You are on page 1of 4

EH/MAR 2018/CEV544

ASSIGNMENT

CEV544
PROCESS CONTROL AND INSTRUMENTATIONS

Instructions.
1. This is a group assignment (refer to the list of groups).
2. PID must be developed using VISIO or AUTOCAD or any applicable software.
3. The assignment must be submitted with front cover (given in the word file) and bind tape.
4. Please include the list of work distribution in the assignment.
5. Submission date : 4h May 2018 (before 4.00pm)

LIST OF GROUPS
PEH2246A1

Groups Name
GROUP 1 FARADILAH BINTI AJMA'IN
AKASHAH BIN ZABRI
MUHAMMAD MUAIN BIN MD SHARIF
GROUP 2 NUR ANINA ASMIRA BINTI ASMURI
NURUL NADIA BINTI MOHAMAD REFAI'
IZDIHAR AMMAR BIN JALALUDDIN
GROUP 3 AMMAR NIZAMUDDIN BIN MHD SUBRE
AHMAD ZULHAFIZAM BIN AHMAD ZAINI
AIMAN BIN MOHAMAD GHAZALI
GROUP 4 IRWIN GREGORY BIN MUMI
KHAIRUL AZHAR BIN KAMAL
MOHAMAD HEIRY MOHD AZMI
GROUP 5 ABDUL MUJIB BIN HAMDAN
LUQMAN MUSTAQIM BIN MUSZAIMI
SYED RAIZUDDIN RAZALI BIN SYED AHMAD
SHAHAZUDDIN
GROUP 6 SITI NORAISHAH BINTI JAINI
NURUL HASNA ASNIERA BT RASNAN
PUTRI NURIN IRDINA BINTI MOHD RIDZA
MUHAMMAD IQBAL BIN ADNAN
GROUP 7 NOR AMALINA BINTI ROFIZAN
NURUL HIDAYAH BINTI ALI
AHMAD FAIZ BIN SULAIMAN
RIDHWAN BIN ROSLI
GROUP 8 NAZIHAH BINTI BUSTARI
IKMAL HISYAM BIN MOHAMAD AWALUDIN
MUHAMAD AZRULLAMINUDDEAN B HASBULLAH
EH/MAR 2018/CEV544

PEH2246B1

Groups Name
GROUP 1 NUR ASHRAAF BINTI AZHA
MUHAMMAD IRFAN BIN MOHAMED HATTA
WAN NADZATUL NADHIRAH BINTI ABDULLAH
GROUP 2 AFIQAH HUSNA BINTI ABD RAZAK
NOR ADILA BINTI MOHD.NASIR
A'TIQAH BINTI ABDUL HADI
GROUP 3 MUHAMMAD SALMAN BIN SAMIN
JAN JAN BIN MOHAMAD NAWALI
GROUP 4 NUR SHAFIQAH BINTI JAMALUDDIN
MOHAMMAD KAMARUL BIN MOHD SIPI
NASYWA BINTI YAZID
GROUP 5 NUR AIN BINTI AMRAN
NUR IZYAN NAZIHAH BINTI DUSUKI
GROUP 6 NUR ELIS SHARMILA BINTI ZULAZMI
SITI NOR ZUBAIDAH BINTI RAMLEE
NURSUHADA BINTI MD ISA
GROUP 7 MUHAMMAD SYAFIQ ADHAM BIN MOHD SAINI
AIZATUL HIKMAH BINTI ZULKAFLI
IZWAN AZREL BIN SHAHHAIZAD
EH/MAR 2018/CEV544

QUESTION

(PO2, CO2)

NATURAL GAS DEHYDRATION CONTROL SYSTEM

Consider the process shown in Figure 1. The process is used to dehydrate the natural gas
entering the absorber, using a liquid dehydrant (glycol). The glycol enters the top of the
absorber and flows down the tower countercurrent to the gas, picking up the moisture in the
gas. From the absorber, the glycol flows through a cross-heat-exchanger into the stripper. In
the reboiler, at the base of the stripper, the glycol is stripped of its moisture, which is boiled off
as steam. This steam leaves the top of the stripper and is condensed and used for the water
reflux. This water reflux is used to condense the glycol vapors that might otherwise be
exhausted along with the stem.

Figure 1 Natural gas dehydration system


EH/MAR 2018/CEV544

a) Develop a complete PID control system for the natural gas dehydration by considering the
possible locations of 3 basic components (measurement, decision and action) for each
controlling variable.

b) Design control systems necessary to control the following variables in order to achieve
optimum production rate of dehydrated natural gas and justify your answer.

i. Liquid level at the bottom of the absorber.

ii. The water reflux into the stripper.

iii. The pressure in the stripper

iv. The pressure in the top third of the stripper

v. The liquid level at the bottom of the stripper

vi. Efficient absorber operation at various throughputs

END OF QUESTION