMO PURNOMO NON-INTERNAL Outsourcing via PT.GMT
222 BIMO PURNOMO NON-INTERNAL Outsourcing via Maulana Malik
223 BIMO PURNOMO NON-INTERNAL Outsourcing via Maulana Malik
224 BIMO PURNOMO NON-INTERNAL Outsourcing via Maulana Malik
225 BIMO PURNOMO NON-INTERNAL Outsourcing via Maulana Malik
226 BIMO PURNOMO NON-INTERNAL Outsourcing via Tri Wardoyo
227 BIMO PURNOMO NON-INTERNAL Outsourcing via Tri Wardoyo
228 BIMO PURNOMO NON-INTERNAL Outsourcing via Tri Wardoyo
229 BIMO PURNOMO NON-INTERNAL Outsourcing via Tri Wardoyo
230 BIMO PURNOMO NON-INTERNAL Outsourcing via Tri Wardoyo
231 BIMO PURNOMO NON-INTERNAL Freelance individual
232 BIMO PURNOMO NON-INTERNAL Freelance individual
233 BIMO PURNOMO NON-INTERNAL Freelance individual
234 BIMO PURNOMO NON-INTERNAL Freelance individual
235 BIMO PURNOMO NON-INTERNAL Outsourcing via Rico
236 BIMO PURNOMO NON-INTERNAL Outsourcing via Rico
237 BIMO PURNOMO INTERNAL
238 BIMO PURNOMO INTERNAL
239 BIMO PURNOMO INTERNAL
240 BIMO PURNOMO INTERNAL
241 BIMO PURNOMO INTERNAL
242 CEPI HENDRI INTERNAL N/A
243 CEPI HENDRI INTERNAL N/A
244 CEPI HENDRI INTERNAL N/A
245 CEPI HENDRI INTERNAL N/A
246 CEPI HENDRI INTERNAL N/A
247 CEPI HENDRI INTERNAL N/A
248 CEPI HENDRI INTERNAL N/A
249 CEPI HENDRI INTERNAL N/A
250 CEPI HENDRI INTERNAL N/A
251 CEPI HENDRI INTERNAL N/A
252 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila
253 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila
254 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila
255 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila
256 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila
257 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila
258 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila
259 CEPI HENDRI NON-INTERNAL Outsourcing via PT.Trigamila

260 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo
261 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

262 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

263 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

264 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

265 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

266 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

267 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

268 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

269 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

270 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

271 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

272 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

273 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

274 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

275 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

276 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

277 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

278 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

279 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

280 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

281 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

282 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

283 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

284 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

285 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

286 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo
287 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

288 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

289 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

290 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

291 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Agus Prabowo

292 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Dody


293 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Dody
294 CEPI HENDRI NON-INTERNAL Subcon Monthly Base via Dody
295 CEPI HENDRI NON-INTERNAL Freelance Individual
296 ROMI SYAFRIN INTERNAL N/A
297 ROMI SYAFRIN INTERNAL N/A
298 ROMI SYAFRIN INTERNAL N/A
299 ROMI SYAFRIN INTERNAL N/A
300 ROMI SYAFRIN INTERNAL N/A
301 ROMI SYAFRIN INTERNAL N/A
302 ROMI SYAFRIN INTERNAL N/A
303 ROMI SYAFRIN INTERNAL N/A
304 ROMI SYAFRIN INTERNAL N/A
305 ROMI SYAFRIN INTERNAL N/A
306 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
307 ROMI SYAFRIN NON-INTERNAL Subcon Monthly base via ABC
308 ROMI SYAFRIN INTERNAL N/A
309 ROMI SYAFRIN INTERNAL N/A
310 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
311 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
312 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
313 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
314 ROMI SYAFRIN INTERNAL N/A
315 ROMI SYAFRIN INTERNAL N/A
316 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
317 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
318 ROMI SYAFRIN INTERNAL N/A
319 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
320 ROMI SYAFRIN INTERNAL N/A
321 ROMI SYAFRIN INTERNAL N/A
322 ROMI SYAFRIN INTERNAL N/A
323 ROMI SYAFRIN INTERNAL N/A
324 ROMI SYAFRIN INTERNAL N/A
325 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
326 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
327 ROMI SYAFRIN INTERNAL N/A
328 ROMI SYAFRIN INTERNAL N/A
329 ROMI SYAFRIN INTERNAL N/A
330 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
331 ROMI SYAFRIN INTERNAL N/A
332 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
333 ROMI SYAFRIN INTERNAL N/A
334 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
335 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
336 ROMI SYAFRIN INTERNAL N/A
337 ROMI SYAFRIN INTERNAL N/A
338 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
339 ROMI SYAFRIN NON-INTERNAL Outsourcing via PT.Trigamila
340 ROMI SYAFRIN INTERNAL N/A
341 ROMI SYAFRIN INTERNAL N/A
342 ROMI SYAFRIN INTERNAL N/A
343 SUBRAN INTERNAL N/A
344 SUBRAN INTERNAL N/A
345 SUBRAN INTERNAL N/A
346 SUBRAN INTERNAL N/A
347 SUBRAN INTERNAL N/A
348 SUBRAN INTERNAL N/A
349 SUBRAN INTERNAL N/A
350 SUBRAN INTERNAL N/A
351 SUBRAN INTERNAL N/A
352 SUBRAN INTERNAL N/A
353 SUBRAN INTERNAL N/A
354 SUBRAN INTERNAL N/A
355 SUBRAN INTERNAL N/A
356 SUBRAN INTERNAL N/A
357 SUBRAN INTERNAL N/A
358 SUBRAN INTERNAL N/A
359 SUBRAN INTERNAL N/A
360 SUBRAN INTERNAL N/A
361 SUBRAN INTERNAL N/A
362 SUBRAN INTERNAL N/A
363 SUBRAN INTERNAL N/A
364 SUBRAN INTERNAL N/A
365 SUBRAN INTERNAL N/A
366 SUBRAN INTERNAL N/A
367 SUBRAN INTERNAL N/A
368 SUBRAN INTERNAL N/A
369 SUBRAN INTERNAL N/A
370 SUBRAN INTERNAL N/A
371 SUBRAN INTERNAL N/A
372 SUBRAN INTERNAL N/A
373 SUBRAN INTERNAL N/A
374 SUBRAN INTERNAL N/A
375 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
376 SUBRAN INTERNAL N/A
377 SUBRAN INTERNAL N/A
378 SUBRAN INTERNAL N/A
379 SUBRAN INTERNAL N/A
380 SUBRAN INTERNAL N/A
381 SUBRAN INTERNAL N/A
382 SUBRAN INTERNAL N/A
383 SUBRAN INTERNAL N/A
384 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
385 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
386 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
387 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
388 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
389 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
390 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
391 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
392 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
393 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
394 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
395 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
396 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
397 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
398 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
399 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
400 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
401 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
402 SUBRAN INTERNAL N/A
403 SUBRAN INTERNAL N/A
404 SUBRAN INTERNAL N/A
405 SUBRAN INTERNAL N/A
406 SUBRAN INTERNAL N/A
407 SUBRAN INTERNAL N/A
408 SUBRAN INTERNAL N/A
409 SUBRAN INTERNAL N/A
410 SUBRAN INTERNAL N/A
411 SUBRAN INTERNAL N/A
412 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
413 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
414 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
415 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
416 SUBRAN NON-INTERNAL Outsourcing via PT.Trigamila
417 Wirahidin INTERNAL N/A
418 Wirahidin INTERNAL N/A
419 Wirahidin INTERNAL N/A
420 Wirahidin INTERNAL N/A
421 Wirahidin INTERNAL N/A
422 Wirahidin INTERNAL N/A
423 Wirahidin INTERNAL N/A
424 Wirahidin INTERNAL N/A
425 Wirahidin INTERNAL N/A
426 Wirahidin NON-INTERNAL Outsourcing via PT.Trigamila
427 Wirahidin INTERNAL N/A
428 Wirahidin INTERNAL N/A
429 Wirahidin INTERNAL N/A
430 Wirahidin INTERNAL N/A
431 Wirahidin NON-INTERNAL Outsourcing via PT.Trigamila
432 Wirahidin NON-INTERNAL Outsourcing via PT.Trigamila
433 Wirahidin NON-INTERNAL Subcon Site-Base via Golden Djava
434 Wirahidin NON-INTERNAL Subcon Site-Base via Golden Djava
435 Wirahidin NON-INTERNAL Subcon Site-Base via Arief BW
436 Wirahidin NON-INTERNAL Subcon Site-Base via Arief BW
437 Wirahidin NON-INTERNAL Subcon Site-Base via Arief BW
438 Wirahidin NON-INTERNAL Subcon Site-Base via Arief BW
439 Wirahidin NON-INTERNAL Subcon Site-Base via I Made Darmada
440 Wirahidin NON-INTERNAL Subcon Site-Base via Arief BW
441 Wirahidin NON-INTERNAL Subcon Site-Base via Golden Djava
442 Wirahidin NON-INTERNAL Subcon Site-Base via Golden Djava
443 Wirahidin NON-INTERNAL Subcon Site-Base via Arief BW
444 Wirahidin NON-INTERNAL Subcon Site-Base via Golden Djava
445 Wirahidin NON-INTERNAL Subcon Site-Base via Arief BW
446 Wirahidin NON-INTERNAL Subcon Site-Base via Pamungkas
447 Wirahidin NON-INTERNAL Subcon Site-Base via Faisal ST
448 Wirahidin NON-INTERNAL Subcon Site-Base via Allan Sullivano
449 Wirahidin NON-INTERNAL Subcon via Terang Telekomunikasi
450 AGUS SUSILO INTERNAL N/A
451 AGUS SUSILO INTERNAL N/A
452 AGUS SUSILO INTERNAL N/A
453 AGUS SUSILO INTERNAL N/A
454 AGUS SUSILO INTERNAL N/A
455 AGUS SUSILO INTERNAL N/A
456 AGUS SUSILO INTERNAL N/A
457 AGUS SUSILO INTERNAL N/A
458 AGUS SUSILO INTERNAL N/A

