You are on page 1of 395

JALAN

DIMENSI VOLUME
STA
PANJANG LUAS LUAS LEBAR P.B.JALAN SIRTU LPA ASMINSHEET
M M M M2 M3 M3 M2
0 + 000
13.00 1.05 3.50 45.50 19.76
0 + 013
I
0 + 013
13.00 1.05 3.50 45.50 17.87
0 + 026
0 + 026
II 56.00 1.20 4.00 224.00 74.88
0 + 082
0 + 082
III 16.00 1.20 4.00 64.00 12.80
0 + 098
0 + 098
IV 27.00 1.20 4.00 108.00 26.28
0 + 125
0 + 125
V 19.00 1.20 4.00 76.00 20.90
0 + 144
0 + 144
VI 86.00 1.35 4.50 387.00 77.40
0 + 230
0 + 000
VII 165.00 0.90 3.00 495.00 97.10
0 + 165
TOTAL 382.00 - 1,445.00 346.98 - -

TALUD KIRI
DIMENSI VOLUME
STA
PANJANG LUAS GALIAN PAS. BATU PLESTERAN URUGAN PASIR PIPA
M M M3 M3 M2 M2 M
0 + 000
13.00 0.70 9.13 57.60
0 + 013
I
0 + 013
13.00 0.62 57.50 8.09 92.00
0 + 026
0 + 026
II 56.00 0.60 33.39
0 + 082
0 + 082
III 16.00 0.09 1.40
0 + 098
0 + 098
IV 27.00 0.55 14.95
0 + 125
0 + 125
VI 19.00 0.09 1.66
0 + 144
0 + 144
V 86.00 0.09 7.51
0 + 230
TOTAL 217.00 57.50 76.13 - 92.00

TALUD KANAN
DIMENSI VOLUME
STA
PANJANG LUAS GALIAN PAS. BATU PLESTERAN URUGAN PASIR PIPA
M M M3 M3 M2 M2 M
0 + 000
13.00 0.81 10.51
0 + 013
I
0 + 013
13.00 0.70 9.13
0 + 026
0 + 026
II 56.00 0.63 35.17
0 + 082
0 + 082
III 16.00 0.09 1.40
0 + 098
0 + 098
IV 27.00 0.60 16.15
0 + 125
0 + 125
VI 19.00 0.60 11.36
0 + 144
0 + 144
V 86.00 0.09 7.51
0 + 230
TOTAL 217.00 - 91.23 - -

167.36
KOORDINAT
X Y

5 28.341 547,235.00 95 24.685 9,541,141.67

R
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN JALAN POROS DESA


PEKERJAAN : PEMBUKAAN JALAN BARU GP. LAM ALING - GP. LAMTUI KEC. COT GLIE (PIK)
LOKASI : KEC. COT GLIE - KAB. ACEH BESAR
T.A : 2016
HARGA

NO. URAIAN PEKERJAAN VOLUME ANALISA SATUAN

( Rp. )
I. PEKERJAAN PERSIAPAN
1 Pengukuran/Pemasangan Profil 1.00 Pkt Ls 500,000.00
2 Mobilisasi 1.00 Pkt Ls 3,000,000.00
3 Administrasi Proyek 1.00 Pkt Ls 500,000.00
SUB TOTAL
II. PEKERJAAN JALAN
1 Pengupasan/Pembersihan Damija 5,230.50 M2 K. 210 1,484.82
2 Timbunan Pilihan/Sirtu 1,370.51 M3 K. 311.b 148,913.59
SUB TOTAL
III. PEKERJAAN TALUD
1 Galian Tanah 18.50 M3 K. 224 47,593.39
2 Pas. Batu Gunung/ Kali 41.63 M3 K. 810 671,120.61
3 Plesteran 1 : 4 tebal 10 mm 58.06 M2 G.50.o 57,766.40
4 Pipa Drainase + Ijuk (terpasang) 74.00 M1 Taksir 12,000.00
SUB TOTAL

Diajukan Oleh : Mengetahui/Menyetujui :


Kontraktor Pelaksana Kuasa Pengguna Anggaran
CV. BINA SAUDARA Bidang Jalan dan Jembatan Dunas B
dan Cipta Karya Kabupaten Aceh

RAFSANJANI NAZARUL KHAIRI, ST. MT


Direktur Nip : 19690601 200012 1 010
MASTER ANALISA
REKAPITULASI
RENCANA ANGGARAN BIAYA

KEGIATAN : PEMBANGUNAN JALAN POROS DESA


PEKERJAAN : PEMBUKAAN JALAN BARU GP. LAM ALING - GP. LAMTUI KEC. COT GLIE (PIK)
LOKASI : KEC. COT GLIE - KAB. ACEH BESAR
T.A : 2016

NO. URAIAN

I. PEKERJAAN PERSIAPAN
II. PEKERJAAN JALAN
III. PEKERJAAN TALUD

(A) JUMLAH
(B) PPN = 10 % x (A)
(C) TOTAL = (A) + (B)
(D) DIBULATKAN

Terbilang : (Dua Ratus Tujuh Puluh Tiga Juta Delapan Ratus Tiga Ribu Rupiah)

Diajukan Oleh : Mengetahui/Menyetujui :


Kontraktor Pelaksana Kuasa Pengguna Anggaran / Ba
CV. BINA SAUDARA Bidang Jalan dan Jembata

RAFSANJANI NAZARUL KHAIRI, ST. MT


Direktur Nip : 19690601 200012 1 010
Addendum - 01

CANA ANGGARAN BIAYA

RU GP. LAM ALING - GP. LAMTUI KEC. COT GLIE (PIK)

JUMLAH

HARGA

( Rp. )

500,000.00
3,000,000.00
500,000.00
4,000,000.00

7,766,351.01
204,087,936.51
211,854,287.52

880,477.72
27,935,395.39
3,353,658.16
888,000.00
33,057,531.27

Mengetahui/Menyetujui :
Kuasa Pengguna Anggaran
Bidang Jalan dan Jembatan Dunas Bina Marga
dan Cipta Karya Kabupaten Aceh Besar

NAZARUL KHAIRI, ST. MT


Nip : 19690601 200012 1 010
Addendum - 01

REKAPITULASI
CANA ANGGARAN BIAYA

RU GP. LAM ALING - GP. LAMTUI KEC. COT GLIE (PIK)

JUMLAH HARGA
( Rp. )

4,000,000.00
211,854,287.52
33,057,531.27

248,911,818.79
24,891,181.88
273,803,000.67
273,803,000.00

iga Juta Delapan Ratus Tiga Ribu Rupiah)

Mengetahui/Menyetujui :
Kuasa Pengguna Anggaran / Barang
Bidang Jalan dan Jembatan

NAZARUL KHAIRI, ST. MT


Nip : 19690601 200012 1 010
DAFTAR UPAH DAN TENAGA KERJA
UNTUK JALAN DESA DAN JALAN LINGKUNGAN
DINAS BINA MARGA DAN CIPTA KARYA
KABUPATEN ACEH BESAR - TA 2016

UPAH TENAGA KERJA


NO. TENAGA KERJA UNIT KODE
( Rp. / Hari )

1 Buruh lapangan tak terlatih Orang/Hari L -101 75,000.00


2 Buruh lapangan kurang terlatih Orang/Hari L -103 75,000.00
3 Buruh lapangan terlatih Orang/Hari L -106 80,000.00
4 Kepala tukang Orang/Hari L-073 90,000.00
5 Mandor lapangan Orang/Hari L-061 85,000.00
6 Mekanik Orang/Hari L-071 97,000.00
7 Mekanik pembantu Orang/Hari L-072 75,000.00
8 Operator terampil Orang/Hari L-081 140,000.00
9 Operator kurang terampil Orang/Hari L-082 75,000.00
10 Pekerja Orang/Hari - 75,000.00
11 Pembantu mekanik Orang/Hari - 75,000.00
12 Pembantu operator Orang/Hari L-083 75,000.00
13 Pembantu supir Orang/Hari L -099 75,000.00
14 Supir truk Orang/Hari L-091 97,000.00
15 Supir personil Orang/Hari L -092 97,000.00
16 Tukang Orang/Hari L-079 80,000.00
DAFTAR HARGA BAHAN / MATERIAL
UNTUK JALAN DESA DAN JALAN LINGKUNGAN
DINAS BINA MARGA DAN CIPTA KARYA
KABUPATEN ACEH BESAR - TA 2016

NO. MATERIAL UNIT KODE

1 Batu Kali/Batu Gunung M3 M-010


2 Kerikil dari Galian Bukit M3 M-011
3 Pasir Beton M3 M-012
4 Batu Belah/Kerakal M3 M-013
5 Kerikil Sungai Ayak M3 M-014
6 Batu Belah 10 - 15 cm M3 M-020
7 Batu Belah 7 - 10 cm M3 M-021
8 Batu Belah 5 - 7 cm M3 M-022
9 Batu Pecah 3 - 5 cm M3 M-023
10 Batu Pecah 2 - 3 cm M3 M-024
11 Batu Pecah 1 - 2 cm M3 M-025
12 Batu Pecah 0,5 - 1 cm M3 M-026
13 Batu Pakhlag (5 -7 Cm) M3 M-027
14 Batu Sikhlag (3 -5 Cm) M3 M-028
15 Gorong^2 Beton Bertulang D=60 cm M M-031
16 Gorong^2 Beton Bertulang D=40 cm M -
17 Pasir Urug M3 M-040
18 Tanah Urug M3 M-040.1
19 Pasir Pasang M3 M-041
20 Sirtu (tak diayak) Material Jalan M3 M-042
21 Tanah Timbunan pilihan M3 M-050
22 Aspal Bitumen Kg M-061
23 Aspal Cement Pen.60/70 atau 80/100 Kg M-061.1
24 Minyak Tanah (Industri) Ltr M-065
25 Minyak Tanah (Subsidi) Ltr M-065.1
26 Minyak Premium (Nonsubsidi) Ltr M-084
27 Minyak Premium (Subsidi) Ltr M-084.1
28 Kayu bakar M3 M-070
29 Semen PC 40 Kg M-080
30 Kapur Kg M-081
31 Batu Kapur Kg M-082
32 Cat Besi (kuda terbang) Kg M-090
NO. MATERIAL UNIT KODE

33 Cat Tembok (vinilex) Kg M-090.a


34 Baja Profil Kg M-161
35 Kawat bronjong dia.3 mm Kg M-162
36 Baut Dia. 1/2 - 6" Bh M-163.a
37 Baut Dia. 1/2 - 8" Bh M-163.b
38 Baut Dia. 1/2 - 10" Bh M-163.c
39 Besi Beton Ulir Kg M-164
40 Baja Konstruksi Kg M-165
41 Paku Kg M-166
42 Besi Beton Polos Kg M-167
NO. MATERIAL UNIT KODE

43 Kawat Beton Kg M-167.a


44 Alat-alat Bantu Set M-170
45 Kayu Tiang Perancah/Bekisting M3 M-180
46 Kayu Untuk Konst. Jembatan M3 M-181
47 Kayu Untuk Konst. Lantai Jembatan Gantung M3 M-181.a
48 Minyak Desel/Solar ( Industri) Ltr M-183
49 Minyak Desel/Solar Ltr M-184
50 Minyak Pelumas Ltr M-185
51 Batu Gunung Royalti M3 MR 10
52 Ganti Rugi Kerikil Galian Royalti M3 MR 11
53 Kerikil Sungai Dipungut Royalti M3 MR 12
54 Ganti Rugi Sirtu Royalti M3 MR 42
55 Aggregat Klas B (sampai di lokasi Pekerjaan) M3 -
56 Aggregat Klas A (Sampai dilokasi pekerjaan) M3 -
57 Aspal Beton AC - WC Ton -
58 Bronjong Dia. 3 mm (2x1x0.5) Pabrikan + Batu m' -
59 Wiremesh Dia. 6 mm ulir Kg W.M6
TAR HARGA BAHAN / MATERIAL
ALAN DESA DAN JALAN LINGKUNGAN
S BINA MARGA DAN CIPTA KARYA
BUPATEN ACEH BESAR - TA 2016

HARGA SATUAN

( Rp. )
150,000.00
150,000.00
150,000.00
150,000.00
150,000.00
180,000.00
170,000.00
170,000.00
270,000.00
290,000.00
330,000.00
335,000.00
170,000.00
160,000.00
725,000.00
575,000.00
100,000.00
60,000.00
145,000.00
90,000.00
96,000.00
12,500.00
12,500.00
12,000.00
2,500.00
10,000.00
6,450.00
300,000.00
50,000.00
7,500.00
7,500.00
78,000.00
HARGA SATUAN

( Rp. )
54,000.00
37,000.00
23,500.00
4,800.00
6,500.00
7,500.00
23,000.00
32,000.00
21,000.00
7,500.00
HARGA SATUAN

( Rp. )
6,500.00
15,000.00
3,000,000.00
4,000,000.00
3,500,000.00
10,000.00
5,000.00
35,000.00
25,000.00
25,000.00
35,000.00
35,000.00
300,000.00
320,000.00
1,396,597.93
550,000.00
55,350.00
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENYEDIAAN KERIKIL SUNGAI
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN TIDAK DISARING
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :

1 Buldozer membuat timbunan kerikil ditepi sungai 1. Mengunakan alat berat 360 m3 / hari
2 Wheel Loader mengisi truck dari timbunan 2. Wheel Loader mengisi 18 truck/jam (6 Jam kerja
3 Dump truck mengangkut kerikil sungai tidak disaring 3. Pengangkutan jarak 10 Km dari sumber
kelokasi pekerjaan/penimbunan 4. Pengambilan material dengan dipungut pembaya
yang berlaku
5. Volume yang diukur berdasarkan 5 ton/truck (lep
6. 1,0 trip/jam/tr
7. Penggunaan alat bantu rata-rata 1 set untuk 1 o

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator Terampil 3 1 L-081 3 140,000
E Pembantu Operator 3 1 L-083 3 75,000
R Supir 18 1 L-091 18 97,000
J Buruh tak terlatih 8 1 L-101 8 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Ganti Rugi Sirtu Royalti 360 M3 MR-42 35,000
T Alat bantu 0.32 Set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Buldozer 100 HP 2 1 E-001 4.5 530,064
R Wheel Loader 105 HP 1 1 E-052 6 398,670
A Dump Truck 5 Ton/125 HP 18 1 E-212 6 342,419
L
A
T
A
N
N

VOLUME 360 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENYEDIAAN KERIKIL SUNGAI
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN TIDAK DISARING
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Truck diisi dengan tenaga manusia disungai 1. Mengunakan tenaga manusia (60 m3/hari).
2 Truck mengangkut kerikil kelokasi pekerjaan atau 2. Muatan 5 truck perjam ( 1 m3/orang/hari)
penimbunan 3. Material dikirimkan ke lokasi pekerjaan atau pen
3 Muatan dibongkar dengan tenaga manusia 4. Jarak angkut 10 Km, 72 menit per trip, 5 trip/hari
5. Pengambilan material dengan dipunggut pemba
royalti yang berlaku
6. Volume yang diukur berdasarkan 3 tonne/truck (
7. Penggunaan alat bantu rata-rata 1 set untuk 1 o
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 L-061 2 85,000
K Supir 5 1 L-091 5 97,000
E Buruh tak terlatih 60 1 L-101 60 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Ganti Rugi Sirtu Royalti 60 M3 MR-42 35,000
T Alat bantu 2.4 Set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Flat bed truck 5 1 E-221 5 217,817
A
L
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MENYEDIAKAN KERIKIL GALIAN TERSARIN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Buldozer menggusur lapis penutup dan menyiapkan 1. Menggunakan alat berat (60m3/hari) dengan 6 ja
kerikil untuk Wheel Loader 2. 50 cm lapisan penutup dibuang untuk mendapat
2 Kerikil (pit-run) disaring 3. Jumlah lapis penutup 1 m3 per 8 m3 kerikil galia
3 Loader mengisi truck 4. Sumber material dengan dipungut pembayaran g
4 Dump truck mengangkut kerikil ke lokasi timbunan 5. Volume yang dihitung berdasarkan 5 tonne/truck
atau pekerjaan 6. 1,0 trip/jam/truck untuk mengangkut material jara
7. Penggunaan alat bantu rata-rata 1 set untuk 1 o
8. Kapasitas penyaringan 18 tonne/jam, dengan ov

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terampil 3 1 L-081 3 140,000
E Pembatu Operator 3 1 L-083 3 75,000
R Sopir 4 1 L-091 4 97,000
J Buruh tak terlatih 4 1 L-101 4 75,000
A Buruh semi terlatih 2 1 L-103 2 75,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Ganti Rugi Kerikil galian royalti 80 M3 MR-11 25,000
E Alat bantu 0.2 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Buldozer 110 HP 1 1 E-001 3 530,064
R Mesin penyaring 80 HP 1 1 E-040 3 97,943
A Wheel Loader 105 HP 1 1 E-052 5 398,670
L Dump truck (5T) - 125 HP 4 1 E-212 6 342,419
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MENYEDIAKAN KERIKIL SUNGAI (TERSARIN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Buldozer menimbun stock disungai 1. Menggunakan alat berat (60 m3/hari)
2 Loader mengangkat muatan truck 2. Wheel Loader mengisi 4 truck/jam (6 Jam/kerja)
3 Kerikil disaring di instalasi penyaringan sesuai 3. Pengangkutan pada jarak 10 Km dari sumber.
ukuran yang dikehendaki 4. Pengambilan material dipungut pembayaran gan
4 Dump truck mengangkat kerikil sungai yang disaring 5. Volume yang diukur berdasarkan 5 tonne/truck (
kelokasi penimbunan atau pekerjaan 6. 1,0 trip/jam/tr
7. Penggunaan alat bantu rata-rata 1 set untuk 1 o
8. kapasitas, screning rata-rata 30 tonne/jam, deng
bahagian halus 20 % terjadi over size 30 %
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 3 1 L-081 3 140,000
E Pembatu Operator 3 1 L-083 3 75,000
R Supir 4 1 L-091 4 97,000
J Buruh tak terlatih 4 1 L-101 4 75,000
A Buruh terlatih 2 1 L-106 2 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Ganti Rugi Sirtu Royalti 80 M3 MR-42 35,000
E Alat bantu 0.24 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Buldozer 110 HP 1 1 E-001 2 530,064
R Mesin penyaring 80 HP 1 1 E-040 2 97,943
A Wheel Loader 105 HP 1 1 E-052 5 398,670
L Dump truck (5T) - 125 HP 4 1 E-212 6 342,419
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PRODUKSI KERIKIL PECAH TERSARING (AL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN MEMPERGUNAKAN KERIKIL SUNGAI
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :

1 Buldozer membuat timbunan dipinggir sungai 1. Menngunakan alat berat (60m3/hari), material d
2 Wheel Loader memuat ketruck yang membongkar 2. Batu diambil dari sungai dan diangkut ketempat
batu ditempat penyaringan 3. 3.3 % batu lolos saringan pada mesin dengan p
3 Batu over size dipecah mesin 4. 70 % batu yang sudah dipecah dicampur kemba
4 Hasil pecahan batu dicampur kembali dengan batu sungai yang lolos saringan
dari sungai yang lolos dari saringan 5. Volume yang diukur berdasarkan 5 ton/truck (lep
6. Jarak angkut dari tempat sumber ke tempat pek
7. Rata-rata umur alat bantu 1 bulan orang/set

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 4 1 L-081 4 140,000
E Pembatu Operator 4 1 L-083 4 75,000
R Supir 4 1 L-091 4 97,000
J Pekerja tak terlatih 5 1 L-101 5 75,000
A Pekerja terlatih 4 1 L-106 4 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Kerikil Sungai dipungut royalti 80 M3 MR-12 35,000
E Alat bantu 0.2 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Buldozer 110 HP 1 1 E-001 2 530,064
R Mesin pecah batu 220 HP 1 1 E-031 4 554,248
A Wheel Loader 115 HP 1 1 E-052 6 398,670
L Dump truck (5T) - 125 HP 4 1 E-212 6 342,419
A
T
A
N
JUMLAH (Rp.)
VOLUME 60 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PRODUKSI BATU PECAH TERSARING (ALA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN MEMPERGUNAKAN BATU QUARRY
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Buldozer mengupas lapangan penutup dan membuat 1. memakai alat berat (60m2/hari) - material diolah
timbunan 2. Pemecahan dalam 2 tahap produksi akhir 18 t/ja
2 Wheel loader memuat ke truck dan membongkar 3. Pemakaian ulang 3 t/jam dan 8 % hilang
ditempat saringan 4. Volume diukur atas dasar 5 t/truck lepas (BJ=1.5
3 Pemecah batu memecah batu over size 5. 1 rit pp/jam/truck
4 Produksi batu pecah disaring 6. Jauh pengiriman 10 km dari sumber bahan
5 Penimbunan batu pecah tersaring dalam timbunan 7. rata-rata umur alat bantu 1 bulan/orang/set
yang terpisah
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 4 1 L-081 4 140,000
E Pembaru Oparator 4 1 L-083 4 75,000
R Supir 4 1 L-091 4 97,000
J Pekerja tak terlatih 5 1 L-101 5 75,000
A Pekerja terlatih 4 1 L-106 4 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Batu gunung royalti 70 M3 MR-10 25,000
E Alat bantu 0.2 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Buldozer 110 HP 1 1 E-001 4 530,064
R Mesin pecah batu 1 1 E-031 4 554,248
A Wheel Loader 115 HP 1 1 E-052 6 398,670
L Dump truck (5T) - 125 HP 4 1 E-212 6 342,419
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMPRODUKSI CAMPURAN LATASIR
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Semua material dikirim oleh suplier ke AMP 1. Latasir dihasilkan dari AMP produksi 100 t/hari
2 Wheel Loader menjaga bin selalu penuh 2. Aspal dipanaskan agar tersedia pada waktunya
3 Produksi mesin 100 t/hari 3. Hasil produksi termasuk pengangkutan sampai 1
4 Hasil produksi diangkutn dengan Dump Truck 4. hasil dimuat dalam Dump Truck Kap.5 t dan dikir
kelokasi penghamparan 5. Rata-rata umur alat bantu, sebulan/orang/set
6. SESUAI SPESIFIKASI BM. NO.12/PT/B/1983
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 3 1 L-081 3 140,000
E Pembantu Operator 3 1 L-083 3 75,000
R Sopir 4 1 L-091 4 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A Buruh terlatih 3 1 L-106 3 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir 45 M3 M-041 145,000
T Aspal 10000 Kg M-061 12,500
E Semen 98 40 Kg M-080 50,000
R Kapur 6 M3 M-081 7,500
I Alat Bantu 0.24 set M-170 15,000
A Batu sungai Pecah Tersaring 1.5 m3 K.017 358,765
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Wheel Loader 105 HP 1 1 E-052 5 398,670
R Mesin pencampur aspal 30t/jam 1 1 E-155 5 1,674,302
A Dump truck (5T) - 125 HP 4 1 E-212 6 342,419
L
A
T
A
N

VOLUME 100 SATUAN Tonne Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMPRODUKSI LAPIS TIPIS ASPAL BETO
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (LATASTON)
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Semua material dikirim oleh leveransir 1. HRS dari AMP dengan produksi 100 t/hari
2 Loader menjaga agar bin tetap penuh 2. Dipakai agregat pecah tersaring
3 Hasil produksi 100 t/hari 3. Aspal dipanaskan duluan agar siap pada waktun
4 Pengangkutan dengan dump truck tertutup dengan 4. Biaya produksi termasuk pengangkutan sejauh 1
terpal 5. Produksi dimuat dengan truck 5 ton, diantar kete
6. Rata-rata umur alat bantu 1 orang/set
7. Spec BM. No.12/PT/1983 (tabel 3.3)
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 1 1 L-061 1 85,000
E Operator Terampil 3 1 L-081 3 140,000
K Pembantu Operator 3 1 L-083 3 75,000
E
R Sopir 4 1 L-091 4 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A Buruh terlatih 3 1 L-106 3 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir 31 M3 M-041 145,000
T Aspal 7300 Kg M-061 12,500
E Semen 90 40 Kg M-080 50,000
R Kapur 1 M3 M-081 7,500
I Alat Bantu 0.24 set M-170 15,000
A Kerikil pecah tersaring 22.5 M3 K.017 358,765
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Wheel Loader 115 HP 1 1 E-052 5 398,670
R Mesin pencampur aspal 30 t/jam 1 1 E-155 5 1,674,302
A Dump truck (5T) - 125 HP 4 1 E-212 6 342,419
L
A
T
A
N

