I . Summary
1. Explanation:
Model LDTN Pump is a suitable c-0rollru:y equipment for the steam tumogenerators in thermal power station and
nuclear power plant to pump over the c.ondensed water out o f t.l;e coodenser,and can also pump over some other
medium similar to condensed water or slightly polluted liquid,chenrically neutral or corrosibn liquids.It can be
used as engmeering pumps in refineries,chemicai and petrochemical plants and energy plants.
2. Performance Range:
Liquid temperature pumped over is lower fhan 120 'C.
The detailed o f pump pe1formance parameters are shown onperformam.:e table and performance curves of
the pump supplied by the factory.
2
OPERATION INSTRUCTION
y;
2
----indicates the average speed head at the pump inlet (m)
gp
Tim value of [NPSHJ. :iliould be positive(+). which. shows the liquid sucked into flange center by the pump
is not evaporated, so that the safety operation of 1mmp shall be ensured by the installation depth he.ad below the
pump mounting flange.
Air inlet
.tff:il
. Working level
Structure Fig. of oil-level meter. 1.0il cup(orgaoio glass) 2.Cupseat(Nylon 1010) 3.Nut(Nylon 1010)
This kind of oil-level meter advantages in simple structure, safe and reliable, easy control and maintenance.
"The cup can easily be pulled out upward and inserted into cup seat in agile movements after the cup is filled up. In
addition, the following points should be noted:
*Four qi 2 small holes at the bottom of cup and one small groove on the seat should be free from any
*
blockage, otherwise, the normal operation shall be affected.
Outer surface of cup should be kept clean to.ensure that the level can been se.en dearly.
-/:( Impacts should be avoided.
( l) Pump should not be operated without water, so, fill up the pump with water before starting.
( 2) Check the rotating direction of motor, the pump should tum anticlockwise seen from driven end. After
connection of motor with water pump, the rotor of pump should be turned by hand smoothly.Attention: The
turning direction of motor must be correct, jf not , the fixing nut on the pump shaft shall loose and cause
accidents.
( 3 >"' Starting shall be performed with the sluice valve on discharge p1peline closed.
2.Starting
( 1 ) With normal speed (RPM) reached, slightly open the sluice valve and check the operations of all
instruments and stuffing box, the idle operation of pump should not be long.
( 2) Check the temperature of bearing and stuffing box, shut it off if it is too high.
( 3) Open the sluice valve to the required position when the operation is normal, then starting is complete.
3. Stopping (shut off)
( 1 ) Gradually dose the sluice valve and cut off the motor power.
( 2) Ifthe pump shall not be used for a longer period, it should be d1ecked oiled and stored carefully.
discharge water, on contrary, air may be sucked into pump chamber to result in poor performance. The following
method can be used in dealing ·with this problem: Charge some water-sealed water with a certain ·pressure to the
pressure test holes on balancing drum' symmetrical to RI/2 pipe blacking place to increase the back pressure of
balancing dnun.
5. if abnormal cooditiom.. (abrupt vibration) occur, emergency meaqsures should be
causes should be found out and troubles should be removed. The ovserving and results should be
re.corded.
6. Possible troubles and trouble shootings:
Foot bolts and seat bolts are loose; Tighten all bolts;
5
Cavitation. Low priming head and higher inlet
7. With no en1eri�e11tc1e,s, the repair and examination of pump shall be carried out together with the overhaul
of machine set.
300LDTN-200 X 5 Vertical Can Pumps
Characteristics
I :
, J l \ !
I
! I 300LDTN-200x5
)·····, '·
, : i
n=148(r /r�iin
-:'
'
I
I j l
�i-J =±:
-
J.
i
l
I
'1 i -r-..�
; .,.,-H i i
i
!
I
I
'
,_ "' "'',
I ·- i-t .l._ ,~ i i
,_
,....__ ..........""" l
j
!
N<Kw)
: i ) 3ilOLDTN-280x5A a/ �i , •..•.
l
,---- 190
......_!
N l -v
i I
I
l
!
l ! ..... . ....
!' ) '
:__.,,,, ,,,,,
<""'"
T",
I
i '- ....
150
!
···- I i 1 i l i
I ',_
~
�
i ; , ........
.
........
i
I ·-_J__..-·-! '
\ - ! i · 120
; :!
···,······· ,.....
i 1
~-
i
, ....... ....... ,-----
j ,, 9
0
i i
----
7;.,____
I
"
i )
I·-- ·-·--- , .......... .........
,-·-·· -·-··· 80%
--......
.,..,.,......-
.
l ~
....
vi""
'
NPSH i
-/---
,--·· i i
·-,,.
(M)
vv
'/ !
j /! 1,0%
7ij·
.
NPSHr.i l ' i
!'-"!
i )
:
!
i l i
_,,..:
:
'
l
--
20%
y
Ll
l \ ) : l i ( i
; T i
\
I i
•
i :
I
0 1/l I l l
I
===::::::r====::r:•
0 lO 20 30 40 50 60 70 80 90 100
=::=::::r:r:::=·. "-.----------=::::r--·--==- ..J.....-==:::::::i
0 45 90 135 180 225 270 315 360
I
-----·--1
Capacity-
(J
1�A'h;tfil POWER
Eff
:iZ,ffi¥tYcif\ rtf-�B.rff *
* '.1/lft 11-/llY
Type Total Speed Impeller
head 11 (NPSH) r Dia
H (%) (m) (mm)
L/S
n power
(r/min)
i 127.0 0.90
300LDTN-200 1-286
1480 147. i 185 75 0.95
X5 2-330
3)5 87.5 140 72 i.,rn
IIi
I
1 1
I
I l
II II Ii
--- ;_,_____----==-
II
-- - .� ·,_
-- ----1
O 1400
I
I
l
O 900:____� l'-
1200x940
[
I II
I
65 =
c31
=
-
Office
# 995, Service Road, RPG Layout, Vijayanagar,
Bangalore - 560 040. INDIA, www.greenesolpower.com
CONDENSING SYSTEM
6y:
HANGZHOU STEAM TURBINE
Cfiina
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
level indication
A
co:,
I
�
�
�
co:, 895
E
�
n::: co:, 560
C)
m
C)
C)
,a:!� :!a
C)
�,
I I
� LO
oct:r.>co;;,
N .,.