459 AGUS SUSILO INTERNAL N/A

460 AGUS SUSILO INTERNAL N/A


461 AGUS SUSILO INTERNAL N/A
462 AGUS SUSILO INTERNAL N/A
463 AGUS SUSILO INTERNAL N/A
464 AGUS SUSILO INTERNAL N/A
465 AGUS SUSILO INTERNAL N/A
466 AGUS SUSILO INTERNAL N/A

467 AGUS SUSILO INTERNAL N/A

468 AGUS SUSILO INTERNAL N/A


469 AGUS SUSILO INTERNAL N/A
470 AGUS SUSILO INTERNAL N/A
471 AGUS SUSILO INTERNAL N/A
472 AGUS SUSILO INTERNAL N/A
473 AGUS SUSILO INTERNAL N/A
474 AGUS SUSILO INTERNAL N/A

475 AGUS SUSILO INTERNAL N/A

476 AGUS SUSILO INTERNAL N/A


477 AGUS SUSILO INTERNAL N/A
478 AGUS SUSILO INTERNAL N/A

479 AGUS SUSILO INTERNAL N/A

480 AGUS SUSILO INTERNAL N/A


481 AGUS SUSILO INTERNAL N/A
482 AGUS SUSILO INTERNAL N/A
483 AGUS SUSILO INTERNAL N/A
484 AGUS SUSILO INTERNAL N/A
485 AGUS SUSILO INTERNAL N/A
486 AGUS SUSILO INTERNAL N/A
487 AGUS SUSILO INTERNAL N/A
488 AGUS SUSILO INTERNAL N/A
489 AGUS SUSILO INTERNAL N/A
490 AGUS SUSILO INTERNAL N/A
491 AGUS SUSILO INTERNAL N/A
492 AGUS SUSILO INTERNAL N/A
493 AGUS SUSILO INTERNAL N/A
494 AGUS SUSILO INTERNAL N/A
495 AGUS SUSILO INTERNAL N/A

496 AGUS SUSILO INTERNAL N/A

497 AGUS SUSILO INTERNAL N/A

498 AGUS SUSILO INTERNAL N/A


499 AGUS SUSILO INTERNAL N/A
500 AGUS SUSILO INTERNAL N/A
501 AGUS SUSILO INTERNAL N/A
502 AGUS SUSILO INTERNAL N/A
503 AGUS SUSILO INTERNAL N/A
504 AGUS SUSILO INTERNAL N/A
505 AGUS SUSILO INTERNAL N/A
506 AGUS SUSILO INTERNAL N/A
507 AGUS SUSILO INTERNAL N/A
508 AGUS SUSILO INTERNAL N/A
509 AGUS SUSILO INTERNAL N/A
510 AGUS SUSILO INTERNAL N/A
511 AGUS SUSILO INTERNAL N/A

512 AGUS SUSILO INTERNAL N/A

513 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila


514 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
515 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
516 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
517 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
518 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
519 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
520 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
521 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
522 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
523 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
524 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
525 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
526 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
527 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
528 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
529 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
530 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
531 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
532 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
533 AGUS SUSILO NON-INTERNAL Outsourcing via PT.Trigamila
533

