3) PRICES:
a) All the Taxes, Levies and other incidental charges shall be
mentioned in percentage only. The End rate will be calculated
automatically in Commercial Offer based on Basic Rate and
percentage of discount, GST and other incidental charges.
b) In case the GST and other levies are not applicable to any of
the items, the same should be left blank or written as ‘0’
(ZERO). In case Basic/Net price offered is inclusive of Excise
duty and Taxes and other levies the rates of the same should
4
b. As soon as the buses are ready for dispatch the supplier will inform
PRTC for carrying out pre-dispatch inspection at the premises
intimated by the Fabricator and the inspection team will reach within
three days of receipt of such notice. It shall be the responsibility of
the fabricator to supply and maintain the vehicles to verify that they
are in working order. Any Bus damaged in transit or which are not in
working order, will have to be repaired immediately within 7 days.
c. Final inspection of the vehicles will be carried out at the time of
delivery of the vehicles.
6
d. During inspection any part of material being used for the fabrication
of the bus body can be sent to CIRT, Pune or any other Govt.
approved lab for sample testing by the inspection team. In case the
sample fails to meet the prescribed specifications, an amount equal to
10% of the cost of the failed item used in completed fabrication of
buses will be recovered from the firm prior to the sample report
received.
Managing Director
Pepsu Road Transport Corporation
Patiala
(TENDER INVITING AUTHORITY)
9
2 PRE-QUALIFICATION INFORMATION
A Turnover details from the Fabrication of bus bodies Turnover Rs. in crores
2014-2015
2015-2016
2016-2017
5 LIST OF CLIENTS
The following firms are our Customers for whom we have fabricated buses offered
by us in the Tender
Sr.No Name of the firm and Address Dated No. and Details
of Delivery.
6 UNDERTAKING
A We are the Bus Body Builders for TATA and
Leyland buses & other chassis manufacturers.
We have fabricated No. of buses and our
production capacity of Buses per month is:
B We undertake to supply the entire quantity specified in the Tender
as per Delivery Schedule
7 DOCUMENTS ATTACHED FOR PRE-QUALIFICATION
We have attached the following documents in for Pre-qualification (Fill ‘Yes’ or
‘No’)
a Demand Draft/Bankers Cheque
b Audited Statement of Accounts for the year 2014-
2015, 2015-2016 and 2016-2017
c Certification of Verification issued by the
Chartered Accountant in the format
prescribed.
d List of Plant, Machinery, Infrastructure and
Skilled Manpower
e Certificate of accreditation
8 THE TENDER DOCUMENTS ALONGWITH EMD RECEIPT AND SUPPORTING
DOCUMENTS SHOULD BE UPLOADED ONLINE (please complete all columns,
incomplete forms are liable to be rejected)
11
Annexure –B
PEPSU ROAD TRANSPORT CORPORATION, PATIALA
HEAD OFFICE, NABHA ROAD, PATIALA.
1. PRE-QUALIFICATION CRITERIA:
Stage-1
a) The E-Tenders who have an average Annual Turnover of Rs.2.00
crores from the fabrication of buses during the last three years i.e.
2014-2015, 2015-2016 and 2016-2017. OR
The bidder should have executed Purchase Order for fabrication of
atleast 200 buses of any STUs/Private operators in last three years.
b) The bidder should be a manufacturer of Bus Bodies for a minimum
period of 5 years.
c) The Tenderer should have the following infrastructure at the
works and premises:
Tools & Plants as per listed below:
i) Chromotising Plant
ii) Shower testing arrangement of complete vehicle.
iii) Battery charger of suitable capacity.
iv) Air Compressor of high capacity alongwith tyre inflating
arrangement.
v) Panel Stretching machine.
vi) Brake press machine of capacity minimum 100 MT
vii) Sheering machine of capacity 6 mm thick.
viii) MIG welding equipments 10 nos. minimum
13
STAGE-3
The Commercial Offers of those Tenderers who qualify in Stage-1
and Stage-2 after evaluation by the Evaluation Committee as per the
criteria of minimum plant and machinery, infrastructure, turnover,
body fabrication capacity etc. will be opened.
2. Evaluation Criteria: Subject to fulfilling pre-qualification criteria
as mentioned above.
3. Specification and Drawing: As enclosed.
4. Tender Form Fee: Rs 6000/-
5. Security Deposit: An amount equal to 10% of the total work
order in shape of Bank DD/Bank Guarantee in favour of MD, PRTC
Patiala.
6. Last date and time for purchase of tender documents:
Dated 26.09.2017 by 11.00 am.