VOLUME 100 SATUAN Tonne Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMPRODUKSI DAN MENGANGKUT
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN ASPAL BETON (LASTON)
(MENGGUNAKAN ALAT/AMP)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Semua material dikirim oleh loeveransir 1. Memakai alat berat (100 t/hari)
2 Loader menjaga agar bin tetap penuh 2. Memakai agregat pecah tersaring
3 Produksi 20 t/jam - 5 jam/hari 3. AMP didirikan didekat penimbunan material
4 Dump truck memuat dan membongkar sampai 4. Aspal dipanaskan lebih dulu agar aspal sudah si
screeder 5. Hasil diangkut dengan truck 5 t dan dikirim samp
6. Harga produksi termasuk pengiriman sejauh 10
7. Rata-rata umur alat bantu 1 bulan/orang/set
8. Spesifikasi BM No. 13/PT/B/1983
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 1 1 L-061 1 85,000
E Operator Terampil 3 1 L-081 3 140,000
K Pembantu Operator 3 1 L-083 3 75,000
E
R Sopir 4 1 L-091 4 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A Buruh terlatih 3 1 L-106 3 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir 27 M3 M-041 145,000
T Aspal 6180 Kg M-061 12,500
E Semen 100 40 Kg M-080 50,000
R Alat Bantu 0.24 set M-170 15,000
I Kerikil pecah tersaring 27.5 M3 K.017 358,765
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Wheel Loader 105 HP 1 1 E-052 5 398,670
R Mesin pencampur aspal 30 T/j 1 1 E-155 5 1,674,302
A Dump Truck (5T) -125 HP 4 1 E-212 6 342,419
L
A
T
A
N

VOLUME 100 SATUAN Tonne Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMBUAT PARIT GALIAN TANAH
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Gali parit 1. Menggunakan tenaga manusia 100 m/hari
2 Pembuangan hasil galian menggunakan truck 2. Dimensi saluran : lebar bawah = 0.50 m
lebar atas = 1.30 m
kedalaman = 0.60 m (vol.
3. 25 % hasil galian dibuang setempat
4. Hasil galian dibuang sejauh 2 Km
5. Menggali dan membuang dihitung : 2.0 m3/hari -
6. Penggunaan alat bantu 1 bulan - orang
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Sopir 1 1 L-091 1 97,000
E Buruh tak terlatih 27 1 L-101 27 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat Bantu 1.44 set M-170 15,000
T
E
R
I
A
L
HARI JAM HARGA
PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Dump Truck (3,5T) -115 HP 1 1 E-211 6 251,089
R
A
L
A
T
A
N

VOLUME 54 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMBUAT PARIT GALIAN TANAH
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Gali saluran tepi jalan dengan greder 1. Menggunakan peralatan berat (500m/hari)
2 Buang hasil galian 2. Volume galian saluran tepi jalan 0.8 m3/M
3. Digali dengan greder
4. 1/3 disebar pada bahu jalan/badan jalan
5. 2/3 dibuang sejauh 1 km
6. 3 rit/pp/jam/truck
7. Pembuatan saluran tepi jalan perhari 500 m
8. Lihat gambar D1:1/4 tipe 2A

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Sopir 4 1 L-091 4 97,000
J Buruh tak terlatih 16 1 L-101 16 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat Bantu 0.64 set M-170 15,000
T
E
R
I
A
L
HARI JAM HARGA
PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Greder 100 HP 1 1 E-010 6 513,564
R Wheel Loader 105 HP 1 1 E-052 6 398,670
A Dump Truck (5T)-125 HP 4 1 E-212 6 342,419
L
A
T
A
N

VOLUME 400 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMBUAT PASANGAN BATU PADA PARIT
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Galian tambahan (0.55 m3/m) 1. Galian parit vol. 0.54 m3/m
2 Pasangan parit berdekatan dengan dinding penahan 2. Ukuran parit galian dalam : tebal 20 cm; lebar ba
tanah bila diperlukan lebar atas = 0.9 m; kedalaman = 0.6 m.
3 Tebal pasangan 20 cm 3. 40 % pembuangan hasil galian dengan truck bia
4 Urugan Kembali dan buang sisa galian 4. 60 % dibuang setempat
5. Bahan-bahan dikirim ke tempat pekerjaan oleh le
6. Hasil produksi 60m/hari
7. Lihat gambar D1; 1/4 tipe B
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Sopir 1 1 L-091 1 97,000
E Buruh tak terlatih 36 1 L-101 36 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat Bantu 1.44 set M-170 15,000
T Konstruksi Pasangan Batu 30 M3 K.810 596,925
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Flat Bed Truck 1 1 E-221 6 217,817
A
L
A
T
A
N

VOLUME 60 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMBUAT PASANGAN BATU PADA PARIT
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN DENGAN PENUTUP PLAT BETON BERTULAN
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Galian tambahan (0.40 m3/m) 1. Galian parit vol. 0.54m3/m
2 Buat dasar Pasangan Batu 2. Ukuran parit galian dalam : tebal 20 cm; lebar ba
3 Pasangan parit berdekatan dengan dinding penahan lebar atas = 0.9 m; kedalaman = 0.6 m.
tanah bila diperlukan 3. Item material termasuk pelengkap buruh, tukang
4 Cor Plat Penutup 4. Plat penutup tebal 15 Cm Pembesian 3 %
5 Letakkan Plat Penutup Timbunan Kembali dan Buang 5. 50 % Sisa Galian dibuang dengan Truck bak terb
Sisa Galian 6. 50 % Sisa Galian dibuang dekat lokasi pekerjaan
7. Bahan Bahan Dikirim ke tempat pekerjaan oleh p
8. Hasil Produksi 20 m/hari
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Sopir 1 1 L-091 1 97,000
E Buruh tak terlatih 12 1 L-101 12 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat Bantu 0.48 set M-170 15,000
T Pembesian 300 M3 K.715 10,297
E Bekisting 17 m2 K.710 101,350
R Konstruksi Pasangan Batu 11 m3 K.810 596,925
I Beton Struktur Klas K.225 (1251) 4 m3 K.722 920,820
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Flat Bed Truck 1 1 E-221 6 217,817
A
L
A
T
A
N

VOLUME 60 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PASANGAN PIPA BETON PRACETAK O 60 CM
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (PRACETAK BERTULANG, TANPA DINDING KEPA
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Gali sepanjang gorong L 1m, dlm 1 m dibawah 1. Menggunakan tenaga manusia (tak termasuk din
permukaan tanah dasar 2. Pipa beton bertulang beli setempat
2 Kirim pipa ketempat pekerjaan 3. Beton klas K.125 digunakan untuk alas dan men
3 Menempatkan pipa ditempat gorong gorong 4. Pipa-pipa dan bahan beton diangkut ke tempat p
4 Uruk kembali dan padatkan sekeliling pipa 5. Tidak termasuk penggalian dan pemadatan kem
gorong sampai permukaan subgrade yang ada
5 Jika tambahan/penggantian gorong-gorong
dibutuhkan pekerja extra

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 4 L-061 4 85,000
K Buruh tak terlatih 7 4 L-101 28 75,000
E
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Beton Massa Klas K.125 (125 t) 4.5 M3 K.720 753,743
T Pipa beton O 60 cm 8 M M-031 725,000
E Alat bantu 1.12 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

VOLUME 8 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PASANGAN PIPA BETON PRACETAK O 80 CM
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (PRACETAK BERTULANG,) TANPA DINDING KEPA
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Gali jalur gorong^2 1.3 m x 1.3 m dibawah 1. Menggunakan tenaga manusia (tak termasuk din
permukaan tanah dasar 2. Pipa beton bertulang beli setempat, panjang 9m
2 Pengadaan pipa sampai ditempat pekerjaan 3. Beton klas C digunakan untuk membungkus pipa
3 Menempatkan pipa ditempatkan gorong-gorong 4. Pengangkutan pipa dan beton sampai tampak p
4 Timbun dan padatkan sekeliling pipa sampai 5. Tidak termasuk penggalian dan pemadatan kem
permukaan tanah dasar yang ada.
5 Jika tambahan/penggantian gorong^2,
dibutuhkan pekerjaan extra

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 3 L-061 3 85,000
K Buruh tak terlatih 8 3 L-101 24 75,000
E
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Beton Massa Klas K.125 (125 l) 8.2 M K.720 753,743
T Pipa Beton Tidak bertulang Ø 80 Cm 9 M M.033 575,000
E Alat bantu 1.28 Set M.170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

VOLUME 9 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN GORONG^2 KOTAK PASANGAN BATU DENG
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN PENUTUP BETON BERTULANG UK.1 X 1 M TA
DDG KEPALA (MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Buat plat beton bertulang 1. Tidak termasuk dinding kepala
2 Gali tanah lebar 2m, dlm 1.2 m 2. Lantai dasar dari pasangan batu tebal 40 cm dia
3 Buang hasil galian dengan truck 3. Dinding pasangan batu bagian dalam miring (kea
4 Cor beton lantai kerja (dasar 50 cm, atas 30 cm, tinggi 100 cm.
5 Tidak termasuk dinding kepala 4. Plat atas (1.8 m x 0.25 m) bertulang, penulangan
6 Buat abutment dari pas. batu 5. Pengiriman material sampai ditempat pekerjaan
7 Pasang plat beton diatasnya 6. Tukang-tukang termasuk dalam biaya produksi
8 Timbun kembali bekas galian dibelakang pondasi 7. sesuai gambar D7;1/3

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 6 L-061 6 85,000
K Operator terlatih 1 2 L-081 2 140,000
E Pembatu Oparator 1 2 L-083 2 75,000
R Supir 1 2 L-091 2 97,000
J Buruh Tak Terampil 5 6 L-101 30 75,000
A Buruh Terlatih 1 6 L-106 6 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M Alat bantu 1.2 set M-170 15,000
A Pembesian 822 kg K.715 10,297
T Begisting 6.3 M2 K.710 101,350
E Konstruksi Pasangan batu 11.35 M3 K.810 596,925
R Beton Struktur K.225 (125 l) 4.55 M3 K.722 920,820
I Pengurugan Kembali 7.6 M3 K.225 340,907
A

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Wheel Loader 105 HP 1 1 E-052 2 398,670
R Flatbed truck 115 HP 1 1 E-221 2 217,817
A
L
A
T
A
N

VOLUME 9 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN GORONG^2 KOTAK PASANGAN BATU DENG
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN PENUTUP BETON BERTULANG UK. 1.5 X 1.
TANPA DINDING KEPALA
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Membuat plat beton bertulang 1. Tidak termasuk dinding kepala
2 Gali tanah lbr 2,5 m dalam 3 m 2. Lantai dasar beton tak bertulang (2,5 m x 40 cm)
3 Buang hasil galian dengan truck 3. Dinding pasangan batu bagian dalam miring (kea
4 Cor beton lantai dasar (dasar 65 cm, atas 35 cm, tinggi 150 cm.
5 Tidak termasuk dinding kepala 4. Plat atas (1.8 m x 0.25 m) bertulang, penulangan
6 Buat abutment dari pas. batu 5. Plat beton bertulang tebal = 30 cm, lebar = 2,5 m
7 Pasang plat beton diatasnya 120 kg/m3
8 Timbun kembali bekas galian dibelakang pondasi 6. Sesuai gambar D7; 1/3
dan dipadatkan
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 6 L-061 6 85,000
K Operator terlatih 1 2 L-081 2 140,000
E Pembatu Oparator 1 2 L-083 2 75,000
R Supir 1 2 L-091 2 97,000
J Buruh Tak Terampil 12 6 L-101 72 75,000
A Buruh Terlatih 2 6 L-106 12 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 2.88 set M-170 15,000
T Pembesian 1744 kg K.715 10,297
E Begisting 10.2 M2 K.710 101,350
R Konstruksi Pasangan batu 26.1 M3 K.810 596,925
I Beton Struktur K.225 (125 l) 9.7 M3 K.722 920,820
A Pengurugan Kembali 13.6 M3 K.225 340,907
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Wheel Loader 105 HP 1 1 E-052 2 398,670
R Flatbed truck 115 HP 1 1 E-221 2 217,817
A
L
A
T
A
N

VOLUME 12 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN DINDING SAYAP GORONG-GORONG
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN PASANGAN BATU (SATU PASANG)
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Gali tanah untuk dinding dan dasar kaki kedua sisi 1. Tubal rata-rata dinding 75 cm
(28 m3) 2. Volume seluruhnya 9 m3
2 Buat dua dinding kepala pasang batu 3. Bahan dikirim sampai ketempat pekerjaan
3 Timbun kembali dengan bahan urugan yang baik 4. Dinding berdiri pada plat pasangan batu tebal 30
(4.25 m3) 5. Lihat gambar standart D 1/2
4 Buang hasil galian yang tidak terpakai

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 6 L-061 6 85,000
K Buruh tak terlatih 6 6 L-101 36 75,000
E Buruh terlatih 1 6 L-106 6 80,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)

M
A Konstruksi Pasangan Batu 1.44 M3 K.810 596,925
T Pengurugan Kembali 9 M3 K.225 340,907
E Alat bantu 4.25 Set M.170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

VOLUME 9 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENGUPASAN DAN PEMBERSIHAN SEMAK PA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN DAMIJA (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Mengupas dan membuang semak-semak dengan 1. Menggunakan tenaga manusia ( 12 m x 100 m/h
tenaga manusia pada DMJ (daerah milik jalan) 2. Tidak ada pohon besar pada DAMIJA
3. DAMIJA 12m
4. Pembersihan DAMIJA 100m Perhari
5. Bakar sampah dilokasi pekerjaan
6. Hasil kerja 50 M2/orang hari
7. Umur alat bantu rata-rata 1 bulan/org/set 3 Alat

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Buruh tak terlatih 22 1 L-101 22 75,000
E
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 1 Set M-170 15,000
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

JUMLAH (Rp.)
VOLUME 1200 SATUAN M2 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENGUPASAN TANAH DAN PEMBERSIHA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN SEMAK PADA DAMIJA
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Grader mengupas dan membuang semak- 1. Menggunakan alat berat (2400m2/hari)
semak dari damija 2. Tidak ada pohon besar dalam damija (hanya sem
3. Lebar damija 12 m
4. Pembersihan damija 200 m per hari
5. Bakar sampah dilokasi pekerjaan

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Oparator 1 1 L-083 1 75,000
R Buruh tak terlatih 2 1 L-101 2 75,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.08 Set M-170 15,000
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Motor Greder 115 HP 1 1 E-100 5 513,564
R
A
L
A
T
A
N

VOLUME 2400 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENGURUGAN TANAH
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Penggalian dan pemuatan ke truck dengan tenaga manusia 1. Menggunakan Tenaga manusia (60m3/hari)
2 Pengiriman kelokasi pekerjaan dengan truck 2. Dipakai material dari penggalian di daerah jalan/
3 Membongkar dan meratakan dengan tenaga manusia 3. Jarak angkut PP < 4 Km (1 trip/jam/truck)
4 Meratakan dan memadatkan lapis demi lapis 4. Lima truck dimuati perjam (3 m3/OH)
tebal tiap lapis 10 Cm 5. Waktu muat 12 Menit/10 org/truck: waktu bongka
6. Pemadatan dengan mesin gilas tandem
7. Kapasitas Pemadatan 60 m3 perhari
8. Tidak termasuk penyiapan tanah dasar.
9. Umur alat bantu rata-rata 1 bulan/Or/set 2 - 3 ala
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 L-061 2 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Oparator 1 1 L-083 1 75,000
R Supir 6 1 L-091 6 97,000
J Buruh tak terlatih 30 1 L-101 30 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 2.4 Set M-170 15,000
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas tandem 6-10 Ton 1 1 E-081 5 199,264
R Truck Tangki air 115 HP 1 1 E-182 5 222,906
A truck Bak terbuka 3,5 ton/115 HP 3 1 E-221 6 217,817
L
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MENGANGKUT MATERIAL UNTUK
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN MENGURUG GALIAN
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Penggalian 1. Menggunakan alat berat (120 M3/HARI)
2 Pengangkutan 2. Dipakai material dari penggalian di daerah jalan
3 Ratakan da padatkan lapis demi lapis, diperbolehkan
tebal tiap lapis 15 cm 3. 2 rit pp/jam/truck
4. Jarak angkut pulang pergi < 4 km
5. Kapasitas pemadatan 120 m3 perhari
6. Tidak termasuk pekerjaan persiapan dilokasi pen

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 4 1 L-081 4 140,000
E Sopir 6 1 L-091 6 97,000
R Buruh tak terlatih 10 1 L-101 10 75,000
J Pembantu Operator 4 1 L-083 4 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.4 Set M-170 15,000
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Excavator 115 - 140 HP 1 1 E-100 4 317,678
R Greder 115 HP 1 1 E-010 5 513,564
A Wheel Loader 105 HP 1 1 E-052 5 398,670
L Mesin gilas bergetar (Vibrator Roller) 1 1 E-082 5 289,508
A Truck tangki air 115 HP 1 1 E-182 5 222,906
T Dump Truck (5-T) 125 HP 4 1 E-212 5 342,419
A
N

VOLUME 120 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN GALIAN TANAH UNTUK KONSTRUKSI
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Penggalian tanah dengan tenaga manusia 1. Menggunakan tenaga manusia
(50 m3/hari) 2. Kapasitas kerja kelompok 50 m3/hr
2 Tanah galian disingkirkan sejauh minimal 30 meter 3. Kedalaman rata-rata galian s/d 3 m
dari lubang galian 4. Untuk jenis tanah berbatu, harga satuan pekerja
dengan faktor 1,5.

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Buruh tak terlatih 30 1 L-101 30 75,000
30 E
R
J
A
HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 1.2 Set M-170 15,000
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

JUMLAH (Rp.)
40 VOLUME 50 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN DAN PEMADATAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (UNTUK JEMBATAN & GORONG^2)
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Struktur dibersihkan dari bahan-bahan organik 1. Bahan timbunan dikirim kelapangan oleh leveran
2 Timbun kembali bagian belakang struktur 2. Digunakan Kerikil Galian /Sungai tidak tersaring
3 Padatkan dengan stemper dan mesin gilas 3. Timbunan dipadatkan berlapis tebal 10 cm
bergetar

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Buruh tak terlatih 10 1 L-101 10 75,000
E Buruh terlatih 3 1 L-106 3 80,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.4 Set M-170 15,000
T Kerikil Sungai Tak disaring 20 M3 K.012 191,106
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas bergetar 1 ton 1 1 E-087 3 45,045
R Stamper 4 HP 1 1 E-088 3 25,114
A
L
A
T
A
N

VOLUME 15 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN DAERAH RAWA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Urugan dikirim sampai ketempat pekerjaan 1. Menggunakan peralatan berat (120 m3/hari)
2 Menghampar dan memadatkan 2. Material pilihan untuk timbunan dikirim ke tempa
oleh leveransir.
3. Pemadatannya mendekati pemadatan untuk L.P

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 3 1 L-081 3 140,000
E Pembantu Operator 1 1 L-091 1 75,000
R Supir 1 1 L.091 1 97,000
J Buruh tak terlatih 6 1 L-102 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Material timbunan/pilihan 144 M3 M-050 96,000
T Alat bantu 0.24 set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Buldozer 110 HP 1 1 E-001 4 530,064
R Mesin gilas 3 roda 6 - 8 ton 1 1 E-080 5 175,285
A Vibrator Roller 1 1 E-082 5 289,508
L Truck tangki air 115 HP 1 1 E-182 5 222,906
A
T
A
N

VOLUME 120 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN DI DAERAH RAWA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Material dikirim sampai ditempat pekerjaan 1. Menggunakan tenaga manusia 60 m3/hari
2 Ditabur dengan tangan dan dipadatkan dengan 2. Material pilihan untuk timbunan dikirim ketempat
mesin gilas roda baja, dan nfinish dengan mesin oleh leveransir, sejauh 10 km.
gilas bergetar. 3. Pemadatannya mendekati pemadatan untuk sub

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 L-061 2 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L.091 1 97,000
J Buruh tak terlatih 60 1 L-101 60 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Material timbunan/pilihan 72 M3 M-050 96,000
T Alat bantu 2.4 Set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 6 - 8 ton 1 1 E-080 5 175,285
R Vibrator Roller 1 1 E-082 5 289,508
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PASANGAN CERUCUK KAYU DI RAWA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Potongan cerucuk dikirim ketempat pekerjaan 1. Memakai tenaga orang (4 group)
2 Cerucuk ditempatkan pada lokasinya 2. Cerucuk pendek dipukul dengan tenaga orang (1
3 Cerucuk dipukul masuk dengan tenaga orang 3. Cerucuk panjang 6 m O 15 cm dipotong dan diki

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Kepala Tukang 2 1 L-073 2 90,000
E Sopir 1 1 L-091 1 97,000
R Pekerja tak terlatih 18 1 L-101 18 75,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Paku jembatan 13 Kg M-166 21,000
T Kayu Cerucuk 5 M3 M-180 3,000,000
E Alat bantu 0.72 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Trailer 1 t 1 1 E-191 1 153,049
R truck bak terbuka 3t - 80 HP 1 1 E-221 5 217,817
A Pompa air (o 5 cm) 30 m3/jam 4 1 E-341 5 25,123
L
A
T
A
N

VOLUME 240 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN BADAN JALAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Material dihampar (maksimal) setiap lapis 20 cm. 1. Menggunakan tenaga manusia (60 M3/hari)
2 Setiap lapis (20 cm) dipadatkan minimal 4 kali 2. Material Timbunan yang termurah untuk timbuna
lintasan dengan mesin gilas tiga roda pekerjaan sejauh 10 Km
3. Harga Material tergantung harga di lokasi peker

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh Tak Terlatih 18 1 L-101 18 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Bahan Timbunan Pilihan 72 M3 M-050 96,000
T Alat bantu 0.2 Set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas tiga roda 1 1 E-080 4 175,285
R Truck tangki air 115 HP 1 1 E-182 3 222,906
A
L
A
T
A
N

JUMLAH (Rp.)
VOLUME 60 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN BADAN JALAN (TANPA PEMADA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Material dihampar (maksimal) setiap lapis 20 cm. 1. Menggunakan tenaga manusia (60 M3/hari)
2 Setiap lapis (20 cm) dipadatkan manual 2. Material Timbunan yang termurah untuk timbuna
pekerjaan sejauh 10 Km
3. Harga Material tergantung harga di lokasi peker

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 1 1 L-081 0 140,000
E Pembantu Operator 1 1 L-083 0 75,000
R Supir 1 1 L-091 0 97,000
J Buruh Tak Terlatih 18 1 L-101 18 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Bahan Timbunan Pilihan 72 M3 M-050 96,000
T Alat bantu 0.2 Set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas tandem 6-10 Ton 1 6 E-081 - 175,285
R Truck tangki air 115 HP 1 6 E-182 - 222,906
A
L
A
T
A
N

JUMLAH (Rp.)
VOLUME 60 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN BADAN JALAN (TANPA PEMADA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Material dihampar (maksimal) setiap lapis 20 cm. 1. Menggunakan tenaga manusia (60 M3/hari)
2 Setiap lapis (20 cm) dipadatkan manual 2. Material Timbunan yang termurah untuk timbuna
pekerjaan sejauh 10 Km
3. Harga Material tergantung harga di lokasi peker

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Buruh Tak Terlatih 18 1 L-101 18 75,000
E Pembantu Operator 1 1 L-083 0 75,000
R Supir 1 1 L-091 0 97,000
J Operator terlatih 1 1 L-081 0 140,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Bahan Timbunan Tanah 72 M3 M-050 60,000
T Alat bantu 0.2 Set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas tandem 6-10 Ton 1 6 E-081 - 175,285
R Truck tangki air 115 HP 1 6 E-182 - 222,906
A
L
A
T
A
N

JUMLAH (Rp.)
VOLUME 60 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN BADAN JALAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Material dihampar (maksimal) setiap lapis 20 cm. 1. Menggunakan peralatan berat (120 m3/hari)
2 Setiap lapis (20 cm) dipadatkan minimal 4 kali 2. Material Timbunan yang termurah untuk timbuna
lintasan dengan Roller 8 Ton. pekerjaan sejauh 10 Km
3. Harga Material tergantung harga di lokasi pekerj

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh Tak Terlatih 4 1 L-101 4 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Bahan Timbunan Pilihan 144 M3 M-050 96,000
T Alat bantu 0.4 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Vibrator Roller 1 1 E-082 3 289,508
A Truck tangki air 115 HP 1 1 E-182 3 222,906
L
A
T
A
N

JUMLAH (Rp.)
VOLUME 120 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN BADAN JALAN (SIRTU)
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Material dihampar (maksimal) setiap lapis 20 cm. 1. Menggunakan peralatan berat (120 m3/hari)
2 Setiap lapis (20 cm) dipadatkan minimal 4 kali 2. Material Timbunan yang termurah untuk timbuna
lintasan dengan Roller 8 Ton. pekerjaan sejauh 10 Km
3. Harga Material tergantung harga di lokasi pekerj

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh Tak Terlatih 4 1 L-101 4 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Sirtu (tak diayak) Material Jalan 132 M3 M-050 90,000
T Alat bantu 0.4 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Vibrator Roller 1 1 E-082 3 289,508
A Truck tangki air 115 HP 1 1 E-182 3 222,906
L
A
T
A
N

JUMLAH (Rp.)
VOLUME 120 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENIMBUNAN BADAN JALAN (SIRTU)
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Material dihampar (maksimal) setiap lapis 20 cm. 1. Menggunakan peralatan berat (120 m3/hari)
2 Setiap lapis (20 cm) dipadatkan minimal 4 kali 2. Material Timbunan yang termurah untuk timbuna
lintasan dengan Roller 8 Ton. pekerjaan sejauh 10 Km
3. Harga Material tergantung harga di lokasi pekerj

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh Tak Terlatih 4 1 L-101 4 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Sirtu (tak diayak) Material Jalan 132 M3 M-050 90,000
T Alat bantu 0.4 Set M-170 15,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Tandem Roller 1 1 E-081 3 199,264
A Truck tangki air 115 HP 1 1 E-182 3 222,906
L
A
T
A
N