Kelompok TITLE / fungsi di


Nama versi PROJECT / sesuai KTP NIK (versi HR)
resource PROJECT

Back Office Andri Mulia Project Manager 1211583


Back Office Astrida Mayangsari Admin 1111205
Back Office Sifa Fauziah Admin Permit 1111203
Back Office Heni Nurmayant Document Control 1412015
Back Office Riesky Irwansyah Document Control 1713585
Back Office Putra Ade Thamrin Document Control 1813600
Back Office MEGI TRI BAWONO 2 Implementaton Supervisor 1713409
Back Office MU'TAMAR Implementaton Supervisor 2004074
Back Office SURIPYONO NOTO SUSANTO Implementaton Supervisor 1613027
Back Office ALMU JAMROH ISDP SS SV & WH 2004106
Back Office IRFAN FIRANANDA SMQC 1512401
Back Office SONY HANAFIAH QHSE 2004109
Back Office RIDWAN SANTOSO Permit Messanger 1111132
Back Office ERIL KHAIRIL HUSAM BSS / Integrator 1412011
Back Office DARWIN SAPUTRA 2 BSS / Integrator 1512375
Back Office ROMADON BSS / Integrator 1211531
Back Office MUHAMMAD RIVAI BSS / Integrator 1713500
Field TRI YANTO Engineer 1110996
Field KIKI RAHMAT HIDAYAT Engineer 1111159
Field DICKI LESMANA Engineer 1111229
Field DHANY ACHMAD Engineer 1211427
Field ROBIN RIZKI SIHOMBING Engineer 1311918
Field DICKY ARIE PERMADI Engineer 1412051
Field LALAN TARLAN Engineer 1412111
Field YUDHISTIRA SABRY 2 Engineer 1512273
Field DANI OKTAFIYANA Engineer 2005272
Field DWI FEBRIANTO Engineer 2009694
Field BARRUN ROHIM Engineer 2010860
Field GORO SUSILO Engineer 1412232
Field ABDUL HAMID Engineer 1512458
Field SLAMET GUNAWAN Team Leader 2004082
Field ACHMAD MUANJARI Team Leader 1111230
Field ENO HARDIYANTO Team Leader 1512428
Field CHAIRUL ICHSAN Team Leader 1612880
Field MUSLIMIN Team Leader 2009702
Field HERIZA FRANSISKA Team Leader 2010799
Field FAHRULLUDIN Team Leader 2010861
Field NANANG KASI YANTO Team Leader 1411967
Field ALFIANSYAH FADILLAH Team Leader 1412038
Field TARYAN NUGRAHA Team Leader 1412209
Field RIYANTO SAPUTRA Team Leader 1412210
Field TAUFIK Installer 1512352
Field RIO PERMANA Installer 1612737
Field DIDIT PRASETIO Installer 1612738
Field ACHMAD MULYADI Installer 1612856
Field HERIANSYAH Team Leader 1612973
Field SOPIAN ISKANDAR Installer 1612974
Field ASEP DAROJAT Installer 1612975
Field FADILAH RUKIAN MADJID Installer T180283
Field PERDIANSYAH Installer T180284
Field Radena Dwi Santka Heryana Team Leader N/A
Field Ayi Muhammad Yusuf Installer N/A
Field Mochamad Komarudin Engineer N/A
Field Yudha Pratama Installer N/A
Field Rona Irawan Installer N/A
Field Maryudi Engineer N/A
Field Arif supriyanto Team Leader N/A
Field Abdul Basit Installer N/A
Field Syarifudin Team Leader N/A
Field Rifaldi Installer N/A
Field Rizal Installer N/A
Field Irpansyah Team Leader N/A
Field Sanusi Installer N/A
Field Ayub Albar Installer N/A
Field Riyat Team Leader N/A
Field Offilany Saputra Installer N/A
Field Hamdan Installer N/A
Field Syafrizal Hakim Pane Team Leader N/A
Field Dimas Installer N/A
Field Hasanudin Installer N/A
Field Burhan Installer N/A
Field Ma'mun Team Leader N/A
Field Nasrudin Installer N/A
Field Agus Installer N/A
Field Sayono Installer N/A
Field Jaenudin Team Leader N/A
Field Mahbub Installer N/A
Field Tarsono Installer N/A
Field Andiyana Installer N/A
Back Office Priyo Widodo Imp Supervisor
Back Office Risdianto Imp Supervisor/HSE
Back Office Asep Supriyadi Imp Supervisor
Back Office Dwi Apri P DC
Back Office Budi Kristanto DC
Back Office Eva Yuniant DC
Back Office Hendy Ferdian QC
Back Office Dwiyani Admin
Back Office Ani Muharsant Admin
Field Achmad Samsuri Engineer
Field Eka Five T P Engineer
Field Ade Maryanto Engineer
Field Supriyono Team Leader
Field Kuriawan Riko A Team Leader
Field Galang Novan A Team Leader
Field Didik Wahyudi Team Leader
Field Kusmiarto Team Leader
Field Bangun Setawan Team Leader
Field Didik Priyono Installer
Field Irwan Sahroni Installer
Field Alif Priyatno Installer
Field Indra Installer
Field Moch Mansur Installer
Field Sutrasno Adi S Installer
Back Office Adi Rismayanto Imp Supervisor
Field Arsikin Sugeng Engineer
Field Gonggo Adi Arif B Installer
Field Kuntoro Engineer
Field Kusno Sujarwadi Team Leader
Field Muslih Rojuli Installer
Field Nur Ashar Hasyim Engineer
Field Slamet Riyadi Engineer
Field Abdul Kasmin
Field Abdul Sabir
Field Abdullah
Field Riski Setawan Saputra
Field Sumarir
Field Yunus
Field Muh Aidul Satria
PUTRI CHAIRIYAH Admin 1411959
NASARUDDIN Coordinator 2004066
FERDIANSAH Document Controler 2004079
SISKA MARBUN Admin 1111038
Supriyadi Team leader 1211568
Andi Rudi Cahyono Installer 1612629
Ardiansyah Tanjung Installer 1612659
Nurdiyanto Engineer 1211537
Marwan Leader 2004180
Asep Suhaeri Engineer N/A
Agus Hidayatulloh Team Leader N/A
Muhammad Wahid Fauzi Installer N/A
Rohadi Installer N/A
Andi Wawan Engineer N/A
Topik Team Leader N/A
Erwin Syahputra Installer N/A
Muhamad Liyadih Installer
Iyus januar Maulana Engineer
Eful Saepul Hamdan Team Leader
Dadang Rahmat Installer
Ari Mardian Lukman Installer
Gita Mustka Arifiender
Hardianto
Erlan Adi Pamungkas
Ricki Ade Chandra
Albert Fernandes SR.Installer 1110962
Alfajri Installer 1412072
Alfajri Gendi Installer 1512409
Andi Kuswara Engineering Engineer 2008656
Andikel Permata Installaton SPV 1111027
Aziz Sumanto SR.Installer 1412005
Cepi Supriyatna JR. Engineer 1111208
Charles Engineer 1311838
Chintya Martnus Project Administrasi 1612675
Deni Kembara Engineer 1110967
Dodi Arkam Implementaton SPV 1111040
Doni Chandra SR.Team Leder 2009684
Eri Supriadi SR.Team Leder 2008667
Febri Suhada SR. Installer 1412192
Hamda Nurrahman Team Leader 2009720
Hari Saputra SR.Engineer 2009711
Harry Kurnia JR. Engineer 1411985
Hendra Yones SR. Team Leader 2007577
Hendri Saputra SR.Installer 1311745
Indra Rahmad JR. Engineer 1412104
Irwanto Engineer 2008658
Jumino SR.Installer 1412226
Mulyadi Dasril SR.Installer 1412225
Resky JR. Engineering Engineer 2008657
Rico Putra SR. Team Leader 2009785
Safirman SR.Installer 1110963
Satria Buana Putra JR. Team Leader 1311846
Satrio Wibowo JR. Engineer 1110968
Suhendri SR. Team Leader 2007576
Sukri Helmi SR.Installer 1311863
Surya Team Leder 2007579
Syafri SR. Installer 2009715
Tasril Ahmad SR. Team Leader 2009695
Teguh Evan Engineer 1110965
Wahyu Purdawan Engineer 1110959
Wartsi Wandi Engineering Engineer 2008679
Yaldi Fandaris SR.Installer 1412023
Putra Apri mananda Installer NY
Aris Toteles Installer NY
Zulfailham Installer NY
Januar Devi Installer NY
Efri Oktarizal Installer NY
Field ADI WIJAYA Engineer 1211453
Field AMINUDIN Team Leader 1411998
Field ANNAAS ZUKHRUF Installer 1512541
Field ASEP SURYANA Installer 1412194
Field AWALUDIN Installer 1612660
Field FAHMI Installer spv 1211541
Field HENDRIK Installer 1612735
Field M IBNU ADAM AZHARI Team leader 1512433
Field NAZAN ZAKARYA Installer spv 1311839
Field SUSANTO Installer 1512387
Field FATAHILLAH Team leader 1311840
Field HENDRA KURNIAWAN MAWARDI Engineer 1110988
Field ENGKUS Installer spv 1412047
Back Office ARIF PRIYONO Engineer 1512235
Field AYI RUKMANA P Engineer 2004114
Field EDWIN TRI PUTRA Engineer 1512297
Field Martn Installer 1612846
Field Saripudin Engineer 1612698
Field Cecep Trisna Installer 1512386
Field Sukarmaji Installer 1713446
Field Dwi Yulianto Installer 1713455
Field Dimas Installer 1813678
Back Office Dendi DC
Field Reffangga Ajib Yudhatama Putra Engineer
Field Anggara pustan Kusuma Perdana Installer NA
Field Slamet catur wicaksono Installer NA
Field Andi Rohadi Engineer NA
Field Subandi Installer NA
Field Indra Haryono Installer NA
Field Suripto Installer NA
Field Anggara Alkhair Engineer NA
Field Hary Setyawan Installer NA
Field Yulianto Engineer NA
Field Miftahudin Installer NA
Field Rois Iskandar Installer NA
Field Kartam Installer NA
Field Maulana Malik Engineer NA
Field Sugiarto Installer NA
Field Andi Susanto Installer NA
Field Heri Installer NA
Field Hasan Bisri Engineer NA
Field Sugiono Installer NA
Field Diana Hudan Installer NA
Field Aziz Juniadi Prasetyo Installer NA
Field Krisdiyanto Engineer NA
Field Djunanto Engineer NA
Field Mugiono Installer NA
Field Abdul Syarifudin Installer NA
Field Asep Saputra Installer NA
Field Jafar Sodik Prihandoko Engineer NA
Field Mohammad Fuad Installer NA
Back Office SARWONO Implementaton Supervisor 2004065
Field ZULFIKAR Engineer 2004103
Field SUHARDI Leader 2004212
Field JOKO ARI WIBOWO Engineer 2005299
Back Office DONNI PRENGKY PANGKEY Engineering Staff Coordinator 2010914
Back Office CEPI HENDRI Project Manager 1412063
Field Anwar Team Leader 1412134
Field Ipanli Suharta Engineer 1311881
Field M. Febrianda Alfiqih Coordinator Huawei Tsel 1512270
Field Miftah Farid Engineer 1612821
Field Saut Pinayungan Installer 1713523
Field Ahmad Shalim Engineer 1713584
Field Dedi Arianto Team Leader 1813595
Field Febi Aditya Putra Engineer 1813622
Field Ghazali Hasan Team Leader 1713524
Back Office R.A. Chera Ayarizki Engineering Huawei
Field Irfan Juanda Document Control Huawei Tsel
Field Suheri Efendi Nasuton Installer
Field Ade Suhendra Lubis Installer
Back Office Riyaldi Rafiza Permit Huawei Tsel
Back Office Delfia Riska Br. Manurung Engineering Huawei
Back Office Muhammad Suhendra Rinata Engineering Huawei Muhammad Suhendra Rinata
Field Fakhry Pebrian Installer

