You are on page 1of 39

Truss U.S.

Engineering
TU-4 Citizen Project
Meet the Team
Site Layout
Citizens Bank-
Presidents’ Key List

● Bocce Court
● Open Concept
● Window Access and
natural lighting
● Parking < 1,500 ft
● Phase II for 1000
people
● Employee Involvement
within the campus
● Aesthetics of Site
Gradation
& Drainage
Goals
-Drain water away
from buildings
-Prevent flooding
-Protect the wetlands
Watersheds

4 main watersheds

Each with their


own BMP

Roadways catch
stormwater runoff

Catch Basins
deliver runoff to
bmp
On Site Retaining Walls
In order for the
site to drain
properly,
retaining walls
had to be placed
in two locations

12” culvert
required
underneath
loading dock
Utilities
Water main

● Fire Hydrant access


● Location
● Buried 4’ below grade

Sewer

● 12 in Sewer line design


● PVC pipe
● Buried 7’ below grade
Pump design

● Mostly gravity fed


○ Needed a pump towards the
end of the system
● Wet Well design
○ Submersible Centrifugal Pump
● Models Chosen
○ WS153D3 (typical flow)
○ 4 x WWO511AC (peak flow)
● Chosen using specifier chart.
○ Using TDH, GPM required
Hydrology Map
● Flow components into the soccer field
watershed
Best Management Practices Design

● Infiltration basin design- Captures


the sites run off and filters it both
chemically and reduces the
turbidity
● Has high cost and maintenance
burdens
● Removes Metals, OC and
Pathogens, Nitrogen and
Phosphorus pollution
Storm Graphs
Proposed LEED Design Details
Platinum Certification Energy Atmosphere -- 33 / 33

-92 Points total

Location and Transportation -- 14 / 16 Materials and Resources -- 10 / 13

Sustainable Sites -- 9 / 10 Indoor Environmental Quality -- 14 / 16

Water Efficiency -- 11 / 11 Innovation -- 1 / 6


Solar Panel Detail
● Side Elevation View of panel
● Using latitude location of
Johnston
● Optimum fixed year-round tilt
angle for panels = 48°
● Designed panels at height of 5 ft
● Attached with screw anchors
● Sits on 3 inches of gravel
Solar Energy Design

● Panel spacing design


● Determining lowest sun points
during peak hours
● Design distance between panels
so there is no shadows
● 12.8 ft minimum spacing
Solar Field Design Layout

● 9 rows
● 13 Columns
● 117 Total Panels
● 24 ft Access Road
● Total Field Area
460’ x 240’ =
110,400 ft^2
Column Layout Building C
● 4 Stories
● 242’-3” x 116’-7”
● Beams spaced at 10’-3” & 10’
● Floor Decking:
- Vulcraft 1.5VL18
- Reinforcement: Welded Wire
Fabric 6x6 - W1.4xW1.4
● Steel Cost Estimation = $2,787,820.00
Structural Calculations
Column Load Data
Dead Load (D) 65 psf Carpet, Flooring, Ductwork, Lighting, Ceiling Dead Load 11 psf
Exterior Side Panels (Dead Load) 20 psf
Live Load (L) 80 psf Partitions Dead Load 15 psf
Roof Load (Lr) 20 psf Office Live Load 50 psf
Snow Load (S)66.9 psf Corridor Live Load above 1st Floor 80 psf
Wind Load (W)47.19 psf Dead load of the Concrete slab 39 psf
Max of (Lr , S , W) 66.9 psf

ASCE 7-10 2.3.2


LFRD Load Combination (Interior Columns) LRFD Load Combination (Exterior Columns)
1.4D= 91 psf 119 psf
1.2D+1.6L+0.5(Lr or S or R)= 239.45 psf 263.45 psf
1.2D+1.6(Lr or S or R) + (L or 0.5W)= 265.04 psf 289.04 psf
1.2D+ 1.0W +L+ 0.5(Lr or S or R)= 238.64 psf 262.64 psf
1.2D+ 1.0E +L+ 0.2(S)= 171.38 psf 195.38 psf
0.9D +1.0W= 105.69 psf 123.69 psf
0.9D + 1.0E= 58.5 psf 78.5 psf

Largest LRFD Combination 265.04 psf 289.04 psf


Structural Calculations
Beam Load Data
Dead Load (D) 65 psf Carpet, Flooring, Ductwork, Lighting, Ceiling Dead Load 11 psf
Exterior Side Panels (Dead Load) 20 psf
Live Load (L) 80 psf Partitions Dead Load 15 psf
Roof Load (Lr) 20 psf Office Live Load 50 psf
Snow Load (S) 66.9 psf Total load for the slab 39 psf
Wind Load (W)47.19 psf
Max of (Lr , S , W) 66.9 psf

