You are on page 1of 1

Proceedings for temple

 We can provide vertical rebars at each ends and in between the spans.
 We can provide RCC lintel,sill and corner stitches.
 We can provide RCC floor beam to tie around the mandir ground floor.
 We have to provide wooden board walls to the first and top floor,the height has to be
seen from photo.

You might also like