Field Eno Prasetyo Engineer


Field Risky K Leader

Field Ampera Yaman Saragih Member

Field Al Amin Marpaung Member

Field Edi Nugroho Engineer

Field Ahmad Rizal D Leader

Field Khaidir Ali Member

Field Suryono Member

Field Raja T Aritonang Engineer

Field Syarifuddin Siregar Leader

Field Anju Luhut Pasaribu Member

Field Brotherson Member

Field Novreza Engineer

Field Apip Persada Tarigan Leader

Field Noviansyah nst Member

Field Nanang Setawan Member

Field Harpan Sihaloho Engineer

Field Aberikus Tobing Leader

Field M Roby Member

Field Boy Boslen Purba Member

Field Alvontus Siregar Engineer

Field Patar Simanjuntak Leader

Field Rinaldi Sianturi Member

Field Tahan Hutauruk Member

Field Royal Malau Engineer

Field Hendri Gultom Leader

Field Erixson Wijaya Sihite Member


Field Guntur Pratama Putra Member

Field Sahanan Sunarto Engineer

Field Surya Candra Darma Leader

Field Abdullah Anggoro Member

Field Angga Andrea NST Member

Field Eri Iskandar Leader


Field Maikel Ferdian Member
Field Buhari Muslim Member
Field Jayusman Quality Control
Field ABDUL HAMIN HASUGIAN Installer 1713244
Field ALI AHMAD MAULANA Installer T170263
Back Office ANDRI SAEFUDIN Coordinator 2005238
Field ANDRI SAPUTRA R Leader 1512385
Field BAMBANG Leader 2005298
Field BILOK SIMATUPANG Engineer 1713243
Back Office CLARA DIVA Project Admin 1713459
Field DADANG GUSNERI Installer 1713518
Field DANI YUELPIT Leader 1412190
Back Office DEVIDEF PRANSISCA Coordinator DC 2007545
Field DIKA IZAR JULIANDY Installer T170208
Field DIRGA PUTRA Installer T160132
Field DODI ISKANDAR Leader 2008629
Field ECI ARYA PUTRA Engineer 2008632
Field FADROL RAHMAN Engineer T170216
Field FAHRUL SIAHAAN Installer T160111
Field FAUZAN MUZAKI Installer T170215
Field FIL U'QAD Installer T160089
Field FIRMAN Engineer 1612820
Field FIRMANSYAH Engineer 1512384
Field GEMA PURNAMA BINTANG Installer T170260
Field GUNAWAN Installer T160123
Field GUNAWAN SYAHPUTRA Engineer 1612814
Field HADIATMA Installer T160124
Back Office HUDYA PUTRA Coordinator 1110969
Field JESSE TOBING Leader 1512474
Field JOHANNES HUTAGALUNG Installer 1412145
Field JUINRO PANDIANGAN Engineer 1612815
Field MARIO ADE PUTRA Engineer 1612827
Back Office MILA FEBRIDA Admin Kas T170205
Back Office MUHAMMAD AWALUDDIN Project Support T170217
Back Office MUHAMMAD RISKI Document Control 1713519
Back Office NOVAL JASNIZAL Document Control 1412189
Field PAGAR ANDREAS Leader 1412196
Field RANDI MUJAHIDDIN Installer T170180
Back Office REZA GUSPIAN Coordinator 2009681
Field RIADI KIFLI Installer T170261
Field RISKI RAMADHANI Leader 1713520
Field ROFIL TAMARA ARBI Installer T170262
Field ROHMAN Installer T160100
Back Office ROMI SYAFRIN Project Manager 2007555
Field SUMARDI Engineer 2004102
Field SURYADI PURNOMO Installer T170243
Field VITO QUINSTA FATTAR Installer T160059
Field YANUARDI Leader 1311798
Field YOGI RAMANDHA Engineer 1411986
Field ZIKRI AHMAD Installer T160130
Back Office SUBRAN Project Manager 2010895
Field Andri Martua Simanjuntak Engineer 1412148
Field Bernard Steven Lumbantoruan Team Leader 1412149
Field Buha Munte Engineer 1412137
Field Dedi Syahrimi Team leader 1311882
Back Office Dewi Maya Sari Kasir & GA 1612822
Field Faqih Abdul Azis Engineer 1512405
Field Hendy Jayasyah Team Leader 1512287
Field Joiada Sihotang Installer 1412144
Field Joni Patla Nasuton Team Leader 1412150
Field M Arifin Harahap Engineer 1412146
Field Mario Silalahi Engineer 1412142
Field Mhd. Rizatul Arifin Selian Engineer 1512289
Field Moris Timson Munthe Team Leader 1512570
Field Muhammad Nicko Prayudha Engineer 1612679
Field Paian Hutagalung Engineer 1412157
Field Paulus Hadi Chandra Sianturi Engineer 1512288
Field Perianto Nasuton Team Leader 1412140
Field Tulus R.F. Samosir Engineer 1412139
Back Office Tumiar Raisa G. Siagian Engineering EID 1412154
Field Zulkarnain Tahir Sinulingga Coordinator EID 1412039
Field Robert Joe Pasaribu Team Leader 1612985
Field Ilyas Syahputra Engineer 1612986
Back Office Muhammad Zaki Permit Access Area Sumbagut 1612987
Field Suyetno Team Leader 1713069
Field Deni Sulaiman Engineer 1713495
Back Office M Saiful Bahri Sub PS 1713496
Field Senator Tarigan Team Leader 1713493
Back Office Vivi Handayani Engineering EID 1713494
Field Suhartono Team Leader 1713517
Field Ahmad Yusuf Lubis Installer
Field Ari Syahputra Installer
Field Dodi Syahputra Installer
Field Habib Fatahillah Installer
Field Marben Badia Pasaribu Installer
Field Murdhoko Suardho Installer
Field Mursal Team Leader
Field Panji Puja Kesuma Installer
Field Suhendra Installer
Field Yudha Simorangkir Team Leader
Field Wanri Tampubolon Installer
Field Hariyanto Silalahi Installer
Field Muhammad Aditya Sentanu Installer Muhammad Aditya Sentanu
Field Indra Zena Installer
Field Fuad Hasan Harahap Installer
Field Tolip Tambak Installer
Field Feri Irawan Installer
Field Muhammad Joko Paisal Installer
Field Victorianus Tarigan Installer
Field Untung Fernando Nadeak Installer
Field Imron Agusta Installer
Field Zulkifli Perdana Manik Installer
Field Ardi Fardiansyah Nasuton Installer
Field Tengku Arief Kurnia Installer
Field Yosia Mangihut Tua Manik Installer
Field Repizal Installer
Field Muhammad Subur Installer
Field Zulfikar Mahran Installer
Field Fedli Kurniawan Installer
Field Budi Syahrianto QC Team
Field Dedi Syahputra Naibaho Engineer
Field Deni Evrizal Sinaga Coordinator Huawei XL
Field Engkus Kuswara Team Leader
Field Karno Marpaung Team Leader
Field Kosim Lubis Engineer
Field Rio Tumbur Marpaung Engineer
Field Fadillah Afif Nst Team Leader
Field Irvan Setawan Harahap Engineer
Field Ronal Hery Yuski Sibarani Installer
Field Fandu Syahputra Installer
Back Office Citra Rahmah Engineering Huawei XL
Field Hotmatua Nusantara Installer
Field Ridho Prayoga Installer
Field Anggi Hamoraon Installer
Back Office WIRAHIDIN PM 2004055
Back Office LUKMAN Koordinator 1412097
Back Office MAY TRI WIDIYANTI DC 1211420
Back Office HER BASUKI SETO YULIANTO DC 2010920
Back Office MUHAMAD MIZAR DC 1211449
Back Office NURMAN ISKANDAR DC 1612599
Field AGUNG MAHARDITYAWAN Asset tagging 1512377
Back Office ERINNA DC 1713447
Field YOGA WIJAYA Asset tagging 1713448
Field Igar Amrullah Asset tagging N/A
Field FIRMAN Asset tagging 1412049
Field ABDUL ROJI Asset tagging 2009688
Field ERIK ERIZA SURANTO Asset tagging 1813586
Field RENGGA HIMAWAN SAIBI Asset tagging 1813680
Field Gary Priyatna Asset tagging N/A
Field Ahmat Fadhlul Hadi Surveyor N/A
Field Dikdik Permana Surveyor N/A
Field Ali Mahmudi Surveyor N/A
Field Rifqi Azqia Surveyor N/A
Field Ferik Setya Khofiddin Surveyor N/A
Field Bayu Aji Saputra Surveyor N/A
Field Akhlis Darmawan Surveyor N/A
Field Firman Setawan Surveyor N/A
Field Dedi Ardiansyah Surveyor N/A
Field Purwanto Surveyor N/A
Field Suprapto Surveyor N/A
Field Abdul Kadir Jaelani Surveyor N/A
Field Suharto Surveyor N/A
Field Sugeng Surveyor N/A
Field Jodie Trighalie Surveyor N/A
Field Suwarto Surveyor N/A
Field Khaerul Rojab Surveyor N/A
Field Beny Supartono ISR N/A
AGUS SUSILO Project Manager 2003028
HERRY MULYA Implementaton Supervisor 1111035
MAMAN DURACHMAN Implementaton Supervisor 2004070
IQBAL RAUF Implementaton Supervisor 2004185
BUDI JARWADI Implementaton Supervisor 2008642
APRILIA SAFITRI Admin 2009714
PUTRI CHAIRIYAH Admin 1411959
ANDI ARDIANSYAH Specialist Engineer 1111198
SUGINO Specialist Engineer 1211566

GIYANTO A Specialist Engineer 2004086

ALI MUSTOFA Specialist Engineer 2006396


DIDI HARYONO Engineer 1110952
ARIES PEADO SIAHAAN Engineer 1111033
MUNDAKIR Engineer 1111070
NURDIYANTO Engineer 1211537
DANIAR YUDHA ASMARA Engineering Engineer 1211567
MOHAMMAD NUR MUSLIH Engineer 1311809

BUDIANTO 2 Engineer 1311891

ROULY Engineer 1512309


ABDUL RAHMAN 3 Engineer 1512400
AHMAD RIZAL Engineer 1512431
MUHAMAD Engineer 1612663
ARI WIBOWO 3 Engineer 1612854
JAKARIA Engineer 2004076
KUSTANTO Engineer 2004081

SOLIN SOLIHIN Engineer 2004171

DENI KURNIAWAN Engineer 2005387


SISWANTO Engineer 2006394
OJI FAOJI Document Control 1612993

AMBAR JANUARIANTO Installaton Supervisor 2004197

LATIF NURHIDAYAT Leader 1211463


EDI TEGUH YUWONO Leader 1211536
SUPRIYADI Leader 1211568
FIRKI KAYUNUS Leader 1412002
NIKMAT GULTOM Leader 1412018
M. ROHID S Leader 1412021
AHMAD SOLEH JAJULI Leader 1412044
RUDI SETIAWAN Leader 1412101
CEPI HARDIANSYAH Leader 1412103
DEBI Leader 1412216
BENYAMIN GINTING Leader 1512365
GATOT PRAWOTO Leader 1512389
ALDIANO SAPUTRO Leader 1612771
IMANUEL SITEPU Leader 2004092
MARWAN Leader 2004180
ARIF MUHIBIN Leader 2009697

WAHYU SULISTYO JAKA S Leader 2010798

SUHERMAN Installer 1311708

CHANDRA WIJAYA Installer 1512407


ANDI RUDI CAHYONO Installer 1612629
ARDIANSYAH TANJUNG Installer 1612659
NUR MUHAMMAD ISKANDAR 2 Installer 1612825
MUHAMAD NUR CAHYONO Installer 1612826
DIMAS HADYANTO SIAHAAN Installer 1612855
KURNIAWAN Installer 1612881
SASI AGUNG RAHMAD Installer 1612970
MUHAMMAD IBRAHIM Installer 1612994
FARID AMRULLAH Installer 1713070
MUHAMMAD HIDAYAT ILYAS Installer 1713456
SUWANYANG Installer 1713497
BENNY ASHAR SULISTIYANTO Installer 1713521
RENDI SUMARDIYATNA Installer 1713522

