Professional Documents
Culture Documents
Coverage Area
Name of Municipality/wards Total Area
(ha) ha %
Kathmandu Metropolitan City
Ward 11 181.27 34.80 19.20
Ward 12 49.64 16.54 33.32
Ward 16 463.33 18.72 4.04
Ward 17 66.71 27.48 41.19
Ward 18 18.24 17.26 94.60
Ward 19 15.09 14.06 93.13
Ward 20 15.39 13.92 90.45
Ward 21 15.37 15.36 100.00
Ward 22 18.71 18.71 100.00
Ward 23 10.35 10.35 100.00
Ward 24 8.53 8.52 99.85
Ward 25 10.31 10.31 100.00
Ward 26 3.80 3.80 100.00
Ward 27 7.70 7.70 100.00
Ward 28 6.82 6.82 99.99
Ward 29 197.13 27.68 14.04
Ward 30 25.91 25.91 100.00
Total in the Wards 1114.32 277.9 24.9
Total for Kathmandu
5194.15 5194.15
Metropolitan City
% coverage 21.45 5.35
Cum
Total Total Population Average Peak
Outfall peak
Pipeline Length Area 2031 Discharge Discharge
flow
NS3, NS15 and NS17 (to Paropakar Marg, Dha Marg, Puspalal
1
Outfall 1) Path
NS10, NS11 and NS2 (to Tripura Marg East and West,
4
outfall 4) Sungabha- Milan Marg
Sukra Path(Indrachowk) - New Road
Chowk, Bir Aspatal Marg, Lekhnath
NS6, NS18, NS8 and NS1
5 Marg (Lainchor), Kantipath
(to outfall 5)
(Lainchor-Tripureswor-Saraswati
Marg)
Gangalal- Yogbir Singh Marg,
6 NS4, NS9 (outfall 6)
Puspalal Path
Primary pipeline
Outfall
Pipeline Length (m)
Line 1
Line 2 5
Line 3
Total