You are on page 1of 2

Project Title: Replacement of 6'' Gas Fuel Header Line at PSA- FORM AS2

2 MS55 Area (SIDE 1)

Maintenance No:
SITE:
Work Pack No:
SC2
SH1 No: SC2480M60247
MC1 No: 01
ARCHITECTURAL INSULATION COATINGS SHT OF
ACCEPTANCE CERTIFICATE
AREA: SYSTEM/SUB SYSTEM: 480
GRID REF.: LOCATION: MS55
ELEVATION: P & I.D. NO.: SCP002-MS55-PR-PID-00003 /
DRG. NO.: TEST PACK NO.:
PIPING/EQUIPMENT SPECIFICATION NO. :-
FINAL PAINT INSULATION INSULATION
LINE NUMBER OR EQUIPMENT ACCEPTED TYPE INS INSTALLED IN
NO. & DESCRIPTION (FIREPROOFING THICKNESS ACCORDANCE
THERMAL, mm WITH SPEC
*YES/NO ACOUSTIC) YES NO
6"-GF-48V-002-E3A-WT YES N/A N/A - -

FOR ITEMS MARKED 'NO' RAISE PUNCH LIST

COMPLETED BY APPROVED BY
COMPANY
TITLE
SIGNATURE
PRINT NAME
DATE

EDPSW

* Circle applicable actions Copyright © 2013 BP Exploration Operating Company Limited BP-CDZZZZ-GE-PRC-0005-00

DOUBLE SIDED FORM


PROJECT TITLE: Replacement of 6'' Gas Fuel Header Line at PSA-2 MS55
Area
ARCHITECTURAL INSULATION COATINGS MAINTENANCE ID No: FORM AS2
ACCEPTANCE CERTIFICATE WORKPACK No: (SIDE 2)
SH1 No: SC2480M60247 SHT OF
MC1 No: 01

STRUCTURAL AND ARCHITECTURAL


PRIMARY AND SECONDARY STEELWORK MODULE WALLS
NORTH SOUTH EAST WEST ROOF DECK
COATING
DESCRIPTION
SPECIFICATION
LINING
DESCRIPTION
SPECIFICATION
FIRE PROOFING
DESCRIPTION
SPECIFICATION
SURFACE
PREPARATION &
FINAL THICKNESS
AVG. dfi
REMARKS

COMPLETED BY APPROVED BY AREA LOCATION MS55


COMPANY GRID REF.
TITLE ELEVATION
SIGNATURE
PRINT NAME
DATE

EDPSWCopyright © 2013 BP Exploration Operating Company Limited BP-CDZZZZ-GE-PRC-


0005-00
DOUBLE SIDED FORM

You might also like