ELECTRICAL WIRING DETAILS

Fig 4

Client's Fuse Board


Septech 2000
Control Panel
M
C
B

Power Supply
7 Core Cable to Treatment Plant

An MCB from the client’s fuse board will supply the power to the Septech 2000 Control

Panel. If an RCBO is installed in the fuse board the MCB should receive the power from

the Primary side of the RCBO, not power from the secondary side of the RCBO.

ELECTRICAL WIRING DIAGRAM FOR


SEPTECH 2000 CONTROL PANEL
Fig 5
Mains Switch Aeration Hour Counter
MCB 2
MCB 1
24hr Timer
Transformer
Buzzer
Alarm Mute
Switch

Neutral
Bar (2,4)

Earth
Bar (7)

Mains Supply

Mains (L)
Float Switch 2 (6)
Aeration Pump (L) (3)
Percolation Pump (L) (1) Float Switch 1 (5)

Design & Print by Mind’s I • 044 32926 • www.mindsi.ie


slope

no.

no.
EXCAVATION DETAIL

Fig 2

PERCOLATION DETAIL

Fig 3
Section through
Percolation Trench Plan View
of Trench
Septech 2000
– Domestic Waste Water Treatment system

Minimum Separation Distances in Metres


Watercours Wells Any Site
Lake Road
e Stream Springs Dwelling Boundary
Treatment
10m 10m 50m 7m 3m 4m
Plant
Percolation
10m 30m 50m 10m 3m 4m
Area

Installation: Percolation Area:


1. The excavator must be on site on morning of 1. For the percolation the following items are
delivery. The client must indicate the level required.
of the inlet pipe at the hole. If ground Approx. 50m of
conditions are dry, the hole can be dug normal gauge hydradare pipe
before our installation personnel arrive. Minimum 1 no. 1_” Philmac Tee.
Where the conditions are wet, the hole Minimum 20 tonnes 20-30mm clean round
should only be excavated through the dry stone.
material and not below until the installer
arrives. The level of rock on the site (if any)
should be noted during the percolation test 2. Check the planning guidelines for the
trial hole excavation. The client must have required length of percolation pipe and
adequately sized rock breaking equipment whether the percolation is sub-surface or a
where required. All excavation is the raised bed.
responsibility of the client.
3. The outlet pipe of the Septech ends in a
2. The installer will explain the levels for the connector for the 1_” pipe. The percolation
bottom of the hole as per Fig. 2 installer joins onto this pipe but only starts
the stone when the percolation area is
3. The truck arrives and the installer places the reached. Do not start the stone at the outlet
tanks in the hole with the truck mounted from the Septech.
crane. The installer will assemble the inter-
connecting pipework and carry out the 4. The percolation trenches should be
wiring of the tanks. The excavator may be constructed similar to Fig. 1 & Figure 3. The
required for backfilling at this stage. The two inspection pots at the end of the pipe
excavation must be backfilled on the day of will arrive with the Septech.
installation.
Notes:
4. The installer will leave the required amount The inlet pipe into the Septech must be
of cable to run back into the house/garage. connected by the builder/owner.
The control panel will be left with the most
senior person on site and this should be kept
for the electrician for fixing and wiring. Commissioning:
When the lids are on the tanks and the Normal use in a house will take 1-2 weeks for
backfilling is complete, the installer is the tanks to fill up. When the tanks are nearly
finished. full the system is ready to be commissioned.
This involves the Service Engineer checking the
Note : installation and turning on the power. The
Please have a mobile number for the excavator Septech warranty commences at the time of
driver the evening before the installation. commissioning.
Please indicate before the day of installation
the level from the top of the finished If you have any queries about Septech
ground to the invert of the inlet pipe. This is Treatment Plants please contact us at the
important to allow enough risers to be address on back page.
placed on the tanks.