You are on page 1of 3

Sr.

Check Points Y/ Remark


No N s

DESIGN

1 Plant North is shown.

2 Grade and paving levels and paving extents are shown. (Dimensions of paving
not required.)

3 Equipment and instrument tag nos. are indicated as per P&ID.

4 All equipment are shown with locating coordinates/dimensions and elevations


(centreline, BTL, u/s of base plate, etc.).

5 All equipment nozzles and vendor package terminal points are clearly
identified and tagged.

6 All tie-in points and battery limits are clearly identified and tagged and
coordinates/elevations are indicated.

7 Line numbers identifies all lines and major locating dimensions & elevation are
given.

8 Flow directions and slope symbols are indicated as per the P&IDs.

9 All secondary pipe supports (standard & special) are indicated and tagged and
the locating dimensions marked.

10 All primary pipe supports are identified by appropriate symbols (e.g. guide,
axial stop, etc.).

11 Laydown/dropdown areas, space for exchanger tube removal and


maintenance access areas are identified.

12 All buildings/shelters/technological structures are located with


coordinates/dimensions. Names/tag nos and overall dimensions are given.

13 Structural grid numbers of pipe racks, buildings and shelters are shown.

14 Pipe racks and sleepers are shown with locating coordinates/dimensions,


widths, TOS elevations and tag numbers (if applicable).

15 The cross sections of pipe racks, multi-level technological structures, culverts,


etc., are shown wherever required.

16 All platforms and ladders/staircases are located with dimensions and


elevations are marked.

DRAFTING

17 The drawing border conforms to the Project specifications or Company


standards, as applicable.

18 Drafting conventions e.g. font types/sizes, text styles, line types,


coordinate/dimension styles, layer structure, etc. are as per the Project
specifications or Company CAD standards, as applicable.
19 Drawing title, drawing number and revision number in the title block are as per
the TDR.

20 Electronic file name is indicated at appropriate location on the drawing.

21 Revision block contains initials of the originator, checker and approver (both
Discipline & Project).

22 Drawing scale is stated in the title block and graphic scale (bar scale) is
shown.

23 The drawing scale conforms to the Project specifications or Company


standards, as applicable.

24 All general notes are checked and the units for dimensions, coordinates &
levels are given in the notes.

25 Legend for applicable symbols is shown (e.g. pipe supports, new/existing


facilities, demolition, scope cloud, etc.).

26 Reference drawing numbers and titles are listed and checked. List shall
include unit plot plan and piping key plan as a minimum.

27 Status stamp (e.g. “For Construction”) is shown.

28 Revision clouds, along with revision number triangles are marked properly, if
applicable.

29 “Hold” clouds, if applicable, are properly marked and the list of “Holds” is
indicated.

30 Key plan is shown and the applicable area/unit of the plot plan is highlighted.

31 Match line co-ordinates and drawing limits are clearly marked and are
consistent with the Key Plan drawing. Continuation drawing numbers are
correctly written.

32 Drawing extracted from 3D CAD model is not manually edited.

NCG : GREEN

LPS : RED

FCD : YELLOW

WBL : COLOR 140

VAP : COLOR 40

SW : COLOR 140

EXISITING PIPING : COLOR 53

EQUIPMENT : CYAN

STRUCTURE & COLOUM : COLOR 8


TEXT : WHITE

LEADDER & DIMENSTION: COLOR 13

EQUIPMENT CENTER LINE: RED

PIPING CENTER LINE : MAGENTA

TEXT HEIGHT:

GRID & TITEL(PLAN ,SECTION.,ECT) -5

SECTION ELEVATIONS & TITEL(LEGENT , NOTES) – 3

OTHER TEXT -2.5