ASCE 7-10 2.3.2


LFRD Load Combination (Beams Levels 1-4) LFRD Load Combination (Beams Roof)
1.4D= 91 psf 91 psf
1.2D+1.6L+0.5(Lr or S or R)= 206 psf 239.45 psf
1.2D+1.6(Lr or S or R) + (L or 0.5W)= 158 psf 265.04 psf
1.2D+ 1.0W +L+ 0.5(Lr or S or R)= 205.19 psf 238.64 psf
1.2D+ 1.0E +L+ 0.2(S)= 158 psf 171.38 psf
0.9D +1.0W= 105.69 psf 105.69 psf
0.9D + 1.0E= 58.5 psf 58.5 psf

Largest LRFD Combination 206 psf 265.04 psf


Structural Calculations
Girder Load Data
3 Equally Spaced Concentrated Loads = 30.74 kips

(Equally to the reactions of beams)


Elevations
Elevations

➢ Column Selection: W 14x132


➢ Beam Selection : W 18x35
➢ Girder Selection: W 24x68
➢ Roof Sections: W 21x44
○ Selections were standardized
to minimize construction error
○ All in Accordance to the Steel
Manual 15th edition
Elevations

- K Bracing system for


Lateral resistance
- Elevation Plan with
Steel Members
Foundation Design
Notes :
● 4000 psi concrete
● 3” Clear Cover of rebar
● 14” square Base Plate
● ¾” Bolts

Subsurface Information:
● Bedrock found between
16-20” below proposed
finished slab elevation
290’

● Footings will sit on


“hard” granite with an
allowable stress of 12ksf
Footing Designs
Design for 1472.29 Kip Column Load Design for 910.33 and 925.75 Kip Column Load
Footing Designs
Design for 773.52 Kip Column Load Design for 447.45 Kip Column Load
Footing Designs
Strip footing Cross Section
Considerations:

● Wind Load = 48 psf, lateral load and moment


on footing

● Vertical Load = 240 lb/ft based on 20 psf


siding load

● Strip footing runs along entire building


perimeter and ties into exterior column
footings
Retaining Wall Design
Design Criteria
● 12 foot cut
● Available Lateral Clearance
● Location of Pre-existing Utilities
○ Two 72” RCP Pipes under Ramp A
● Subsurface Soil Conditions: Topsoil, Fill, Glacial Deposits, Glacial Sand
● Glacial Deposits contained numerous boulders and cobbles
● No bedrock in 25 feet of exploration
● Groundwater 8-10’ below proposed grade
● Other Considerations: Time of Construction, Cost, Constructability
Soldier Pile Retaining Wall Design
● Length of Wall: 245.6’
● Height: 4.5’ to 12.5’
● Driven Grade 50 Steel H-Piles
○ Spacing: Ranges from 10’ to 7.5’ to 5’
○ W8x36 - W12x84
● Precast Reinforced Concrete Panels
○ Sizes: 2’ , 3’ , 4’
○ Standard reinforcement per span width to minimize construction error
○ 5 foot span: #8 at 10” ; 7.5’ span: #8 at 9”, 10’ span #8 at 8”
Retaining Wall Design
Retaining Wall Design
Roadway Cross Section
● Rhode Island Standard Details
No.
○ 1.2.0 - Combination Drain
○ 7.3.0 - Granite Curb
● Rhode Island Department of
Transportation Highway
Design Manual No.
○ 620.01.1 - Bituminous
Pavement
Roadway Cross Details
RIDOT Standards

Left: 1.2.0
Right: 7.3.0
Horizontal and Vertical Alignment
Horizontal and Vertical Alignments
performed using Civil3D and confirmed
with hand calcs.

All radii for the roadway are in


compliance with code for the design
speed of 25 mph by being greater than
or equal to 100 ft.

Vertical alignment calcs performed


using a k value for 35 mph because the
k value for 25 gave a curve length too
short.

Catch Basin and catch basin piping can


be seen below the roadway at a depth
below the frost depth of 4 ft.
Parking Garage and Lot Layout

● Garage Parking is 4
floors
● Ramp is a single helix
threaded design
Parking Count

Total Parking Spots - 2,753 Spots

● Main Parking Lot - 711 Spots Parking Garage - 1794 Spots


● Parking Lot 2 - 254 Spots
● Handicap - 58 Spots
Proposed Roundabout and Signalized Intersection
Pavement Design
Questions?

You might also like