N"'SI-N
05.07.08 ISSUED FOR APPROVAL
C) "'Sr
REV I DATE REVISION
B¥
"'Sr C)
C)
I
c.o c.o
mm
C)
I
4-M20
C) c..::> c..::> C)
baseframe USER S, V. POWER PRIVATE LIMITED
! ! !! 0
S. V. POWER PRIVATE LIMITED - HYDERABAD
I iii
a- CLIENT
�I l»>r�1p11,)))-);S'j
�* ** CONSULTANT DESEIN PRIVATE LIMITED - NEW DEHLI
f.'!:t!::
:@'<C ..,,_,i :ti=� DESIGN DATA TECHNICAL REQUIREMENT
* slide plate
View A Design Code• HEI Hydraulic test steam side 0.5 Mpa(G) PROJECT X 63 MW COAL BASED THERMAL POWER PLANT
0
<Sl <Sl!i!!t:
grouting 0
Water side 2.8 MPa(G)
--:t
TECHNICAL DATA GPSPL/HTC JOB NO. TITLE GA DRAWING OF GLAND STEAM CONDENSER
fS.eep time 30minutes ,without leallage P-1084/T-7426
Type C0-0300-32
Heat Exchange surface 30m2
Power 3 01\W Voltage 415V
G Drain/Vent
F Safety Valve
1/2"
11/4"
ANSI 1501bs
t.N,11c;n1h� 1
4
1
~, \ -1400
0Cr18Ni9 ? ;tt__A
Foundation bolts Exhaust 4" ANSI 150lbs
2-3595-0300-31
Operating Condensate outlet 8" ANSI 150lbs
IA I N
Sealing Steam Inlet Pressure 1.08 Bar(a) A I Condensate inlet 8" ANSI 150lbs i Ji. # rf.
Safety Valve Set Pressure 1.2 bar(g)
Item size Rating and Code Quantity p · i1: y_ li'l-uilllllTfll?ill!
OPERATING MANUAL GLAND STEAM CONDENSER 0-6330-7426-01
1. TERMS
2 3 4 4 3 12 6 7
2. TASK
The function of gland steam Condenser is to slightly bring the negative pressure
of leakage pipelines for front and rear gland seal of turbine, leakage passes into
a gland steam Condenser through the leakage pipelines and it are condensed into
the water, then it are supplied to the boiler.
The gland steam condenser is motor-fan type and its structure refers to Fig1.
The side of heat exchanger water takes on a structure of 1 flow. First cooling
water passes into the water chamber of inlet through an inlet of gland steam
condenser, and then passes into the tube bank. When cooling water is flow in the
heat change pipe, the cooling water exchanges heat with the steam at side of
steam side, cooling water shucks many heat when steam are condensed, water
temperature is increased and passes into the water chamber of outlet, then
cooling water flows off a gland steam condenser via the outlet of cooling water.
The steam from turbine gland seal (front and rear) passes into the inner side of
shell via leakage pipeline and leakage inlet of gland steam condenser. The steam
contacts with the heat exchange pipes in the tube bank and exchange the heat.
When the great mass of steam passes through outer wall of heat exchange pipe,
it releases many heat and to condense into condensate, the condensate are
exhausted from a drain port and into a drain pipeline. Because there is
non-condensing air in the leakage steam, in order to make sure leakage steam
can pass the leakage pipeline, it must be extracted by the motor-fan and to
exhaust to the atmosphere.
4. INSTALLATION
Installation steps:
1. Checking the foundation first and clean the foundation surface then.
2. Arrange the GSVC on the operation plat and adjust the location
3. Checking the connection of every nozzle according the design/piping
arrangement.
4. Fix the ejector (grouting)
5. Piping connection and power supply.
Notice in installation:
Notice:
1. Please make sure the steam piping is unblocked, same as the water
piping.
2. Open the cooling water valve (inlet & outlet) first.
3. After the cooling water inside, please open the steam inlet valve.
4. The cooling water pump only can be stopped after the equipments stop.
TEST CERTIFICATES
6y:
HANGZHOU STEAM TURBINE
Cliina
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
Type 2-3595-0300-30
Code WT7426
Serial No.
Page 1 of 9
HT AC SHEET:O
condenser
11:-ifili
Quality assurance department
ffl!*~t: sm:
Chief of Signature: Date:
Page 2 of 9
HT AC SHEET: 1
INDEX
I I I
I CODE:
DESCRIPTION SHEET No.
No
1 I 1
INDEX
2 MATERIAL REPORTS OF MAIN PARTS 2
7 INSPECTION
- RBCORD OF CLEANL INESS 7
Page 3 of 9
H T A C SHEET: 2
MECHANICALPROPERTIES
CHEMTICAL COMPOSTIONS
CERT.
NAME MATERlAL
No.
THICKNESS
Ii 5 CONCLUSION
Si Mn Ni Cr Mo
as ab Ak 1!li rtll ti\ !J&
p s MPa MPa % J BEND EST
20# 10 0.56 0.26 0.54 0.028 0. 006 485 430 29 --- Acceptable
SHELL
115
Q235B 50 0.14 0.19 0.52 0. Oll 0.012 250 460 27 120 Acceptable
TUBE PLATE
ll5
TUBE SUPPORT Q235A 6 0.17 0.17 0.38 0. 014 0.011 --- 325 450 37 --- Acceptable
PLATE
540 51
CONDENSING 0Crl8Ni9 cp15X1 0.046 0.31 0.70 0.033 0.001 8.16 18.31 Acceptable
550 52
TUBE
86
Cu
WELDING JQMG50-6 cp 1. 2 0. 074 0.94 1. 48 o. 013 0.016 470 560 29 90 Acceptable
0.117
- MATERIAL 81
Page 4 of 9
H T AC SHEET:3
type:
0-1760-1305-01 INSPECTION RECORD OF TUBE PLATE
I
% Inspection Item Inspection Requirement
I No. Result
1 Size of the Tube Sheet 580 0 2
+
580
I
2 Thickness of the Tube Sheet 38 38 I
I
3 Diameter of the Tube Sheet Hole +
15 0. 4 15.3
I
4 Surface Roughness of the Tube Hole Ra5
Acceptable
I
5 Deviation of Pitch of the Tube Sheet Hole �1. 5mm
Acceptable
I
6 Ra12.5
Surface Roughness of the Tube Sheet t Acceptable
7 JB2901
Keeping the Tube Holes from Rust JB2901 « Anti-rust
Acceptable
Specification for Steam
Turbine))
B L A N K
. .