JUMLAH (Rp.)
VOLUME 120 SATUAN M3 Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN GALIAN TANAH DAN PEMBUANGAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Digali dengan tenaga manusia 1. Menggunakan tenaga manusia (32 m3/hari)
2 Dimuat ke truck dengan tenaga manusia 2. 20 % dibuang ditempat, selagi truck tidak ada
3 Buang hasil galian tak terpakai menggunakan 3. 80 % dibuang dengan truck
truck 3,5 ton. 4. Jarak 1 rit pp < 2 km
5. Penggunaan alat bantu 1 bln orang
6. Tidak termasuk pemadatan tanah dasar
7. 1.6 rit pp/jam/truck

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Sopir 1 1 L-091 1 97,000
E Buruh tak terlatih 24 1 L-101 24 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 1.44 Set M-170 -
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Flatbed Truck 1 1 E-221 4 217,817
R
A
L
A
T
A
N

VOLUME 32 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN GALIAN TANAH DAN PEMBUANGAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Penggalian dengan buldozer 1. Menggunakan peralatan berat (200 m3/hari)
2 Hasil galian dibuang dengan truck sejauh 1 km 2. 20 % terbuang ditempat
3 Permukaan tanah dibentuk dan dirapihkan 3. 80 % diangkut dan dibuang dengan truck
dengan grader 4. 2.5 rit pp/jam/truck
5. Jarak 1 rit pp < 2 km
6. Tidak termasuk pekerjaan pemadatan tanah das
7. 1.6 rit pp/jam/truck

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 3 1 L-081 3 140,000
E Pembantu Operator 3 1 L-083 3 75,000
R Supir 4 1 L-091 4 97,000
J Buruh Tak Terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.24 Set M-170 -
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Excavator 115 - 140 HP 1 1 E-001 5 317,678
R Grader 115 HP 1 1 E-010 5 513,564
A Wheel Loader 105 HP 1 1 E-052 5 398,670
L Dump truck (5 T) 125 HP 4 1 E-212 5 342,419
A
T
A
N

VOLUME 200 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENYIAPAN TANAH DASAR
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (DENGAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Pembentukan tanah dasar dengan tenaga manusia 1. Menggunakan tenaga orang (8 m x 400 m/hari)
2 Pemadatan dengan mesin gilas 3 roda 2. 50 m2/hari orang
3. Penggunaan alat bantu 1 bulan-orang
4. Tenaga dicari setempat

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Buruh tak terlatih 64 1 L-101 64 75,000
J
A
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 3.2 Set M-170 -
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 1 1 E-080 5 175,285
R
A
L
A
T
A
N

VOLUME 3200 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENYIAPAN TANAH DASAR
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Pembentukan tanah dasar dengan Greder 1. Menggunakan alat berat ( 8m x 500m/hari)
2 Pemadatan dengan mesin gilas roda besi 2. Damija dibersihkan dari semak dll
3. Lebar dasar jalan 8m
4. Hasil kerja menyiapkan dasar jalan 500m/hari

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Buruh tak terlatih 4 1 L-101 4 75,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 3.2 Set M-170 -
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 1 1 E-080 6 175,285
R Motor Greder 100 Hp. 1 1 E.010 6 513,564
A
L
A
T
A
N

VOLUME 4000 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMBENTUK BAHU JALAN KERAS
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Bahan timbunan yang baik dihampar dengan 1. Menggunakan tenaga orang (96 m3/hari, pemad
tenaga orang 2. Material pilihan dikirim sampai tempat pekerjaan
2 Pemadatan bahu jalan dengan mesin gilas bergetar 3. Leveransir meletakkan material timbunan sepan
4. 10 cm timbunan padat dibutuhkan pada 1 m leb
5. Penghamparan timbunan dengan tenaga manu
6. Pemadatan dengan mesin gilas getar kecil

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 3 1 L-061 3 85,000
K Buruh tak terlatih 76 1 L-101 76 75,000
E Buruh terlatih 1 1 L-106 1 80,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Bahan Timbunan Pilihan 116 M3 M-050 96,000
T Alat bantu 3.84 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas bergetar 1 ton 1 1 E-087 5 45,045
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 96 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMBENTUK BAHU JALAN KERAS
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Bahan timbunan yang baik yang sesuai untuk bahu 1. Menggunakan alat berat (2000 m2 bahu jalan/ha
jalan keras ditimbun disepanjang bahu jalan 2. 10 cm timbunan padat dibutuhkan pada 1 m leba
2 Tenaga, semi terlatih mengatur penimbunan 3. Bahan timbunan yang terpilih dikirim leveransir s
3 Bahan dihampar dengan greder 4. Leveransir meletakkan material timbunan disepa
4 Pemadatan dengan greder bergetar yang kecil 5. Material disebar dengan greder
6. 200 m3 timbunan padat perhari

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 3 1 L-081 3 140,000
E Pembantu Operator 3 1 L-083 3 75,000
R Buruh Tak terlatih 4 1 L-101 4 75,000
J Buruh terlatih 2 1 L-106 2 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Kerikil sungai tanpa disaring 240 M3 K.012 191,106
T Alat bantu 0.16 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas bergetar 1 ton 2 1 E-087 5 45,045
R Greder 115 HP 1 1 E-010 5 513,564
A
L
A
T
A
N

VOLUME 200 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMOTONG BAHU JALAN TINGGI
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Perbaiki bahu jalan tingginya melebihi lapisan 1. Menggunakan tenaga manusia (48 m2/hari)
permukaan jalan antara parit & pekerasan jalan 2. Rata-rata bahu jalan dipotong setinggi 10 cm de
2 Muat dan bongkar ke/dari dengan tenaga manusia 3. Semua sampah/kotoran dibuang sejauh 1 km, ka
3 Buang semua tanah buangan 4. Memuat dan membuang dengan tenaga manusi
5. Hasil kerja rata-rata 1,5 m3/hari - orang
6. Penggunaan alat bantu 1 bulan-orang

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Sopir 4 1 L-091 4 97,000
E Buruh tak terlatih 32 1 L-101 32 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 1.6 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Flatbed truck 3,5 t/80 HP 2 1 E-221 5 217,817
R
A
L
A
T
A
N

VOLUME 48 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMOTONG BAHU JALAN TINGGI
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Perbaiki bahu jalan antara saluran samping 1. Menggunakan alat berat (150 m3/hari)
dan perkerasan 2. Greder memotong bahu jalan setinggi 10 cm, dit
2 Gunakan loader untuk memuat sampah ketempat 1 km pada satu sisi jalan
dumptruck 3. Jarak membuang 1 rit pp < 2 km
4. 2,5 rit pp/jam/truck

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 4 1 L-091 4 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 0.24 set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Greder 115 HP 1 1 E-010 5 513,564
R Wheel Loader 1 1 E-052 6 398,670
A Dump truck (5T) 4 1 E-212 6 342,419
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PEMBERSIHAN SEMAK DLL PADA BAHU JAL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Pemotongan semak belukar yang tumbuh 1. Menggunakan Tenaga Manusia (2 x 1,5 m x 500
pada bahu jalan 2. Dengan Lebar 1,5 M dari tepi jalan rata-rata luas
2 Bersihkan Rumput / semak dari bahu jalan dan aspal 1500 m2/Km satu sisi
3. Hasil Kerja 60 M2/Orang hari
4. Sampah/ reruntuhan di buang sajauh 1 Km
5. Umur alat bantu rata-rata 1 bulan/orang/set 3 se

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L.061 1 85,000
K Buruh tak terlatih 25 1 L-101 25 75,000
E
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 1 set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

VOLUME 1500 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PEMBERSIHAN PARIT
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Bersihkan dan bentuk kembali saluran Type V 1. Menggunakan alat berat (2 x 1 km/hari)
dengan greder 2. Greder menyingkirkan runtuhan tanah dari parit
2 Buang kelebihan tanah menggunakan 3. Pekerjaan berikutnya meratakan badan jalan
Wheel Loader dan dumptruck 4. 10 m3/100 m runtuhan tanah dibuang sejauh 1 k
5. 2,5 rit pp/jam/truck
6. Hasil kerja pembersihan parit 2000 m/hari

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 4 1 L-091 4 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 0.24 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Greder 115 HP 1 1 E-010 5 513,564
R Wheel Loader 105 HP 1 1 E-052 6 398,670
A Dump truck (5T) - 125 HP 4 1 E-212 6 342,419
L
A
T
A
N

VOLUME 2000 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PEMBERSIHAN PARIT
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Bersihkan saluran samping dan gorong-gorong 1. Menggunakan tenaga manusia
dari kotoran/sampah dan tumbuh-tumbuhan 2. Membersihkan sampah, kotoran yang menyumb
2 Buang sampah/kotoran tersebut dengan dari dan gorong-gorong
menggunakan truck, dimuat oleh tenaga orang 3. Pembuangan runtuhan sejauh 1 Km
4. Penggunaan alat bantu 1 bulan-orang
5. Kapasitas 1.0 rit pp/jam/tru

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Sopir 2 1 L-091 2 97,000
E Buruh tak terlatih 36 1 L-101 36 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 1.44 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Flatbed truck 3,5 t/80 HP 2 1 E-221 5 217,817
R
A
L
A
T
A
N

VOLUME 500 SATUAN M Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN LPB KLAS A AGGREGAT PECAH TERSARIN
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat pecah tersaring ditimbun disamping jalan 1. Menggunakan alat berat (150m3/hari)
oleh pemasok 2. Material ditimbun sepanjang jalan oleh leveransi
2 Greder membentuk ulang permukaan jalan lama 3. Dikirim batu quarry/kerikil sengai pecah tersaring
3 Greder menghampar Agregat 4. Dihampar dan dipadatkan sampai tebal 15 Cm
4 Jalan disiram air dengan truck tangki 5. Dihampar dan dipadatkan 1000m2/hari
5 Pemadatan dengan mesin gilas 6-8 Ton sampai 100% 6. Koefisien pemadatan * 1,2
7. Gradasi bahan lapis pondasi bawah LPA semua
saringan 75mm sesuai rev.spec.umum B.M. Mar

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Kerikil sungai Pecah tersaring 129 M3 K.017 358,765
T Pasir urug 51 M3 M.040 100,000
E Alat bantu 0.24 Set M-170 -
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas 3 Roda 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN LPB KLAS A AGGREGAT PECAH TERSARIN
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat pecah tersaring ditimbun disamping jalan 1. Menggunakan Tenaga Manusia (60m3/hari)
oleh pemasok 2. Material ditimbun sepanjang jalan oleh leveransi
2 Membentuk ulang permukaan jalan lama Dan 3. Dikirim batu quarry/kerikil sengai pecah tersaring
menghampar Agregat dengan tenaga manusia 4. Dihampar dan dipadatkan sampai tebal 15 Cm
3 Jalan disiram air dengan truck tangki 5. Dihampar dan dipadatkan 400 M2/hari
4 Pemadatan dengan mesin gilas 6-8 Ton sampai 100% 6. Koefisien pemadatan * 1,2
5 Perapian dengan tenaga manusia 7. Gradasi bahan lapis pondasi bawah LPA semua
saringan 75mm sesuai rev.spec.umum B.M. Mar

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 l-061 2 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 48 1 L-101 48 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Kerikil sungai pecah tersaring 51.5 M3 K.017 358,765
T Pasir urug 20.5 M3 M.040 100,000
E Alat bantu 0.24 Set M-170 -
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Mesin gilas 3 Roda 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN LPB KLAS B KERIKIL TERSARING
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat pecah tersaring ditimbun disamping jalan 1. Menggunakan alat berat (150m3/hari)
oleh pemasok 2. Material ditimbun sepanjang jalan oleh leveransi
2 Greder membentuk ulang permukaan jalan lama 3. Dikirim batu quarry/kerikil sungai tersaring yang
3 Greder menghampar Agregat 4. Dihampar dan dipadatkan sampai tebal 15 Cm
4 Jalan disiram air dengan truck tangki 5. Dihampar dan dipadatkan 1000m2/hari
5 Pemadatan dengan mesin gilas 6-8 Ton sampai 100% 6. Koefisien pemadatan * 1,2
7. Gradasi bahan lapis pondasi bawah LPA semua
saringan 75mm sesuai rev.spec.umum B.M. Mar

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Kerikil sungai tersaring 180 M3 K.016 303,773
T
E Alat bantu 0.24 Set M-170 -
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas 3 Roda 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN LPB KLAS B KERIKIL TERSARING
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat pecah tersaring ditimbun disamping jalan 1. Menggunakan Tenaga Manusia (60m3/hari)
oleh pemasok 2. Material ditimbun sepanjang jalan oleh leveransi
2 Membentuk ulang permukaan jalan lama Dan 3. Dikirim batu quarry/kerikil sungai tersaring yang
menghampar Agregat dengan tenaga manusia 4. Dihampar dan dipadatkan sampai tebal 15 Cm
3 Jalan disiram air dengan truck tangki 5. Dihampar dan dipadatkan 600m2/hari
4 Pemadatan dengan mesin gilas 6-8 Ton sampai 100% 6. Koefisien pemadatan * 1,2
5 Perapian dengan tenaga manusia 7. Gradasi bahan lapis pondasi bawah LPA semua
saringan 75mm sesuai rev.spec.umum B.M. Mar

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 l-061 2 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 48 1 L-101 48 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Kerikil sungai tersaring 72 M3 K.016 303,773
T
E Alat bantu 0.24 Set M-170 -
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Mesin gilas 3 Roda 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN KONSTRUKSI LAPIS PONDASI BAWAH (LPB) KL
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil ditimbun sepanjang jalan oleh levenrasir 1. Menggunakan alat berat
2 Grader menghampar kerikil dan ukuran yang 2. Kerikil ditimbun sepanjang jalan oleh leveransir
besar dipisah 3. Material kerikil kali tanpa disaring dikirim leveran
3 Pemadatan menggunakan mesin gilas dan truck air tempat pekerjaan
4. 6 % kerikil dengan ukuran lebih (oversize), yang
penghamparan dengan grader
5. Dihampar setebal 15 cm dipadatkan menjadi 10
6. hasil kerja 1200 m2 perhari (max 300 meter)

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Kerikil sungai tidak tersaring 191 M3 K.012 191,106
T Alat bantu 0.24 Set M-170 -
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas 3 Roda 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN LAPIS PONDASI BAWAH (LPB) KLS C SIRT
(MENGGUNAKAN BURUH )
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat ditempatkan sepanjang jalan oleh leveransir 1. Menggunakan tenaga manusia setempat
2 Menghampar agregat dengan tenaga orang 2. Kerikil ditimbun sepanjang jalan oleh leveransir
3 Pemadatan dalam 2 lapis memakai truck air & mesin 3. Kerikil dengan ukuran lebih (oversize) yang tersi
gilas roda baja dengan orang dihitung 6 %
4 Perapihan dengan tangan 4. Dihampar dalam 2 lapis dan dipadatkan, tebal pa
5. Penggunaan alat bantu + 1 bulan orang
6. Hasil kerja menghampar dan memadatkan 600 m
7. Kerikil kali tanpa disaring dikirim leveransir samp

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 l-061 2 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 48 1 L-101 48 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 2.4 Set M-170 -
T Kerikil sungai tanpa di saring 72 M3 K.012 191,106
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 6 - 8 T 1 1 E-080 5 175,285
R Truck tangki air 115 HP 1 1 E-182 5 222,906
A
L
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN KONSTRUKSI LAPIS PONDASI BAWAH
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (LPB) - TELFORD
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :

1 Material disiapkan dilokasi pekerjaan 1. Menggunakan tenaga manusia 400 m2 per hari
2 Menghampar pasir setebal 5 cm 2. Material-material dikirim ke tempat pekerjaan ole
3 Batu pecah berukuran besar (10-15 cm) disusun berdiri 3. Batu sudah di pecah
4 Batu pecah yang lebih kecil mengisi rongga diatasnya 4. Dipadatkan sampai tebal 20 cm
sehingga rata dan kemudian dipadatkan/digilas dengan
mesin gilas

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 3 1 L-061 3 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Buruh tak terlatih 90 1 L-101 90 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Batu Belah 7 - 10 cm 50 M3 M-021 170,000
T Batu Sikhlag 3 - 5 cm 20 M3 M-028 160,000
E Pasir urug 30 M3 M-040 100,000
R Alat bantu 4 Set M-170 15,000
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 Roda 6-8 Ton 1 1 E-080 6 175,285
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 80 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN KONSTRUKSI LAPIS PONDASI BAWAH
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN KLAS B AGGREGAT PECAH TERSARING
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat Pecah tersaring ditimbun di sepanjang jalan 1. Menggunakan alat berat ( 150 M3/hari)
Oleh pemasok 2. Materaial ditimbun disepanjang jalan oleh pemas
2 Greder membentuk ulang permukaan jalan 3. dikirim batu quarry/bahan timbunan kerikil pecah
3 Greder menghampar agregat 4. Dihampar dan dipadatkan sampai mencapai 15 C
4 Jalan disiram air dengan truck air 5. Dihampar dan dipadatkan 1000 m2/hari
5 Pemadatan dengan mesin gilas 8 - 10 Ton 6. Koefisien pemadatan = 1 : 2

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Batu Pecah tersaring 122.5 M3 K.017 358,765
E Pasir urug 50.5 M3 M-040 100,000
R Alat bantu 0.24 Set M-170 -
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas 3 Roda 6-8 Ton 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN KONSTRUKSI LAPIS PONDASI ATAS (LPA) KL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat Pecah tersaring ditimbun di sepanjang jalan 1. Menggunakan alat berat ( 150 M3/hari)
Oleh pemasok 2. Materaial ditimbun disepanjang jalan oleh pemas
2 Greder membentuk ulang permukaan jalan 3. dikirim batu quarry/bahan timbunan kerikil pecah
3 Greder menghampar agregat 4. Dihampar dan dipadatkan sampai mencapai 15 C
4 Jalan disiram air dengan truck air 5. Dihampar dan dipadatkan 1000 m2/hari
5 Pemadatan dengan mesin gilas 8 - 10 Ton 6. Koefisien pemadatan = 1 : 2

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T
E Alat bantu 0.24 Set M-170 -
R Agregat Klas A 188.79 M3 - 320,000
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas 3 Roda 6-8 Ton 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN KONSTRUKSI LAPIS PONDASI ATAS (LPA) KL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Agregat ditimbun disepanjang jalan 1. Menggunakan tenaga manusia, 60 m3/hari
2 Material dihampardengan tenaga manusia 2. Penggadaan barang oleh leveransir
3 Pemadatan pekerasan dengan mesin gilas roda 3. Buruh menhampar batu pecah diatas LPB ( + 15
baja dan tangki air 4. Menggunakan 135 m3 batu pecah mesin denga
24 m3 atau 140 m3 kerikil pecah mesin dengan
5. Rongga-rongga ditutup dengan pasir urug deng
6. Dipadatkan sampai 10 cm padat
7. Hasil kerja menghampar dan memadatkan 600

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 48 1 L-101 48 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Agregat Klas A 75.516 M3 - 320,000
E Alat bantu 2.4 Set M-170 -
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 Roda 6-8 Ton 1 1 E-080 5 175,285
R Truck tangki air 115 HP 1 1 E-182 5 222,906
A
L
A
T
A
N
JUMLAH (Rp.)

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN KONSTRUKSI LAPIS PONDASI ATAS (LPA) KL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN KERIKIL TERSARING
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil disuplai dan ditimbun disepanjang jalan 1. Menggunakan alat berat 150 M3/HARI
oleh leveransir 2. Kerikil ditimbun disepanjang jalan oleh leveransi
2 Menghampar dengan grader 3. Dihampar dan dipadatkan hingga padat tebal pa
3 Pemadatan dengan mesin gilas bergetar dengan 4. Hasil kerja menghampar dan memadatkan 1500
tangki air dan mesin gilas roda baja

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 0.24 Set M-170 -
E Agregat disaring 187.5 M3 K.016 303,773
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas 3 Roda 6-8 Ton 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN LAPIS PONDASI ATAS (LPA) KELAS B
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN KERIKIL TERSARING
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil pecah ditimbun disepanjang jalan oleh leveransir 1. Menggunakan tenaga manusia 60 M3/hari
2 Material di hampar dengan tenaga manusia 2. Kerikil ditimbun dan letakkan disepanjang jalan o
3 Dipadatkan dengan mesin gilas roda baja 3. Buruh menghampar kerikil pecah diatas LPB dal
disertai truck air 4. Dipadatkan hingga didapat tebal pada 10 cm
5. Hasil kerja menghampar dan memadatkan 750 m

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 l-061 2 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 48 1 L-101 48 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 2.4 Set M-170 -
T Agregat disaring 75 M3 K.016 303,773
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 6 - 8 T 1 1 E-080 5 175,285
R truck tangki air 115 HP 1 1 E-182 5 222,906
A
L
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN KONSTRUKSI LAPIS PONDASI ATAS (LPA) KL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN KERIKIL PECAH TERSARING
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil disuplai dan ditimbun disepanjang jalan 1. Menggunakan alat berat 150 M3/HARI
oleh leveransir 2. Kerikil ditimbun disepanjang jalan oleh leveransi
2 Menghampar dengan grader 3. Dihampar dan dipadatkan hingga padat tebal pa
3 Pemadatan dengan mesin gilas bergetar dengan 4. Hasil kerja menghampar dan memadatkan 1500
tangki air dan mesin gilas roda baja

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 l-061 1 85,000
K Operator terlatih 2 1 L-081 2 140,000
E Pembantu Operator 2 1 L-083 2 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 6 1 L-101 6 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 0.24 Set M-170 -
E Agregat Klas B 188.79 M3 - 300,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas 3 Roda 6-8 Ton 1 1 E-080 5 175,285
A Truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 150 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN LAPIS PONDASI ATAS (LPA) KELAS B
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN KERIKIL PECAH TERSARING
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil pecah ditimbun disepanjang jalan oleh leveransir 1. Menggunakan tenaga manusia 60 M3/hari
2 Material di hampar dengan tenaga manusia 2. Kerikil ditimbun dan letakkan disepanjang jalan o
3 Dipadatkan dengan mesin gilas roda baja 3. Buruh menghampar kerikil pecah diatas LPB dal
disertai truck air 4. Dipadatkan hingga didapat tebal pada 10 cm
5. Hasil kerja menghampar dan memadatkan 750 m

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 1 l-061 2 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 48 1 L-101 48 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 2.4 Set M-170 -
T Agregat Klas B 75.516 M3 - 300,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 6 - 8 T 1 1 E-080 5 175,285
R truck tangki air 115 HP 1 1 E-182 5 222,906
A
L
A
T
A
N

VOLUME 60 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN LABURAN ASPAL PASIR (BURAS)
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Hanya berfungsi sbg penutup permukaan jalan 1. Kemampuan kerja 2400 (4 x 600) m2/hari
supaya tidak berdebu 2. Pasir dikirim oleh leveransir sampai ditempat ker
2 Lubang-lubang yang ada harus ditambal dan 3. Kebutuhan aspal 1,2 Lt/m2 aspal residu 0,96 l/m
permukaan kering bebas debu 4. Pasir disebar rata-rata 55 m2/m3
3 Aspal yang telah dipanaskan s/d 110 disiram secara 5. Pemanasan aspal dengan ketel dilakukan diloka
merata 6. Pasir dimuat ulang kedalam truck dengan tenaga
4 Kemudian pasir disebarkan diatasnya dan digilas dihampar dengan mesin penghampar
dengan mesin pneumatic 7. Spesifikasi BM.05/PT/B/1983

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 1 1 L-061 1 85,000
E Operator terlatih 2 1 L-081 2 140,000
K Pembantu Operator 2 1 L-091 2 75,000
E Supir 1 1 L-099 1 97,000
R Buruh tak terlatih 12 1 L-101 12 75,000
J Buruh terlatih 2 1 L-106 2 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir 12 M3 M-041 145,000
T Aspal 2280 Kg M-061 12,500
E Minyak bakar 120 Lt M-065 12,000
R Alat bantu 0.4 Set M-170 -
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas roda keret 8 - 15 t 1 1 E-084 5 208,898
R Mesin Penyemprot Aspal 1000 Lt 1 1 E-153 5 65,048
A Dump truck (3,5 T) / 115 HP 1 1 E-212 5 342,419
L Copressor 210 m3/jam 1 1 E-301 4 164,714
A
T
A
N

VOLUME 2400 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN JAPAT PEMBENTUKAN DAN PENGERIKILA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN ULANG 4 CM ( MENGGUNAKAN ALAT )

PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Grader membentuk kembali perkerasan 1. Menggunakan alat berat (3 x 1,5 km/hari 4500 m
2 Leveransir menuangkan agregat disepanjang 2. Dimulai dengan pekerjaan perbaikan penurunan
dengan truck lubang pada muka jalan
3 Grader menghampar agregat 3. Grader lakukan 2 lintasan dan 3 lintasan mengha
4 Permukaan disiram dengan truck air jalan lebar 2 m, panjang 1,5 km diselesaikan seh
5 Gilasan memadatkan material lepas 4. Agregat dikirim ketempat pekerjaan oleh leveran
5. Tebal pemadatan agregat tersaring rata-rata 4 cm
6. Penggunaan alat bantu 1 bulan/orang
7. Dipakai agregat tersaring (K014 atau K016)
TOTAL VOL. UPAH
PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 1 1 L-061 1 85,000
E Operator terlatih 2 1 L-081 2 140,000
K Pembantu Operator 2 1 L-091 2 75,000
E Supir 1 1 L-099 1 97,000
R Buruh tak terlatih 1 1 L-101 1 75,000
J Buruh terlatih 6 1 L-106 6 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.5 Set M-170 -
T Kerikil Galian tersaring 180 M3 K.014 300,273
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Grader 115 HP 1 1 E-010 5 513,564
R Mesin gilas roda karet 1 1 E-084 5 208,898
A truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 3750 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN LAPIS PENETRASI MAKADAM (LAPEN) = 5 C
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Semprotkan aspal (tack coat) 0,8 l/m3 1. Mengunakan tenaga buruh
2 Hamparkan agregat pokok 3-5, 25 m2/m3 dan 2. Harga material (agregat pokok, agregat pengun
padatkan adalah harga dilokasi proyek
3 Hamparkan split 2-3, 45 m2/m3 dan padatkan 3. Volume aspal cair untuk tack coat/prime coat 0,8
4 Semprotkan aspal (2,5 kg/m2) 4. Tebal lapisan penetrasi = 5 cm
5 Hamparkan agregat pengunci split 1-2, 90 m2/m3 5. Agregat dikirim sampai tempat pekerjaan oleh le
dan padatkan
6 Semprotkan aspal 1,5 kg/m2 dan gilas
7 Taburkan pasir rata-rata 400 m2/m3

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 2 3 L-061 6 85,000
K Operator terlatih 2 3 L-081 6 140,000
E Pembantu Operator 2 3 L-083 6 75,000
R Supir 1 3 L-091 3 97,000
J Buruh tak terlatih 66 3 L-101 198 75,000
A Buruh terlatih 2 3 L-106 6 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M Batu pecah 3-5 cm 56 M3 M-023 270,000
A Batu pecah 2-3 cm 31.11 M3 M-024 290,000
T Batu pecah 1-2 cm 15.55 M3 M-025 330,000
E Pasir beton 3.5 M3 M-041 145,000
R Aspal 6270 Kg M-061 12,500
I Minyak bakar 450 Lt M-065 12,000
A Alat bantu 8.16 Set M-170 -
L Kayu Bakar 2 M3 M-070 300,000

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 1 3 E-080 5 175,285
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 1400 SATUAN M2 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN PENGHAMPARAN DAN PEMADATAN
LATASIR 2 CM (MEMAKAI ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Supplier mengirim material sampai bin spreader 1. Mengunakan peralatan berta 1750 m2/hari
2 Material dihampar dengan spreader dan dipadatkan 2. pasir aspal dikirim oleh leveransir ketempat peke
dengan mesin gilas roda baja dan roda ban pneumatic 3. BJ Asbuton padat 1,9 ton/m3
4. Rata - rata tebal lapisan padat 3 cm

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 4 1 L-081 4 140,000
E Pembantu Operator 4 1 L-083 4 75,000
R Buruh tak terlatih 6 1 L-101 6 75,000
J Buruh terlatih 2 1 L-106 2 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Aspal 700 Kg M-061 12,500
T Minyak bakar 175 Lt M-065 12,000
E Alat bantu 0.24 Set M-170 -
R Campuran latasir 66 Ton K.020 1,810,131
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin Gilas Tandem 6-10 T 1 1 E-081 5 199,264
R Mesin Gilas Roda Karet 8 - 15 T 1 1 E-084 5 208,898
A Mesin Penyemprot Aspal 1000 Lt 1 1 E-153 5 65,048
L Asphat Fhinisher 1 1 E-157 5 250,488
A Copressor 210 M3/jam 1 1 E-301 4 164,714
T
A
N

VOLUME 1750 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN PENGHAMPARAN DAN PEMADATAN LATAST
(LASTATON) (MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Pengiriman material sampai ke bin preader 1. Mengunakan alat berat 1500 m2/hari
2 Material dihampar dengan mesin spreader, dipadatkan 2. Asbuton campuran panas dikirim oleh leveransir
dengan mesin gilas roda baja dan roda ban pneumatic 3. BJ Asbuton padat 2,2 ton/m3
4. Spec- BM No. 12/DT/B/1983
5. Rata - rata tebal lapisan 3 cm

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 4 1 L-081 4 140,000
E Pembantu Operator 4 1 L-083 4 75,000
R Buruh tak terlatih 12 1 L-101 12 75,000
J Buruh terlatih 8 1 L-106 8 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Aspal 600 Kg M-061 12,500
T Minyak bakar 150 Lt M-065 12,000
E Alat bantu 0.48 Set M-170 -
R Campuran lataston 100 Tonne K.035 1,480,271
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas tandem 6-10 ton 1 1 E-081 5 199,264
R Mesin gilas roda keret 8 - 15 T 1 1 E-084 5 208,898
A Mesin penyemprot aspal 1000 L 1 1 E-153 5 65,048
L Mesin penghampar 1,82 m 1 1 E-157 5 250,488
A Compressor 210 M3/jam 1 1 E-301 4 164,714
T
A
N

VOLUME 1500 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA
DIREKTORAT BINA PROGRAM JALAN ANALISA BIAYA PEKERJAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN MENGAMPAR DAN MEMADATKAN LATASI
(MENGGUNKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Membersihkan permukaan aspal lama 1. Memakai tenaga orang ( 1600 m2/hari)
2 Melapisi dengan tack coat 2. Campuran dikirim ke tempat pekerjaan oleh leve
3 Taburkan pasir aspal dengan tangan 3. BJ 1,9 t/m3
4 Gilas dan padatkan 4. Tack coat 0,6 L/m2adat
5. Menurut spec BM no.02/PT/B/1983

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 3 1 L-081 3 140,000
E Pembantu Operator 3 1 L-083 3 75,000
R Supir 1 1 L-091 1 97,000
J Buruh tak terlatih 12 1 L-101 12 75,000
A Buruh terlatih 2 1 L-106 2 80,000

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Aspal 640 Kg M-061 12,500
T Minyak bakar 160 Lt M-065 12,000
E Alat bantu 0.48 Set M-170 -
R Campuran latasir 60 Ton K.020 1,810,131
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas tandem 6-10 ton 1 1 E-081 5 199,264
R Mesin gilas roda keret 8 - 15 T 1 1 E-084 5 208,898
A Spayer aspal 200 L 1 1 E-154 5 65,048
L Dump truck terbuka (3,5 T)/115 HP 1 1 E-221 5 217,817
A
T
A
N

VOLUME 1600 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MENGHAMPAR LAPIS PERMUKAAN ASPA
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN BETON (LASTON) (MENGGUNAKAN ALAT
AC - WC
PROPINSI : ACEH KABUPATEN : ACEH BESA

URAIAN : ANGGAPAN/ASUMSI :
1 Pengisian material sampai bin dari spreader 1. Menggunakan peralatan
2 Material dihamparkan dengan spreader dan dipadatkan 2. Hotmix dikirim leveransir sampai ke spreader
dengan mesin gilas roda baja dan roda ban pneumatic 3. BJ padat 2,25 t/m3 tebal padat 5 cm
3 Suhu pemadatan awal min 110 - pemadatan akhir 60 4. Produkasi 900 m2 padat
5. Disemprot tack coat 0,4 l/m2
6. Spec BM no.B/PT/BM

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terampil 5 1 L-081 5 140,000
E Pembantu Operator 5 1 L-083 5 75,000
R Buruh Tak terlatih 15 1 L-101 15 75,000
J Buruh terlatih 10 1 L-106 10 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir beton 0.9 M3 M-041 145,000
T Aspal 360 Kg M-061 12,500
E Minyak bakar 90 Lt M-065 12,000
R Alat bantu 0.48 Set M-170 -
I Campuran laston 100 Tonne K.040 1,338,894
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Mesin gilas tandem 6-10 Ton 1 1 E-081 5 199,264
A Mesin gilas roda keret 8-15 T 1 1 E-084 5 208,898
L Mesin penyemprot aspal 1000 L 1 1 E-153 3 65,048
A Mesin penghampar 1,82 m 1 1 E-157 5 250,488
T Compressor 210 m3/jam 1 1 E-301 4 164,714
A
N

VOLUME 900 SATUAN M2 Harga Satuan


Untuk ketebalan konstruksi 4 Cm
Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN ASPHALT TREATED BASE LEV. (ATBL)
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Wheel Loader memuat Agregat dan Asphalt ke dalam 1. Menggunakan alat berat (cara mekanik)
cold Bin AMP. 2. Lokasi pekerjaan : sepanjang jalan
2 Agregat dan aspal dicampur dan dipanaskan dengan 3. Kondisi existing jalan : sedang
AMP untuk dimuat langsung kedalam Dump Truck dan 4. Jarak rata-rata Base Camp ke lokasi pekerjaan
diangkut ke lokasi pekerjaan. 5. Tebal Lapis ATBL padat 3 cm
3 Campuran panas ATBL dihampar dengan Finisher dan
dipadatkan dengan Tandem & peneumatic Tire Roller

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 0.165 1 L-061 0.1687 85,000
K Buruh tak terlatih 1.15 1 L-101 1.1809 75,000
E
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M Agegat Kasar 0.300 m3 M-024 290,000
A Agregat Halus 0.230 m3 M-025 330,000
T Filer 55.600 Kg - 1,250.0
E Aspal 60.500 Kg M-061.1 12,500
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Wheel Loader 1 1 E - 052 0.0165 398,670
R Mesin Pencampur Aspal 125 HP 1 1 E - 155 0.0241 1,674,302
A Genset 1 1 - 0.0241 415,273
L Dump Truck 1 1 E - 212 0.2133 342,419
A Asphalt Finisher 1 1 E - 157 0.0301 250,488
T Tandem Roller 1 1 E - 080 0.0249 199,264
A P. Tyre Roller 1 1 E - 084 0.0185 208,898
N Alat Bantu 1 Ls 1 65,000

VOLUME 1 SATUAN Ton Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN ACUAN UNTUK BETON STRUKTUR
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Penggadaan bahan oleh leveransir 1. Kelompok tukang kayu memasang 20 m2 dalam
2 Tukang kayu memotong dan membuat acuan / 2. 1/2 material dapat dipakai kembali
perancah 3. Penggadaan bahan oleh leveransir
3 Tukang kayu membongkar acuan/perancah setelah 4. Untuk 1 m3 beton digunakan 20 lbr playwood uk
disetujui oleh direksi 5. Tukang kayu membongkar perancah

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Kepala Tukang 1 1 L-073 1 90,000
K Tukang 2 1 L-079 2 80,000
E Buruh tak terlatih 4 1 L-101 4 75,000
R Buruh terlatih 2 1 L-106 2 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Paku 4 Kg M-166 21,000
T Kayu bekisting 0.411 M3 M-180 3,000,000
E Alat bantu 0.56 Set M-170 -
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 20 SATUAN M2 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENULANGAN BETON (MEMOTONG,
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN MEMBENGKOK DAN MEMASANG BESI TULAN
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Pemotongan dan pembengkokan dan perakitan 1. 200 kg tulangan jadi disiapkan dalam 1 hari
tulangan dilakukan ditempat pekerjaan bersama-sama 2. Besi untuk tulangan dikirim ke tempat pekerjaan
persiapan pekerjaan beton 3. Batang-batang tulangan dibengkok ditempat pe
4. Penyusutan tulangan dihitung 10% dan pemaka

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Tukang 1 1 L-079 1 80,000
E Buruh tak terlatih 2 1 L-101 2 75,000
R Buruh terlatih 1 1 L-106 1 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Tulangan Besi Beton 220 Kg M-167 7,500
T Alat bantu 0.12 Set M-170 -
E Kawat Beton 2.2 Kg M-167.a 6,500
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 200 SATUAN Kg Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN BETON NON STRUKTUR / RABAT BETON
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN KELAS K.125

PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Material dikirimkan oleh leveransir 1. Bahan-bahan dikirim ketempat pekerjaan oleh le
2 Acuan dan tulangan besi beton dipasang 2. Dipakai agregat pecah dan tersaring
3 Percampuran beton ditempat pekerjaan 3. Hasil kerja 6,0 m3/hari - 6 jam (9 campuran perj
4 Beton di cor dan digetarkan sampai padat 4. Campuran 1 PC : 3 PS : 5 Kr (atau 1 = 8)
5. Dalam 1 m2 beton dibutuhkan 6,25 zak (40 kg/z
6. Setiap percampuran memerlukan = 30 Kg seme
7. Dibutuhkan untuk alas pondasi beton

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E
K Mandor 1 4 L-061 4 85,000
E Buruh tak terlatih 12 4 L-101 48 75,000
R Buruh terlatih 2 4 L-106 8 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir beton 12 M3 M-041 145,000
T Semen 144 40 Kg M-080 50,000
E
R Alat bantu 1.92 Set M-170 -
I Kerikil tersaring 16 M3 M-014 150,000
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Alat penggetar beton 4 HP 1 4 E-089 6 21,178
R Concrete mixer 1 4 E-252 6 29,452
A Pompa air ( 5 cm) 30 m3/jam 1 4 E-341 2 25,123
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 23 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN BETON STRUKTUR KELAS K.175
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN MENGGUNAKAN ALAT PENGADUK 125 Ltr

PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Material dikirimkan oleh leveransir 1. Bahan-bahan dikirim ketempat pekerjaan oleh le
2 Acuan dan tulangan besi beton dipasang 2. Dipakai agregat pecah dan tersaring
3 Percampuran beton ditempat pekerjaan 3. Hasil kerja 6,0 m3/hari - 6 jam (9 campuran perja
4 Beton dicor dan digetar sampai padat 4. Campuran 1 PC : 3 PS : 5 Kr (atau 1 = 8)
5. Dalam 1 m2 beton dibutuhkan 6,25 zak (40 kg/za
6. Setiap percampuran memerlukan = 30 Kg semen
7. Dibutuhkan untuk alas pondasi beton

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 4 L-061 4 85,000
K Kepala Tukang 1 4 L-073 4 90,000
E Buruh tak terlatih 12 4 L-101 48 75,000
R Buruh terlatih 2 4 L-106 8 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir beton 12 M3 M-041 145,000
T Semen 180 40 Kg M-080 50,000
E
R Alat bantu 1.92 Set M-170 -
I Kerikil tersaring 17.5 M3 M-014 150,000
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Alat penggetar beton 4 HP 1 4 E-089 6 21,178
R Concrete mixer 125 L/6 HP 1 4 E-251 6 29,452
A Pompa air ( 5 cm) 30 m3/jam 1 4 E-341 2 25,123
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 24 SATUAN M2 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN BETON STRUKTUR K.225
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT PENGADUK
BETON 125 LITER)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Pemasok mengirim material 1. Bahan-bahan dasar dikirim kelokasi pekerjaan o
2 Acuan dan tulangan besi beton dipasang 2. Dipakai agregat pecah dan tersaring yang termu
3 Beton diaduk dilokasi pekerjaan 3. Dicor 6,17 m3/hari dengan 54 adukan/6 jam/har
4 Beton dicor dan digetar sampai padat 4. Adukan 1 Pc:2Ps:3Kr (Yaitu 1:5):semen:350 Kg
5. Anggap tiap adukan membutuhkan 1 zak (27,8
55,6 liter pasir:83,3 liter kerikil dan 18,3 liter air
6. Tidak termasuk acuan dan tulangan besi beton
7. Beton bertulang dipakai untuk pilar, gorong-goro
8. Sesuai Peraturan beton bertulang Indonesia (PB

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 6 L-061 6 85,000
K kepala Tukang 1 6 L-073 6 90,000
E Buruh tak terlatih 8 6 L-101 48 75,000
R Buruh terlatih 2 6 L-106 12 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir beton 18 M3 M-041 145,000
T Semen 324 40 Kg M-080 50,000
E Alat bantu 2 Set M-170 -
R Batu Pecah 2-3 27 M3 M-024 290,000
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Alat penggetar beton 4 HP 1 6 E-089 5 21,178
R Concrete mixer 125 l / 6 HP 1 6 E-251 5 29,452
A Pompa air ( 0 5 cm ) 30 m3/jam 1 6 E-341 2 25,123
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 37 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN BETON STRUKTUR K.275
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT PENGADUK
BETON 250 LITER)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Pemasok mengirim material 1. Bahan-bahan dasar dikirim kelokasi pekerjaan o
2 Acuan dan tulangan besi beton dipasang 2. Dipakai agregat pecah dan tersaring yang termu
3 Beton diaduk dilokasi pekerjaan 3. Dicor 12 m3/hari dengan 48 adukan/6 jam/hari
4 Beton dicor dan digetar sampai padat 4. Adukan 2 Pc:3Ps:6Kr (Yaitu 2:9):semen:400 Kg
5. Anggap tiap adukan membutuhkan 2,5 zak (69,
104,2 liter, pasir: 208,3 liter, kerikil dan 42,5 liter
6. Tidak termasuk acuan dan tulangan besi beton
7. Beton bertulang dipakai untuk pilar, gorong-goro

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)

P Mandor 1 1 L-061 1 85,000


E kepala Tukang 4 1 L-073 4 90,000
K Buruh tak terlatih 24 1 L-101 24 75,000
E Buruh terlatih 3 1 L-106 3 80,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir beton 5 M3 M-041 145,000
T Semen 120 40 Kg M-080 50,000
E Alat bantu 1 Set M-170 -
R Batu Pecah 2-3 10 M3 M-024 290,000
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Alat penggentar beton 4 HP 2 1 E-089 12 21,178
R Concrete mixer 250 l / 20 HP 1 1 E-252 6 69,481
A Pompa air ( 0 5 cm ) 30 m3/jam 1 1 E-341 2 25,123
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 12 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN KONSTRUKSI PASANGAN BATU
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Material disiapkan dilokasi oleh leveransir 1. Dilakukan untuk pekerjaan gorong-gorong, jemb
2 Pekerja membawa batu pecah ketempat tukang batu bekerja tanah dan struktur lainnya yang menggunakan k
3 Tukang batu memasang batu pecah dengan adukan pasir 2. Material-material dikirim ketempat pekerjaan ole
semen dan dirapikan. 3. Tidak termasuk galian/timbunan
4. Bagian M-170 diperbolehkan pakai bambu

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Kepala Tukang 1 1 L-073 1 90,000
E Buruh tak terlatih 12 1 L-101 12 75,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Batu gunung 5 M3 M-010 150,000
T Pasir Pasang 1.2 M3 M-041 145,000
E Semen 19 40 Kg M-080 50,000
R Alat bantu 0.7 Set M-170 15,000
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Pompa air ( 0 5 cm ) 30 m3/jam 1 1 E-341 1 25,123
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 5 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN BRONJONG PENAHAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Gali muka tanah untuk tempat bronjong 1. Batu dikirim kelapangan oleh leveransir
2 Rangkai dan bentuk anyaman bronjong 2. Anyaman bronjong dikirim kelapangan oleh lever
3 Isi anyaman kawat dengan batu 3. Selesai dalam 2 hari
4 Anyaman dibuat kokoh dengan ikatan kawat
5 Timbun kembali hingga mantap

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 2 L-061 2 85,000
K Buruh tak terlatih 35 2 L-101 70 75,000
E
R Buruh terlatih 2 2 L-106 4 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Batu kali 25 M3 M-010 150,000
T Kawat bronjong dia.3 mm 200 M3 M-162 23,500
E Alat bantu 3.2 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

VOLUME 25 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PEMBENTUKAN DAN PERATAAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN BAHU JALAN
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Grader melakukan 1 lintasan untuk memotong 1. Menggunakan alat berat
dan 1 lintasan untuk meratakan sepanjang bahu jalan 2. Mandor menguasai juga pekerjaan lain dengan b
2 Buruh membersihkan sampai pada gorong-gorong 3. Meratakan bahu jalan 5 km/hari
dan rintang-rintangan 4. Harga satuan ini untuk satu sisi bahu jalan

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Buruh terlatih 4 1 L-101 4 80,000
R Pembantu Operator 1 1 L-083 1 75,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.16 Set M-170 15,000
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Grader 115 HP 1 1 E-010 5 513,564
A
L
A
T
A
N

VOLUME 5 SATUAN M3 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PERALATAN KEMBALI JALAN KERIKIL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Grader membuat lintasan pemotongan dan lintasan 1. Menggunakan alat berat
penyebaran 3 kali 2. Mandor melakukan juga pengawasan pekerjaan
3. Hasil kerja grader 2 km/hari

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator terlatih 1 1 L-081 1 140,000
E Pembantu Operator 1 1 L-083 1 75,000
R Supir 1 1 L-091 1 97,000
J Buruh Tak terampil 2 1 L-101 2 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.08 Set M-170 15,000
T
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R Grader 115 HP 1 1 E-010 5 513,564
A truck tangki air 115 HP 1 1 E-182 5 222,906
L
A
T
A
N

VOLUME 2 SATUAN Km Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMPERBAIKI PENURUNAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (JALAN KERIKIL)
(MEMPERGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Gali dan buang material LPA yang bercampur lempung 1. Pengadaan agregat ditempat pekerjaan oleh lev
2 Taburkan material yang tidak tercampur lempung dan 2. Galian sedalam 40 cm
padatkan 3. truck menyingkirkan material yang tak dapat digu
3 Angkat sebarkan dan padatkan agregat tambahan gerobak materail tersebut diangkut dari tempat p
4. Lapisan pekerjaan lama setebal 10 cm dapat dig
5. Rata-rata hasil kerja kelompok 25 m2/hari

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 1 1 L-061 1 85,000
E Supir 1 1 L-091 1 97,000
K Buruh tak terlatih 12 1 L-101 12 75,000
E Buruh terlatih 2 1 L-106 2 80,000
R
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Alat bantu 0.48 Set M-170 15,000
T Kerikil sungai pecah tersaring 10 m3 K.017 290,000
E
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas bergetar 1 ton 1 1 E-087 5 45,045
R Stamper 4 HP 1 1 E-088 3 25,114
A Dump truck (3,5T)/115 HP 1 1 E-221 5 217,817
L
A
T
A
N

VOLUME 25 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENGHAMPARAN JALAN KERIKIL (BATU PEC
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN 5 CM PADAT (MEMPERGUNAKAN BURUH

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil pecah ditimbun sepanjang jalan oleh leveransir 1. Menggunakan tenaga orang, dicari setempat
2 Material dihampar dengan tenaga orang, 15 m2/m3 2. Lubang-lubang yang besar telah diperbaiki sebe
3 Dipadatkan dengan mesin gilas roda baja dan disiram 3. Kerikil sudah ditimbun sepanjang jalan oleh leve
dengan truck air 4. Buruh menghampar batu pecah diatas LPB
5. Tebal Padat ± 5 cm
6. Hasil kerja menghampar dan menggilas 1200 m
7. Memakai batu pecah 68 m3 dengan binder 11 m
pecah 70 m2 dengan binder 7 m3

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 2 1 L-061 2 85,000
E Operator terlatih 1 1 L-081 1 140,000
K Pembantu Operator 1 1 L-083 1 75,000
E Supir 1 1 L-091 1 97,000
R Buruh Tak terlatih 68 1 L-101 68 75,000
J Buruh Terlatih 4 1 L-106 4 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir urug 7.5 M3 M-040 100,000
T Alat bantu 2.72 Set M-170 15,000
E Kerikil Pecah Tersaring 71 M3 K.017 358,765
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 1 1 E-080 5 175,285
R Truck tangki air 1 1 E-182 5 222,906
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 1200 SATUAN M2 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENGHAMPARAN JALAN KERIKIL TERSARIN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN 3 CM PADAT (MEMPERGUNAKAN BURUH

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil pecah ditimbun sepanjang jalan oleh leveransir 1. Menggunakan tenaga orang, dicari setempat
2 Material dihampar dengan tenaga orang, 15 m2/m3 2. Lubang-lubang yang besar telah diperbaiki sebe
3 Dipadatkan dengan mesin gilas roda baja 3. Kerikil sudah ditimbun sepanjang jalan oleh leve
4. Buruh menghampar batu kerikil diatas LPB
5. Tebal Padat ± 5 cm
6. Hasil kerja menghampar dan menggilas 1200 m

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 2 1 L-061 2 85,000
E Operator terlatih 1 1 L-081 1 140,000
K Pembantu Operator 1 1 L-083 1 75,000
E Supir 4 1 L-091 4 97,000
R Buruh Tak terlatih 68 1 L-101 68 75,000
J Buruh Terlatih 4 1 L-106 4 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 2.72 Set M-170 15,000
E Kerikil Tersaring 71 M3 M-014 150,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 1 1 E-080 5 175,285
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 1200 SATUAN M2 Harga Satuan


Untuk Ketebalan 3 Cm Harga Satuan
Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENGHAMPARAN JALAN KERIKIL TERSARIN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN 5 CM PADAT (MEMPERGUNAKAN BURUH

PROPINSI : ACEH KABUPATEN : ACEH BES


URAIAN : ANGGAPAN/ASUMSI :
1 Kerikil pecah ditimbun sepanjang jalan oleh leveransir 1. Menggunakan tenaga orang, dicari setempat
2 Material dihampar dengan tenaga orang, 15 m2/m3 2. Lubang-lubang yang besar telah diperbaiki sebe
3 Dipadatkan dengan mesin gilas roda baja 3. Kerikil sudah ditimbun sepanjang jalan oleh leve
4. Buruh menghampar batu kerikil diatas LPB
5. Tebal Padat ± 5 cm
6. Hasil kerja menghampar dan menggilas 1200 m

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 2 1 L-061 2 85,000
E Operator terlatih 1 1 L-081 1 140,000
K Pembantu Operator 1 1 L-083 1 75,000
E Supir 4 1 L-091 4 97,000
R Buruh Tak terlatih 68 1 L-101 68 75,000
J Buruh Terlatih 4 1 L-106 4 80,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A
T Alat bantu 2.72 Set M-170 15,000
E Kerikil Tersaring 71 M3 M-014 150,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin gilas 3 roda 1 1 E-080 5 175,285
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 1200 SATUAN M2 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENGHAMPARAN JALAN KERIKIL PECAH TERS
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN 5 CM PADAT
(MENGGUNAKAN ALAT)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Perkerasan dibentuk ulang dengan greder 1. Menggunakan alat berat
2 Leveransir membagi agregat sepanjang jalan memakai 2. Lubang-lubang yang besar telah diperbaiki sebe
dumptruck. 3. Greder melakukan 2 lintasan memotong dan 5 li
3 Penyebaran agregat dengan greder 4. Batu pecah dikirim ketempat pekerjaan oleh leve
4 Penyiraman dengan truck air 5. Tebal padat rata-rata 5 cm
5 Padatkanlah material-material yang lepas 6. Hasil kerja menghampar dan memadatkan 3000
(150 m3 padat)
7. Memakai batu pecah 170 m3 dengan binder 28
175 m3 dengan binder 18 m3.