SANGAJI Installer 2010797

BAGUS TRI WIBOWO Installer N/A


RIYAN HIDAYATULLAH Installer N/A
ALDIANO MANULLANG Installer N/A
RIZKY APRILIA SANJAYA Installer N/A
ANGGA GUSDIAN PRAMANA Installer N/A
RONY SETIAWAN Installer N/A
ARI GUSTIRA Installer N/A
SULAEMAN Installer N/A
IRFAN ROUSDI TANJUNG Installer N/A
MUHAMMAD RIDHO Installer N/A
M.RAMADHAN Installer N/A
DIKO TOURINO Document Control N/A
AHMAD ILHAM MASYKURI HAMDY Installer N/A
CHANDRA YUDHA PRASUTIO Installer N/A
RICO SAMUEL Installer N/A
RIAN NURAHMAT Installer N/A
MUNANTO Installer N/A
APRI KURNIAWAN Installer N/A
DIO DAMRI Installer N/A
MUHAMMAD YUSUF Installer N/A
FADILA ROSAL Installer N/A
449 466

Grade / Posisi
NAMA (versi HR) TITLE (versi HR) Homebase
(versi HR)

ANDRI MULIA 2 420 Implementaton Supervisor Jakarta


ASTRIDA MAYANG SARI 314 Admin Jakarta
SIFA FAUZIAH 312 Engineering Engineer Jakarta
HENI NURMAYANTI 312 Engineering Engineer Jakarta
RIESRY IRWANSYAH 249 Document Control Jakarta
PUTRA ADE THAMRIN 249 Document Control Jakarta
MEGI TRI BAWONO 2 410 Implementaton Supervisor Jakarta
MU'TAMAR 430 Implementaton Supervisor Jakarta
SURIPYONO NOTO SUSANTO 420 Implementaton Supervisor Jakarta
ALMU JAMROH 312 Engineering Engineer Jakarta
IRFAN FIRANANDA 312 Engineering Engineer Jakarta
SONY HANAFIAH 310 Engineer Jakarta
RIDWAN SANTOSO 217 General Staff Jakarta
ERIL KHAIRIL HUSAM 318 CME/BSS Engineer Jakarta
DARWIN SAPUTRA 2 338 CME/BSS Engineer Jakarta
ROMADON 330 Engineer Jakarta
MUHAMMAD RIVAI 240 Installaton Supervisor Jakarta
TRI YANTO 310 Engineer Jakarta
KIKI RAHMAT HIDAYAT 310 Engineer Jakarta
DICKI LESMANA 310 Engineer Jakarta
DHANY ACHMAD 310 Engineer Jakarta
ROBIN RIZKI SIHOMBING 310 Engineer Jakarta
DICKY ARIE PERMADI 310 Engineer Jakarta
LALAN TARLAN 310 Engineer Jakarta
YUDHISTIRA SABRY 2 320 Engineer Jakarta
DANI OKTAFIYANA 320 Engineer Jakarta
DWI FEBRIANTO 310 Engineer Jakarta
BARRUN ROHIM 310 Engineer Jakarta
GORO SUSILO 318 CME/BSS Engineer Jakarta
ABDUL HAMID 240 Installaton Supervisor Jakarta
SLAMET GUNAWAN 240 Installaton Supervisor Jakarta
ACHMAD MUANJARI 220 Leader Jakarta
ENO HARDIYANTO 210 Leader Jakarta
CHAIRUL ICHSAN 210 Leader Jakarta
MUSLIMIN 210 Leader Jakarta
HERIZA FRANSISKA 210 Leader Jakarta
FAHRULLUDIN 220 Leader Jakarta
NANANG KASI YANTO 110 Installer Jakarta
ALFIANSYAH FADILLAH 120 Installer Jakarta
TARYAN NUGRAHA 120 Installer Jakarta
RIYANTO SAPUTRA 120 Installer Jakarta
TAUFIK 120 Installer Jakarta
RIO PERMANA 120 Installer Jakarta
DIDIT PRASETIO 120 Installer Jakarta
ACHMAD MULYADI 120 Installer Jakarta
HERIANSYAH 120 Installer Jakarta
SOPIAN ISKANDAR 120 Installer Jakarta
ASEP DAROJAT 120 Installer Jakarta
FADILAH RUKIAN MADJID N/A Teknisi Jakarta
PERDIANSYAH N/A Teknisi Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
PUTRI CHAIRIYAH 324 Admin Jakarta
NASARUDDIN 430 Implementaton Supervisor Jakarta
FERDIANSAH 310 Engineer Jakarta
SISKA MARBUN 324 Admin Jakarta
SUPRIYADI 230 Engineer Jakarta
ANDI RUDI CAHYONO 130 Leader Jakarta
ARDIANSYAH TANJUNG 120 Installer Jakarta
NURDIYANTO 310 Installer Jakarta
MARWAN 230 Leader Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
N/A N/A Jakarta
ALBERT FERNANDES 130 Installer Padang
ALFAJRI 120 installer Padang
ALFAJRI GENDI 130 installer Padang
ANDI KUSWARA (New) 322 Engineering Engineer Padang
ANDIKEL PERMATA 310 Junior Engineer Padang
AZIZ SUMANTO 130 installer Padang
CEPI SUPRIYATNA (New) 310 Engineer Padang
CHARLES 310 Engineer Padang
CHINTYA MARTINUS 324 Admin Padang
DENI KEMBARA 310 Junior Engineer Padang
DODI ARKAM 430 Implementaton Supervisor Padang
DONI CHANDRA 230 Leader Padang
ERI SUPRIADI 230 Leader Padang
FEBRI SUHADA 130 installer Padang
HAMDA NURRAHMAN 230 Leader Padang
HARI SAPUTRA 320 engineer Padang
HARRY KURNIA 310 engineer Padang
HENDRA YONES 230 Leader Padang
HENDRI SAPUTRA 130 installer Padang
INDRA RAHMAD 310 engineer Padang
IRWANTO 310 irwanto Padang
JUMINO 130 installer Padang
MULYADI DASRIL 130 installer Padang
RESKY 310 Engineering Engineer Padang
RICO PUTRA 240 Leader Padang
SAFIRMAN 120 installer Padang
SATRIA BUANA PUTRA 210 Leader Padang
SATRIO WIBOWO 310 engineer Padang
SUHENDRI 230 Leader Padang
SUKRI HELMI 120 installer Padang
SURYA 230 surya Padang
SYAFRI 130 installer Padang
TASRIL AHMAD 240 Leader Padang
TEGUH EVAN 310 engineer Padang
WAHYU PURDAWAN 310 engineer Padang
WARTSI WANDI 310 engineer Padang
YALDI FANDARIS 130 Leader Padang
PUTRA APRI MANANDA - installer Padang
ARIS TOTELES - installer Padang
ZULFA ILHAM - installer Padang
JANUAR DEVI - installer Padang
EFRI OKTARIZAL - installer Padang
ADI WIJAYA Engineer Jabo
AMINUDIN Team Leader Jabo
ANNAAS ZUKHRUF Installer Jabo
ASEP SURYANA Installer spv Jabo
AWALUDIN Installer Jabo
FAHMI Installer spv Jabo
HENDRIK N/A Installer Jabo
M IBNU ADAM AZHARI N/A Team leader Jabo
NAZAN ZAKARYA N/A Team leader Jabo
SUSANTO N/A Installer Jabo
FATAHILLAH N/A Team leader Jabo
HENDRA KURNIAWAN MAWARDI N/A Engineer Jabo
ENGKUS N/A Installer spv Jabo
ARIF PRIYONO N/A Engineer Jabo
AYI RUKMANA P Engineer Jabo
EDWIN TRI PUTRA Engineer Jabo
Martn Installer Jabo
Saripudin Engineer Jabo
Cecep Trisna Installer Jabo
Sukarmaji Installer Jabo
Dwi Yulianto Installer Jabo
Dimas Installer Jabo
Dendi DC Jabo
NA
NA
NA
NA
NA
NA
NA
NA
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
NA N/A N/A
SARWONO 410 Implementaton Supervisor Semarang
ZULFIKAR 310 Engineer Semarang
SUHARDI 220 Leader Semarang
JOKO ARI WIBOWO 310 Engineer Semarang
DONNI PRENGKY PANGKEY 242 Engineering Staff Coordinator Jakarta
CEPI HENDRI Medan
Anwar Medan
Ipanli Suharta Medan
M. Febrianda Alfiqih Medan
Miftah Farid Medan
Saut Pinayungan Medan
Ahmad Shalim Medan
Dedi Arianto Medan
Febi Aditya Putra Medan
Ghazali Hasan Medan
R.A. Chera Ayarizki Medan
Irfan Juanda Medan
Suheri Efendi Nasuton Medan
Ade Suhendra Lubis Medan
Riyaldi Rafiza Medan
Delfia Riska Br. Manurung Medan
Muhammad Suhendra Rinata Medan
Fakhry Pebrian Medan