Pl
Operator: Inspector: Checker:
2007.6.28 : 2007. 7.3 2007. 7.5
Date: Date: Date:
Page 5 of 9
H T A C SHEET:4
type:
0-1760-1305-01 INSPECTION RECORD OF SUPPORT PLATE
I
Inspection Item Inspection Requirement Result
I No. I II
1 Size of the Support Sheet 404-o.s 404
I I
2 Thickness of the Support Sheet 6 6
I
3 Diameter of the Support Sheet Hole 15.5•05 15.8
I I
4 I
Surface Roughness of the Support Ho I e Ra6.3 Acceptable
I I
5 Deviation of Pitch of the Support
Sheet Hole <1.5mm Acceptable
B L A N K
Page 6 of 9
H T AC
-1 SHEET:5
type:
~
0-1760-1305-01 INSPECTION RECORD WELDING OF SHELL
I
Inspection Item Inspection Requirement
No. Result
1 Size of She I I I NS I DE D I A. : <b 406 405
H
2
3
I
Deviation of Shel I
Straightness of Shel I
I
I
THICKNESS:10
ACCODING DRAWING
::::::::1
10
Acceptable
Acceptable
I
I
I
4 Deviation of flange :::::::: 1% 3 nm
B L A N K
Page 7 of 9
H T AC 7j( 1,J\ � 1� fr.
I=! ]ff SHEET:6
0-1760-1305-0l REPORT OF HYDRAULIC TEST �%/TYPE:
I
ff % ;ji it � § ;ji it Jf *
f m*
No. Inspection Item
I I Inspection Requirement I Result
1 If.}] *-. .i ;J:1 � fjj (MPa) 0"-'3.0 Mpa
Acceptable
I Measuring Range of Pressure Gauge I I
2 If. fJ *-. .i ;J:1-tf �/4Li 1.5 t&/2 f;
Acceptable
I Pressure Gauge Grade/Quantity I I
3 If. }] *- :ft- ;t El Jl:}J 11 tk. $}] fl
Acceptable
Date of Galibrating Pressure Gauge
I I
4 7J<-'.tiJ'Z¥kEs.}] (MPa) 2.8 Mpa 2.8 Mpa
Pressure of Hydrau I ic Test of Water Side
I I I
I I
BLANK I
iU{--ft*-:
Last Result:
$.rJ'oi� 0.5 /2.8 MPa, 30 Min ff-J;J<.Es.i)Z¥k, 7*-�JJt11�iwi.fJUl, 7J<-Es.i)Z¥fti}� o
The product has been hydraulic test at pressure 0.5/2.8 MPa, 30 Min.
We didn't find leaking, Hydrau I ic test is OK.
if 11 w
,:::r
qi7t*f �
� ij.&. w
-� ,:::r
HTAC #l 003 �t�tw
Operator: Inspector: Checker:
El $}1: 2008. 1.28 El $}1: 2008. 1.28 El $}1:
Date: Date: Date:
Page 8 of 9
H T AC fl ia J3t ;fft � ic �~
1Jl SHEET: 7
�%/TYPE:
0-1760-1305-01 Inspection Record of Cleanliness
ff % t& :if :rm § t&1!t�>R �*
I No. Inspection Item I Inspection Requirement Result
1 ire#- 0J *- mi ffit Jt {rt� Ill CI eanIiness
Acceptable
I I nner surface of Shel I I Grade Ill I
2 ire#-Yr*- mi IV
Acceptable
I Outer Surface of Shel I I I
3 'if tJi :ft:r F� tJi Ill
Acceptable
I Tube Sheets and Tube Support PI ates I I
4 �tJiYr*- mi Ill
I nner Surface of Water box Covers
Acceptable
and outer Surface of Water box
Covers
5 ,t Jp 'ifYr*- do Ill
Acceptable
I I Outer Surface of Cooling Tubes I I
B L A N K
4! 11 ,:;:>
Y-l ft�t� #?: .,,,.�
�b..
,:;:>
!'A .. HTAC #?: 003 �k�t�:
Operator: Inspector: Checker:
El Jjj . 2008. 1.24 El Jjj: 2008. 1.24 El Jjj:
Date: Date: Date:
Page 9 of 9
E
Office
# 995, Service Road, RPC Layout, Vijayanagar,
Bangalore - 560 040. INDIA, www.greenesolpower.com
6y:
HANGZHOU STEAM TURBINE
Cfiina
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
OIL TANK
Drawing 2-0620-1400-03
OIL COOLER
Drawing 2-4684-0110-12
FILTER OF OIL
OIL PUMP
AOP EOP
Flow m 3 /h 80-150 40
Gy:
HANGZHOU STEAM TURBINE
China
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
10
21500kg
34000kg
_LJ__ ---L- I
- -----1----------,
I 2210 I 2210 I 2210 I
�
i
7000
� FOUNDATION LAYOUT
!
9 I
uu
cbffi~6 "'! � USER S. V. POWER PRIVATE LIMITED
CllENT S. V. POWER PRIVATE LIMITED - HYDERABAD
i: :i DC EMERGENCY c 8-8
PROJECT
GPSPL/HTC JOB NO. I
1 X 63 MW COAL BASED THERMAL POWER PLANT
GA DRAWING OF LUBE OIL SUPPLY UNIT
LUBE OIL PUMP A&B OUT P-108t/T-7426
AC EMERGENCY
LUBE OIL PUMP ( k 21500
{tl:im i14m 3
.J:.1? Oil Supply Unit
--l--l-~--l-~4?~t~~a.---i~-i----i2-1 685-1400-03
!!