7. Last date and time for submission of tender documents
Dated 25.10.2017 Time 12.00 Noon.
8. Opening of Prequalification Offers (Technical Offers):
Dated 25.10.2017 Time 01.00 pm.
9. Opening of Commercial Offers: Dated 25.10.2017 Time
03.00 pm. (The opening Date of Commercial Offer is subject to
change based on the time taken for evaluation of the committee. The
date of opening of Commercial Offer will be communicated to
participants, in case of change)
10. Other Standard Terms and Conditions are as enclosed.
11. However in case the Bus code is enforced or comes into
effect then the specifications as detailed above will remain
the same unless and until the code specifically specified for
particular sort of a specification in which case the
specification specified by the code will be implemented.
2014-2015
2015-2016
2016-2017
Chartered Accountant
work order shall constitute one lot for the purpose of the agreement.
The delivery of the chassis falling in one lot, to the Contractor, shall
be completed by the PRTC within a period of eight days from the date
of delivery of the first chassis of the lot. The work order shall be
deemed to have been modified to the extent of number of chassis
delivered under a different work order during the aforesaid period.
3. The Contractor shall fabricate bus bodies on the chassis
hander over to him, in one lot, within the time mentioned in this
clause, which shall be deemed to be the essence of the contract.
Otherwise Contractor is liable to pay liquidity damages as mentioned
in this agreement. The time allotted for fabrication of bus bodies shall
be 45 days from the date of delivery of the vehicle in one lot.
Lead period of 10 days will be allowed one time from the date
of release of order for first allotment.
The save days on any chassis due to early completion of bus
bodies will be suitably adjusted to a maximum of 7 days in the next
lot. As regards save days on any chassis due to early completion of
bus bodies earned later on shall not be adjusted against the early
with-held amount against the late completion of buses
4. If the work of fabrication is held up for want of any
material to be supplied by PRTC an intimation in this regard should
immediately be sent to this office through fax/email which will be
verified by the inspection team based on which exemption in the
delivery schedule may be claimed by the fabricator.
5. (i) The period allowed for fabrication of bus bodies will
start from the date when the chassis reached in the premises of the
firm against allotment order to the contractor.
(ii) In case first chassis is handed over to the body builder by
11.00 AM of the day, that day shall count as full day towards the
period given for fabrication of bus bodies, (iii) Where the final
18
continue to serve as security till the expiry of a period of one and half
years from the date of fabrication of the last bus body, on the chassis
made over to him, in pursuance of this contract, for the removal of
defects in bus bodies fabricated by the Contract discovered during the
aforesaid period of one and half years, provided that any shortfall in
the amount of bank guarantee due to the forfeiture in full or in part,
shall be made good by the Contractor within 10 days of a notice by
PRTC by providing a fresh bank guarantee. In case, the shortfall in
bank guarantee is not made good within the stipulated period of 10
days PRTC shall without prejudice to the right or remedies under the
contract or under law be at liberty to stop allotment of further chassis
to the Contractor.
12. In the event of contractor failing to complete the work and
getting the complete bus or buses finally inspected within the period
mentioned in clause 3, he shall be liable to pay to the PRTC Rs.2000/-
lump-sum per chassis per day by way of penalty.
13. (i) The Contractor shall give information about completion
of
bus body/bodies 48 hours earlier to the Managing Director
and the final inspection shall be conducted by the Inspection
Officer within 48 hours of the time intimated for completion
of bus body/bodies. The Contractor shall not be liable for
any penalty in case the final inspection is delayed beyond 48
hours of the time intimated by the Contractor for completion
of bus body/bodies.
(ii) In the case complete bus is not delivered by the Contractor
even after 55 days of the expiry of the scheduled time allotted
for carrying out the fabrication work, the PRTC shall be at
liberty to take over the chassis if work has not been started
and part/fully built body if work has already commenced and
22
25. During inspection any part of material being used for the fabrication
of the bus body can be sent to CIRT, Pune or any other Govt.
approved lab for sample testing by the inspection team. In case the
sample fails to meet the prescribed specifications, an amount equal to
10% of the cost of the failed item used in completed fabrication of
buses will be recovered from the firm prior to the sample report
received.
26.
However in case the Bus code is enforced or comes into
effect then the specifications as detailed above will remain
the same unless and until the code specifically specified for
particular sort of a specification in which case the
specification specified by the code will be implemented.
WITNESSES:
1. _____________________________
27
2. _____________________________
ANNEXURE –C
STATEMENT SHOWING THE RATES OFFERED FOR FABRICATION OF
ORDINARY BUS CHASSIS OF 210" WB CHASSIS
210"
Wheelbase
Note.