Medan
Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan

Medan
Medan

Medan

Medan

Medan

Medan

Medan
Medan
Medan
Medan
ABDUL HAMIN HASUGIAN 120 Installer Pekanbaru
ALI AHMAD MAULANA Installer Pekanbaru
ANDRI SAEFUDIN 420 Implementaton Supervisor Pekanbaru
ANDRI SAPUTRA R 220 Leader Pekanbaru
BAMBANG 230 Leader Pekanbaru
BILOK SIMATUPANG 310 Engineer Pekanbaru
CLARA DIVA 244 Admin Assistant Coordinator Pekanbaru
DADANG GUSNERI 120 Installer Pekanbaru
DANI YUELPIT 210 Leader Pekanbaru
DEVIDEF PRANSISCA 342 Engineering Engineer Coordinator Pekanbaru
DIKA IZAR JULIANDY Installer Pekanbaru
DIRGA PUTRA Installer Pekanbaru
DODI ISKANDAR 220 Leader Pekanbaru
ECI ARYA PUTRA 310 Engineer Pekanbaru
FADROL RAHMAN Engineer Pekanbaru
FAHRUL SIAHAAN Installer Pekanbaru
FAUZAN MUZAKI Installer Pekanbaru
FIL U'QAD Installer Pekanbaru
FIRMAN AM.d 2 310 Engineer Pekanbaru
FIRMANSYAH 2 240 Installaton Supervisor Pekanbaru
GEMA PURNAMA BINTANG Installer Pekanbaru
GUNAWAN Installer Pekanbaru
GUNAWAN SYAHPUTRA 310 Engineer Pekanbaru
HADIATMA Installer Pekanbaru
HUDYA PUTRA 410 Implementaton Supervisor Pekanbaru
JESSE TOBING 210 Leader Pekanbaru
JOHANNES HUTAGALUNG 120 Installer Pekanbaru
JUINRO PANDIANGAN 310 Engineer Pekanbaru
MARIO ADE PUTRA 2 240 Installaton Supervisor Pekanbaru
MILA FEBRIDA Project Admin Pekanbaru
M. AWALLUDIN Engineer Pekanbaru
MUHAMMAD RISKI 249 Document Control Pekanbaru
NOVAL JASNIZAL 310 Engineer Pekanbaru
PAGAR ANDREAS 210 Leader Pekanbaru
RANDI MUJAHIDDIN Installer Pekanbaru
REZA GUSPIAN 420 Implementaton Supervisor Pekanbaru
RIADI KIFLI Installer Pekanbaru
RISKI RAMADHANI 210 Leader Pekanbaru
ROFIL TAMARA ARBI Installer Pekanbaru
ROHMAN Installer Pekanbaru
ROMI SYAFRIN 510 Project Manager Pekanbaru
SUMARDI 310 Engineer Pekanbaru
SURYADI PURNOMO Installer Pekanbaru
VITO QUINSTA FATTAR Installer Pekanbaru
YANUARDI 220 Leader Pekanbaru
YOGI RAMANDHA 310 Engineer Pekanbaru
ZIKRI AHMAD Installer Pekanbaru
SUBRAN Medan
Andri Martua Simanjuntak Medan
Bernard Steven Lumbantoruan Medan
Buha Munte Medan
Dedi Syahrimi Medan
Dewi Maya Sari Medan
Faqih Abdul Azis Medan
Hendy Jayasyah Medan
Joiada Sihotang Medan
Joni Patla Nasuton Medan
M Arifin Harahap Medan
Mario Silalahi Medan
Mhd. Rizatul Arifin Selian Medan
Moris Timson Munthe Medan
Muhammad Nicko Prayudha Medan
Paian Hutagalung Medan
Paulus Hadi Chandra Sianturi Medan
Perianto Nasuton Medan
Tulus R.F. Samosir Medan
Tumiar Raisa G. Siagian Medan
Zulkarnain Tahir Sinulingga Medan
Robert Joe Pasaribu Medan
Ilyas Syahputra Medan
Muhammad Zaki Medan
Suyetno Medan
Deni Sulaiman Medan
M Saiful Bahri Medan
Senator Tarigan Medan
Vivi Handayani Medan
Suhartono Medan
Ahmad Yusuf Lubis Medan
Ari Syahputra Medan
Dodi Syahputra Medan
Habib Fatahillah Medan
Marben Badia Pasaribu Medan
Murdhoko Suardho Medan
Mursal Medan
Panji Puja Kesuma Medan
Suhendra Medan
Yudha Simorangkir Medan
Wanri Tampubolon Medan
Hariyanto Silalahi Medan
Muhammad Aditya Sentanu Medan
Indra Zena Medan
Fuad Hasan Harahap Medan
Tolip Tambak Medan
Feri Irawan Medan
Muhammad Joko Paisal Medan
Victorianus Tarigan Medan
Untung Fernando Nadeak Medan
Imron Agusta Medan
Zulkifli Perdana Manik Medan
Ardi Fardiansyah Nasuton Medan
Tengku Arief Kurnia Medan
Yosia Mangihut Tua Manik Medan
Repizal Medan
Muhammad Subur Medan
Zulfikar Mahran Medan
Fedli Kurniawan Medan
Budi Syahrianto Medan
Dedi Syahputra Naibaho Medan
Deni Evrizal Sinaga Medan
Engkus Kuswara Medan
Karno Marpaung Medan
Kosim Lubis Medan
Rio Tumbur Marpaung Medan
Fadillah Afif Nst Medan
Irvan Setawan Harahap Medan
Ronal Hery Yuski Sibarani Medan
Fandu Syahputra Medan
Citra Rahmah Medan
Hotmatua Nusantara Medan
Ridho Prayoga Medan
Anggi Hamoraon Medan
WIRAHIDIN 520 Project Manager Jakarta
LUKMAN 2 420 Implementaton Supervisor Jakarta
MAY TRI WIDIYANTI 320 Engineer Jakarta
HER BASUKI SETO YULIANTO 312 Engineering Engineer Jakarta
MUHAMAD MIZAR 312 Engineering Engineer Jakarta
NURMAN ISKANDAR 211 Surveyor Jakarta
AGUNG MAHARDITYAWAN 211 Surveyor Jakarta
ERINNA 219 Document Control Jakarta
YOGA WIJAYA 120 Installer Jakarta
N/A N/A N/A Jakarta
FIRMAN 2 110 Installer Jakarta
ABDUL ROJI 220 Leader Jakarta
ERIK ERIZA SURANTO 241 Surveyor Coordinator Jakarta
RENGGA HIMAWAN SAIBI 221 Surveyor Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
N/A N/A N/A Jakarta
AGUS SUSILO 520 PROJECT MANAGER Jakarta
HERRY MULYA 420 IMPLEMENTATION SUPERVISOR Jakarta
MAMAN DURACHMAN 420 IMPLEMENTATION SUPERVISOR Jakarta
IQBAL RAUF 420 IMPLEMENTATION SUPERVISOR Jogjakarta
BUDI JARWADI 420 IMPLEMENTATION SUPERVISOR Jakarta
APRILIA SAFITRI 334 ADMIN Jakarta
PUTRI CHAIRIYAH 324 ADMIN Jakarta
ANDI ARDIANSYAH 340 SPECIALIST ENGINEER Jakarta
SUGINO 340 SPECIALIST ENGINEER Jakarta

GIYANTO A 340 SPECIALIST ENGINEER Jogjakarta

ALI MUSTOFA 340 SPECIALIST ENGINEER Jakarta


DIDI HARYONO 310 ENGINEER Jogjakarta
ARIES PEADO SIAHAAN 330 ENGINEER Jakarta
MUNDAKIR 320 ENGINEER Jakarta
NURDIYANTO 310 ENGINEER Bogor
DANIAR YUDHA ASMARA 322 ENGINEERING ENGINEER Jakarta
MOHAMMAD NUR MUSLIH 310 ENGINEER Jakarta

BUDIANTO 2 310 ENGINEER Jakarta

ROULY 330 ENGINEER Jakarta


ABDUL RAHMAN 3 320 ENGINEER Bogor
AHMAD RIZAL 310 ENGINEER Jakarta
MUHAMAD 310 ENGINEER Jakarta
ARI WIBOWO 3 330 ENGINEER Jakarta
JAKARIA 330 ENGINEER Jakarta
KUSTANTO 310 ENGINEER Serang

SOLIN SOLIHIN 330 ENGINEER Jakarta

DENI KURNIAWAN 330 ENGINEER Jakarta


SISWANTO 330 ENGINEER Jakarta
OJI FAOJI 219 DOCUMENT CONTROL Jakarta

AMBAR JANUARIANTO 240 INSTALLATION SUPERVISOR Jogjakarta

LATIF NURHIDAYAT 210 TEAM LEADER Jakarta


EDI TEGUH YUWONO 210 TEAM LEADER Jakarta
SUPRIYADI 230 TEAM LEADER Bogor
FIRKI KAYUNUS 210 TEAM LEADER Jakarta
NIKMAT GULTOM 220 TEAM LEADER Bogor
M. ROHID S 210 TEAM LEADER Jakarta
AHMAD SOLEH JAJULI 210 TEAM LEADER Jakarta
RUDI SETIAWAN 210 TEAM LEADER Jakarta
CEPI HARDIANSYAH 220 TEAM LEADER Jakarta
DEBI 220 TEAM LEADER Jakarta
BENYAMIN GINTING 210 TEAM LEADER Jakarta
GATOT PRAWOTO 220 TEAM LEADER Jakarta
ALDIANO SAPUTRO 220 TEAM LEADER Jakarta
IMANUEL SITEPU 230 TEAM LEADER Jakarta
MARWAN 230 TEAM LEADER Jakarta
ARIF MUHIBIN 210 TEAM LEADER Jakarta

WAHYU SULISTYO JAKA S 220 TEAM LEADER Serang

SUHERMAN 140 INSTALLER Jakarta

CHANDRA WIJAYA 120 INSTALLER Jakarta


ANDI RUDI CAHYONO 130 INSTALLER Jakarta
ARDIANSYAH TANJUNG 120 INSTALLER Bogor
NUR MUHAMMAD ISKANDAR 2 120 INSTALLER Jakarta
MUHAMAD NUR CAHYONO 120 INSTALLER Jakarta
DIMAS HADYANTO SIAHAAN 120 INSTALLER Jakarta
KURNIAWAN 120 INSTALLER Jakarta
SASI AGUNG RAHMAD 120 INSTALLER Jakarta
MUHAMMAD IBRAHIM 120 INSTALLER Jakarta
FARID AMRULLAH 120 INSTALLER Jakarta
MUHAMMAD HIDAYAT ILYAS 120 INSTALLER Jakarta
SUWANYANG 120 INSTALLER Jakarta
BENNY ASHAR SULISTIYANTO 120 INSTALLER Jakarta
RENDI SUMARDIYATNA 120 INSTALLER Jakarta

