Loss co-efficients:
Entrance, K1 = 0.25 Expansion, K5 =
Bend, K2 = 0.51 Bend, K6 = 0.51
Sluice valve, K3 = 0.20 Bend, K7 = 0.51
Contraction, K4 = 0.17 NRV, K8 = 2.3
Sluice valve, K9 = 0.2
Bend, K10 = 0.51
ΣK = 1.13 ΣK = 4.03
NPSHₐ (pt-pv)/γ ± Z - Hf
pt/γ = 10 m
pv/γ = 0.3 m
Z= 0.789 m (approx.)
Hf = 0.709196 m (assuming)
ΣK = 4.7
0.243466 M
1.144288 M
3727729.3396549
MM 0.1 MM
8500
9.5988379
0.0108533
M 0.2020666 M
System head calculation for the proposed pumping station at Ranichak, PS- Daspur, Paschim medinipur.
Loss co-efficients:
K1 = 0.25 K5 =
K2 = 0.51 K6 = 0.51
K3 = 0.20 K7 = 0.51
K4 = 0.17 K8 = 2.3
K9 = 0.2
K10 = 0.51
ΣK = 1.13 ΣK = 4.03
K11 = 1.5
K12 = 0.2
K13 = 2
K14 = 1
ΣK = 4.7
0.267794 M
1.258632 M
3811508.9989736
MM 0.1 MM
8300
9.5781562
0.0109002
M 0.2285979 M
System head calculation for the proposed pumping station at Ranichak, PS- Daspur, Paschim medinipur.
Common header
Suction pipe Delivery pipe Unit
pipe
Selecting pipe dia. = 600 750 1600 MM
Velocity, V = 3.509 2.246 2.467 M/s
Pipe length as per site plan (L) = 4.5 11 130 M
Loss co-efficients:
K1 = 0.25 K5 = K11 = 1.5
K2 = 0.51 K6 = 0.51 K12 = 0.2
K3 = 0.20 K7 = 0.51 K13 = 2
K4 = 0.17 K8 = 2.3 K14 = 1
K9 = 0.2
K10 = 0.51
ΣK = 1.13 ΣK = 4.03 ΣK = 4.7