JLJlLJ
? 'I? bu xllf, Ni,- Niinn?:��R0m I �-u :{!tffl7�?iWc
2 3 4 5 6 7 8
OPERATING MANUAL OIL SUPPLY UNIT 0-4000-7426-01
3. DIAGRAM OF FOUNDATION
Quantity 8
4. OUTLINE DRAWINGS
I
I
I
I
I
I
I
I
I I I I
����
1.1 Net weight of service of oil supply: 21SOOkg, operating weight : 34000kg .
1.3 Four lifting eyes are provided on the baseplate of service of oil supply.
1.5 The mounting standard: DL50 11-92 (( Electric power construct and
acceptance technical specifications of turbine»
2.1 Flushing
After the working of installation has been finished, entire oil system is
flushed completely and to eliminate all dirt in the pipelines and oil
system . The flushing is done according to GB10 968-89 standard «Flushing
technical specifications of oil system before turbine running)) .
2.2.2 When first filling oil, oil level is high than maximum oil level, but
is 150mm less than top of oil tank .(because the oil is filled to the
equipments and pipe in running, thereby oil level may be return to
position between the maximum and minimum)
2.3.1 Check a double oil filter for lubrication oil . The other of double oil
filter must ensure free and open an air draining valve of oil filter.
2.3.2 Check a double oil filter for governing oil . The other of double oil
filter must ensure free and open an air draining valve of oil filter.
2.3.3 Check a double oil cooler. The other of double oil cooler must
ensure free and open an air draining valve and an inlet/ outlet
valve of cooling water.
2.3.5 The pipelines between the outlets of two main oil pumps and
auxiliary oil pump to the lubricating oil (and governing oil) must
be free.
2.3.6 The pipelines that the outlet of emergency oil pumps to the inlet
of lubricating oil must be free.
2.4.2.1 When main and auxiliary oil pumps are stopped because
the failure, an emergency oil pump must start
automatically.
3.1 Start a main oil pump according to the operating manual of turbine
starting.
3.2 After turbine is normal run, the service of oil supply provides the
lubricating oil for turbine safety run.
3.5 Under the cooling water flow are not decreased, if temperature of
flowed off oil exceeds 48 °C, the oil cooler has been dirt. To use standby
oil cooler and overhaul oil cooler.
3.8 Inspect the oil quality in the oil tank periodically. If impurity content
(moisture) are exceed to standard, oil in the oil tank shall purge. When
phy sical property of oil is worse, oil should be changed.
3.9 The reasons of oil pressure deviation for main oil pipe of lubricating oil:
4.1 Check the service of oil supply periodically (one checking is general per
annum).
4.2 Before the service of oil supply is operated, check the oil pumps, double
oil cooler, double oil filter, check each assemblies, valves, electric and
interlocking devices, check each setting values, check oil level of oil
tank etc.
4.3 If the service of oil supply is reassembled, mounting work is done
according to the DL5011-92 ((Electric power construct and acceptance
technical specifications of turbine» . At the time, whether flushing is
done according to actual circumstances. If needs a flushing, flushing
processes must be done according to GB10968-89 standard «Flushing
technical specifications of oil system before turbine running)) .
TEST CERTIFICATES
Gy:
HANGZHOU STEAM TURBINE
Cfiina
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
�: fjt 5til it ti
Name Oil Supply Unit
c::J
� "J:f:
Type 2-1685-1400-03
1t �:
Code WT7426
!; c::J
"J:f:
Serial No.
$Um 13 Jffi:
Date Of Manuf. 2008 � 3 JI
Page 1 of 10
'
H T AC Yi SHEET:O
tBr!!tt~
t � : {�5�11 INSTRUMENT OF RATIFICATION OF PRODUCT DELIVRY ~~:
11:ifili
$*~t: 8Jffl:
Chief of Signature: Date:
1�%/CODE:
ff % pg ?& ]!( %
No DESCRIPTION SHEET
No.
1 m ffe- 1
INDEX
' 1<-- -� �b. 21:.
2 1ih :tlil 1 7 1s -'fl. .j)l 0 2
kk ..
Page 3 of 10
H T A C � SHEET:2
�%/type:
0-1760-1305-01 Oil Tank Hydraulic Test Report
!¥% No.
*-& 1't :im §
Inspection Item
*-& 1't Jf
Inspection quirement
* �*
Result
1
iru � }i JJ<. i� � at r� (h) 4 ,J, Bt 24h
Watering Time Of Oil Tank
2
;J:i 1t * JI +t
Leaking Inspecting
{JG 1f1oJ1i.i.:f 1lif *iiL
No Leaking.
Acceptable
-��*=
Last Result:
5ru �� 24 h �yf;k i��, ;;;jc£�1r*im-tl\'Jz, yf7J<.*imi��1r�o
Oil Tank has been hydraulic test for 24 hours. We didn't find leaking, Hydraulic test
is OK.
"' "'
1#: 11= Y1 !_�1* ,¥'--
�
�A
-'2- Y1 h,.. -
'ifi 7' T' �ft �i �
Operator: Inspector: Checker:
El $}] : 08-3-7 El $}] 08-3-8 El $}]
Date: Date: Date:
Page 4 of 10
H T AC 1Ellffif~ia&lO}tD~~*E ]Jt SHEET: 3
Inspection Report of Oil Tank �%/type:
0-1760-1305-01 cleanliness and Seal Nozzle
I
ff %
No.
fitiftJn§ f.<�>R �*
Inspection Item Inspection Requirement Result
�����*�.��+*fr�r*J*ril+*
0)-%�itJ£ J:.�-ff�itih O
2 Acceptable
Inside clean up No impurity, Inspect the inner surface
with white glove and no dirt on glove.
�171:,-f;t, it4t�f;Hhho
:itotrJ#;:�
-
3 Coat Anti-rust soft-fi Im oi I after Acceptable
Inspect before Seal
clean.
I I i
JfJ 5mm :)! �
- �it P, :f :5ft.)fj �pg� l.i;l$� Jt
5t~#P;Jfril:f- # JfJ pg,t-!llJT! � IE o
4 Inspect flange Seal Seal with 5mm flange cover, tight by Acceptable
Nozzle four fluorine polythene shim and four
bolts.
BLANK
4! 11 m iMJtir- �
� -��A ,=:>
� . A:,...-
'§i.$;)' ])fr �t �
Operator: Inspector: Checker:
El $}1: 08-3-13 El $}1 08-3-15 El $}1
Date: Date: Date:
Page 5 of 10
H T A C Yl SHEET:4
�%/type:
0-1760-1305-01 REPORT OF HYDRAULIC TEST of Oil pressure
No.
