You are on page 1of 4

ARDEX CL11

Commercial Levelling & Smoothing


Compound
FEATURES
Produces a smooth, flat, absorbent surface for the
subsequent laying of all kinds of commercial floor-coverings
Excellent flow with self-smoothing properties
Cement-based
Pumpable
Early trafficable
Ideal for and economical use with ARDEX floor-covering Adhesives
Low VOC
Protein free

ARDEX HONG KONG LIMITED


Unit D, 16/F., CNT Tower , No.338 Hennessy Road,
Wanchai, Hong Kong
TEL: (852) 2529 6325
FAX: (852) 2529 8615
ARDEX CL11
Commercial Levelling & Smoothing Compound

DESCRIPTION Substrates where the measured moisture level is above


ARDEX CL11 is a rapid hardening cementitious self leveling 5.5% or 70% by Relative Humidity (RH) test method,
compound. It can be applied by trowel or by pump. It can must first be sealed with ARDEX WPM300 Damp Proof
be walked on after approximately 2 – 3 hours and is ready Membrane prior to the installation of ARDEX CL11.
for subsequent applications after 24-48 hours depending
on layer thickness, type of floor covering and site Direct to earth sub-floors must be protected from rising
conditions. damp by containing a functioning damp-proof membrane
(DPM) – if this is not included underneath the substrate,
Grey powder with special cements, high quality synthetic then use ARDEX WPM300.
resins, selected fillers and other special additives.
After suitable preparation, the substrate must be
AREAS of APPLICATION thoroughly vacuumed and properly primed with
Smoothing substrates in residential and commercial ARDEX P51 dispersion bonding primer for a successful
areas such as shopping centers, schools, hospitals, and installation. For further information, contact
residential homes. ARDEX Technical Services.

Filling, smoothing and levelling of concrete slabs and PRIMING


cementitious screeds prior to application of floor Normal/Standard Concrete & Existing ARDEX Self-
coverings such as rubber, vinyl, linoleum, carpet, Levelling Compounds
ceramic tiles and floating timber floors. Use ARDEX P51, diluted 1:3 with water. Apply evenly
with a bristle push broom. Allow to dry to a thin, clear
SUBSTRATE PREPARATION film (minimum 1 hour).
The substrate must be cured, sound, solid, clean and
dry with good surface integrity – in other words, Very Absorbent Substrates
sufficiently cured, firm, load bearing and free from all Apply 2 coats of diluted (1:3) P51 primer. Allow each
contaminants such as dust, laitance, oil and grease, coat to dry sufficiently before proceeding.
adhesive, putty and coating residues, release agents,
curing compounds, etc. High Strength/ Dense/ Non-Porous Substrates
Use a solvent-free (ARDEX R2E) or water-based
Concrete floors must be at least 4 weeks old. Screeds (ARDEX WPM300) epoxy primer and blind with sand
must be at least 2 weeks old. Conducting a moisture (~ 0.5 – 1mm). Allow each primer to cure to a hard film
test of the substrate prior to installation is advisable. (24 hours) before proceeding. Once cured, sweep the
Mechanically prepare the substrate surface using surface with a stiff bristle push broom and then
recommended preparation methods such as thoroughly vacuum to remove all loose sand before
shot-blasting, scarifying, diamond grinding, shaving or application of ARDEX CL11.
other suitable methods to provide a roughened, clean,
sound, solid and open porous surface. Do NOT install ARDEX CL11 until the primer has
Acid etching is not an acceptable method of cleaning thoroughly dried.
the subfloor. Do not use solvents or sweeping Refer to the relevant product datasheet for specific
compounds. instructions in relation to each primer.

Repair minor defects such as superficial cracking and


holes using an appropriate ARDEX product, MIXING RATIO
ie: ARDEX A45 fast setting patching mortar. All joints 5.5L of clean water per 25kg bag of ARDEX CL11.
and cracks subject to movement must be brought
through to the final floor finish and suitably detailed for MIXING
the particular application. ARDEX floor levelling products react and harden quickly
when mixed with water. Thorough mixing with a heavy
duty electric drill fitted with an ARDEX mixing paddle.
ARDEX CL11
Commercial Levelling & Smoothing Compound

Always mix the powder into the water. In such cases ARDEX CL11 can be mixed with clean &
dry 2 – 10mm aggregate. First mix the ARDEX CL11,
The normal mixing time for a 25kg bag is 2-3 minutes. starting with a slight reduction (~ 0.3L) in the normal
mixing water amount and then add 1/3 to 2/3 parts of
Concrete or screed mixers, paint mixers, spiral mixers aggregate by volume (up to 1 part by weight). Finish the
and hand mixing are not suitable. surface with a neat coat of ARDEX CL11 if required.

INSTALLATION Gradient Smoothing or Ramping


ARDEX CL11 can be applied in temperature ranges For gradient smoothing or ramping applications, the
(substrate & atmospheric) from 10° - 35°C. addition of a suitable fine, clean & dry aggregate
(~ 0.5mm) at a level to approx 1/2 by volume to the
ARDEX CL11 has a flow time of approx. 10 - 15 minutes mixed material will reduce the flow to a trowel-able
at 20°C. At lower temperatures this time is extended consistency. A reduction in the water amount by
and at higher temperatures this time is shortened. approx. 0.5L will also assist.

