Check minutes
Edition 01
01.2014
• Valid for serial n° •
120N / 0516
ITC SA.- Inter Techno Commerce S.A. – 122, rue de la Fusion – CH 1920 – Martigny
Switzerland – Tf +41 277 222 191 – Fx +41 277 222 185 – e-mail : info@itcsa.com
Transfer Inspection
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
We here with confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
10h or Daily
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checked √
We here with confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
50 h or 1 Week
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checked √
1 Check locks, hinges, gas compression springs, etc. for proper functionality and O
replace if necessary
2 Clean cooling fins of hydraulic oil cooler O
3 Clean cooling fins of water cooler O
4 Clean dust discharge valve on the air filter O
5 Chain drive-Check tumbler, transmission and hydro motor for fixed seating O
6 Check rack roller and supporting rollers for mobility and wear O
7 Check functionality of parking brake O
8 Greasing the running shaft of conveyor O
9 Greasing the drive sprocket of conveyor drive O
10 Visual inspection of boom equipment for possible cracks O
11 Check transfer belt conveyor drive motor fastening and chain tension O
12 Seal check of all lines, hoses, control valves, hydraulic pumps, cylinders, etc. O
13 Maschine nach Schmierstellenübersicht abschmieren. O
14 Lubricate machine according to lubrication overview O
15 Check rack roller and supporting rollers for mobility and wear O
16 Check condition and fastening of base plates on the travel gear steel chain O
17 Check diesel engine air filter and fuel filter O
We here with confirm that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
100 h or 2 Week
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checked √
We here with confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
300 h or 2 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We here with confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
600 h or 4 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We here with confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
900 h or 6 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We here with confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
1200 h or 8 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We here with confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
1500 h or 10 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
1800 h or 12 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
2100 h or 14 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
2400 h or 16 month
Diesel: ….
Electro: …
Total hours: ………… Date: …………. Visa: …………………..
checks to be carried out at operating temperature checked √
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
10 h or Daily
checked √
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
50 h or 1 month
We herewith confirm that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
375 h or 9 month
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
We herewith confirm, that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
625 h or 15 month
We here with confirm that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
750 h or 18 month
We here with confirm that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
875 h or 21 month
We here with confirm that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
1000 h or 2 Years
We here with confirm that above mentioned maintenance works were carried out.
Date: __ / __ / 201_
Place:: ………………………………. Signature and stamp: …………………………………..
[ bar ]
Group A (5606.660.444) ---- ---- ----
Main Pressure Control Valve 350
Dipper stick up 380 ---- ---- ----
down 380 ---- ---- ----
Bucket up 380 ---- ---- ----
down 380 ---- ---- ----
Option (Hammer) on 200 ---- ---- ----
Option TCU on 220 ---- ---- ----
Jib up 380 ---- ---- ----
down 270 ---- ---- ----
Travel drive left for. 280 ---- ---- ----
Rev. 280 ---- ---- ----
Travel drive right for. 280 ---- ---- ----
Rev. 280 ---- ---- ----
Group B (5606.660.446)
King post for. 380 ---- ---- ----
rev. 270 ---- ---- ----
Option (free) for. 250 ---- ---- ----
rev. 250 ---- ---- ----
Option (Swivel console) left 250 ---- ---- ----
right 250 ---- ---- ----
Option (Tilting console) on 380 ---- ---- ----
off 270 ---- ---- ----
Group C (5606.660.448)
Main Pressure Control Valve 230
Pony truck up. 250 ---- ---- ----
down 250 ---- ---- ----
Cable reel on 200 ---- ---- ----
off 200 ---- ---- ----
Apron right on 250 ---- ---- ----
off 250 ---- ---- ----
Apron left on 250 ---- ---- ----
off 250 ---- ---- ----
Conveyor up/down for. 250 ---- ---- ----
Rev. 250 ---- ---- ----
Conveyor drive up 250 ---- ---- ----
down 250 ---- ---- ----
Option (Hammer stroke) for 150 ---- ---- ----
Rev. 75 ---- ---- ----