�11:Jf>K �*
Inspection Item Inspection Requirement Result
1m '.�Ui411I i��).Ij:J (MPa)
Pressure of Hydraulic Test of Steam 2.4"'1. 6 l.6Mpa
Side
·�#¥*:
Last Result:
J.F.F£� 2.4"-' 1.6 MPa, 30 Min �11411IM�.5tdUl1f*-;lJiiw�litl.1IfJi��%�o
The product has been hydraulic test at pressure 2.4�1.6 MPa, 30 Min. We didn't find
leaking, Hydraulic test is OK.
it 11 ""'
In f�JtJ:it �
'3- -�f'- ""'
In .h,... - '
'.§i AT �i�i �:
Operator: Inspector: Checker:
El Jl:JJ : 08-4-30 El Jl:JJ 08-4-30 El Jl:JJ
Date: Date: Date:
Page 6 of 10
H T A C gf SHEET:5
'ff mJ1He,1v¥nit D t&1ft~ 1a-
�%/type:
0-1760-1305-01 Inspection Report of piping cleanliness
I I
ff
No.
% ~~~§ ;f1H1f�* �*
Inspection Item Inspection Requirement Result
1 f���*�•���;� ��#������, ��, ��, m•*'
��� ��' ��, ��·**' �*�*ili*£�
Inner-outer surface of @, 0
Acceptable
piping treated by Clean al I oxide, welding slag, splash,
phosphatization and adhesion, dust, oi I deposit, rust
passivation and etc, to show the metal surface
2 ���*�**· A�+•���*�+•�
� %��.ff. �1-¥-�,'t�h O
Acceptable
Inside clean up No impurity, Inspect the inner surface with
white glove and no dirt on glove.
3
5-t�MP�� ms�5-t��MP, ��m���G��fi#
m � ,t--i,Ui� IE
-
- -
Inspect flange Seal
o
Acceptable
Seal with 5mm flange cover, tight by four
Nozzle
fluorine polythene shim and four bolts.
4
!Jft fLM P ��
4rxJ m *'' £JJti :l.l! x� 4FJ � o
-
Steel helical plug and copper seat with Acceptable
Inspect screw nozzle
annealing.
BLANK
- '
Jt 11 � i�fltiP- f'-
� �h..
-'ti.
,::>
Y{
b
'§£ °A J �t �t m
Operator: Inspector: Checker:
El $}]: 08-3-13 El $}] .. 08-3-15 El $}]
Date: Date: Date:
Page 7 of 10
I
H T AC ~~ru =ff rnia1tlo i-t tJ ~1ttli15 Y-l SHEET: 6
Inspection Report of Oil Filter �%/type:
0-1760-1305-0l
� *
I and Seal Nozzle
ff % 1&:ilJ:ln§ 1&:!lJf*
I No. I Inspection Item Inspection Requirement I Result
1
����*�·�·�� ��#������.��. �-.�·�·
� *�. ��. �A·*�' �*�-��£
Inner/ outer surface of $..�o
Acceptable
she I I treated by Clean al I oxide, welding slag, splash,
acid dip and adhesion, dust, oi I deposit, rust
phosphatization. and etc , to show the metal surface.
2
�ff���*�,-�+•&•�*�+•
-
� ���Jl1. J:.�,f}�)j�ho
Acceptable
Inside clean up No impurity, Inspect the inner surface
with white glove and no dirt on glove.
4
f¥J 5mm :;,! �
- 1i:#P, :l:JtffJ!!Um j, Z.,��)t
:;,! #Ptfr�
- :#-f¥J12Y1'-!11,J��[m
Inspect flange Seal Acceptable
0
5
!l!J� fLit Ptfr�
1ru lift iJ�;:&rdtk� m � 0
BAL N K
1i1f�3i< �*
No. Inspection Item Inspection Requirement Result
)l��)e!=, �)cl=,)Ii(�)IjJ (MPa)
Oil pressure test of lube oil 1.5 MPa 1. 5Mpa
pipeline.
ltJI af f§J (Min)
2 30 Min 30Min
Time of Keeping Pressure
3
:Mt i:-% il�'Ht JJl 1f 1iiJ 1ft I :f 1l 1f *' JJilL
Acceptable
Leaking Inspecting No Leaking.
:l:tt�*=
Last Result:
;zjs:_J•: Jb� 1. 5 MPa, 30 Min 1¥J)e!=,)Ii(�, ;:,1dt�1f%M�*-· )IjJi(�,€t-;J4L
The product has been hydraulic test at pressure 1. 5 Mpa, 30 Min. We didn't find
leaking, Hydraulic test is OK.
4l 11 ,::>
!){
.. _ks..
3i. "A J
- ' lJft �i in
Operator: Inspector: Checker:
El $}1: 08-4-30 El $}1 . 08-4-30 El $}1
Date: Date: Date:
Page 9 of 10
HT AC $��1fi23f< --- 9l SHEET:8
1'.;$ (nam)
0-1760-1305-01 INSPECTION RECORD OF COATING
I I I 00% (No.)
ff % �1!f:rjj!§ �11t:J!* 5¥0 i,2,� 1iff!iAi'i
I No. I Item Requirement and RECORD I validate I
1 jµ);J:;f;fz. ii, "t ,;j,- El $}) 2008 4- 3 jJ 13 El
Steel surface
��}
date of Blast clean
I I I
:,tmxtiJUi <85%
��}
I Relative humidity I I
_ilJ1J � ,;j,-J�*-i:;r-;,fi Sa2 1/2
Blast clean to Swedish ��}
Standard Sa2 1/2
2 i't,t- it-M:, i� El $}) 2008 4- 3 jJ 19 El
Coating date of coating prinsh
��}
I I
:,tmx-bJUt <85%
Relative humidity
��}
I I
f-fl�)f)i Dry Fi Im Thickness
-*>f Requ. : 80um fi"-*. Resu. 85um
��}
I I
it- ii, ,t- El $}) 2008 4- 4 jJ 30 El
date of coating finish
��}
I I
:,tmx-b.N.Ji <85%
��}
I Relative humidity I I
f-fl{,lf)i Dry Fi Im Thickness
-*.,t. Requ. : 80um fi"-*. Resu. 78um ��}
I I I
3 �_.I..-}j°;'} OJt?:l�"ti'tAirless Spray
Method of Application Q,1p1]1't Brush
1:ft���
01-tfft"ii't Conventiona I Spray
��}
��.i:
Remark:
*�����*fflk���*��'*F��AA��#
at* �iCi! it �J.., t.i #L �ft 7*.-if � Jttf Ji� Jl, i4nt- ;tz_ lfJ !RJ� {f
Jt ff!-' ilh,t-�1}o
Jt. 11
""'
]){ f$ icJL �
� -�
�b.