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P Mandor 1 1 L-061 1 85,000
E Operator terlatih 3 1 L-081 3 140,000
K Supir 1 1 L-091 1 97,000
E Buruh tak terlatih 6 1 L-101 6 75,000
R Pembantu Operator 3 1 L-083 3 75,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir urug 19 M3 M-040 100,000
T Alat bantu 0.24 Set M-170 15,000
E Kerikil sungai pecah tersaring 177 M3 K.017 358,765
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Greder 115 Hp 1 1 E-010 5 513,564
R Mesin gilas 3 roda 6-8 T 1 1 E-080 6 175,285
A Mesin gilas roda karet 8-15 T 1 1 E-084 6 208,898
L Truck tangki air 1 1 E-182 6 222,906
A
T
A
N

VOLUME 3000 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PERBAIKAN LUBANG JALAN ASPAL
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MEMPERGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Menggali persegi sampai dasar yang mantap 1. Rata-rata Kedalaman 10 cm.
2 Gantikan LPA tersebut dan Padatkan 2. Termasuk Pengadaan Material.
3 Sapu Bersih Permukaan 3. Rata-rata Hasil Kerja Kelompok 35 M2/Hari
4 Dilapis Prime/Resap dan Ditutup Lapis 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3
Permukaan Baru

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Supir 1 1 L-091 1 97,000
E Buruh tak terlatih 8 1 L-101 8 75,000
R Buruh terlatih 2 1 L-106 2 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir Beton 0.5 M3 M-041 145,000
T Aspal 17.5 Kg M-061 12,500
E Minyak Bakar 17.5 Ltr M-065 12,000
R Alat Bantu 0.32 Set M-170 15,000
I Kerikil Pecah Tersaring 4 M3 K.017 358,765
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin Gilas Bergetar 1 1 E-087 5 45,045
R
A Truck bak terbuka 1 1 E-221 5 217,817
L
A
T
A
N

VOLUME 35 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENAMBALAN JALAN ASPAL DENGAN AC-W
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MEMPERGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Menggali persegi sampai dasar yang mantap 1. Rata-rata Kedalaman 10 cm.
2 Gantikan LPA tersebut dan Padatkan 2. Termasuk Pengadaan Material.
3 Sapu Bersih Permukaan 3. Rata-rata Hasil Kerja Kelompok 35 M2/Hari
4 Dilapis Prime/Resap dan Ditutup dgn AC-WC tebal 4 Cm 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Supir 1 1 L-091 1 97,000
E Buruh tak terlatih 8 1 L-101 8 75,000
R Buruh terlatih 2 1 L-106 2 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Material Klas A 4.585 M3 - 320,000
T Aspal 17.5 Kg M-061 12,500
E Minyak Bakar 17.5 Ltr M-065 12,000
R Aspal Beton (AC-WC) 3.15 Ton - 1,396,598
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin Gilas Bergetar 1 Ton 1 1 E-087 5 45,045
R Truck bak terbuka 1 1 E-221 5 217,817
A
L
A
T
A
N

VOLUME 35 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENAMBALAN JALAN ASPAL DENGAN LATAS
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MEMPERGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Menggali persegi sampai dasar yang mantap 1. Rata-rata Kedalaman 10 cm.
2 Gantikan LPA tersebut dan Padatkan 2. Termasuk Pengadaan Material.
3 Sapu Bersih Permukaan 3. Rata-rata Hasil Kerja Kelompok 35 M2/Hari
4 Dilapis Prime/Resap dan Ditutup dgn Latasir tebal 2,5 Cm 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Supir 1 1 L-091 1 97,000
E Buruh tak terlatih 8 1 L-101 8 75,000
R Buruh terlatih 2 1 L-106 2 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Material Klas A 4.585 M3 - 320,000
T Aspal 17.5 Kg M-061 12,500
E Minyak Bakar 17.5 Ltr M-065 12,000
R Latasir 35 M2 L.15a 87,064
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin Gilas Bergetar 1 Ton 1 1 E-087 5 45,045
R Truck bak terbuka 1 1 E-221 5 217,817
A
L
A
T
A
N

VOLUME 35 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN MEMPERBAIKI PENURUNAN MUKA JALAN
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN ASPAL
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BESA
URAIAN : ANGGAPAN/ASUMSI :
1 Galian dan singkirkan material pondasi yang mengadung 1. Material dikirim ke lapangan oleh supplier.
lempung. 2. Galian sedalam 40 cm.
2 Tebarkan material pondasi yang baik (yang tidak mengadung 3. Menyingkirkan material yang tak dapat digunaka
lempung). 4. Material diangkut dari tempat penimbunan ke te
3 Angkut, sebar dan padatkan lapis demi lapisan agregat tam- dengan menggunakan gerobak.
bahan (maksimum lapis 20 cm) 5. Hasil kerja rata-rata per kelompok 20 m2/hari.
4 Labur dan ditutup dengan lapis permukaan yang baru.

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Operator Terlatih 1 1 L-081 1 140,000
E Sopir 1 1 L-091 1 97,000
R Buruh terlatih 3 1 L-106 3 80,000
J Buruh tak terlatih 16 1 L-101 16 75,000
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M Batu Pecah tersaring 7.2 m3 K. 017 270,000
A Pasir Ayak untuk Beton 0.8 m3 M - 041 145,000
T Aspal Bitumen 10 Kg M - 061 12,500
E Minyak Tanah 10 Lt M - 065 12,000
R Alat Bantu 0.64 Set M-170 15,000
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Flatback Truck 1 1 E-221 5 217,817
R Roller Pedesterian 1 1 E-087 3 45,045
A Stamper 1 1 E-088 3 25,114
L Asp. Spayer, towed 400 L 1 1 E-154 3 65,048
A
T
A
N

VOLUME 20 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENAMBALAN JALAN ASPAL DENGAN LAPE
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MEMPERGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BESA


URAIAN : ANGGAPAN/ASUMSI :
1 Menggali persegi sampai dasar yang mantap 1. Rata-rata Kedalaman 10 cm.
2 Gantikan LPA tersebut dan Padatkan 2. Termasuk Pengadaan Material.
3 Sapu Bersih Permukaan 3. Rata-rata Hasil Kerja Kelompok 35 M2/Hari
4 Dilapis Prime/Resap dan Ditutup dgn LAPEN tebal 5 Cm 4. Umur alat bantu rata-rata 1 bulan/orang/set @ 3

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 85,000
K Supir 1 1 L-091 1 97,000
E Buruh tak terlatih 8 1 L-101 8 75,000
R Buruh terlatih 2 1 L-106 2 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Material Klas A 4.585 M3 - 320,000
T Aspal 17.5 Kg M-061 12,500
E Minyak Bakar 17.5 Ltr M-065 12,000
R Lapen tebal 5 Cm 35 M2 K.618 110,002
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Mesin Gilas Bergetar 1 Ton 1 1 E-087 5 45,045
R Truck bak terbuka 1 1 E-221 5 217,817
A
L
A
T
A
N

VOLUME 35 SATUAN M2 Harga Satuan


Over Head dan Provit
Total
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN BETON STRUKTUR K.250
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN ALAT PENGADUK
BETON 125 LITER)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Pemasok mengirim material 1. Bahan-bahan dasar dikirim kelokasi pekerjaan o
2 Acuan dan tulangan besi beton dipasang 2. Dipakai agregat pecah dan tersaring yang termu
3 Beton diaduk dilokasi pekerjaan 3. Dicor 6,17 m3/hari dengan 54 adukan/6 jam/har
4 Beton dicor dan digetar sampai padat 4. Adukan 1 Pc:2Ps:3Kr (Yaitu 1:5):semen:350 Kg
5. Anggap tiap adukan membutuhkan 1 zak (27,8
55,6 liter pasir:83,3 liter kerikil dan 18,3 liter air
6. Tidak termasuk acuan dan tulangan besi beton
7. Beton bertulang dipakai untuk pilar, gorong-goro
8. Sesuai Peraturan beton bertulang Indonesia (PB

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 6 L-061 6 85,000
K Kepala Tukang 1 6 L-073 6 90,000
E Buruh tak terlatih 12 6 L-101 72 75,000
R Buruh terlatih 2 6 L-103 12 80,000
J -
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Pasir beton 16.65 M3 M-041 145,000
T Semen 347.8 40 Kg M-080 50,000
E Alat bantu 2 Set M-170 -
R Batu Pecah 2-3 28.86 M3 M-024 290,000
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E Alat pengentar beton 4 HP 1 6 E-089 5 21,178
R Concrete mixer 125 l / 6 HP 1 6 E-251 5 29,452
A Pompa air ( 0 5 cm ) 30 m3/jam 1 6 E-341 2 25,123
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 37 SATUAN M3 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN PENULANGAN BETON (MEMOTONG,
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN MEMBENGKOK DAN MEMASANG BESI TUL. U
(MENGGUNAKAN BURUH)
PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Pemotongan dan pembengkokan dan perakitan 1. 200 kg tulangan ulir jadi disiapkan dalam 1 hari
tulangan dilakukan ditempat pekerjaan bersama-sama 2. Besi untuk tulangan dikirim ke tempat pekerjaan
persiapan pekerjaan beton 3. Batang-batang tulangan dibengkok ditempat pe
4. Penyusutan tulangan dihitung 10% dan pemaka

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E Mandor 1 1 L-061 1 80,000
K Tukang 1 1 L-079 1 80,000
E Buruh tak terlatih 2 1 L-101 2 75,000
R Buruh terlatih 1 1 L-106 1 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Tulangan Besi Ulir 220 Kg M-164 23,000
T Alat bantu 0.12 Set M-170 15,000
E Kawat Beton 2.2 Kg M-167.a 6,500
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 200 SATUAN Kg Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
DIREKTORAT JENDERAL BINA MARGA ANALISA BIAYA PEKERJAAN
DIREKTORAT BINA PROGRAM JALAN ACUAN UNTUK RABAT BETON
SUB.DIT.PERENCANAAN JALAN LOKAL DAN KABUPATEN (MENGGUNAKAN BURUH)

PROPINSI : ACEH KABUPATEN : ACEH BES

URAIAN : ANGGAPAN/ASUMSI :
1 Penggadaan bahan oleh leveransir 1. Kelompok tukang kayu memasang acuan beton
2 Tukang kayu memotong dan membuat acuan/ 2. 2/3 material acuan beton dapat dipakai kembali
perancah 3. Penggadaan bahan oleh leveransir
3 Tukang kayu membongkar acuan/perancah setelah 5. Tukang kayu membongkar acuan
disetujui oleh direksi

TOTAL VOL. UPAH


PEKERJAAN VOLUME HARI KODE
Hr/Org (Rp/Hari)
P
E
K Tukang 0.0357 1 L-079 0.0357 80,000
E Buruh terlatih 0.0143 1 L-103 0.0143 80,000
R Mandor 0.0007 1 L-061 0.0007 80,000
J
A

HARGA
MATERIAL JUMLAH SATUAN KODE
(Rp/Unit)
M
A Paku 0.1218 Kg M-166 21,000
T Kayu bekisting 0.017 M3 M-180 3,000,000
E Alat bantu 0.01 Set M-170 15,000
R
I
A
L

HARI JAM HARGA


PERALATAN JUMLAH KODE
KERJA KERJA (Rp/Jam)
P
E
R
A
L
A
T
A
N

JUMLAH (Rp.)

VOLUME 1 SATUAN M2 Harga Satuan


Over Head dan Provit
TOTAL (Rp.)
EKERJAAN
IKIL SUNGAI K.012
RING
AN ALAT)
TEN : ACEH BESAR

3 / hari
k/jam (6 Jam kerja)
ari sumber
dipungut pembayaran ganti, rugi royalti

kan 5 ton/truck (lepas) Bj = 1.5

ata 1 set untuk 1 orang perbulan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
420,000
225,000
1,746,000
600,000

PEKERJA 3,076,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

12,600,000
4,800

MATERIAL 12,604,800
BIAYA SUB TOTAL
(Rp.) (Rp.)

4,770,572
2,392,022
36,981,228

PERALATAN 44,143,821
JUMLAH (Rp.) 59,824,621
166,179.50 /M3
ad dan Provit 24,926.93 /M3
TOTAL (Rp.) 191,106.43 /M3
EKERJAAN
IKIL SUNGAI K.013
RING
N BURUH)
TEN : ACEH BESAR

(60 m3/hari).
orang/hari)
ekerjaan atau penimbunan
per trip, 5 trip/hari/truck
dipunggut pembayaran ganti rugi

kan 3 tonne/truck (lepas BJ = 1,5)


ata 1 set untuk 1 orang perbulan
BIAYA SUB TOTAL
(Rp.) (Rp.)

170,000
485,000
4,500,000

PEKERJA 5,155,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,100,000
36,000

MATERIAL 2,136,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

5,445,422
PERALATAN 5,445,422
JUMLAH (Rp.) 12,736,422
212,273.70 /M3
ad dan Provit 31,841.06 /M3
Total 244,114.76 /M3
EKERJAAN
GALIAN TERSARING K.014
AN ALAT)

TEN : ACEH BESAR

3/hari) dengan 6 jam kerja perhari


g untuk mendapatkan kerikil
r 8 m3 kerikil galian
ngut pembayaran ganti rugi yang berlaku
arkan 5 tonne/truck lepas (BJ=1.5)
angkut material jarak 10 km dari sumber
ata 1 set untuk 1 orang perbulan
ne/jam, dengan oversize 25 %

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
420,000
225,000
388,000
300,000
150,000
PEKERJA 1,568,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,000,000
3,000

MATERIAL 2,003,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,590,191
293,830
1,993,351
8,218,051

PERALATAN 12,095,423
JUMLAH (Rp.) 15,666,423
261,107.04 /M3
ad dan Provit 39,166.06 /M3
Total 300,273.10 /M3
EKERJAAN
UNGAI (TERSARING) K.016
AN ALAT)

TEN : ACEH BESAR

m3/hari)
/jam (6 Jam/kerja)
Km dari sumber.
ut pembayaran ganti rugi yang berlaku
kan 5 tonne/truck (Lepas) Bj = 1.5

ata 1 set untuk 1 orang/bulan


30 tonne/jam, dengan ditambah
ver size 30 %
BIAYA SUB TOTAL
(Rp.) (Rp.)

85,000
420,000
225,000
388,000
300,000
160,000
PEKERJA 1,578,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,800,000
3,600

MATERIAL 2,803,600
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,060,127
195,887
1,993,351
8,218,051

PERALATAN 11,467,416
JUMLAH (Rp.) 15,849,016
264,150.26 /M3
ad dan Provit 39,622.54 /M3
Total 303,772.80 /M3
EKERJAAN
H TERSARING (ALAT) K.017
ERIKIL SUNGAI
AN ALAT)
TEN : ACEH BESAR

m3/hari), material diolah 2 kali


diangkut ketempat pemecahan batu
da mesin dengan produksi 30 tonne/jam
ah dicampur kembali dengan batu dari

kan 5 ton/truck (lepas), 1,0 trip/tr, BJ=1,5


mber ke tempat pekerjaan 10 KM.
ulan orang/set

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
560,000
300,000
388,000
375,000
320,000
PEKERJA 2,028,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,800,000
3,000

MATERIAL 2,803,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,060,127
2,216,991
2,392,022
8,218,051

PERALATAN 13,887,191
JUMLAH (Rp.) 18,718,191
311,969.84 /M3
ad dan Provit 46,795.48 /M3
TOTAL (Rp.) 358,765.32 /M3
EKERJAAN
TERSARING (ALAT) K.018
BATU QUARRY
AN ALAT)
TEN : ACEH BESAR

i) - material diolah 2 kali


oduksi akhir 18 t/jam
8 % hilang
ruck lepas (BJ=1.5)

umber bahan
lan/orang/set

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
560,000
300,000
388,000
375,000
320,000
PEKERJA 2,028,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,750,000
3,000

MATERIAL 1,753,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,120,254
2,216,991
2,392,022
8,218,051

PERALATAN 14,947,318
JUMLAH (Rp.) 18,728,318
312,138.63 /M3
ad dan Provit 46,820.79 /M3
Total 358,959.42 /M3
EKERJAAN
PURAN LATASIR K.020
AN ALAT)

TEN : ACEH BESAR

oduksi 100 t/hari


ia pada waktunya
angkutan sampai 10 Km dari AMP
ck Kap.5 t dan dikirim ketempat pekerjaan
bulan/orang/set
O.12/PT/B/1983
BIAYA SUB TOTAL
(Rp.) (Rp.)

85,000
420,000
225,000
388,000
450,000
240,000
PEKERJA 1,808,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,525,000
125,000,000
4,900,000
45,000
3,600
538,148

MATERIAL 137,011,748
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,993,351
8,371,512
8,218,051
PERALATAN 18,582,914
JUMLAH (Rp.) 157,402,662
1,574,026.62 /Ton
ad dan Provit 236,103.99 /Ton
Total 1,810,130.61 /Ton
EKERJAAN
IPIS ASPAL BETON K.035
ON)
AN ALAT)
TEN : ACEH BESAR

ksi 100 t/hari

r siap pada waktunya


gangkutan sejauh 10 Km dari HMP
5 ton, diantar ketempat pekerjaan
rang/set
el 3.3)
BIAYA SUB TOTAL
(Rp.) (Rp.)
85,000
420,000
225,000

388,000
450,000
240,000
PEKERJA 1,808,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

4,495,000
91,250,000
4,500,000
7,500
3,600
8,072,220

MATERIAL 108,328,320
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,993,351
8,371,512
8,218,051
PERALATAN 18,582,914
TOTAL 128,719,234

1,287,192.34 /Ton
ad dan Provit 193,078.85 /Ton
Total 1,480,271.19 /Ton
PEKERJAAN
MENGANGKUT K.040
(LASTON)
N ALAT/AMP)
TEN : ACEH BESAR

unan material
gar aspal sudah siap saat dimulai
t dan dikirim sampai spreader
giriman sejauh 10 km
ulan/orang/set

BIAYA SUB TOTAL


(Rp.) (Rp.)
85,000
420,000
225,000

388,000
450,000
240,000
PEKERJA 1,808,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

3,915,000
77,250,000
5,000,000
3,600
9,866,046

MATERIAL 96,034,646
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,993,351
8,371,512
8,218,051
PERALATAN 18,582,914
JUMLAH (Rp.) 116,425,560
1,164,255.60 /Ton
ad dan Provit 174,638.34 /Ton
Total 1,338,893.94 /Ton
EKERJAAN
ALIAN TANAH K.110
N BURUH)

TEN : ACEH BESAR

a 100 m/hari
wah = 0.50 m
as = 1.30 m
an = 0.60 m (vol. = 0.54 m3/M')

tung : 2.0 m3/hari - orang


an - orang
BIAYA SUB TOTAL
(Rp.) (Rp.)

85,000
97,000
2,025,000

PEKERJA 2,207,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

21,600

MATERIAL 21,600
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,506,531
PERALATAN 1,506,531
JUMLAH (Rp.) 3,735,131
69,169.09 /M3
ad dan Provit 10,375.36 /M3
Total 79,544.46 /M3
PEKERJAAN
GALIAN TANAH K.111
AN ALAT)

TEN : ACEH BESAR

(500m/hari)
an 0.8 m3/M

adan jalan

perhari 500 m

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
388,000
1,200,000

PEKERJA 2,103,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

9,600

MATERIAL 9,600
BIAYA SUB TOTAL
(Rp.) (Rp.)

3,081,384
2,392,022
8,218,051
PERALATAN 13,691,456
JUMLAH (Rp.) 15,804,056

39,510.14 /M3
ad dan Provit 5,926.52 /M3
Total 45,436.66 /M3
PEKERJAAN
BATU PADA PARIT K.112

AN BURUH)
TEN : ACEH BESAR

bal 20 cm; lebar bawah = 0.50 m;


n = 0.6 m.
n dengan truck biasa, sejauh 1 km

at pekerjaan oleh leveransir

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
97,000
2,700,000

PEKERJA 2,882,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

21,600
17,907,739

MATERIAL 17,929,339
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,306,901
PERALATAN 1,306,901
JUMLAH (Rp.) 22,118,240
368,637.34 /M
ad dan Provit 55,295.60 /M
Total 423,932.94 /M
PEKERJAAN
BATU PADA PARIT K.113
BETON BERTULANG
AN BURUH)
TEN : ACEH BESAR

bal 20 cm; lebar bawah = 0.50 m;


n = 0.6 m.
gkap buruh, tukang, penggetar beton dll
mbesian 3 %
ngan Truck bak terbuka sejauh 1 Km
kat lokasi pekerjaan
at pekerjaan oleh pemasok

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
97,000
900,000

PEKERJA 1,082,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

7,200
3,088,950
1,722,950
6,566,171
3,683,282

MATERIAL 15,068,553
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,306,901
PERALATAN 1,306,901
JUMLAH (Rp.) 17,457,454
290,957.57 /M
ad dan Provit 43,643.63 /M
Total 334,601.20 /M
EKERJAAN
RACETAK O 60 CM K.121
NPA DINDING KEPALA)
N BURUH)
TEN : ACEH BESAR

a (tak termasuk dinding ujung)

ntuk alas dan menyelubungi pipa beton


angkut ke tempat pekerjaan oleh leveransir
n pemadatan kembali lapisan perkerasan

BIAYA SUB TOTAL


(Rp.) (Rp.)

340,000
2,100,000

PEKERJA 2,440,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

3,391,843
5,800,000
16,800

MATERIAL 9,208,643
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN -
JUMLAH (Rp.) 11,648,643
1,456,080.39 /M
ad dan Provit 218,412.06 /M
Total 1,674,492.44 /M
EKERJAAN
RACETAK O 80 CM K.123
ANPA DINDING KEPALA
N BURUH)
TEN : ACEH BESAR

a (tak termasuk dinding ujung)


mpat, panjang 9m dipasang 4 hari
membungkus pipa dan dasar pipa
n sampai tampak pekerjaan
n pemadatan kembali lapis pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

255,000
1,800,000

PEKERJA 2,055,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,180,692
5,175,000
19,200

MATERIAL 11,374,892
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN -
JUMLAH (Rp.) 13,429,892
1,492,210.20 /M
ad dan Provit 223,831.53 /M
Total 1,716,041.74 /M
PEKERJAAN
NGAN BATU DENGAN K.127
ANG UK.1 X 1 M TANPA
UNAKAN BURUH)
TEN : ACEH BESAR

atu tebal 40 cm diatas pasir


n dalam miring (kearah tegak)
gi 100 cm.
tulang, penulangan 120 kg/m3
itempat pekerjaan
m biaya produksi

BIAYA SUB TOTAL


(Rp.) (Rp.)

510,000
280,000
150,000
194,000
2,250,000
480,000
PEKERJA 3,864,000
BIAYA SUB TOTAL
(Rp.) (Rp.)
18,000
8,463,723
638,505
6,775,095
4,189,733
2,590,895

MATERIAL 22,675,950
BIAYA SUB TOTAL
(Rp.) (Rp.)

797,341
435,634
PERALATAN 1,232,974
JUMLAH (Rp.) 27,772,925
3,085,880.52 /M
ad dan Provit 462,882.08 /M
Total 3,548,762.60 /M
PEKERJAAN
NGAN BATU DENGAN K.128
LANG UK. 1.5 X 1.5 M
G KEPALA
TEN : ACEH BESAR

ng (2,5 m x 40 cm)
n dalam miring (kearah tegak)
gi 150 cm.
tulang, penulangan 120 kg/m3
0 cm, lebar = 2,5 m dengan berat tulangan

BIAYA SUB TOTAL


(Rp.) (Rp.)