SANGAJI 130 INSTALLER Jakarta

BAGUS TRI WIBOWO N/A INSTALLER Jakarta


RIYAN HIDAYATULLAH N/A INSTALLER Jakarta
ALDIANO MANULLANG N/A INSTALLER Jakarta
RIZKY APRILIA SANJAYA N/A INSTALLER Jakarta
ANGGA GUSDIAN PRAMANA N/A INSTALLER Jakarta
RONY SETIAWAN N/A INSTALLER Jakarta
ARI GUSTIRA N/A INSTALLER Jakarta
SULAEMAN N/A INSTALLER Jakarta
IRFAN ROUSDI TANJUNG N/A INSTALLER Jakarta
MUHAMMAD RIDHO N/A INSTALLER Jakarta
M.RAMADHAN N/A INSTALLER Jakarta
DIKO TOURINO N/A DOCUMENT CONTROL Jakarta
AHMAD ILHAM MASYKURI HAMDY N/A INSTALLER Jakarta
CHANDRA YUDHA PRASUTIO N/A INSTALLER Jakarta
RICO SAMUEL N/A INSTALLER Jakarta
RIAN NURAHMAT N/A INSTALLER Jakarta
MUNANTO N/A INSTALLER Jakarta
APRI KURNIAWAN N/A INSTALLER Jakarta
DIO DAMRI N/A INSTALLER Jakarta
MUHAMMAD YUSUF N/A INSTALLER Jakarta
FADILA ROSAL N/A INSTALLER Jakarta
SAAT INI support di Project Saat ini sedang DIPINJAM
??? oleh PM...….?

Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Huawei - Telkomsel
Bali Anggun Setyono
East Java Uut Suryanto
Bali Anggun Setyono
Bali Anggun Setyono
East Java Uut Suryanto
East Java Uut Suryanto

East Java Uut Suryanto


Bali Anggun Setyono
Bali Anggun Setyono
Bali Anggun Setyono
Bali Anggun Setyono
Bali Anggun Setyono
Bali Anggun Setyono
Bali Anggun Setyono
CAA XL & EID XL PM Choirul & PM Agus S
EID Tsel Kalimantan
CAA XL
EID Tsel Kalimantan & EID XL PM Choirul & PM Bimo P
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
CAA XL
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
EID Tsel Kalimantan
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Tinem Telkomsel Tidak ada dipinjam
Core
Core
Core
Core
Core
Core
Core
Core
Core
Core
TE
TE
TE
FTTH/TE/HSE
TE
TE
TE
TE
TE
TE
TE
TE

EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ
EID XL CJ

Pak Adi Seta

Pak Adi Seta


Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Ericsson Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Huawei Tidak ada dipinjam
Hw Xl dan Eid Tsel
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL + Huawei
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Ericsson TSEL
Huawei XL
Huawei XL
Huawei XL
Huawei XL
Huawei XL
Huawei XL
Huawei XL
Huawei XL
Huawei XL
Huawei Jabodetabek Ady Seta
Huawei XL
Huawei XL
Huawei XL
Huawei XL
Huawei XL
uawei Survey, TSEL Asset Tagging, Huawei ISR, Mabes CCTV
Huawei Survey, TSEL Asset Tagging
HW HCPT
TSEL Asset Tagging
HW TSEL
HW TSEL
TSEL Asset Tagging
Huawei ISR, Permit
TSEL Asset Tagging
TSEL Asset Tagging
TSEL Asset Tagging
TSEL Asset Tagging
TSEL Asset Tagging
TSEL Asset Tagging
TSEL Asset Tagging
TSEL Asset Tagging
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei TSEL Bali
Huawei HCPT Jabodetabek
Huawei HCPT Jabodetabek
Huawei TSEL Bali
TSEL Asset tagging
Huawei ISR

Plan akan Handle EID-XL CJ

Plan akan di tarik ke Project Support


Resign per 15 Jan 2018
Plan akan di tarik ke PM
Iqbal

Dipinjamkan ke HW-Tsel
Jabo per 15 Feb
Dipinjamkan ke EID-Tsel Kalimantan per 1 Feb

Dipinjamkan ke HW-Tsel
Jabo per 15 Feb

Dipinjamkan ke HW-Tsel
Jabo per 1 Mar

Dipinjamkan ke HW-Tsel
Jabo per 15 Feb

Dipinjamkan ke EID-Tsel Kalimantan per 1 Feb

Support CAA Pak Choirul

Dipinjamkan ke HW-Tsel
Jabo per 1 Mar
Dipinjamkan ke HW-Tsel
Jabo per 15 Feb

Dipinjamkan ke EID-Tsel Kalimantan per 1 Feb


Dipinjamkan ke EID-Tsel Kalimantan per 1 Feb
Dipinjamkan ke HW-Tsel
Jabo per 15 Feb
Keterangan lain

Sedang masa percobaan PM selama 6 bulan (Start From 15 Des 2017)


OG Proposed Team Leader
OG Proposed Team Leader
OG Proposed Team Leader
OG Proposed Team Leader

OG Proposed Team Leader


Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Not Actve 24/12/2017
Not Actve 24/12/2017
Not Actve 24/12/2017
Not Actve 24/12/2017
Not Actve 26/01/2018
Not Actve 26/01/2018
Not Actve 26/01/2018
Not Actve 26/01/2018

Not Actve 25/02/2018


Not Actve 25/02/2018
cut of per jan 2018

cut of per jan 2018

cut of per jan 2018

cut of per jan 2018

cut of per jan 2018

cut of per jan 2018

cut of per jan 2018


cut of per jan 2018

cut of per jan 2018

cut of per jan 2018

cut of per jan 2018

cut of per jan 2018

cut of per jan 2018


cut of per jan 2018
cut of per jan 2018

Saat ini team full aktvitas


Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Saat ini team full aktvitas
Daftar Test Tools & Installation Tools

D Y
Size/ Brand/ SN/ O O
NO TOOLS QTY D G
Note
I I

I R
S B A
K A M
A M A
N B N
D A D
A N H
R G A
80 77 78 78 79
A. INSTALLATION TOOLS
1 Kunci 6 - 22mm 1 1 0 1
2 Kunci 30 - 32mm 2 2 2 2
3 Kunci 10" 2 1 0 2
4 Kunci 13" 2 1 2 2
5 Kunci 16" 2 2 2 2
6 Kunci 17" 2 0 0 2
7 Kunci 19" 2 2 2 2
8 Kunci 24" 2 2 2 2
9 Kunci 12"/15" 1 1 1 1
10 Kunci 10 - 24mm 1 1 1 1
11 Kunci Torx set Lipat 1 0 0 0
12 Kunci 1.5 - 10mm 1 1 1 1
13 Kunci T8-T40 1 1 1 0
14 Kunci 10,11,13 1 1 1 0
15 Kunci 12,14,17 1 1 0 1
16 Obeng Set cadik 1 1 1 0
17 Pahat Kayu 1 1 1 0
18 Pahat Beton 1 0 1 0
19 Tang 10" 1 1 1 1
20 Tang 6" 1 1 1 1
21 Tang p 6" 1 0 1 1
22 Tang Potong Ties 1 1 0 1
23 Tang Kombinasi 1 0 1 1
24 Mesin 22mm 1 1 1 0
25 Mesin 22mm 1 0 0 0
26 Mata b 6 1 1 1 0
27 Mata b 10 1 1 1 0
28 Mata b 12 1 1 1 0
29 Mata b 16 1 1 1 0
30 Mata 6 1 1 1 0
31 Mata 10 1 1 1 0
32 Mata 12 1 1 1 0
33 Mata 16 1 1 1 0
34 Kepala BOS SDS - Plate So 1 1 1 0
35 Krone LSA 1 1 1 1
36 Krone K52 1 1 1 1
37 Krone K57 1 1 1 1
38 Tang Ampere AC/DC 1 0 0 0
39 Multi Constant 2 1 1 2
40 Crimpi Ak - 15 1 1 1 1
41 Tool 6PK - 230PA 1 1 1 1
42 Martil 1 kg 1 1 0 1
43 Kikir 6" 1 1 0 0
44 Kikir bulat 1 1 0 0
45 Crimping RJ45/RJ11 1 1 1 0
46 Water 9" 1 1 1 1
47 Tali 5/8 Nylon 1 1 1 1
48 Pulley 2 ton 1 1 1 1
49 Rubbe 16 oz 1 1 1 1
50 Cable 8" 1 1 1 0
51 Knife 7" 1 1 1 1
52 Gunting 1 1 1 1
53 Tool 20" 1 1 1 1
54 Gergaji besi 1 1 1 1
55 Mata gergaji 1 1 1 0
56 Obeng 6" 1 1 1 1
57 Obeng 6" 1 0 1 1
58 Obeng 4" 1 1 0 1
59 Obeng 4" 1 1 0 0
60 Obeng 3" 1 1 1 1
61 Obeng 3" 1 1 0 1
62 Obeng 4" 1 1 1 0
63 Obeng 4" 1 1 1 0
64 4-W 10-12,13-14 1 1 1 1
65 Siku 8" 1 1 1 1
66 Cable 10m 1 1 1 0
67 Meter 5m 1 0 0 1
68 Meter 100 m 1 1
69 Test 100-500VAC 1 0 0 1
70 Wire 2 way 1 1 1 0
71 Elpress YQK (Merah) 1 1 1 0
72 Penitik 1 1 1 0
73 Solder 1 1 1 1
74 Shack 0.9 Ton 2 0 0 0
75 Shack 1.5 Ton 2 0 1 0
76 Compass 1 0 1 1
77 Print CASIO 1 1 1 1
78
79
80