""'
]){ E�T'
A.,.. - lJfr �t �
Operator: Inspector: Checker:
El $JJ . 08-3-19 El $JJ: 08-5-5 El $JJ
Date: Date: Date:
Page 10 of 10
Office:
# 995, Service Road, RPG Layout, Vijayanagar,
Bangalore - 560 040. INDIA, www.greenesolpower.com
6y:
HANGZHOU STEAM TURBINE
Cfiina
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
Type 1251Y-120A
Flow 80-150 m 3 /h
Head 112-102 m
Power of Motor 75 kW
2. OPERATING
T he auxiliary oil pump is used for a standby oil pump. It has the capacity of oil
supply 100 percent.
3. The detail appliance of the main oil pump refers to the operating
manual of it.
OPE Rt\TIOf\J
- -
-3-
ZHEJIANG PU!\.f.P OPERA110N
2.Notice
(1) Pump mounting lleight,pipe length,diameter and flow velocity should fit the condito11.
(2) In 9ase long delivery,bigger diameter pipe should be taken.
(3) If a back check valve is mounted to disd1arge pipe,it should outside ofsluise.
OPERATION AND 1\1.A.INTENANCE:
I .Check to see if the direction of rotation is correct.
2.Before starting,pour liquid intothe chamber and suction pipe.The stored air and leakage air in
suction pipe are not allowed.
3 .Keep oil level within the number of oil gage.Pump having first worked for 100 hours,the
lubrication. oil in pump should be changed.Afterwards deaning and oil-changing should be:
proceeded once per 40(}0 houre.
4: The tempe:rctture in beari11.g must not rise over 70 C.
°
6.If the enviromnental temperature is below O"C,Iet the liquid .out of .pmnp after you stop
running.
Troube Reme�ies
..
.
pump liquid. · pugged. 1
3.Check impeller and
. foot valve.
I
.
4. The d1rect1on of rntatmn I 4 .Replace the termmal of ilie mot01..
,____________i_s _w_r·o_n_g. --�· __
! 1. Too lo�v speed. I
I
, Too low capacity and
l 2.Ex'Cessive wear of seal ·i .Check the power system.
I ing j 2.Replace
. .. the seal . ring.
. .
I
1
head I r .
I 3.Foot wvalve or impeller I 3.Check impeller and foot valve.
I I is blocked..
i
1
l.Too 1nuch c��a?it:y.
!.
I . I
! . I
lf--
l TI1e motor gets too 2.TI1e concentnc1ty betw- 11.Close the gate of slruce valve J
i
I hat,and there is much. I een p111np shaft and mo- ! properly. .
1
-4-
ZHE.llANG PUf,:lJ) GENERAL \VORKS COivlPA.NY LDT ·---- OPEH.JfflON INSTRUCTION
R R E T
N (kv,;)
Eff. NPSHr !rnpelier
�rt=
rpm 'J.b m rnm Rema,ks
Shaft Size
.�
1 -
65 6.3 43 3.0
4.l 39 2.9
2.8 4 Yl12M-2
9.9 28 2.7
50fY-60X2 15 Y160Mr2
54
�(\
..:_'J1,..J 8.33 104 J 6.4 52 3.2
30 8.33 68 JU 54 3.0
�--5-
ZHEJIANG PUMP GENERAL WORKS COMPANY LDT OPERATION JNSTRUCT!ON
I(�'
1 L�·,,,p
· .1DF
P1E 11 ilAi\1\l""t:
llv,, TABLE
21 52
31.5 56 3.8
80IY�60X2A
59 27.I 71 4.8
65 3.8
64 3.5
65 4.0
85 51.4 HJO
· G--·
-
ZHEJIANG PUMP GENERAL WORKS COMPANY OPERr'\T!ON INSTRUCTION
·--------·
LDT ------�
!Jli IYfllihUilf..!1tffl
CONSTRUCTION IlRJiWING FOit HORIZONTAL SINGLE-STAGB OIL PUMP OF TYPE rv
j G 4 3 1
'
Outlet! l.!J i1
:!P
1n1et
1!2 nJLtf�itiJJi�I!
C.ONSTilUCTION Dl'U.WING FOR HOR[ZONTAL DOilRLE-STAGE OIL PUMP Of! TYPE IY
Olitiet'.i.& t1
\
9 -.--8 7 1 1
I
tu
,. ··-"·�---ti/I,,_.·
lnM
1 •'111:itI/,W
a,hl,.!1,! ...
'J :w,
fl.ii• J.e<jili/(•
•i M.;i;. 1.��
i lt-1\ll J,,Vk�,'il'f;,.i
, .Jll,IJ;,!,.!J\I. fj,�cff,.
t: �,. 7·f�
ll'lii. 90,5/Ii�!'
11,;.:":£fs J,Jr-.11:f,
o :tf,\!- rlldf!
1r. t;t,11:.. l'l,1lfl,
11+·R
l.Couplfag 2.Sh&ft 3.Jmin.q 4.Haig fruie 5.Mecha:iicil �,1 Uwnp c&iing Ulrst lmpeHer
t Seding ring UurJ.� wver 10. Diffo:e.r 11.lmp�llet
--7-
Hm Hm
-'-'-..L...;...L--!--'-J-l+-"-f--!---.+--'--'---J·___l.-l--"-f-,--'-+-,-<---J-1.. I I
10+1
S 6 7 8 'I l® 12.5 15 2!l 3C 40 50 6'1 7G 00 90 100 120 150 180 20&
3 /L' JO
Ill ,u
I t
¢200
,------.