510,000
280,000
150,000
194,000
5,400,000
960,000
PEKERJA 7,494,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

43,200
17,957,096
1,033,770
15,579,733
8,931,958
4,636,338

MATERIAL 48,182,095
BIAYA SUB TOTAL
(Rp.) (Rp.)

797,341
435,634
PERALATAN 1,232,974
JUMLAH (Rp.) 56,909,070
4,742,422.46 /M
ad dan Provit 711,363.37 /M
Total 5,453,785.83 /M
PEKERJAAN
ONG-GORONG K.139
SATU PASANG)
AN BURUH)
TEN : ACEH BESAR

at pekerjaan
ngan batu tebal 30 cm

BIAYA SUB TOTAL


(Rp.) (Rp.)

510,000
2,700,000
480,000

PEKERJA 3,690,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

859,571
3,068,165
63,750

MATERIAL 3,991,487
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
JUMLAH (Rp.) 7,681,487
853,498.50 /M3
ad dan Provit 128,024.78 /M3
Total 981,523.28 /M3
PEKERJAAN
RSIHAN SEMAK PADA K.210
AKAN BURUH)

TEN : ACEH BESAR

ia ( 12 m x 100 m/hari)
DAMIJA

Perhari

ulan/org/set 3 Alat

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
1,650,000

PEKERJA 1,735,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

15,000

MATERIAL 15,000
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
JUMLAH (Rp.) 1,750,000
1,458.33 /M2
ad dan Provit 218.75 /M2
TOTAL (Rp.) 1,677.08 /M2
PEKERJAAN
AN PEMBERSIHAN K.211
DAMIJA
AN ALAT)
TEN : ACEH BESAR

0m2/hari)
damija (hanya semak-semak)

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
140,000
75,000
150,000

PEKERJA 450,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,200

MATERIAL 1,200
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
PERALATAN 2,567,820
JUMLAH (Rp.) 3,019,020
1,257.93 /M2
ad dan Provit 188.69 /M2
Total 1,446.61 /M2
PEKERJAAN
N TANAH K.220
N BURUH)

TEN : ACEH BESAR

ia (60m3/hari)
an di daerah jalan/lokasi lain
p/jam/truck)
m3/OH)
ruck: waktu bongkar 5 menit/5 OR/truck
as tandem
perhari
ah dasar.
ulan/Or/set 2 - 3 alat
BIAYA SUB TOTAL
(Rp.) (Rp.)

170,000
140,000
75,000
582,000
2,250,000

PEKERJA 3,217,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

36,000

MATERIAL 36,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

996,320
1,114,528
3,920,704
PERALATAN 6,031,552
JUMLAH (Rp.) 9,284,552
154,742.54 /M3
ad dan Provit 23,211.38 /M3
Total 177,953.92 /M3
PEKERJAAN
ERIAL UNTUK K.221
GALIAN
AN ALAT)
TEN : ACEH BESAR

M3/HARI)
an di daerah jalan atau tempat lain yang

perhari
siapan dilokasi pengambilan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
560,000
582,000
750,000
300,000

PEKERJA 2,277,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,000

MATERIAL 6,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,270,713
2,567,820
1,993,351
1,447,538
1,114,528
6,848,376

PERALATAN 15,242,325
JUMLAH (Rp.) 17,525,325
146,044.37 /M3
ad dan Provit 21,906.66 /M3
Total 167,951.03 /M3
PEKERJAAN
K KONSTRUKSI K.224
N BURUH)

TEN : ACEH BESAR

m3/hr
/d 3 m
rga satuan pekerjaan K. 224 dikalikan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
2,250,000

PEKERJA 2,335,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

18,000

MATERIAL 18,000
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
JUMLAH (Rp.) 2,353,000
47,060.00 /M3
ad dan Provit 7,059.00 /M3
TOTAL (Rp.) 54,119.00 /M3
PEKERJAAN
N PEMADATAN K.225
& GORONG^2)
AN BURUH)
TEN : ACEH BESAR

angan oleh leveransir


gai tidak tersaring yang termurah
tebal 10 cm

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
750,000
240,000

PEKERJA 1,075,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,000
3,822,129

MATERIAL 3,828,129
BIAYA SUB TOTAL
(Rp.) (Rp.)

135,136
75,343
PERALATAN 210,480
JUMLAH (Rp.) 5,113,608
340,907.23 /M3
ad dan Provit 51,136.08 /M3
Total 392,043.31 /M3
PEKERJAAN
ERAH RAWA K.230
AN ALAT)

TEN : ACEH BESAR

(120 m3/hari)
n dikirim ke tempat pekerjaan sejauh 10 km

madatan untuk L.P.B

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
420,000
75,000
97,000
450,000

PEKERJA 1,127,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

13,824,000
3,600

MATERIAL 13,827,600
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,120,254
876,424
1,447,538
1,114,528
PERALATAN 5,558,744
JUMLAH (Rp.) 20,513,344
170,944.53 /M3
ad dan Provit 25,641.68 /M3
Total 196,586.21 /M3
PEKERJAAN
AERAH RAWA K.231
AN BURUH)

TEN : ACEH BESAR

a 60 m3/hari
n dikirim ketempat pekerjaan masing-masing

madatan untuk subbase (L.P.B)

BIAYA SUB TOTAL


(Rp.) (Rp.)

170,000
280,000
150,000
97,000
4,500,000

PEKERJA 5,197,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,912,000
36,000

MATERIAL 6,948,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
1,447,538
1,114,528
PERALATAN 3,438,490
JUMLAH (Rp.) 15,583,490
259,724.83 /M3
ad dan Provit 38,958.72 /M3
Total 298,683.56 /M3
PEKERJAAN
K KAYU DI RAWA K.232
AN BURUH)

TEN : ACEH BESAR

an tenaga orang (100 tiang/hari/group)


m dipotong dan dikirim ketempat pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
180,000
97,000
1,350,000

PEKERJA 1,712,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

273,000
15,000,000
10,800

MATERIAL 15,283,800
BIAYA SUB TOTAL
(Rp.) (Rp.)

153,049
1,089,084
502,463
PERALATAN 1,744,597
JUMLAH (Rp.) 18,740,397
78,084.99 /M
ad dan Provit 11,712.75 /M
Total 89,797.74 /M
EKERJAAN
DAN JALAN K.310
N BURUH)

TEN : ACEH BESAR

ia (60 M3/hari)
urah untuk timbunan di kirim ke lokasi

rga di lokasi pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
140,000
75,000
97,000
1,350,000

PEKERJA 1,747,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,912,000
3,000

MATERIAL 6,915,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

701,139
668,717
PERALATAN 1,369,856
JUMLAH (Rp.) 10,031,856
167,197.60 /M3
ad dan Provit 25,079.64 /M3
TOTAL (Rp.) 192,277.24 /M3
EKERJAAN
(TANPA PEMADATAN) K.310.a
N BURUH)

TEN : ACEH BESAR

ia (60 M3/hari)
urah untuk timbunan di kirim ke lokasi

rga di lokasi pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
-
-
-
1,350,000

PEKERJA 1,435,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,912,000
3,000

MATERIAL 6,915,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
-
PERALATAN -
JUMLAH (Rp.) 8,350,000
139,166.67 /M3
ad dan Provit 20,875.00 /M3
TOTAL (Rp.) 160,041.67 /M3
EKERJAAN
(TANPA PEMADATAN) K.310.b
N BURUH)

TEN : ACEH BESAR

ia (60 M3/hari)
urah untuk timbunan di kirim ke lokasi

rga di lokasi pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
1,350,000
-
-
-

PEKERJA 1,435,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

4,320,000
3,000

MATERIAL 4,323,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
-
PERALATAN -
JUMLAH (Rp.) 5,758,000
95,966.67 /M3
ad dan Provit 14,395.00 /M3
TOTAL (Rp.) 110,361.67 /M3
EKERJAAN
DAN JALAN K.311
AN ALAT)

TEN : ACEH BESAR

(120 m3/hari)
urah untuk timbunan di kirim kelokasi

ga di lokasi pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
300,000

PEKERJA 912,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

13,824,000
-

MATERIAL 13,824,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
868,523
668,717
PERALATAN 4,105,059
JUMLAH (Rp.) 18,841,059
157,008.83 /M3
ad dan Provit 23,551.32 /M3
TOTAL (Rp.) 180,560.15 /M3
EKERJAAN
JALAN (SIRTU) K.311.a
AN ALAT)

TEN : ACEH BESAR

(120 m3/hari)
urah untuk timbunan di kirim kelokasi

ga di lokasi pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
300,000

PEKERJA 912,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

11,880,000
-

MATERIAL 11,880,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
868,523
668,717
PERALATAN 4,105,059
JUMLAH (Rp.) 16,897,059
140,808.83 /M3
ad dan Provit 21,121.32 /M3
TOTAL (Rp.) 161,930.15 /M3
EKERJAAN
JALAN (SIRTU) K.311.b
AN ALAT)

TEN : ACEH BESAR

(120 m3/hari)
urah untuk timbunan di kirim kelokasi

ga di lokasi pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
300,000

PEKERJA 912,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

11,880,000
6,000

MATERIAL 11,886,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
597,792
668,717
PERALATAN 3,834,329
JUMLAH (Rp.) 16,632,329
138,602.74 /M3
ad dan Provit 20,790.41 /M3
TOTAL (Rp.) 159,393.15 /M3
PEKERJAAN
PEMBUANGAN K.320

AN BURUH)
TEN : ACEH BESAR

a (32 m3/hari)
i truck tidak ada

nah dasar

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
97,000
1,800,000

PEKERJA 1,982,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

871,268
PERALATAN 871,268
JUMLAH (Rp.) 2,853,268

89,164.61 /M3
ad dan Provit 13,374.69 /M3
Total 102,539.30 /M3
PEKERJAAN
PEMBUANGAN K.321
AN ALAT)

TEN : ACEH BESAR

(200 m3/hari)

engan truck

madatan tanah dasar

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
420,000
225,000
388,000
450,000

PEKERJA 1,568,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,588,391
2,567,820
1,993,351
6,848,376

PERALATAN 12,997,937
JUMLAH (Rp.) 14,565,937

72,829.69 /M3
ad dan Provit 10,924.45 /M3
Total 83,754.14 /M3
PEKERJAAN
AH DASAR K.341
URUH)

TEN : ACEH BESAR

8 m x 400 m/hari)

an-orang

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
140,000
75,000
4,800,000

PEKERJA 5,100,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
PERALATAN 876,424
JUMLAH (Rp.) 5,976,424

1,867.63 /M3
ad dan Provit 280.14 /M3
Total 2,147.78 /M3
PEKERJAAN
AH DASAR K.342
AN ALAT)

TEN : ACEH BESAR

x 500m/hari)

jalan 500m/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
300,000

PEKERJA 815,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,051,709
3,081,384
PERALATAN 4,133,093
JUMLAH (Rp.) 4,948,093

1,237.02 /M2
ad dan Provit 185.55 /M2
Total 1,422.58 /M2
EKERJAAN
JALAN KERAS K.410
N BURUH)

TEN : ACEH BESAR

(96 m3/hari, pemadatan 960 m bahu jalan)


ai tempat pekerjaan oleh leveransir
ial timbunan sepanjang bahu jalan
hkan pada 1 m lebar bahu jalan
ngan tenaga manusia
as getar kecil

BIAYA SUB TOTAL


(Rp.) (Rp.)

255,000
5,700,000
80,000

PEKERJA 6,035,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

11,136,000
-

MATERIAL 11,136,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

225,227
PERALATAN 225,227
JUMLAH (Rp.) 17,396,227

181,210.70 /M3
ad dan Provit 27,181.61 /M3
TOTAL (Rp.) 208,392.31 /M3
EKERJAAN
JALAN KERAS K.411
AN ALAT)

TEN : ACEH BESAR

0 m2 bahu jalan/hari)
hkan pada 1 m lebar bahu jalan
dikirim leveransir sampai ditempat pekerjaan
al timbunan disepanjang bahu jalan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
420,000
225,000
300,000
160,000

PEKERJA 1,190,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

45,865,543
-

MATERIAL 45,865,543
BIAYA SUB TOTAL
(Rp.) (Rp.)

450,455
2,567,820
PERALATAN 3,018,275
JUMLAH (Rp.) 50,073,818

250,369.09 /M3
ad dan Provit 37,555.36 /M3
Total 287,924.45 /M3
EKERJAAN
JALAN TINGGI K.420
N BURUH)

TEN : ACEH BESAR

a (48 m2/hari)
setinggi 10 cm dengan tenaga manusia
ng sejauh 1 km, kapasitas 1.6 rit/pp/jam/trk
an tenaga manusia
ari - orang
an-orang

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
388,000
2,400,000

PEKERJA 2,873,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,178,169
PERALATAN 2,178,169
JUMLAH (Rp.) 5,051,169

105,232.69 /M3
ad dan Provit 15,784.90 /M3
Total 121,017.59 /M3
EKERJAAN
JALAN TINGGI K.421
AN ALAT)

TEN : ACEH BESAR

m3/hari)
setinggi 10 cm, ditebar 1,5 m, sepanjang

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
388,000
450,000

PEKERJA 1,353,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
2,392,022
8,218,051
PERALATAN 13,177,892
JUMLAH (Rp.) 14,530,892

96,872.61 /M3
ad dan Provit 14,530.89 /M3
Total 111,403.51 /M3
EKERJAAN
L PADA BAHU JALAN K.422
N BURUH)

TEN : ACEH BESAR

ia (2 x 1,5 m x 500 m/Hari)


jalan rata-rata luas yang dibersihkan

sajauh 1 Km
ulan/orang/set 3 set

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
1,875,000

PEKERJA 1,960,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN -
JUMLAH (Rp.) 1,960,000

1,306.67 /M2
ad dan Provit 196.00 /M2
Total 1,502.67 /M2
EKERJAAN
N PARIT K.423
AN ALAT)

TEN : ACEH BESAR

1 km/hari)
an tanah dari parit
an badan jalan
dibuang sejauh 1 km

2000 m/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
388,000
450,000

PEKERJA 1,353,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
2,392,022
8,218,051
PERALATAN 13,177,892
JUMLAH (Rp.) 14,530,892

7,265.45 /M
ad dan Provit 1,089.82 /M
Total 8,355.26 /M
EKERJAAN
N PARIT K.424
N BURUH)

TEN : ACEH BESAR

an yang menyumbat, tumbuh-tumbuhan

an-orang

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
194,000
2,700,000

PEKERJA 2,979,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

MATERIAL -
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,178,169
PERALATAN 2,178,169
JUMLAH (Rp.) 5,157,169

10,314.34 /M
ad dan Provit 1,547.15 /M
Total 11,861.49 /M
EKERJAAN K.510
PECAH TERSARING
AN ALAT)
TEN : ACEH BESAR

m3/hari)
alan oleh leveransir
gai pecah tersaring yang termurah
mpai tebal 15 Cm
00m2/hari

bawah LPA semua harus melalui


ec.umum B.M. Maret 1989 Buku 3

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
450,000

PEKERJA 1,062,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

46,280,726
5,100,000
-

MATERIAL 51,380,726
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
876,424
1,114,528

PERALATAN 4,558,772
JUMLAH (Rp.) 57,001,499

380,009.99 /M3
ad dan Provit 57,001.50 /M3
Total 437,011.49 /M3
EKERJAAN K.511
PECAH TERSARING
N BURUH)
TEN : ACEH BESAR

sia (60m3/hari)
alan oleh leveransir
gai pecah tersaring yang termurah
mpai tebal 15 Cm
0 M2/hari

bawah LPA semua harus melalui


ec.umum B.M. Maret 1989 Buku 3

BIAYA SUB TOTAL


(Rp.) (Rp.)

170,000
140,000
75,000
97,000
3,600,000

PEKERJA 4,082,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

18,476,414
2,050,000
-

MATERIAL 20,526,414
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
1,114,528

PERALATAN 1,990,952
JUMLAH (Rp.) 26,599,366

443,322.77 /M3
ad dan Provit 66,498.42 /M3
Total 509,821.19 /M3
EKERJAAN K.512
L TERSARING
AN ALAT)
TEN : ACEH BESAR

m3/hari)
alan oleh leveransir
gai tersaring yang termurah
mpai tebal 15 Cm
00m2/hari

bawah LPA semua harus melalui


ec.umum B.M. Maret 1989 Buku 3

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
450,000

PEKERJA 1,062,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

54,679,104

MATERIAL 54,679,104
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
876,424
1,114,528

PERALATAN 4,558,772
JUMLAH (Rp.) 60,299,877

401,999.18 /M3
ad dan Provit 60,299.88 /M3
Total 462,299.05 /M3
EKERJAAN K.513
L TERSARING
N BURUH)
TEN : ACEH BESAR

sia (60m3/hari)
alan oleh leveransir
gai tersaring yang termurah
mpai tebal 15 Cm
0m2/hari

bawah LPA semua harus melalui


ec.umum B.M. Maret 1989 Buku 3

BIAYA SUB TOTAL


(Rp.) (Rp.)

170,000
140,000
75,000
97,000
3,600,000

PEKERJA 4,082,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

21,871,642

MATERIAL 21,871,642
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
1,114,528

PERALATAN 1,990,952
JUMLAH (Rp.) 27,944,594

465,743.23 /M3
ad dan Provit 69,861.49 /M3
Total 535,604.72 /M3
EKERJAAN K.514
I BAWAH (LPB) KLS C SIRTU
AN ALAT)
TEN : ACEH BESAR

an oleh leveransir
ring dikirim leveransir sampai

h (oversize), yang tersingkir saat


r
datkan menjadi 10 cm padat
max 300 meter)

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
450,000

PEKERJA 1,062,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

36,501,328
-

MATERIAL 36,501,328
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
876,424
1,114,528

PERALATAN 4,558,772
JUMLAH (Rp.) 42,122,100

280,814.00 /M3
ad dan Provit 42,122.10 /M3
Total 322,936.10 /M3
EKERJAAN K.515
(LPB) KLS C SIRTU
N BURUH )
TEN : ACEH BESAR

a setempat
an oleh leveransir
versize) yang tersingkir saat penghamparan

ipadatkan, tebal padat 10 cm padat


ulan orang
memadatkan 600 m2/hari (4 m x 150 m)
im leveransir sampai ditempat pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

170,000
140,000
75,000
97,000
3,600,000

PEKERJA 4,082,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
13,759,663

MATERIAL 13,759,663
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
1,114,528

PERALATAN 1,990,952
JUMLAH (Rp.) 19,832,615

330,543.59 /M3
ad dan Provit 49,581.54 /M3
Total 380,125.12 /M3
EKERJAAN
ONDASI BAWAH K.516
FORD
AN ALAT)
TEN : ACEH BESAR

ia 400 m2 per hari


mpat pekerjaan oleh leveransir

BIAYA SUB TOTAL


(Rp.) (Rp.)

255,000
140,000
6,750,000

PEKERJA 7,145,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

8,500,000
3,200,000
3,000,000
60,000

MATERIAL 14,760,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,051,709
PERALATAN 1,051,709
JUMLAH (Rp.) 22,956,709

286,958.86 /M3
ad dan Provit 43,043.83 /M3
TOTAL (Rp.) 330,002.69 /M3
EKERJAAN
ONDASI BAWAH K.517
CAH TERSARING
AN ALAT)
TEN : ACEH BESAR

M3/hari)
g jalan oleh pemasok
bunan kerikil pecah tersaring
mpai mencapai 15 Cm
00 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
450,000

PEKERJA 1,062,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

43,948,752
5,050,000
-

MATERIAL 48,998,752
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
876,424
1,114,528
PERALATAN 4,558,772
JUMLAH (Rp.) 54,619,524

364,130.16 M3
ad dan Provit 54,619.52 M3
Total 418,749.68 M3
EKERJAAN
ASI ATAS (LPA) KLS A K.520
AN ALAT)

TEN : ACEH BESAR

M3/hari)
g jalan oleh pemasok
bunan kerikil pecah tersaring
mpai mencapai 15 Cm
00 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
450,000

PEKERJA 1,062,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
60,412,800

MATERIAL 60,412,800
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
876,424
1,114,528

PERALATAN 4,558,772
TOTAL 66,033,572

440,223.82 /M3
ad dan Provit 66,033.57 /M3
Total 506,257.39 /M3
EKERJAAN
ASI ATAS (LPA) KLS A K.521
N BURUH)

TEN : ACEH BESAR

ia, 60 m3/hari
eransir
h diatas LPB ( + 15 cm)
ecah mesin dengan binder (pasir urug)
cah mesin dengan binder (pasir urug)
an pasir urug dengan tenaga orang

memadatkan 600 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
140,000
75,000
97,000
3,600,000

PEKERJA 3,997,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

24,165,120
-

MATERIAL 24,165,120
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
1,114,528
PERALATAN 1,990,952
JUMLAH (Rp.) 30,153,072

502,551.21 /M3
ad dan Provit 75,382.68 /M3
TOTAL (Rp.) 577,933.89 /M3
EKERJAAN
ASI ATAS (LPA) KLS B K.522
SARING
AN ALAT)
TEN : ACEH BESAR

M3/HARI
alan oleh leveransir
gga padat tebal padat 10 cm
memadatkan 1500 m2/hari (4 m x 375 m)

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
450,000

PEKERJA 1,062,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
56,957,400

MATERIAL 56,957,400
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
876,424
1,114,528

PERALATAN 4,558,772
TOTAL 62,578,173

417,187.82 /M3
ad dan Provit 62,578.17 /M3
Total 479,765.99 /M3
EKERJAAN
S (LPA) KELAS B K.523
SARING
N BURUH)
TEN : ACEH BESAR

a 60 M3/hari
disepanjang jalan oleh leveransir
cah diatas LPB dalam dua lapis
bal pada 10 cm
memadatkan 750 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)

170,000
140,000
75,000
97,000
3,600,000

PEKERJA 4,082,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
22,782,960

MATERIAL 22,782,960
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
1,114,528
PERALATAN 1,990,952
TOTAL 28,855,912

480,931.87 /M3
ad dan Provit 72,139.78 /M3
Total 553,071.66 /M3
EKERJAAN
ASI ATAS (LPA) KLS B K.522.a
ERSARING
AN ALAT)
TEN : ACEH BESAR

M3/HARI
alan oleh leveransir
gga padat tebal padat 10 cm
memadatkan 1500 m2/hari (4 m x 375 m)

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
280,000
150,000
97,000
450,000

PEKERJA 1,062,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
56,637,000

MATERIAL 56,637,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
876,424
1,114,528

PERALATAN 4,558,772
TOTAL 62,257,772

415,051.82 /M3
ad dan Provit 62,257.77 /M3
Total 477,309.59 /M3
EKERJAAN
S (LPA) KELAS B K.523.a
ERSARING
N BURUH)
TEN : ACEH BESAR

a 60 M3/hari
disepanjang jalan oleh leveransir
cah diatas LPB dalam dua lapis
bal pada 10 cm
memadatkan 750 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)

170,000
140,000
75,000
97,000
3,600,000

PEKERJA 4,082,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
22,654,800

MATERIAL 22,654,800
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424
1,114,528
PERALATAN 1,990,952
TOTAL 28,727,752

478,795.87 /M3
ad dan Provit 71,819.38 /M3
Total 550,615.25 /M3
PEKERJAAN
PASIR (BURAS) K.612
KAN ALAT)

TEN : ACEH BESAR

600) m2/hari
ampai ditempat kerja
pal residu 0,96 l/m3
m3
el dilakukan dilokasi pekerjaan
uck dengan tenaga manusia dan
hampar

BIAYA SUB TOTAL


(Rp.) (Rp.)
85,000
280,000
150,000
97,000
900,000
160,000

PEKERJA 1,672,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,740,000
28,500,000
1,440,000
-

MATERIAL 31,680,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,044,491
325,239
1,712,094
658,855

PERALATAN 3,740,680
TOTAL 37,092,680

15,455.28 /M2
ad dan Provit 2,318.29 /M2
Total 17,773.58 /M2
EKERJAAN
AN PENGERIKILAN K.613
GUNAKAN ALAT )

TEN : ACEH BESAR

1,5 km/hari 4500 m2)


baikan penurunan dan menutup

3 lintasan menghampar, untuk


m diselesaikan sehari
erjaan oleh leveransir
aring rata-rata 4 cm
an/orang
14 atau K016)
BIAYA SUB TOTAL
(Rp.) (Rp.)
85,000
280,000
150,000
97,000
75,000
480,000

PEKERJA 1,167,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

-
54,049,158

BIAYA 54,049,158
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
1,044,491
1,114,528

PERALATAN 4,726,839
TOTAL 59,942,997

15,984.80 /M2
ad dan Provit 2,397.72 /M2
Total 18,382.52 /M2
EKERJAAN
AM (LAPEN) = 5 CM K.618
BURUH)

TEN : ACEH BESAR

k, agregat pengunci, agregat penutup aspal)

coat/prime coat 0,8 Lt/m2

at pekerjaan oleh leveransir

BIAYA SUB TOTAL


(Rp.) (Rp.)

