Professional Documents
Culture Documents
Review Period: JUNE 2016 - MARCH 2017 Date of Review : MARCH 2017
District:
School: _______________________
MFO KRAs OBJECTIVES TIMELINE WEIGHT PERFORMANCE INDICATORS ACTUAL RESULTS RATING SCORE
1-No Action research conducted 1 - Action research conducted with expenses more 1- No action research done
than 10% over the budget
Seminars, Attends seminars , trainings , workshops
Trainings , and other work-related activities ( school , 5 - 5 or more seminars , trainings , workshops in any level
5%
Workshops district , division , region , national level ) attended
Attended within the school year June
3- 2 seminars/workshops/trainings / LAC conducted/ facilitated 3 - Conducted seminars/ trainings / workshops / LAC utilizing 3 - Conducted seminars / trainings / workshops / LAC 3-5 days
supported by TCR low-cost , indigenous materials with 5% more than the budget beyond the specified time in the training design
alloted.
2- 1 seminars/workshops/trainings / LAC conducted /facilitated 2 - Conducted seminars/ trainings / workshops / LAC 2 - Conducted seminars / trainings / workshops / LAC 6-8 days
supported by evidence/TCR utilizing low-cost , indigenous materials with 10 % more than beyond the specified time in the training design
the budget alloted.
1- 1 seminar/workshop/training / LAC conducted / facilitated 1 - Conducted seminars/ trainings / workshops / LAC 1 - Conducted seminars / trainings / workshops / LAC 9-12
withoutout evidence / TCR utilizing low-cost , indigenous materials with 15% more than days or more beyond the specified time in the training design
the budget alloted.
Demonstration 5% 5 - demonstration teaching conducted based on
teachings served 5 - 3 demonstration teachings conducted with MOVs 5-100% of demonstration teachings done with appropriate
Conducts demonstration teaching during June alloted time
the year to March instructional materials / ICT equipment
4-80-99% of demonstration teachings done with appropriate 4 - demonstration teaching conducted 1- 5 minutes
4- 2 demonstration teachings conducted with MOVs
Instructional materials / ICT equipment after the alloted time
3-60-79% of demonstration teachings done with appropriate 3 - demonstration teaching conducted 6- 10 minutes
3-1 demonstration teachings served with MOVs Instructional materials/ ICT equipment after the alloted time
2-40-59% of demonstration teachings done with apropriate 2 - demonstration teaching conducted 11-15 minutes
2 - 1 demonstration teaching served without MOVs Intructional materials/ ICT equipment after the alloted time
1-39% and below of demonstration teachings done with 1 - demonstration teaching conducted 15 minutes
1- Failed to serve any demonstration teaching inappropriate Intructional materials / ICT equipment beyond alloted time
45%
Prepares LPs/ DLL using appropriate
Instructional
LPs & DLLs strategies, methodologies and 5- 100 % LP/ DLLs with complete parts using appropriate strategies, approches 5-100% & above teaching-process facilitated using
Competence 5- 100% LP/ DLL with IMs are prepared a day before
Prepared instructional materials within the year June to and Instructional materials prepared appropriate localized materials / ICT equipment
March 15%
4 - 80-99%% LP/ DLLs with complete parts using appropriate strategies, 4- 80%-99% of teaching-process facilitated using 4 - 100% of LP/DLL with IMs prepared during the day
approches and Instructional materials parts appropriate localized instructional materials/ ICT equipment
3- 60-79% LP/ DLLs with complete parts using appropriate strategies, approches 3- 60% - 79% of teaching-process facilitated using 3- 100% LP/ DLL prepared a day late
and Instructional materials prepared appropriate localized instructional materials/ ICT equipment
2- 40-59% LP/ DLLs with complete parts using appropriate strategies, approches 2-40%-59% of teaching-process facilitated using 2- 100% LP/DLL prepared 2 days late
and Instructional materials prepared appropriate localized instructional materials/ ICT equipment
1- 39 % or less of LP/ DLLs with complete parts using appropriate strategies, 1- 39% & below teaching-process facilitated using 1- 100% LP/DLL prepared 3 days late
approches and Instructional materials prepared appropriate localized instructional materials / ICT equipment
2 - Conducted instructional and class monitoring of 40%-59%% of 2 - Reports submitted 3-4 days after
teachers with appropriate monitoring tool / STAR observation form
4 - 3 teacher mentoring /coaching sessions conducted 4-3 mentoring/coaching sessions done using appropriate 4 -mentoring reports submitted on time
(with report) Ims/ICT equipment following scheduled time