I
·----------------·-~--·---~------------------------·---·---------------~----------------·--··
IYf f, WJfi!,;1t·jm{Jif f!f
Performance Range of Single and Double Stage Centrifugal Oil Pum.p
Hm Hm
�-+-+-+-+--+-+ 60
50
---'-c
30 5f-...-'---!-----'-f-'-l--'-J.-.'--IC--!-- 1 6�0 1-+-
-!-----l-.L.J...--.J--.--'-..+--�L....!--l-+--'-!-L--+-1+1+-'--'----+-n' ffiJ-....J/!. 30
6 7 8 9 10 i2.5 !5 20 30 1,0 50 60 70 80 90 !00 120 150 180 200 "' u
125
H(m) i!Efillk�!J Characteristics
120
l I I I I I I 125IY-120A
'I
.......... ...........
.....
I I I I l � I
I! I I ! I I
I I [ ! I I
1:
I
-
11 " _.,,.........-: �-I N(!ii)
·--I
....v
- ,_ >--- _:j_,__
- --~- I I
I )-" l
j
-- IF/' I I -- __.!
f _
/l Il N.-· , I_....v
" I l --_;.,,
/ - -,
l I I I
\
I .
I .V1 I """"'I,.,.,.. I
r -
-
I /I I I l
I
.
I
0 12.5 2li
--L��-'--�-'--�-'-�---'-�--1
au 50 L/S
0 30 60 oo 120 100 180 m 3/h
I
/ li Capacity .ii Head;Jt
!
I
l Speed I ritlill Motor Type I *1:$ Eff. !.�lit NPSH.I llf!if Impeller! I
*
1
/ if! Size m3/h 1/s I Iii rpm I )jJ Povrer % m I dia. (m)
80 22. 2 I 112 I'' 45. 4 !
i 4. 0 I
w.2 I
i
I' I
I
I 125IY-120A 135 ns I 105 2950 I Y280S-2/75kw -57
1
290
I I
1
!
I
1
I t5 I
--j
I 1so 1 41.1 I
I
I 102 :
I
I
60. 4
125IY-120Af-1t'1ilf JJ�,l�t!{t
liliPif� ill P Outline and Installation Dimensions of Type 125IY-l20A Centrifugal Oil Pump
Discharge flange of pump
. '0180
.----·-\ 8-�17.5_
fiJfl lfflilw**"
coupling guo.rci lnlernediute couplin'5J-+.------=--------1 ------1
Y280S-2/75Kw
-1
;i32 115.
·�ll!."IWTOR
1 _j
-·--1 ~I
.
*:P_l� I - -,- . - +-
//)
- - --
u,
,.o
"' .
!
I
Q
LJ,
--:!"
§:jL_-L---�
.,.u ,c ...---. r---i
,,,/- ·--·--
--
8-¢17.5
f - ----=-=- - ----------4---,-
-- ·----;
- ____-_-
r -,
---I rI -- ! -- -- ---
! I -- -·-- - --
I
r T- - · - -1-1- -- -
I - --- -· -- l-· --
I
l 1J
I I I I
LL_ _ _ _ __ _ _
I I
J
l I
- --- - - - ---------�-
- - - - - - ----- -- - ------
IY o l
Hm Hm
30f-'--+-'--+-"-+-.J...-i-4~-+--+--~-l--L...J_~)---"--+-"-+--"-+-L.....+-,-'-+'-+-'-+----'----+~i60c-+--~--'-----4 30
5 6 7 8 9 10 i2,5 !5 20 i,O 50 60 70 81l 90 10ll i2!l 15(\ 180 200
,ll tl 'ff,;_
ill· ,_,. �
Outlet Flange
Office
# 995, Service Road, RPC Layout, Vijayanagar,
Bangalore - 560 040. INDIA, www.greenesolpower.com
6y:
HANGZHOU STEAM TURBINE
Cfiina
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
Type BOYL-30
Flow 40 m3 /h
Head 25-30 m
2. OPERATING
3. The detail appliance of the main oil pump refers to the operating
manual of it.
��1fEffli)tW3�
OPERATION INSTRUCTION
;1Jf3I7}(�)�J���BqJ
ZHEJIANG PUMP GENERAL WORKS COMPANY LTD ,,
:Jfufll:: i}Jf¥I'gj'llffiNitrrTM!!!tL1JJlir 72 Address :72 Lisan Road , Linhai, Zhejiang
it!,i!: f�� (0576) 5181685 Telephone: Sell Department (0576)5181685
1$Jt: (0576) 5181926 Fax: (0576) 5181926
YL ~1JL~-lfl-g&fl:A¥ifF~ Li iE!JilJI, fallljJiftr~iM&7'J o·c,-so·c12Pfi1B
1 1
O {#~$B,rJLlHmWrtil
~ITT 5!iHMnE ¥lijffi';rU ~llizffl"
'ZHEJ1ANG PUMP G'ENERAL WORKS OPERATION INSTRUCTION
GENERAL
Type. YL pump is a vertical single-grade. centrifugal oil pump. It is used to deliver the
° °
turbine oil which the temperature is 0 C-80- C.Provide the steam turbine and assists mechanical
oil forcing lubricious the-usefulness of the-hydraulic pressure:
The explanation to j)tttnp type significance is given an example:
This pumv feature: The organism verticality of pump dispnses, and· it is little to cover an
area of the area, and settlement the difficulty on the installation such as assists machinery and
pipe route etc on the steam turbine oil tank; it is orderly and beautiful to look at to make
generator room .equipment .disp.o.se• .Since .the impeller .and pump b.ody of p.ump is .soaked m the
oil, need not the v.aiv.e device at bottom; The lubricious .unnecessruy additional oil ofthe hearing
.of pump is solved by the pump .self The pump structure is simply reliable .and the function is
stable .and it is ronv.enient to operate.
This factory still -can require on the basis -of user the impmvement pump to stretch in the oil
tank the right and wrong -size in -order to adapt the ·oil tank of various -capacities.
STRUCTURE
The pump is formed by pump body,. pump cover (absorbing into the brass-wind
instruments.) bearing fraITI.ey pump axle and impeller� Llnkingthe verticality electrical machine
by the dti11 and stereotyped flange, pump axle and e1ectrica1 machine axle is with the connection
transmission of flexibility shaft by claw coupling. The discharge was installed on th.e dull and
stereotyped flange. Whole pump can be perpendicular installed convenient on the oil tank of
user. Detailed material can be consulted the structure diagrammatic sketch of pump and random
pump always to install the picture; The-rotation direction of pump: Looking from the-electrical
machine direction, the pumps 50YL-100 and 65YL-100 are counter clockwise, Other pumps are
clockwise.