510,000
840,000
450,000
-
14,850,000
480,000

PEKERJA 17,130,000
BIAYA SUB TOTAL
(Rp.) (Rp.)
15,120,000
9,021,900
5,131,500
507,500
78,375,000
5,400,000
-
600,000
MATERIAL 114,155,900
BIAYA SUB TOTAL
(Rp.) (Rp.)
2,629,273

PERALATAN 2,629,273
JUMLAH (Rp.) 133,915,173

95,653.69 /M2
ad dan Provit 14,348.05 /M2
TOTAL (Rp.) 110,001.75 /M2
YA PEKERJAAN K.621
DAN PEMADATAN
MEMAKAI ALAT)
TEN : ACEH BESAR

1750 m2/hari
nsir ketempat pekerjaan

t 3 cm

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
560,000
300,000
450,000
160,000

PEKERJA 1,555,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

8,750,000
2,100,000
-
119,468,620

MATERIAL 130,318,620
BIAYA SUB TOTAL
(Rp.) (Rp.)

996,320
1,044,491
325,239
1,252,441
658,855
PERALATAN 4,277,347
TOTAL 136,150,967

77,800.55 /M2
ad dan Provit 11,670.08 /M2
Total 89,470.64 /M2
EKERJAAN K.636
MADATAN LATASTON
UNAKAN ALAT)
TEN : ACEH BESAR

m2/hari
rim oleh leveransir ke tempat pekerjaan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
560,000
300,000
900,000
640,000

PEKERJA 2,485,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

7,500,000
1,800,000
-
148,027,119

MATERIAL 157,327,119
BIAYA SUB TOTAL
(Rp.) (Rp.)

996,320
1,044,491
325,239
1,252,441
658,855

PERALATAN 4,277,347
TOTAL 164,089,465

109,392.98 /M2
ad dan Provit 16,408.95 /M2
Total 125,801.92 /M2
EKERJAAN K.638
ADATKAN LATASIR
N BURUH)
TEN : ACEH BESAR

m2/hari)
ekerjaan oleh leveransir

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
420,000
225,000
97,000
900,000
160,000

PEKERJA 1,887,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

8,000,000
1,920,000
-
108,607,837

MATERIAL 118,527,837
BIAYA SUB TOTAL
(Rp.) (Rp.)

996,320
1,044,491
325,239
1,089,084

PERALATAN 3,455,136
TOTAL 123,869,972

77,418.73 /M2
ad dan Provit 11,612.81 /M2
Total 89,031.54 /M2
EKERJAAN
ERMUKAAN ASPAL K.641
GGUNAKAN ALAT)
- WC
TEN : ACEH BESAR

pai ke spreader
t 5 cm

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
700,000
375,000
1,125,000
800,000

PEKERJA 3,085,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

130,500
4,500,000
1,080,000
-
133,889,394

MATERIAL 139,599,894
BIAYA SUB TOTAL
(Rp.) (Rp.)

996,320
1,044,491
195,144
1,252,441
658,855

PERALATAN 4,147,251
TOTAL 146,832,145

163,146.83 /M2
130,517.46 /M2
ad dan Provit 19,577.62 /M2
Total 150,095.08 /M2
EKERJAAN
ASE LEV. (ATBL) DEV. 6.3.(5)a
AN ALAT)

TEN : ACEH BESAR

a mekanik)

e lokasi pekerjaan 20 Km

BIAYA SUB TOTAL


(Rp.) (Rp.)

14,340
88,568

PEKERJA 102,907
BIAYA SUB TOTAL
(Rp.) (Rp.)
87,000
75,900
69,500
756,250

MATERIAL 988,650
BIAYA SUB TOTAL
(Rp.) (Rp.)

6,578
40,351
10,008
73,038
7,540
4,962
3,865
-
PERALATAN 146,341
TOTAL 1,237,898

1,237,897.74 TON
ad dan Provit 185,684.66 TON
Total 1,423,582.41 TON
EKERJAAN
ON STRUKTUR K.710
N BURUH)

TEN : ACEH BESAR

asang 20 m2 dalam 1 hari kerja

ransir
20 lbr playwood uk.: 120cm x 240cm x 1,75cm
erancah

BIAYA SUB TOTAL


(Rp.) (Rp.)

90,000
160,000
300,000
160,000

PEKERJA 710,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

84,000
1,233,000
-

MATERIAL 1,317,000
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
JUMLAH (Rp.) 2,027,000

101,350.00 /M2
ad dan Provit 15,202.50 /M2
TOTAL (Rp.) 116,552.50 /M2
EKERJAAN
N (MEMOTONG, K.715
ANG BESI TULANGAN)
N BURUH)
TEN : ACEH BESAR

n dalam 1 hari
e tempat pekerjaan oleh leveransir
ngkok ditempat pekerjaan
g 10% dan pemakaian kawat baja dihitung 1%

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
80,000
150,000
80,000

PEKERJA 395,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,650,000
-
14,300

MATERIAL 1,664,300
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
JUMLAH (Rp.) 2,059,300

10,296.50 /Kg
ad dan Provit 1,544.48 /Kg
TOTAL (Rp.) 11,840.98 /Kg
EKERJAAN
R / RABAT BETON K.720
125

TEN : ACEH BESAR

at pekerjaan oleh leveransir


rsaring
m (9 campuran perjam)
(atau 1 = 8)
n 6,25 zak (40 kg/zak) PC (250 kg/m3)
ukan = 30 Kg semen
si beton

BIAYA SUB TOTAL


(Rp.) (Rp.)

340,000
3,600,000
640,000

PEKERJA 4,580,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,740,000
7,200,000

-
2,400,000

MATERIAL 11,340,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

508,262
706,839
200,985

PERALATAN 1,416,087
JUMLAH (Rp.) 17,336,087

753,742.91 /M3
ad dan Provit 113,061.44 /M3
TOTAL (Rp.) 866,804.34 /M3
EKERJAAN
KELAS K.175 K.721
ENGADUK 125 Ltr

TEN : ACEH BESAR

t pekerjaan oleh leveransir


rsaring
(9 campuran perjam)
(atau 1 = 8)
6,25 zak (40 kg/zak) PC (250 kg/m3)
kan = 30 Kg semen
si beton

BIAYA SUB TOTAL


(Rp.) (Rp.)

340,000
360,000
3,600,000
640,000

PEKERJA 4,940,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,740,000
9,000,000

-
2,625,000

MATERIAL 13,365,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

508,262
706,839
200,985
PERALATAN 1,416,087
JUMLAH (Rp.) 19,721,087

821,711.95 /M2
ad dan Provit 123,256.79 /M2
TOTAL (Rp.) 944,968.75 /M2
EKERJAAN
TUR K.225 K.722
AT PENGADUK
LITER)
TEN : ACEH BESAR

elokasi pekerjaan oleh pemasok


rsaring yang termurah
4 adukan/6 jam/hari
1:5):semen:350 Kg/m3:air:160Kg/m3:2487Kg
uhkan 1 zak (27,8 liter lepas) semen portland
l dan 18,3 liter air
angan besi beton yang sudah dipasang
k pilar, gorong-gorong, dinding penahan dll
lang Indonesia (PBI 1971 NI.2)

BIAYA SUB TOTAL


(Rp.) (Rp.)

510,000
540,000
3,600,000
960,000

PEKERJA 5,610,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,610,000
16,200,000
-
7,830,000

MATERIAL 26,640,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

635,328
883,549
301,478

PERALATAN 1,820,355
JUMLAH (Rp.) 34,070,355

920,820.40 /M3
ad dan Provit 138,123.06 /M3
TOTAL (Rp.) 1,058,943.46 /M3
PEKERJAAN
TUR K.275 K.726
AT PENGADUK
LITER)
TEN : ACEH BESAR

elokasi pekerjaan oleh pemasok


rsaring yang termurah
adukan/6 jam/hari
2:9):semen:400 Kg/m3:air:170Kg/m3:2598Kg
uhkan 2,5 zak (69,4 liter lepas) semen portland
erikil dan 42,5 liter air
angan besi beton yang sudah dipasang
k pilar, gorong-gorong, dinding penahan dll

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
360,000
1,800,000
240,000

PEKERJA 2,485,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

725,000
6,000,000
-
2,900,000

MATERIAL 9,625,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

508,262
416,886
50,246

PERALATAN 975,394
JUMLAH (Rp.) 13,085,394

1,090,449.52 /M3
ad dan Provit 163,567.43 /M3
TOTAL (Rp.) 1,254,016.95 /M3
EKERJAAN
ANGAN BATU K.810
N BURUH)

TEN : ACEH BESAR

orong-gorong, jembatan, dinding penahan


ng menggunakan konstruksi pasangan batu
mpat pekerjaan oleh leveransir

pakai bambu

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
90,000
900,000

PEKERJA 1,075,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

750,000
174,000
950,000
10,500

MATERIAL 1,884,500
BIAYA SUB TOTAL
(Rp.) (Rp.)

25,123
PERALATAN 25,123
JUMLAH (Rp.) 2,984,623

596,924.63 /M3
ad dan Provit 89,538.70 /M3
TOTAL (Rp.) 686,463.33 /M3
PEKERJAAN
ENAHAN K.815
AN BURUH)

TEN : ACEH BESAR

everansir
apangan oleh leveransir

BIAYA SUB TOTAL


(Rp.) (Rp.)

170,000
5,250,000

320,000

PEKERJA 5,740,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

3,750,000
4,700,000
48,000

MATERIAL 8,498,000
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
TOTAL 14,238,000

569,520.00 /M3
ad dan Provit 85,428.00 /M3
Total 654,948.00 /M3
PEKERJAAN
N PERATAAN K.855
LAN
AN ALAT)
TEN : ACEH BESAR

rjaan lain dengan baik

si bahu jalan

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
140,000
320,000
75,000

PEKERJA 620,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,400

MATERIAL 2,400
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
PERALATAN 2,567,820
TOTAL 3,190,220

638,044.00 /M3
ad dan Provit 95,706.60 /M3
Total 733,750.60 /M3
PEKERJAAN
I JALAN KERIKIL K.860
AN ALAT)

TEN : ACEH BESAR

awasan pekerjaan lain dengan baik

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
140,000
75,000
97,000
150,000

PEKERJA 547,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,200

MATERIAL 1,200
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
1,114,528
PERALATAN 3,682,348
TOTAL 4,230,548

2,115,274.06 /Km
ad dan Provit 317,291.11 /Km
Total 2,432,565.17 /Km
PEKERJAAN
ENURUNAN K.870
RIKIL)
AN BURUH)
TEN : ACEH BESAR

pekerjaan oleh leveransir

yang tak dapat digunakan dan dengan


ngkut dari tempat penimbunan
al 10 cm dapat digunakan lagi (25 %)
k 25 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)
85,000
97,000
900,000
160,000

PEKERJA 1,242,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

7,200
2,900,000

MATERIAL 2,907,200
BIAYA SUB TOTAL
(Rp.) (Rp.)

225,227
75,343
1,089,084
PERALATAN 1,389,655
TOTAL 5,538,855

221,554.21 /M2
ad dan Provit 33,233.13 /M2
Total 254,787.35 /M2
EKERJAAN
ERIKIL (BATU PECAH) K.875
GUNAKAN BURUH)

TEN : ACEH BESAR

dicari setempat
lah diperbaiki sebelumnya
ang jalan oleh leveransir
ah diatas LPB

menggilas 1200 m2/hari


dengan binder 11 m3 atau kerikil

BIAYA SUB TOTAL


(Rp.) (Rp.)
170,000
140,000
75,000
97,000
5,100,000
320,000

PEKERJA 5,902,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

750,000
40,800
25,472,338

MATERIAL 26,263,138
BIAYA SUB TOTAL
(Rp.) (Rp.)
876,424 876,424
1,114,528 1,114,528

PERALATAN 1,990,952
JUMLAH (Rp.) 34,156,090

28,463.41 /M2
ad dan Provit 4,269.51 /M2
TOTAL (Rp.) 32,732.92 /M2
EKERJAAN
KERIKIL TERSARING K.875.a
GUNAKAN BURUH)

TEN : ACEH BESAR

dicari setempat
lah diperbaiki sebelumnya
ang jalan oleh leveransir
kil diatas LPB

menggilas 1200 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)
170,000
140,000
75,000
388,000
5,100,000
320,000

PEKERJA 6,193,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

40,800
10,650,000

MATERIAL 10,690,800
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424 876,424
PERALATAN 876,424
JUMLAH (Rp.) 17,760,224

14,800.19 /M2
8,880.11 /M2
ad dan Provit 1,332.02 /M2
TOTAL (Rp.) 10,212.13 /M2
EKERJAAN
KERIKIL TERSARING K.875.b
GUNAKAN BURUH)

TEN : ACEH BESAR

dicari setempat
lah diperbaiki sebelumnya
ang jalan oleh leveransir
kil diatas LPB

menggilas 1200 m2/hari

BIAYA SUB TOTAL


(Rp.) (Rp.)
170,000
140,000
75,000
388,000
5,100,000
320,000

PEKERJA 6,193,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

40,800
10,650,000

MATERIAL 10,690,800
BIAYA SUB TOTAL
(Rp.) (Rp.)

876,424 876,424
PERALATAN 876,424
JUMLAH (Rp.) 17,760,224

14,800.19 /M2
ad dan Provit 2,220.03 /M2
TOTAL (Rp.) 17,020.21 /M2
PEKERJAAN
RIKIL PECAH TERSARING K.877
DAT
AN ALAT)
TEN : ACEH BESAR

ah diperbaiki sebelumnya
memotong dan 5 lintasan menghampar
pekerjaan oleh leveransir

memadatkan 3000 m2/hari

dengan binder 28 m3 atau kerikil pecah

BIAYA SUB TOTAL


(Rp.) (Rp.)
85,000
420,000
97,000
450,000
225,000

PEKERJA 1,277,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,900,000
3,600
63,501,462

MATERIAL 65,405,062
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,567,820
1,051,709
1,253,390
1,337,434

PERALATAN 6,210,352
TOTAL 72,892,414

24,297.47 /M2
ad dan Provit 3,644.62 /M2
Total 27,942.09 /M2
EKERJAAN
JALAN ASPAL K.880
AN BURUH)

TEN : ACEH BESAR

ok 35 M2/Hari
ulan/orang/set @ 3 alat

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
97,000
600,000
160,000

PEKERJA 942,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

72,500
218,750
210,000
4,800
1,435,061

MATERIAL 1,941,111
BIAYA SUB TOTAL
(Rp.) (Rp.)

225,227

1,089,084
PERALATAN 1,314,312
TOTAL 4,197,423

119,926.38 /M2
ad dan Provit 17,988.96 /M2
Total 137,915.33 /M2
EKERJAAN
AL DENGAN AC-WC K.880.a
AN BURUH)

TEN : ACEH BESAR

ok 35 M2/Hari
ulan/orang/set @ 3 alat

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
97,000
600,000
160,000

PEKERJA 942,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,467,200
218,750
210,000
4,399,283

MATERIAL 6,295,233
BIAYA SUB TOTAL
(Rp.) (Rp.)

225,227
1,089,084
PERALATAN 1,314,312
TOTAL 8,551,545

244,329.87 /M2
ad dan Provit 36,649.48 /M2
Total 280,979.35 /M2
EKERJAAN
AL DENGAN LATASIR K.880.c
AN BURUH)

TEN : ACEH BESAR

ok 35 M2/Hari
ulan/orang/set @ 3 alat

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
97,000
600,000
160,000

PEKERJA 942,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,467,200
218,750
210,000
3,047,228

MATERIAL 4,943,178
BIAYA SUB TOTAL
(Rp.) (Rp.)

225,227
1,089,084
PERALATAN 1,314,312
TOTAL 7,199,490

205,699.72 /M2
ad dan Provit 30,854.96 /M2
Total 236,554.68 /M2
EKERJAAN
NAN MUKA JALAN K.885

N BURUH)
TEN : ACEH BESAR

oleh supplier.

tak dapat digunakan.


penimbunan ke tempat penghamparan

mpok 20 m2/hari.

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
140,000
97,000
240,000
1,200,000

PEKERJA 1,762,000
BIAYA SUB TOTAL
(Rp.) (Rp.)
1,944,000
116,000
125,000
120,000
9,600

MATERIAL 2,314,600
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,089,084
135,136
75,343
195,144
PERALATAN 1,494,708
TOTAL 5,571,308

278,565.40 /M2
ad dan Provit 41,784.81 /M2
Total 320,350.21 /M2
EKERJAAN
AL DENGAN LAPEN K.880.b
AN BURUH)

TEN : ACEH BESAR

ok 35 M2/Hari
ulan/orang/set @ 3 alat

BIAYA SUB TOTAL


(Rp.) (Rp.)

85,000
97,000
600,000
160,000

PEKERJA 942,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

1,467,200
218,750
210,000
3,850,061

MATERIAL 5,746,011
BIAYA SUB TOTAL
(Rp.) (Rp.)

225,227
1,089,084
PERALATAN 1,314,312
TOTAL 8,002,323

228,637.80 /M2
ad dan Provit 34,295.67 /M2
Total 262,933.48 /M2
EKERJAAN
TUR K.250 K.731
AT PENGADUK
LITER)
TEN : ACEH BESAR

elokasi pekerjaan oleh pemasok


rsaring yang termurah
4 adukan/6 jam/hari
1:5):semen:350 Kg/m3:air:160Kg/m3:2487Kg
uhkan 1 zak (27,8 liter lepas) semen portland
l dan 18,3 liter air
angan besi beton yang sudah dipasang
k pilar, gorong-gorong, dinding penahan dll
lang Indonesia (PBI 1971 NI.2)

BIAYA SUB TOTAL


(Rp.) (Rp.)

510,000
540,000
5,400,000
960,000

PEKERJA 7,410,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,414,250
17,390,000
-
8,369,400

MATERIAL 28,173,650
BIAYA SUB TOTAL
(Rp.) (Rp.)

635,328
883,549
301,478
PERALATAN 1,820,355
JUMLAH (Rp.) 37,404,005

1,010,919.05 /M3
ad dan Provit 151,637.86 /M3
TOTAL (Rp.) 1,162,556.91 /M3
EKERJAAN
N (MEMOTONG, K.715.a
SANG BESI TUL. ULIR)
N BURUH)
TEN : ACEH BESAR

pkan dalam 1 hari


e tempat pekerjaan oleh leveransir
ngkok ditempat pekerjaan
g 10% dan pemakaian kawat baja dihitung 1%

BIAYA SUB TOTAL


(Rp.) (Rp.)

80,000
80,000
150,000
80,000

PEKERJA 390,000
BIAYA SUB TOTAL
(Rp.) (Rp.)

5,060,000
1,800
14,300

MATERIAL 5,076,100
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
JUMLAH (Rp.) 5,466,100

27,330.50 /Kg
ad dan Provit 4,099.58 /Kg
TOTAL (Rp.) 31,430.08 /Kg
EKERJAAN
BAT BETON K.710.a
N BURUH)

TEN : ACEH BESAR

asang acuan beton


at dipakai kembali
ransir

BIAYA SUB TOTAL


(Rp.) (Rp.)

2,856
1,144
56

PEKERJA 4,056
BIAYA SUB TOTAL
(Rp.) (Rp.)

2,558
51,000
150

MATERIAL 53,708
BIAYA SUB TOTAL
(Rp.) (Rp.)
PERALATAN
JUMLAH (Rp.) 57,764

57,763.80 /M2
ad dan Provit 8,664.57 /M2
TOTAL (Rp.) 66,428.37 /M2
DAFTAR ANALISA

Anl. A.18 : 1 M3 Urugan Pasir


1.200 M3 M-040 Pasir Urug @ Rp. 100,000 Rp.
0.250 OH L-101 Pekerja Galian Tanah @ Rp. 75,000 Rp.
0.010 OH L-061 Mandor @ Rp. 85,000 Rp.
Jumlah Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.

Anl. A.18 a : 1 M3 Timbunan Tanah


1.200 M3 M-040 Tanah Timbun @ Rp. 60,000 Rp.
0.300 OH L-101 Pekerja Galian Tanah @ Rp. 75,000 Rp.
0.010 OH L-061 Mandor @ Rp. 85,000 Rp.
Jumlah Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.

Anl. A.18 b : 1 M3 Timbunan Tanah


0.300 OH L-101 Pekerja Galian Tanah @ Rp. 75,000 Rp.
0.010 OH L-061 Mandor @ Rp. 85,000 Rp.
Jumlah Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.

Supl. Va : 1 M3 Beton K.225 untuk Rabat Beton


1.000 M3 K.722 Beton massa K.225 @ Rp. 1,058,943 Rp.
6.667 M2 K.710.a Papan Bekisting Rabat Beton @ Rp. 66,428 Rp.
Jumlah Rp.

Supl. Vb : 1 M3 Beton Bertulang K.225 untuk Plat Beton dan Lantai Jembatan
1.00 M3 K.722 Beton massa K.225 @ Rp. 1,058,943 Rp.
5.00 M2 K.710 Kayu Bekisting/Perancah Beton @ Rp. 116,553 Rp.
Jumlah Rp.

Supl. Vc : 1 M3 Beton Bertulang K.225 untuk Balok Jembatan, Portal, dll


1.00 M3 K 722 Beton massa K.225 @ Rp. 1,058,943 Rp.
4.167 M2 K 710 Acuan beton/bekisting @ Rp. 116,553 Rp.
Jumlah Rp.

L.15 a : 1 M2 Lapis Asminsheet, tebal 3 cm


1.000 Kg M-061 Aspal @ Rp. 12,500 Rp.
4.000 Kg M-061 Aspal @ Rp. 12,500 Rp.
0.040 M3 M-012 Kerikil @ Rp. 150,000 Rp.
0.020 M3 M-041 Pasir Pasang @ Rp. 145,000 Rp.
0.010 M3 M-070 Kayu api @ Rp. 300,000 Rp.
0.180 OH L-101 Pekerja @ Rp. 75,000 Rp.
0.010 OH L-061 Mandor @ Rp. 85,000 Rp.
0.010 OH L-081 Masinis @ Rp. 97,000 Rp.
0.030 Mesin Gilas 3 Roda @ Rp. 175,285 Rp.
Jumlah Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.
Anl. G.50 i 1 M2 Plesteran 1 Pc : 2 Ps, t = 15 mm
Tenaga Kerja
0.200 OH L-079 Tukang Batu @ Rp. 80,000 Rp.
0.020 OH L-073 Kepala Tukang @ Rp. 90,000 Rp.
0.250 OH L-102 Pekerja @ Rp. 75,000 Rp.
0.020 OH L-061 Mandor @ Rp. 85,000 Rp.
0.252 Zak M-080 Semen @ Rp. 50,000 Rp.
0.017 M3 M-012 Pasir Pasang @ Rp. 145,000 Rp.
Jumlah Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.

Anl. G.50 k 1 M2 Plesteran 1Pc : 3Ps, t = 10 mm


0.1349 Zak M-080 Semen @ Rp. 50,000 Rp.
0.0130 M3 M-012 Pasir Pasangan @ Rp. 145,000 Rp.
A. Bahan Rp.

0.1500 OH L-079 Tukang Batu @ Rp. 80,000 Rp.


0.0150 OH L-073 Kepala Tukang @ Rp. 90,000 Rp.
0.4000 OH L-102 Pekerja @ Rp. 75,000 Rp.
0.0200 OH L-061 Mandor @ Rp. 85,000 Rp.
B. Upah Rp.
Jumlah ( A+B ) Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.

Anl. G.50 o 1 M2 Plesteran 1 Pc : 4 Ps, t = 10 mm


0.116 Zak M-080 Semen @ Rp. 50,000 Rp.
0.011 M3 M-012 Pasir Pasangan @ Rp. 145,000 Rp.
A. Bahan Rp.

0.150 OH L-079 Tukang Batu @ Rp. 80,000 Rp.


0.015 OH L-073 Kepala Tukang @ Rp. 90,000 Rp.
0.400 OH L-102 Pekerja @ Rp. 75,000 Rp.
0.020 OH L-061 Mandor @ Rp. 85,000 Rp.
B. Upah Rp.
Jumlah ( A+B ) Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.

Anl. G.67 1 M2 Cor Beton t = 7 cm


0.425 Zak M-080 Semen @ Rp. 50,000 Rp.
0.044 M3 M-041 Pasir Pasang @ Rp. 145,000 Rp.
0.070 M3 M-012 Kerikil @ Rp. 150,000 Rp.
A. Bahan Rp.

