SOIL INVESTIGATION FOR THE PROPOSED PERLIS INLAND PORT PROJECT AT CHUPING VALLEY, MUKIM

TITI TINGGI, PERLIS

BH1 BH2 BH3 BH4


RL Level
Depth (m) SPT SPT SPT SPT sSi - sandy SILT
sGv - sandy GRAVEL
gv S - gravelly SAND
0 - - - - - - - - sC - sandy CLAY
1.5 8 cSi 15 sSi 30 cSi 15 cSi gvC - gravelly CLAY
3 12 cSi 45 cSi 65 sSi 100 cSi S - SAND
4.5 50 sSi 60 siS 25 sSi 100 cSi C - CLAY
6 50 cSi 85 cSi 60 sSi 25 cSi LM - LIMESTONE
7.5 50 siGV 90 sSi 30 GV 45 sSi GR - GRANITE
9 50 NIL 75 cSi 55 siGV 30 sSi GV - GRAVEL
10.5 50 NIL 100 sSi NIL NIL 50 cSi
12 15 sSi Concrete
13.5 44%44% LM Clay Layer
15 90%68% LM Sand
16.5 76%60% LM Silt
18 80%66% LM Gravel
19.5 LIMESTONE