Cement handling

Cement Screw
Main components Drain
Cement silo Cement mixer

Ventilation fan Cement pump

1
Cement handling
Main components
Valves for cement unit

Emergency operation
A86 Scale
instrument

D512 I/O Module

2
Cement handling
Cement valves

Y250 Dust collector

Y595 Cement swing arm

Y591 Drain lid off

Y564 Cement screw

Y519 Cement mixer

Y517 Cement pump

3
Cement handling
Emergency operation

Water Pump

Drain off Lid

Cement Pump A86 Scale


instrument

4
Cement handling
Cement pump

B 269 Inductive Sensor – Pump piston end position

5
Cement handling
Operator panel for cement unit

6
Cement handling
ACH Valves
Cement Vibrator

Pinch valve Y599

Water filling Y560


Water nozzle mixer Y596
Water nozzle pump Y597
Butterfly valve close Y598:1
Butterfly valve open Y598:2

7
Cement handling
Air Valves and Reducing valve

8
Cement handling
Air Valves and Reducing valve
Air Valve AWCM, High pressure water
Air Valve AWCP, Low pressure water
Cleaning the mixer
Cleaning the cementpump

#19

9
Cement handling
Air Pressure Regulator #9 and Gauge for Y 599

10
Cement handling
Dry Cement on/off (operated by Y589:1/Y589:2)

Butterfly Valve

11
Emergency Operation

Cement Pump
Drain off Lid A86 Scale
Instrument
Water Pump

D 512

D 555

12
Air Valve AWC

13
Y 563 Air to Cement Silo Vibarator

14
Pinch Valve XACO3 (Operated by Y599)

XACO3

15
Load Cell

Load Cell behind


Hydraul cylinder for Inside is the
the cover
fast drain off lid pinch valve
16
Load cell exposed

Load Cell

17
Cement handling
Operator panel for cement unit

Activate mixer C-clockwise Open/close dry


Agitator cement valve
Activate mixer clockwise

Activate control panel


Bottom lid open/close

Open cement valve Cement screw

Cement pump start Cement pump cleaning


valve
Water valve refill
Swing cement unit
Water valve for cleaning
Final cleaning program
Swing cement unit

18
Cement unit

Cement
Low pressure water
High pressure water
Air
Dry Cement
19
Operator panel for Cement unit

20
Decoder for operators panel for cement

D540
Decoder

21
Boltec
Cement handling

▪ 1000 kg dry cement capacity


▪ Built in vibrators. RCS
controlled operating
sequences during mixing.
▪ Built in dust suppresion
▪ Screw feed for feeding the
cement to the mixer

22
Boltec cement handling system
The steps of injecting a bore hole with cement

▪ Preparations
– Pre-wash: Mixer, the pump and hose
– Check cement level in silo
– Select recipe of the cement (W/C)
– Start automatic mixing

▪ Drill the bolt hole


▪ Feed the cement injection hose in the bore hole
▪ Inject cement
▪ Insert bolt

23
Boltec cement handling system
Automatic washing

▪ Rapid draining valve opening


▪ Cement valve opens
▪ Water valve opens
▪ Mixer starts
▪ Mixer stops and water valve closes
▪ Rapid draining valve and water valve
closes
▪ Water valve opens and pump starts
▪ All stops and rapid draining valve opens

24
Boltec cement handling system
Manual cleaning 1/6

▪ Remove the mixer

25
Boltec cement handling system
Manual cleaning 2/6

▪ Close rapid draining valve


▪ Close cement valve

26
Boltec cement handling system
Manual cleaning 3/6

▪ Open tap for high pressure water


▪ Start cement pump and leave
water and pump on 5 to 10
minutes

27
Boltec cement handling system
Manual cleaning 4/6

▪ Clean the mixer screw and


cover while flushing
with the high pressure
water

▪ Shut off tap for high


pressure water

28
Boltec cement handling system
Manual cleaning 5/6

▪ Open rapid draining valve


▪ Open cement valve

29
Boltec cement handling system
Manual cleaning 6/6

▪ Open tap for high pressure


water and flush the system
and clean the bucket, shut
the tap
▪ Assemble the cement mixer

30
Boltec cement handling system
Fill cement into the rigs cement silo

Ce Ce
me mCe
nt entme
nt

31
Boltec cement handling system
Select recipe

32
Boltec
Cementmixing indications

Water filling Water filled

Filling cement Cement filled

Mixing cement Cement mixed

33
Boltec
Cement unit - Water

34
Boltec
Cement unit - Cement

35
Boltec
Cement unit - Mixing

36
Cement
Cement unit - Cleaning

37
Cement
Drilling – Cement injecting

38
Cement
Cement injecting

39
Cement
Bolt installation