1 Detailed specifications/ drawings of bus bodies are as per
enclosure. (If AIS052 code not enforced)
2 The outside/inside of the bus body is to be painted as per colour
scheme approved by the PRTC.
28
To
M/s__________________________
_____________________________
_____________________________
dated ___________________
Dear Sir,
effected in constitution of
M/s___________________________________________ Our liability under
his guarantee is restricted to Rs_________ ___________
(Rupees__________________________________________) and shall
not be extended beyond _____________________(Date). All claims under
this guarantee must be represented to the
banker__________________________(name and address of bank).
Dated the_________________________
32
ANNEXURE-D
Telephone No.0175-2311716
Fax No. 0175-2311717
be provided.
24 To avoid Water leakage Top quality Sikka flux shall be provided
on the each and every joint and each
rivets of roof top to prevent water
leakage.
25 Foot board and Mud- Plane GI sheet 16G and extra Chequered
guards plates provided at the foot board and also
at the mud-guards
26 Convenience of the Provide PVC Grip handles (14 pcs per
passengers bus) along with rod for the convenience
of the passengers
27 Side Exterior Panelling 1. Stretch panel 1mm GP sheet
IS:277:1985 (up to latest)
2. Sole bar to skirt rail 12G Aluminium
sheet IS:737:1966 (3R) (up to latest)
28 Roof Exterior Panelling Roof exterior panel shall be of 18G
Aluminium sheet joggle jointed in full
length.
29 Interior Panelling Interior roof and side panel shall be done
with 20G (0.91mm)
30 Window frame H & F section fitted in sleek EPDM rubber.
31 Flooring 3.15 mm chequered Aluminium sheet
shall be used.
1. PRTC bus bodies must be fabricated from those bus body builders
who have approved bus body code AIS052 and must be ARAI
approved.
2. Roof Top Aluminium Sheet - 1.22mm (18 S W G).
3. Inner Panels Aluminium Sheet -0.91mm (20 S W G)
4. Outer Strech Panel G P S P (20 SW G.)
5. Outer Lower Panels Aluminium 2.65 mm.
6. Rear End Corners shall be of Aluminium Moulding as per H R E C
Pattern.
7. Aluminium Chequered Sheet-3.15 mm tank.
8. Toughened Glass … Clear Glass.
9. Luggage Carrier Of 350mm HT shall be Fabricated With G.I Tube
40x40x2, Covered With gauge G.I Sheet Panels of Four Sides.
Luggage Carrier Flooring Shall Be Fabricated With the M.S Angle
40x40x5 resting with the Supports on Roof brackets and GI Section
14 Gauge MIG welded longitudinally with MS Angle Roof Sticks.
Luggage Platform Should be Fabricated at Rear of Luggage Carrier on
the roof top. Reinforcement should be given in the Structure at leg
Resting Places of Platform.
35
10. PVC handles shall be fitted on the top of each passenger seats.
11. Back of last six seats should be folding type so that it can be used as
sleeper for driver/conductor rest.
12. One 12 litre water tank (Rehbar) shall be provided in the Driver cabin.
13. Reflective tape: Front should be white, Rear should be Red and Sides
should be of Yellow colour (as per the CMVR).
14. Graphics:
a) Insignia at both sides.
b) PRTC – Front & Rear wind screens.
c) Emergency Door, In & Out door.
15. Side view mirror brackets – CRERW pipe 1"dia side view mirror
brackets for both side shall be provided.
One mirror shall be provided at the front of Driver seat inside the bus.
Fire extinguisher 2kg of ISI approved shall be fitted near the front
seat at suitable place.
16. Two stoppers shall be fixed near the rear tyres.
17. All the roof sticks will be welded with Cant Rail Sections with the help
of cleats and from the rear each roof stick will be welded as per the
size width of internal roof sheets (width means each joint of internal
roof should be rested on the center section of roof sticks).
18. Top quality Sikka flux shall be provided on the each and every joint
and each rivets of roof top to prevent water leakage.
19. Shower test shall be done in the presence of PRTC inspection team.
20. There shall be no water leakage from the window frames.
21. Seat number shall be written.
22. All the modifications required in the bus body (regarding the chassis
of EURO IV) will be amended by the bus owner to the body builder.
23. The front show structure and complete show will be as per P.R.T.C.
approved type.
24. The passenger bus seats should be of ARAI approved seats.
Note: If there is any variation in specification and drawing of PRTC with
AIS052 code in dimension then the material will be used as per the
approved code only.
44 SECTION DETAILS 44