Compas Sunto 1 0 1
Compas Silva 0 1 0
P a
O p
O u
L t
r
X a
T
M /
A P
A R K P
N J I D U A TOTAL
D E O A G REMARK
TOOLS
R S N - A
I S A I R
E Y D a
S a E Y t A
A T n U N
P O u P E R D
U B a U L i R P
T I r T F s E O
R N d R I k A O
A G i A T i S L
78 78 79 79 78 78 75 3 650

1 1 1 1 1 0 1 8
2 1 2 1 2 2 2 18
2 1 2 1 2 2 2 15
2 1 2 1 2 2 1 16
2 1 2 1 2 2 2 18
0 1 0 0 0 0 1 4
2 1 2 1 2 2 2 18
2 1 2 1 2 2 2 18
1 1 1 1 1 1 1 10
1 1 1 1 1 0 1 9
1 0 0 0 0 0 0 1
1 1 1 1 1 0 1 9
1 1 0 0 1 1 1 7
1 1 1 1 1 1 1 9
1 1 1 1 1 1 1 9
0 0 0 0 0 1 0 3
0 0 0 1 0 0 3
1 0 0 1 0 1 4
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 9
1 1 1 1 1 0 7
1 1 1 1 1 1 0 8
1 1 0 0 0 0 0 4
0 1 1 1 1 1 1 1 7
0 1 0 1 1 1 1 7
1 1 0 1 1 1 1 8
0 1 0 1 1 1 1 7
0 1 1 1 1 1 1 8
1 1 1 1 1 1 1 9
1 1 1 1 1 0 1 8
0 1 1 1 1 1 1 8
1 0 1 1 1 1 1 8
0 1 0 0 0 1 1 5
0 1 1 0 0 0 0 5
1 1 1 0 0 1 0 7
1 1 1 0 0 1 0 7
0 0 0 0 0 0 0 0
1 1 1 1 1 2 2 13
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 10
0 1 1 1 1 1 1 8
1 1 1 1 1 1 1 8
1 1 1 1 1 1 1 8
0 0 0 1 1 1 0 5
1 1 1 1 1 0 1 9
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 10
1 1 1 1 1 0 1 8
1 1 1 1 1 1 0 9
1 1 1 1 1 0 0 8
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 9
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 9
1 0 1 1 1 1 1 8
1 0 1 1 1 1 1 7
1 1 1 1 1 1 1 10
1 1 1 1 1 1 1 9
0 1 1 1 1 1 0 7
1 1 1 1 1 1 0 8
1 1 1 1 1 1 0 9
1 1 1 1 1 1 1 10
1 0 1 0 1 1 1 4 11
1 1 1 1 1 1 1 8
1 1 3
1 1 1 1 1 1 0 7
1 1 1 1 1 1 1 9
1 1 1 1 1 1 1 9
1 1 1 1 1 1 0 8
1 1 0 0 1 0 0 6
1 0 0 0 0 0 0 1
1 0 0 0 0 0 0 2
0 0 1 0 1 1 0 5
1 1 1 1 1 0 1 3 12
0
0
0

Total

0 0 1 0 1 1 0 5 3 rusak
0 0 0 0 0 0 0 1
Total
Tools Price Total Estmasi
Requeste
d

2 -
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-

-
-
-
-

-
-
-
-
-
-
-
-
-
-
-
-

Total -
Data Pencapaian Pekerjaan
Periode Jan '18 s.d Maret'18 (3 bulan terakhir)

Nama direct Nama indirect


Category Nama PM Nama Project Customer Customer

ITC Andri M Telkomsel_Non TDD Huawei Telkomsel

ITC Cepi Hendri Huawei Telkomsel NS Swap Huawei Telkomsel

ITC Bimo EID XL CJ EID XL

ITC Zulherman Tinem Telkomsel EID Telkomsel

ITC Subran Tsel Tinem_Sumbagut Ericsson Telkomsel

ITC Subran Huawei_New Colo_JPS Huawei XL

ITC & Survey Iqbal R AirSpan Smartfren Smartfren

Survey Wirahidin Huawei Survey Huawei TSEL, HCPT


Asset Tagging Wirahidin Telkomsel Asset tagging Telkomsel Telkomsel

ISR Wirahidin Huawei ISR Huawei HCPT

ITC Romi Syafrin Huawei Tsel Huawei Telkomsel

ITC Romi Syafrin XL U900 Huawei XL

Survey ROMI SYAFRIN SEAHAWK PROJECT Huawei XL

ITC ROMI SYAFRIN SEAHAWK PROJECT Huawei XL

ITC ROMI SYAFRIN Indonesia H3I Nepa 2017 Huawei HCPT

ITC Romi Syafrin Tinem_Sumbagteng Ericsson Telkomsel

ITC Alamsyah Tari HCPT New Site/MCP/AAU Huawei H3I

Core Alamsyah Tari Tsel/Isat/telkom/h3i Huawei Tsel/Isat/telkom/h


FTTH Alamsyah Tari FTTH OSP Im2 Huawei Indosat

ITC Sigit Pramono XL Central Java Huawei XL

ITC Sigit Pramono H3I Central Java Huawei H3I

ITC Choirul Hadi EID/Tsel Kalimantan Ericsson Telkomsel


Choirul Hadi
Choirul Hadi
Choirul Hadi
Choirul Hadi
ITC Choirul Hadi CAA-XL CAA XL Asiata
Choirul Hadi
Choirul Hadi
Choirul Hadi
Supply Resources Choirul Hadi MII Resources MII MII
ITC Agus Susilo Abis Over IP Ericsson XL

ITC Agus Susilo XL Capacity Management Ericsson XL

ITC Agus Susilo LTE 2017 Batch 3 Ericsson XL

ITC Agus Susilo DWDM 2017 Ericsson XL


Jumlah Site
Milestone Jan'18 Feb'18 Maret'18

MOS
OA 156 68
SMQC Approved 61 43
ATP Doc Approved 78 114
ESAR Approved 176 49
MOS 1 6
OA 1 7
SMQC Approved 11 10
ATP Doc Approved 18 7
ESAR Approved 68 105
MOS 26 0
OA 24 10
Pre ATP Approved 0 49
ATP Doc Approved 71 0
BAST Approved 79 31
MOS 42 76
OA 42 76
ATP GEO 42 76
ATP Doc Approved 42 76
BASt APPROVED 63 201
MOS RBS + TRM 130 116
OA 80 50
ATP 25 18
BAUT 113 26
BAST 144 38
MOS 5 3
OA 5 2
SMQC Approved 4 6
ATP Doc Approved 9 7
ESAR Approved 14 2
Survey
MOS
OA
E-Smart Approved 0 0
E-ATP Approved 0 0
BAST Approved 0 0
Survey 104 102
ESAR Approved 16 0
Tagging Done 197 243
BAST Approve 400 225
Resi 706 28
SPP 734 106
SPP Paid 242 540
ISR 106 580
ESAR Approved 0 0
MOS 8 0 8
OA 6 7 11
SMQC Approved 3 5 15
ATP Doc Approved 3 5 25
ESAR Approved 3 5 25
MOS 2 5 3
OA 2 5 1
SMQC Approved 2 5 1
ATP Doc Approved 2 5 1
ESAR Approved 2 5
MOS 16
OA 16
SMQC Approved 15
ATP Doc Approved 15
ESAR Approved 15
MOS 13
OA 10
SMQC Approved 6
ATP Doc Approved 6
ESAR Approved
MOS
OA
SMQC Approved
ATP Doc Approved
ESAR Approved
MOS 19 39 37
OA 19 39 37
SMQC Approved 19 39 N/A
ATP Doc Approved 19 39 N/A
ESAR Approved 18 27 N/A
MOS 9 15
OA 9 14
SMQC Approved 1 1
ATP Doc Approved 1 1
ESAR Approved 1 1
MOS 1 1
OA 1 1
SMQC Approved 1 1
ATP Doc Approved 2
ESAR Approved 1 1
MOS 0 0
OA
SMQC Approved
ATP Doc Approved
ESAR Approved
MOS 10 10
OA 10 11
SMQC Approved 16 4
ATP Doc Approved 4 0
ESAR Approved 7 6
MOS
OA
SMQC Approved
ATP Doc Approved
ESAR Approved 1
MOS N/A 8
OA N/A 8
ATP Doc Approved N/A N/A
BAUT Approved N/A N/A
BAST Approved N/A N/A
MOS 2 N/A
OA 2 N/A
ATP Doc Approved 1 N/A
BAST Approved N/A 1
BAST Approved 45 62
MOS 50 2
OA 50 2
ATP Approved 50 2
BAST Approved 13 1
GR 13 1
MOS
OA
ATP Approved 8
BAST Approved 8
GR 6
MOS 2 3
OA 1 4
ATP Approved 3
BAST Approved
GR
MOS 28
OA 28
ATP Approved 28
BAST Approved
GR