MATERIAL APPROVAL FORM
MAYFAIR TOWER ON PLOT NO. BB-A08.048
ml S|
[Submission No.:ECC/J326/ AC/18 ey ob | SEF 5I5\
Revision No.:02 cone
IDEYAAR Development PJSC
farex Consulting Engineers
engineering Contracting Company (ESS) |
Project Mayfair Tower, Pot NovA06.049,Business Bay
[Sub-contractor / [Dubal Master Electromechanical
supplier (applicable) :
system deserpion AI
prosict_— [Sound Aerators 7
Locator Use is perahos erawigs
ate of Submission
ecified Manufacturer _|Gemumameo - Aides - Bete oad
Proposed Manufacturer —|Betec cad
Jeountry of origin [UAE
i.ocel Agent Name Bete cad
Model
FTechnical Dala IAs attached
[Contact numer of te
Jsupplier! Agent ceca
Delivery Period [7-8 weeks from date of LPO.
jequostos dats of 77.05.10
[soprova:
[Speciicaton Giause No. (Par il 16-8
(Actus! Timo Recuired on
[ete
JOther altachments fany [Ni
[Samples Ni
[Reason for Alternative Nil . = =
Notes Nit
ICONTRACTOR’S ATTESTATION
For the
[Contractor
Received by AREX Dete:
JAPP ~ Approved
JAWC.— Approves wit Commants
JAwo m= Approved wth Commensand Reset
IN/APP - Not Approved: o
RE — Relectad o
JAuthorzed Signature: \ y date
|Comments:
Trerlf Gilg Tie Printing lowtn pee!
= Cand
de RAP DT
tad naka TAY ited WE LA Fes Ph ry |
Tala Te subTRATS Goring Tis Taview do fat Faleve The Coriractor from compliance wih the correct
is check ia only fr review of general conformance with the design concept of the pro]
[Corrections & comments
requirement and apecificatio
Material Aporoval Form.lasund on 20.05.2008_Rev.01 1of1
Q0E 122440 Mamn1 NTH4HM
shh