0.135 OH L-079 Tukang @ Rp. 80,000 Rp.


0.014 OH L-073 Kepala Tukang @ Rp. 90,000 Rp.
0.360 OH L-102 Pekerja @ Rp. 75,000 Rp.
0.036 OH L-061 Mandor @ Rp. 85,000 Rp.
B. Upah Rp.
Jumlah ( A+B ) Rp.
Over Head dan Provit = 10% x Jumlah Rp.
Total Rp.
120,000
18,750
850
139,600
13,960
153,560

72,000
22,500
850
95,350
9,535
104,885

22,500
850
23,350
2,335
25,685

1,058,943
442,878
1,501,821

1,058,943
582,763
1,641,706

1,058,943
485,674
1,544,618

12,500
50,000
6,000
2,900
3,000
13,500
850
970
5,259
94,979
9,498
104,476
16,000
1,800
18,750
1,700
12,600
2,480
53,330
5,333
58,662

6,745
1,885
8,630

12,000
1,350
30,000
1,700
45,050
53,680
5,368
59,048

5,800
1,595
7,395

12,000
1,350
30,000
1,700
45,050
52,445
5,245
57,690

21,250
6,380
10,500
38,130

10,800
1,215
27,000
3,060
42,075
80,205
8,021
88,226
REKAPITULASI HARGA ANALISA SATUAN PEKERJAAN
UNTUK JALAN DESA DAN JALAN LINGKUNGAN
DINAS BINA MARGA DAN CIPTA KARYA
KABUPATEN ACEH BESAR - TA 2016

STANDAR ANALISA KABUPATEN (ANALISA - K)

NO. KODE KETERANGAN SAT

1 K. 012 Penyediaan Kerikil Sungai Tidak Disaring (Menggunakan Alat) M3


2 K. 013 Penyediaan Kerikil Sungai Tidak Disaring (Menggunakan Buruh) M3
3 K. 014 Menyediakan Kerikil Galian Tersaring (Menggunakan Alat) M3
4 K. 016 Menyediakan Kerikil Sungai Tersaring (Menggunakan Alat) M3
5 K. 017 Menyediakan Kerikil Pecah Tersaring, Menggunakan Kerikil Sungai (Alat) M3
6 K. 018 Produksi Batu Pecah Tersaring, Menggunakan Batu Quarry (Alat) M3
7 K. 020 Memproduksi Campuran Latasir (Alat) TON
8 K. 035 Memproduksi Lapis Tipis Aspal Beton (LATASTON), (Alat) TON
9 K. 040 Memproduksi dan Mengangkut Aspal Beton ( Alat / AMP ) TON
10 K. 110 Membuat Parit Galian Tanah (Menggunakan Buruh) M3
11 K. 111 Membuat Parit Galian Tanah (Menggunakan Alat) M3
12 K. 112 Membuat Pasangan Batu pada Parit Galian Tanah (Buruh) M'
13 K. 121 Pas. Gorong2 Pipa Beton O 60 Cm (Pracetak Bertulang Tanpa Dinding Kepala), (Buruh) M'
14 K. 123 Pas. Gorong2 Pipa Beton O 80 Cm (Pracetak Bertulang Tanpa Dinding Kepala), (Buruh) M'
15 K. 127 Gorong2 Kotak Pas. Batu dengan Penutup Beton Bertulang Ukuran 1,0 x 1,0 M (Buruh) M'
16 K. 128 Gorong2 Kotak Pas. Batu dengan Penutup Beton Bertulang Ukuran 1,5 x 1,5 M (Buruh) M'
17 K. 139 Dinding Sayap Gorong2 Pas. Batu, Satu Pasang (Menggunakan Buruh) M'
18 K. 210 Pengupasan Tanah dan Pembersihan Semak pada Damija (Menggunakan Buruh) M2
19 K. 211 Pengupasan Tanah dan Pembersihan Semak pada Damija (Menggunakan Alat) M2
20 K. 220 Pengurugan Tanah (Menggunakan Buruh) M3
21 K. 221 Mengangkut dan Menguruk Material Timbunan (Menggunakan Alat) M3
22 K. 224 Galian Tanah Untuk Konstruksi (Buruh) M3
23 K. 225 Penimbunan dan Pemadatan Untuk Konstruksi (Menggunakan Buruh) M3
24 K. 230 Penimbunan Daerah Rawa (Menggunakan Buruh) M3
25 K. 231 Penimbunan Daerah Rawa ( Pekerja ) (Menggunakan Buruh) M3
26 K. 232 Pasangan Cerucuk Kayu di Rawa (Menggunakan Buruh) M'
27 K. 310 Membentuk Badan Jalan Subgrade dengan Tanah Timbunan Pilihan (Menggunakan Buruh) M3
28 K. 310.a Membentuk Badan Jalan Subgrade dengan Tanah Timbunan Pilihan (Menggunakan Buruh) M3
29 K. 310.b Membentuk Badan Jalan Subgrade dengan Tanah Timbunan (Menggunakan Buruh) M3
30 K. 311 Membentuk Badan Jalan Subgrade dengan Tanah Timbunan Pilihan (Menggunakan Alat) M3
31 K. 311.a Membentuk Badan Jalan Subgrade dengan Timbunan Sirtu (Menggunakan Alat) M3
32 K. 311.b Membentuk Badan Jalan Subgrade dengan Timbunan Sirtu (Menggunakan Alat,Tandem Roller) M3
33 K. 320 Membentuk Badan Jalan Subgrade di Daerah Galian Tanah Biasa (Menggunakan Buruh) M3
NO. KODE KETERANGAN SAT

34 K. 321 Membentuk Badan Jalan Subgrade di Daerah Galian Tanah Biasa (Menggunakan Alat) M3
35 K. 341 Penyiapan Tanah dasar (Menggunakan Buruh) M2
36 K. 342 Penyiapan Tanah dasar (Menggunakan Alat) M2
37 K. 410 Membentuk Bahu Jalan Keras (Menggunakan Buruh) M3
38 K. 411 Membentuk Bahu Jalan Keras (Menggunakan Alat) M3
39 K. 420 Memotong Bahu Jalan Tinggi (Menggunakan Buruh) M2
40 K. 421 Memotong Bahu Jalan Tinggi (Menggunakan Alat) M2
41 K. 422 Pembersihan Semak Dll pada Bahu jalan (Menggunakan Buruh) M2
42 K. 423 Pembersihan Parit Samping (Menggunakan Alat) M'
43 K. 424 Pembersihan Parit Samping (Menggunakan Buruh) M'
44 K. 510 Konstruksi Lapis Pondasi Bawah (LPB) Klas A (Menggunakan Alat) M'
45 K. 511 Konstruksi Lapis Pondasi Bawah (LPB) Klas A (Menggunakan Buruh) M'
46 K. 512 Konstruksi Lapis Pondasi Bawah (LPB) Klas B (Menggunakan Alat) M'
47 K. 513 Konstruksi Lapis Pondasi Bawah (LPB) Klas B (Menggunakan Buruh) M'
48 K. 514 Konstruksi Lapis Pondasi Bawah (LPB) Klas C (Menggunakan Alat) M3
49 K. 515 Konstruksi Lapis Pondasi Bawah (LPB) Klas C (Menggunakan Buruh) M3
50 K. 516 Konstruksi Lapis Pondasi Bawah (LPB) Telford (Menggunakan Buruh) M3
51 K. 517 Konstruksi (LPB) Klas B Kerikil pecah Tersaring (Menggunakan Alat) M3
52 K. 520 Konstruksi Lapis Pondasi Atas (LPA) Klas A (Menggunakan Alat) M3
53 K. 521 Konstruksi Lapis Pondasi Atas (LPA) Klas A (Menggunakan Buruh) M3
NO. KODE KETERANGAN SAT

54 K. 522 Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Tersaring (Menggunakan Alat) M3
55 K. 523 Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Tersaring (Menggunakan Buruh) M3
56 K. 522.a Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Pecah (Menggunakan Alat) M3
57 K. 523.a Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Pecah (Menggunakan Buruh) M3
58 K. 612 Laburan Aspal Pasir (BURAS) (Menggunakan Alat) M2
59 K. 613 Japat Pembentukan dan Pengkerikilan Ulang 4 Cm (Menggunakan Alat) M2
60 K. 618 Lapis Penetrasi Makadam 5 Cm (LAPEN) (Menggunakan Buruh) M2
61 K. 621 Penghamparan dan Pemadatan LATASIR 2 Cm (Menggunakan Alat) M2
62 K. 636 Penghamparan dan Pemadatan LATASTON (Menggunakan Alat) M2
63 K. 638 Menghampar dan Memadatkan LATASIR (Menggunakan Buruh) M2
64 K. 641 Menghampar Lapis Permukaan Aspal Beton (LASTON) (Menggunakan Alat) Tebal 4 cm M2
65 Div. 6.3.5 (a) ATBL (Menggunakan Alat) Ton
66 K. 710 Perancah (Bekisting) untuk Beton Bertulang (Menggunakan Buruh) M2
67 K. 710.a Bekisting untuk Rabat Beton M2
68 K. 715 Penulangan Besi Beton Polos (Menggunakan Buruh) Kg
69 K. 715.a Penulangan Besi Beton Ulir (Menggunakan Buruh) Kg
70 K. 720 Beton Non Struktur / Rabat Klas K.125 M3
71 K. 721 Beton Non Struktur / Rabat Klas K.175 M3
72 K. 722 Beton Struktur K.225 (Menggunakan Alat Pengaduk Beton 125 Liter ) M3
73 K. 726 Beton Struktur K.275 (Menggunakan Alat Pengaduk Beton 250 Liter ) M3
74 K. 731 Beton Struktur K.250 (Menggunakan Alat Pengaduk Beton 125 Liter ) M3
75 K. 810 Konstruksi Pasangan Batu (Menggunakan Buruh) M3
76 K. 815 Bronjong Penahan (Menggunakan Buruh) M3
77 K. 855 Pembentukan dan Perataan Bahu Jalan (Menggunakan Alat) Km
78 K. 860 Perataan Kembali Jalan Kerikil (Menggunakan Alat) Km
79 K. 870 Memperbaiki Penurunan Jalan Kerikil (Menggunakan Buruh) M2
80 K. 875 Penghamparan Jalan Kerikil 5 Cm Padat (Menggunakan Buruh) - Agregat Pecah M2
81 K. 875.a Penghamparan Jalan Kerikil 3 Cm Padat (Menggunakan Buruh) - Kerikil Tersaring M2
82 K. 875.b Penghamparan Jalan Kerikil 5 Cm Padat (Menggunakan Buruh) - Kerikil Tersaring M2
83 K. 877 Penghamparan Jalan Kerikil 5 Cm Padat (Menggunakan Alat) - Agregat Pecah M2
84 K. 880 Perbaikan Lubang Jalan Aspal (Menggunakan Buruh) M2
85 K. 880.a Penambalan Jalan Aspal dengan AC-WC tebal 4 cm (Menggunakan Buruh) M2
86 K. 880.b Penambalan Jalan Aspal Dengan Lapen tebal 5 cm (Menggunakan Buruh) M2
87 K. 880.c Penambalan Jalan Aspal Dengan Latasir tebal 2,5 cm (Menggunakan Buruh) M2
88 K. 885 Memperbaiki Penurunan Muka Jalan (Jalan Aspal) M3
89 Supl.Va 1 M3 Beton K.225 untuk Rabat Beton M3
90 Supl.Vb 1 M3 Beton Bertulang K.225 untuk Plat Beton dan Lantai Jembatan M3
91 Supl.Vc 1 M3 Beton Bertulang K.225 untuk Balok Jembatan, Portal, dll M3
92 A.18 Urugan Pasir M3
NO. KODE KETERANGAN SAT

93 A.18.a Timbunan Tanah M3


94 A.18.b Urugan Kembali M3
95 L.15.a Lapis Asminsheet Tebal = 3 Cm M2
96 G.50.i 1 M2 Plesteran 1 Pc : 2 Ps, t = 15 mm M2
97 G.50.k 1 M2 Plesteran 1Pc : 3Ps, t = 10 mm M2
98 G.50.o 1 M2 Plesteran 1 Pc : 4 Ps, t = 10 mm M2
99 G.67 1 M2 Cor Beton t = 7 cm M2
REKAPITULASI HARGA ANALISA SATUAN PEKERJAAN
UNTUK JALAN DESA DAN JALAN LINGKUNGAN
DINAS BINA MARGA DAN CIPTA KARYA
KABUPATEN ACEH BESAR - TA 2016

TANDAR ANALISA KABUPATEN (ANALISA - K)

HARGA
NO. KODE KETERANGAN SAT SATUAN
(Rp.)
1 K. 012 Penyediaan Kerikil Sungai Tidak Disaring (Menggunakan Alat) M3 19
2 K. 013 Penyediaan Kerikil Sungai Tidak Disaring (Menggunakan Buruh) M3 24
3 K. 014 Menyediakan Kerikil Galian Tersaring (Menggunakan Alat) M3 30
4 K. 016 Menyediakan Kerikil Sungai Tersaring (Menggunakan Alat) M3 30
5 K. 017 Menyediakan Kerikil Pecah Tersaring, Menggunakan Kerikil Sungai (Alat) M3 35
6 K. 018 Produksi Batu Pecah Tersaring, Menggunakan Batu Quarry (Alat) M3 35
7 K. 020 Memproduksi Campuran Latasir (Alat) TON 1,81
8 K. 035 Memproduksi Lapis Tipis Aspal Beton (LATASTON), (Alat) TON 1,48
9 K. 040 Memproduksi dan Mengangkut Aspal Beton ( Alat / AMP ) TON 1,33
10 K. 110 Membuat Parit Galian Tanah (Menggunakan Buruh) M3 7
11 K. 111 Membuat Parit Galian Tanah (Menggunakan Alat) M3 4
12 K. 112 Membuat Pasangan Batu pada Parit Galian Tanah (Buruh) M' 42
13 K. 121 Pas. Gorong2 Pipa Beton O 60 Cm (Pracetak Bertulang Tanpa Dinding Kepala), (Buruh) M' 1,67
14 K. 123 Pas. Gorong2 Pipa Beton O 80 Cm (Pracetak Bertulang Tanpa Dinding Kepala), (Buruh) M' 1,71
15 K. 127 Gorong2 Kotak Pas. Batu dengan Penutup Beton Bertulang Ukuran 1,0 x 1,0 M (Buruh) M' 3,54
16 K. 128 Gorong2 Kotak Pas. Batu dengan Penutup Beton Bertulang Ukuran 1,5 x 1,5 M (Buruh) M' 5,45
17 K. 139 Dinding Sayap Gorong2 Pas. Batu, Satu Pasang (Menggunakan Buruh) M' 98
18 K. 210 Pengupasan Tanah dan Pembersihan Semak pada Damija (Menggunakan Buruh) M2
19 K. 211 Pengupasan Tanah dan Pembersihan Semak pada Damija (Menggunakan Alat) M2
20 K. 220 Pengurugan Tanah (Menggunakan Buruh) M3 17
21 K. 221 Mengangkut dan Menguruk Material Timbunan (Menggunakan Alat) M3 16
22 K. 224 Galian Tanah Untuk Konstruksi (Buruh) M3 5
23 K. 225 Penimbunan dan Pemadatan Untuk Konstruksi (Menggunakan Buruh) M3 39
24 K. 230 Penimbunan Daerah Rawa (Menggunakan Buruh) M3 19
25 K. 231 Penimbunan Daerah Rawa ( Pekerja ) (Menggunakan Buruh) M3 29
26 K. 232 Pasangan Cerucuk Kayu di Rawa (Menggunakan Buruh) M' 8
27 K. 310 Membentuk Badan Jalan Subgrade dengan Tanah Timbunan Pilihan (Menggunakan Buruh) M3 19
28 K. 310.a Membentuk Badan Jalan Subgrade dengan Tanah Timbunan Pilihan (Menggunakan Buruh) M3 16
29 K. 310.b Membentuk Badan Jalan Subgrade dengan Tanah Timbunan (Menggunakan Buruh) M3 11
30 K. 311 Membentuk Badan Jalan Subgrade dengan Tanah Timbunan Pilihan (Menggunakan Alat) M3 18
31 K. 311.a Membentuk Badan Jalan Subgrade dengan Timbunan Sirtu (Menggunakan Alat) M3 16
32 K. 311.b Membentuk Badan Jalan Subgrade dengan Timbunan Sirtu (Menggunakan Alat,Tandem Roller) M3 15
33 K. 320 Membentuk Badan Jalan Subgrade di Daerah Galian Tanah Biasa (Menggunakan Buruh) M3 10
HARGA
NO. KODE KETERANGAN SAT SATUAN
(Rp.)
34 K. 321 Membentuk Badan Jalan Subgrade di Daerah Galian Tanah Biasa (Menggunakan Alat) M3 8
35 K. 341 Penyiapan Tanah dasar (Menggunakan Buruh) M2
36 K. 342 Penyiapan Tanah dasar (Menggunakan Alat) M2
37 K. 410 Membentuk Bahu Jalan Keras (Menggunakan Buruh) M3 20
38 K. 411 Membentuk Bahu Jalan Keras (Menggunakan Alat) M3 28
39 K. 420 Memotong Bahu Jalan Tinggi (Menggunakan Buruh) M2 12
40 K. 421 Memotong Bahu Jalan Tinggi (Menggunakan Alat) M2 11
41 K. 422 Pembersihan Semak Dll pada Bahu jalan (Menggunakan Buruh) M2
42 K. 423 Pembersihan Parit Samping (Menggunakan Alat) M'
43 K. 424 Pembersihan Parit Samping (Menggunakan Buruh) M' 1
44 K. 510 Konstruksi Lapis Pondasi Bawah (LPB) Klas A (Menggunakan Alat) M' 43
45 K. 511 Konstruksi Lapis Pondasi Bawah (LPB) Klas A (Menggunakan Buruh) M' 50
46 K. 512 Konstruksi Lapis Pondasi Bawah (LPB) Klas B (Menggunakan Alat) M' 46
47 K. 513 Konstruksi Lapis Pondasi Bawah (LPB) Klas B (Menggunakan Buruh) M' 53
48 K. 514 Konstruksi Lapis Pondasi Bawah (LPB) Klas C (Menggunakan Alat) M3 32
49 K. 515 Konstruksi Lapis Pondasi Bawah (LPB) Klas C (Menggunakan Buruh) M3 38
50 K. 516 Konstruksi Lapis Pondasi Bawah (LPB) Telford (Menggunakan Buruh) M3 33
51 K. 517 Konstruksi (LPB) Klas B Kerikil pecah Tersaring (Menggunakan Alat) M3 41
52 K. 520 Konstruksi Lapis Pondasi Atas (LPA) Klas A (Menggunakan Alat) M3 50
53 K. 521 Konstruksi Lapis Pondasi Atas (LPA) Klas A (Menggunakan Buruh) M3 57
HARGA
NO. KODE KETERANGAN SAT SATUAN
(Rp.)
54 K. 522 Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Tersaring (Menggunakan Alat) M3 47
55 K. 523 Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Tersaring (Menggunakan Buruh) M3 55
56 K. 522.a Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Pecah (Menggunakan Alat) M3 47
57 K. 523.a Konstruksi Lapis Pondasi Atas (LPA) Klas B Kerikil Pecah (Menggunakan Buruh) M3 55
58 K. 612 Laburan Aspal Pasir (BURAS) (Menggunakan Alat) M2 1
59 K. 613 Japat Pembentukan dan Pengkerikilan Ulang 4 Cm (Menggunakan Alat) M2 1
60 K. 618 Lapis Penetrasi Makadam 5 Cm (LAPEN) (Menggunakan Buruh) M2 11
61 K. 621 Penghamparan dan Pemadatan LATASIR 2 Cm (Menggunakan Alat) M2 8
62 K. 636 Penghamparan dan Pemadatan LATASTON (Menggunakan Alat) M2 12
63 K. 638 Menghampar dan Memadatkan LATASIR (Menggunakan Buruh) M2 8
64 K. 641 Menghampar Lapis Permukaan Aspal Beton (LASTON) (Menggunakan Alat) Tebal 4 cm M2 15
65 Div. 6.3.5 (a) ATBL (Menggunakan Alat) Ton 1,42
66 K. 710 Perancah (Bekisting) untuk Beton Bertulang (Menggunakan Buruh) M2 11
67 K. 710.a Bekisting untuk Rabat Beton M2 6
68 K. 715 Penulangan Besi Beton Polos (Menggunakan Buruh) Kg 1
69 K. 715.a Penulangan Besi Beton Ulir (Menggunakan Buruh) Kg 3
70 K. 720 Beton Non Struktur / Rabat Klas K.125 M3 86
71 K. 721 Beton Non Struktur / Rabat Klas K.175 M3 94
72 K. 722 Beton Struktur K.225 (Menggunakan Alat Pengaduk Beton 125 Liter ) M3 1,05
73 K. 726 Beton Struktur K.275 (Menggunakan Alat Pengaduk Beton 250 Liter ) M3 1,25
74 K. 731 Beton Struktur K.250 (Menggunakan Alat Pengaduk Beton 125 Liter ) M3 1,16
75 K. 810 Konstruksi Pasangan Batu (Menggunakan Buruh) M3 68
76 K. 815 Bronjong Penahan (Menggunakan Buruh) M3 65
77 K. 855 Pembentukan dan Perataan Bahu Jalan (Menggunakan Alat) Km 73
78 K. 860 Perataan Kembali Jalan Kerikil (Menggunakan Alat) Km 2,43
79 K. 870 Memperbaiki Penurunan Jalan Kerikil (Menggunakan Buruh) M2 25
80 K. 875 Penghamparan Jalan Kerikil 5 Cm Padat (Menggunakan Buruh) - Agregat Pecah M2 3
81 K. 875.a Penghamparan Jalan Kerikil 3 Cm Padat (Menggunakan Buruh) - Kerikil Tersaring M2 1
82 K. 875.b Penghamparan Jalan Kerikil 5 Cm Padat (Menggunakan Buruh) - Kerikil Tersaring M2 1
83 K. 877 Penghamparan Jalan Kerikil 5 Cm Padat (Menggunakan Alat) - Agregat Pecah M2 2
84 K. 880 Perbaikan Lubang Jalan Aspal (Menggunakan Buruh) M2 13
85 K. 880.a Penambalan Jalan Aspal dengan AC-WC tebal 4 cm (Menggunakan Buruh) M2 28
86 K. 880.b Penambalan Jalan Aspal Dengan Lapen tebal 5 cm (Menggunakan Buruh) M2 26
87 K. 880.c Penambalan Jalan Aspal Dengan Latasir tebal 2,5 cm (Menggunakan Buruh) M2 23
88 K. 885 Memperbaiki Penurunan Muka Jalan (Jalan Aspal) M3 32
89 Supl.Va 1 M3 Beton K.225 untuk Rabat Beton M3 1,50
90 Supl.Vb 1 M3 Beton Bertulang K.225 untuk Plat Beton dan Lantai Jembatan M3 1,64
91 Supl.Vc 1 M3 Beton Bertulang K.225 untuk Balok Jembatan, Portal, dll M3 1,54
92 A.18 Urugan Pasir M3 15
HARGA
NO. KODE KETERANGAN SAT SATUAN
(Rp.)
93 A.18.a Timbunan Tanah M3 10
94 A.18.b Urugan Kembali M3 2
95 L.15.a Lapis Asminsheet Tebal = 3 Cm M2 10
96 G.50.i 1 M2 Plesteran 1 Pc : 2 Ps, t = 15 mm M2 5
97 G.50.k 1 M2 Plesteran 1Pc : 3Ps, t = 10 mm M2 5
98 G.50.o 1 M2 Plesteran 1 Pc : 4 Ps, t = 10 mm M2 5
99 G.67 1 M2 Cor Beton t = 7 cm M2 8
DAFTAR BIAYA SEWA PERALATAN PER JAM KERJA
UNTUK JALAN DESA DAN JALAN LINGKUNGAN
DINAS BINA MARGA DAN CIPTA KARYA
KABUPATEN ACEH BESAR - TA 2016

HARGA ALAT BIAYA SEWA ALAT


NO PERALATAN KODE
Rp. 000 ( Rp. )
1 ASPHALT MIXING PLANT E - 155 2,600,000.00 1,674,302.40
2 ASPHALT FINISHER E - 157 550,000.00 250,488.10
3 ASPHALT SPRAYER E - 154 145,000.00 65,047.89
4 BULLDOZER 100-150 HP E - 001 1,350,000.00 530,063.50
5 COMPRESSOR AIR 210 m3/h E - 301 98,000.00 164,713.76
6 CONCRETE MIXER 0.3 -0.6 M3 E - 253 45,000.00 69,480.95
7 SCREENING PLANT E - 040 150,000.00 97,943.38
8 DUMP TRUCK 3-4 M3 E - 211 325,000.00 251,088.51
9 DUMP TRUCK E - 212 535,000.00 342,418.78
10 EXCAVATOR 80 - 140 HP E - 100 790,000.00 317,678.13
11 FLAT BED TRUCK 3 - 4 M3 E - 221 175,000.00 217,816.89
12 GENERATOR SET 125 KVA - 150,000.00 415,273.29
13 MOTOR GRADER > 100 HP E - 010 1,400,000.00 513,564.00
14 TRACK LOADER 75 - 100 HP E - 053 700,000.00 345,503.63
15 WHEEL LOADER 1.0 - 1,6 M3 E - 052 950,000.00 398,670.26
16 THREE WHEEL ROLLER 6 - 8 T E - 080 350,000.00 175,284.84
17 TANDEM ROLLER 6 - 10 T E - 081 500,000.00 199,264.06
18 TIRE ROLLER 8 - 10 T E - 084 396,100.00 208,898.27
19 VIBRATORY ROLLER 5 - 8 T E - 082 650,000.00 289,507.50
20 CONCRETE VIBRATOR E - 089 21,120.00 21,177.59
21 STONE CRUSHER E - 031 700,000.00 554,247.84
22 WATER PUMP E - 341 24,000.00 25,123.17
23 WATER TANKER 3000 - 4500 L E - 182 200,000.00 222,905.63
24 PEDESTRIAN ROLLER 1 T E - 087 77,000.00 45,045.50
25 TAMPER VIB PLATE E - 088 29,150.00 25,114.46
26 PUMP WATER / CONCRETE PUMP E - 341 176,000.00 25,123.17
27 TRAILER, TRONTON E - 019 276,000.00 153,049.45
28 CONCRETE MIXER 125 Ltr E - 252 25,000.00 29,451.64
29 CONCRETE MIXER 250 Ltr E - 253 40,000.00 69,480.95