Work to an area that suits the size of the installation CURING & DRYING TIMES
team such that fresh mortar is poured into workable After 2-3 hours ARDEX CL11 is normally hard enough to
mortar, which can then be spread, gauged and trowelled receive foot traffic (at 25°C).
within the flow time of the material.
Application of Floor Coverings
Pour the mixed ARDEX CL11 material onto the prepared Permeable floor coverings such as conventional carpet,
& primed substrate and then spread into place using ceramic tiles and floating floors can be applied onto the
appropriate tools. Rake the material to gauge the cured ARDEX CL11 after 1 day.
thickness and then smooth the surface with a flat trowel
if required. The use of a spiked roller may aid the final Direct stick impervious floor coverings such as vinyl and
levelling of the material, but is not normally necessary. If linoleum can generally be applied after 48 hours.
used, the spiked roller should be used within the flow
time of the product and limited to a maximum of 2 passes. In cases where the product has been bulked-out with
aggregate, allow an extra 24 hours curing for each
Studded shoes should be worn when walking in the fresh 4mm of thickness above 8mm.
mortar to avoid leaving marks.
For ease & efficiency in applying material in large areas, Refer to the relevant product datasheet or
ARDEX CL11 can be pumped with continuously working Manufacturer’s instructions for specific application and
auger or piston style pumps with a capacity of 20 – 40L usage details in the relation to the chosen floor covering.
of mortar per minute. If the pumps are not in operation
for 15 minutes they should be cleaned. Full Cure
ARDEX CL11 will gain sufficient strength after 24 hours to
Protect the surface of the setting material from wind, allow access for the commencement of finishing or light
sunlight and contamination for 24 hours. traffic activity.
The application of a small test area prior to complete
installation is recommended in uncertain circumstances. Allow 7 days curing at 20° before subjecting the material
to full service conditions.
APPLICATION THICKNESS
General Note: higher temperatures may reduce curing & drying
ARDEX CL11 can be applied from 2–30mm in one times, whilst lower temperatures will extend the drying and
application. curing time.

For economic considerations the addition of aggregates COVERAGE


or use of premixed ARDEX CL11 Base Mix is advisable A 25kg bag will cover approximately 7.5m² at 2mm
for layers continuously thicker than 10mm. thickness – assuming a flat surface.
ARDEX CL11
Commercial Levelling & Smoothing Compound
CLEAN-UP TECHNICAL DATA
Clean all tools, equipment, hands, etc with water General
immediately after use. Hardened material will have to be Packaging: 25kg
removed using mechanical means.
Coverage: 7.5m² @ 2mm
Shelf-Life: 6 months
PACKAGING
25kg bag
In Accordance with ARDEX Quality Standards
STORAGE & SHELF LIFE Powder
ARDEX CL11 has a shelf life of approximately 6 months Mixing Ratio: 5.5L Water to 25kg Powder
if stored in dry conditions in the original un-opened Bulk Density of Powder: approx. 1.3kg/L
packaging. Consumption: approx. 1.6kg powder/mm/m²

HEALTH & SAFETY Wet-Fresh-Mixed Mortar


ARDEX CL11 is considered non-hazardous in normal usage, Application Temperature: 10°C – 35°C
however it contains Portland cement & quartz sand and Mixed Mortar Density: approx. 2.0kg/L
reacts alkaline which may cause some skin irritation after pH of Fresh Mortar: approx. 12
prolonged contact. Avoid generation and breathing of dust. Flow Time (20°C): approx. 10 - 15 minutes
Avoid contact with eyes or skin. Wear suitable protective Walkability (20°C): approx. 2-3 hours
Application Thickness: 2 – 30mm
dust mask, gloves and safety glasses. In case of contact
with eyes, rinse for several minutes under running water. Resistant to Chair Castors: Yes
In case of contact with skin, rinse with running water. If Suitable with Floor Heating: No
dust is inhaled, remove to fresh air, ensure breathing Moisture Tolerant: No
passages are clear and rinse mouth with water. In the Freeze-Thaw Stable: No
case of adverse symptoms, seek medical advice.
In Accordance with Chinese National Standard:-
Physiologically and ecologically safe when in the cured JC/T985-2005
state. Flow
Initial: > 135mm
For further information, please consult the Material Safety After 20 minutes: > 130mm
Data Sheet (MSDS). Compressive Strength
After 1 day: approx. 10 MPa
After 7days: approx. 21 MPa
After 28 days: approx. 33 MPa
Flexural Strength
After 1 day: approx. 3 MPa
After 7days: approx. 3.5 MPa
After 28 days: approx. 7.2 MPa
Adhesion Strength: approx. 1.5 MPa
Shrinkage: - 0.07%
VOC content : < 5g / L

The technical details, recommendations and other information contained in this datasheet are
given in good faith and represents the best of our knowledge and experience at the time of
printing. It is your resposnsibility to ensure that our products are used and handled correctly and
in accordance with any applicable National or Local Standard, our instructions & recommendations,
and only for the uses they are intended. Regional specific recommendations, standards, codes of
practice,building regulations or industry guidelines may effect specific installation recommendations.
Our Company policy is one of continuous Research & Development; we therefore reserve the
right to update this information at any time without prior notice. We guarantee the consistent high
quality of our products; however, as we have no control over site conditions or the execution of
the work, we accept no liability for any loss or damage which may arise as a result thereof. The
supply of our products and services is also subject to certain terms, warranties & exclusions;
these details will be made available to you on request. You should make yourself familiar with them.

You might also like