us2
us United States
cz) Patent Application Publication co) Pub. No.: US 2013/0311147 Al
oy
0s)
om
en
@
(86)
()
Greenwood
DRILLING OPTIMIZATION
01303111471
(43) Pub. Date: Nov. 21, 2013
Publication Classification
ioe Sekirse —— avoson
sige: altburton Energy Servers tne, 2) US: Ch
Asie: atiburton ere Series i oe oat 1750 01301)
7 ‘USPC. TORT
Appi Nor 1a092.99
PCTNo, POTIUSI223343 In accordance with aspects of the present invention, a method
$37 pe eee ee ar
(2),(4) Date: Jul.29, 2013
Related U.S. Application Data
include identifying a plurality of task workflows related to a
‘well design identifying links between individ tasks in the
plurality of tsk workflows; and performing tasks inthe pl
Provisional application No. 61/438,$89, fled on Feb. _rality of task workflows in order to optimize the well design
1.2011, cording to optimization criteria
100
»~ 102
112
Optimized
Reservoir
Analysis
Optimizes
Production
Well
Construction
Performance
Optimization
Optimized
Briling
Performance
110
Opiimized
Completions
Optimized
Casing and
Cementing
Performance,
106
108Patent Application Publication
100
~
Nov. 21, 2013 Sheet 1 of 7
102
US 2013/0311147 AI
112
Optimized
Resorvoir
‘Analysis
Optimized
Bring
Performance
Well
Construction
Performance
Optimization
104
Optimized
Production
110:
Optimized
Optimized
Casing and
Gementing
Performance,
Completions
106
Figure 1
108US 2013/0311147 AI
Nov. 21, 2013 Sheet 2 of 7
Patent Application Publication
einydeg.
abpaymouy
uonnoexg
Zz aunbi4
GoW
uo\esedaig
Buluuelg
~
802
~
902
~
yz
~
202
NX 002.Patent Application Publication
Nov. 21, 2013 Sheet 3 of 7
340,
US 2013/0311147 AI
eePatent Application Publication Nov. 21, 2013 Sheet 4 of 7 US 2013/0311147 AIPatent Application Publication Nov. 21, 2013 Sheet 5 of 7 US 2013/0311147 AI
406
_
404
404
404
404
523:
524:
525:
526-
527.
Figure 5Patent Application Publication Nov. 21, 2013 Sheet 6 of 7 US 2013/0311147 AI
402
a2 x
~O—O[
B07 TQS Q
6080) 654 S507 “S658
6099~O__- 404
610-412
BiG 870
612 70
oe Ee 672
me)
616
BIG 410
BIG 72
sO 410
8I~O__G- 4
B2~GQ__G- M10
BG 682
82~G__G- 678
6B~G_G- 410
H~OTQ @Q F
8G 8 406 Sata S512 Figure 6
a .Patent Application Publication Nov. 21, 2013 Sheet 7 of 7 US 2013/0311147 AI
704-1
704-2 704-N
Optimization Controller
- ;
(x J
704-J
Figure 7US 2013/0311147 Al
DRILLING OPTIMIZATION
RELATED APPLICATIONS,
[0001] This application claims priority to U.S. Provisional
Application No. 61/438,589, fled on Fob. 1, 2011, which is
hhereia incorporated by reference ia its entirety.
TECHNICAL FIELD
10002] |The preset invention eltes to optimization ofthe