You are on page 1of 2

Item

Number Description Unit Quantity Rate Amount


(TT )
CLASS D
Demolition and Site Clearance

General Clearance - Rental of


Backhoe for the removal of trees,
stumps, old existing buildings and
other structures as well as pipelines.
The Contractor shall allow for the
mobilization of machinery and the
D.1. work force to the site. 1 $2,000.00
To
D Demolition and Site Clearance Summary $2,000.00

PRELIMINARY – Class A
Site Preparation

Area under construction includes the


provision and maintenance of a
temporary shed for the storage of
material, tools, and tackle and the
use of all persons on the site. Also the
use of scaffolding would be supplied
A for workmen
Scaffolding shall be provided and
safeguarded, for the safety and
security of the works and the
protection of the workers sum 1 $25000 $25000.00
Galvanize shall be supplied for the
construction of the temporary shed
roofing Sheets 10 $224 $2,240.00
Preparation of site area includes the
necessary material to construct the
shed and to create the boundary
lines for the site construction
5/8'' Ply sheets 20 $180 $3,600.00
1x4x16 R.P.P. Lengths 20 $60 $1,200.00
2x2x14 R.P.P. Lengths 30 $52.50 $1,575.00
2 1/2'' P.P. Nails Box 1 $280 $280.00
100 lb. Strain Nylon Line to be used
for creating boundary lines Reels 2 $25 $50.00
3'' P.P. Nails Box 1 $280 $280.00
600 gal Water Tank will be provided
for the use of water for the works
including drinking water, and paying
all charges and other expenses in
connection with the supply form
water mains or any other method of
A.3.2.2. water supply, storage or distribution 2 $800 $1,600.00

To
A Preliminary Summary $35,825.00

BILL OF QUANTITIES
PRELIMINARY & DEMOLITION AND SITE CLEARANCE