There are two kinds of bearings of type to the pump axle upper outer garment: the bearing
1 is for the short cylmder roller bearing of Dan Lie; Tbe bearing 2 is 2 Dan Lie ball thrust
hearings.
I
8.33 34 4..J
SOYL-30- 40
46 l 11.l
12.8
..
30-
25
3000 5
5.2 I
7.5 65
60
160
I
Zi-42
HOV
J t :I I f J I J J I J
jJNJ�ffl
CONSTRUCTION DRAWING OF OIL PUMP
.,s
r
r
l!
ii:ri! !lllfJIII Characteristics
Pll!IO of G11tlet
41S
son.-so
H lFOOllO :r/lUI
- --
·f: :·
H,
au. "--
'31
II N
11.h
11'
I.)
��
v L,--
• ur.
/
10 I
Office:
# 995, Service Road, RPG Layout, Vijayanagar,
Bangalore - 560 040. INDIA, www.greenesolpower.com
6y:
HANGZHOU STEAM TURBINE
Cfiina
Oil Tank
<Project:
S. V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
1. GENERAL
1. An oil tank is to store the lubricating oil and governing oil of turbine, it
also can separate off the water and air as well as to eliminate the foam
and deposit the impurity.
Section view 1 2
Front view
-
Hangzhou Steam Turbine Auxiliary Equipment Company Limited Page 2 of 6
OPERATING MANUAL OIL TANK 0-4300-7426-01
1. Isolate Plate
5. Electric Heater
6. Draining Port
7. Connection Joint
1. An oil tank is seal and can prevent the water and dust into.
2. The bottom of oil tank is gradient; to ensure the draining fully, there is a
drain port at the lowest point.
3. For maintenance the inner of oil tank, a man hole is provided on the top
of oil tank.
4. The filter gauze is mounted on the return oil port so that to ensure the
cleanliness of oil tank inner.
5. A remote level indicator meter is provided on the oil tank. The remote
level indicator meter has an alarm (high and low level) device.
6. An oil choker with the filtering cover is provided to eliminate the oil
spray in the oil tank.
7. Two isolate plates are provided in the inner of oil tank; it can fully
eliminate the foam and deposited impurity.
8. The joint of oil purifier is provided on the top of oil tank (upper is inlet
and lo w is outlet).
10. At the man hole, a ladder is mounted in the inner of oil tank so that
maintenance personnel are easy to access.
11. A filter gauze for fill the oil is mounted on the top of oil tank.
Section view
1
2
4 3
1. Cover
2. Limiting bolt
3. Filter gauze
4. Face plate of oil tank
1. Before filling the oil to oil tank, inner of oil tank should be clean. If the
foreign material is found in the inner of oil tank, it is cleaned.
2. The oil (lubricating oil and governing oil) used must be met specified
grade.
When first filling oil, oil quantity is high than the highest level, but it is
150mm less than the face plate of oil tank. Actual data and length of
connecting oil pipe on site is considered.
When the steam turbine is operated, the waste of oil in the oil system is
much small. Only if the oil level is lower than the lowest oil level to fill
oil. But oil quantity is not much too so that to prevent oil overflow to the
oil tank when turbine is shut.
4. If wave of oil level is large (wind pressure of exhaust fan may has
problem), position of filter gauze cover should be adjusted and to
achieve the pressure balance.
Check the oil quality in the oil tank periodically through a draining port.
If impurity content (moisture) are exceed to standard, oil in the oil tank
shall purge. When physical property of oil is worse, oil should be
changed.
• If there are steel grains in the oil, to indicate that metal surface
of movement parts are hit.
6y:
HANGZHOU STEAM TURBINE
China
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.
LC 1r:;
iV I-·-----
L 5: ---··---J
N
+
- ,crn�
con
R
---·-- 13 E>
r--'--t-__:__+---��f--- I Y2 1 ±e
E6 °E\ E@Wle
f _\-
t\ t\\ f;j\
, V1
i!J()Q Au 0 LJEw 12
Suck oil pump Water tonk heater
LaL1 L1 U5
Lz- L2 L2 V5
L L3 L3
l'\iVIJ
.,,. R
<., tLO'.i E@11,U·o·§ AA10·§
Q �6tEA:>2 Turn on valve Water-seal valve Exhaust dirty valve
C Heater1 Heater2
J
H \;v11I
5134
�fl
indica\or indicator centrifugal machine indicotor elec\romognetism stop
E
i,0,fa!,''0
Air switch
L 1 L2 N 40
~
Ii N 42
"'W 1,1 44
T1
T
I I
I I &1
1i
LTD\
F ±aN'A:.;-
Transformer ·b (0
FUlmL
O AC220V J
I N
23 1 I
I
AC24V �El t@Wle
1 R 1
1:100 IAu x1, 'u_t'· ..
I
<u~----r~~-r-~~~~.-~~~~--~~1 I
1--i-H---i---t--,H--.-l-+--F~FUJl~=:J=:J=::J 2XJ j15
FU21 ~1
I "� ES 16----g
IT AC415V/AC220V AC24V
24 L N
R I,--....l---
~h~
HB1 HB2 HB3
E6 'E £@},;'ie
�;
1:uo0
Y6 Y7 Y8
31 33 37 34 35 36
YVI YV2
ES FR1 FR2
FU2 __
-T 23 _c;
j______-'""----'��--0
~---1.
51
__ __ '------'----'------'--------'-----'
SB1 3
00000
rr1
COM R
SB2 rr 5
00001 01000 r--�-·---N
SB3 rr 7
" 00002 01001
XJ 9 00003
TE 11 01002
00004
0 003� {:Y!
HT 13
oooosP LC 1
"' _1_5____j 00006 01004�
14
010051
---jJ
·O �0
Ee ;4A-: 810%,B
NA-MMB31J4
E
Office
# 995, Service Road, RPG Layout, Vijayanagar,
Bangalore - 560 040. INDIA, www.greenesolpower.com
6y:
HANGZHOU STEAM TURBINE
Cfiina
<Project:
S.V. POWER PRIVATE LIMITED
Renki Village, Pali Thesil, Korba Dist., Chhattisgarh State.