GASTOS GENERALES 10.00% 15,674.42 1,617.15 3,385.36 3,558.71 7,113.20 15,674.42 0.00
0.00%
UTILIDAD 10.00% 15,674.42 1,617.15 3,385.36 3,558.71 7,113.20 15,674.42 0.00
FACTOR DE RELACION 1.00000 188,093.01 19,405.78 40,624.36 42,704.56 85,358.31 188,093.01 0.00
GASTOS GENERALES 10.00% 19,413.98 8,356.59 4,620.72 4,112.64 2,324.03 19,413.98 0.00
FACTOR DE RELACION 1.00000 232,967.79 100,279.05 55,448.67 49,351.70 27,888.36 232,967.78 0.01
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01 OBRAS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA UND 1.00 1,255.19 1,255.19 1.00 1,255.19 - 0.00 - 0.00 1.00 1,255.19 0.00 0.00
01.02 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 3.00 850.00 2,550.00 1.00 850.00 1.00 850.00 1.00 850.00 3.00 2,550.00 0.00 0.00
01.03 TRANSPORTES DE MATERIALES Y EQUIPO GLB 1.00 8,500.00 8,500.00 1.00 8,500.00 - 0.00 - 0.00 1.00 8,500.00 0.00 0.00
01.04 TRAZO, NIVEL Y REPLANTEO INICIAL M 511.70 3.52 1,801.18 511.70 1,801.18 - 0.00 - 0.00 511.70 1,801.18 0.00 0.00
01.05 TRAZO, NIVEL Y REPLANTEO FINAL M 511.70 1.05 537.29 - 0.00 - 0.00 511.70 537.29 511.70 537.29 0.00 0.00
01.06 SEGURIDAD EN OBRA MES 3.00 1,332.76 3,998.28 - 0.00 2.00 2,665.52 1.00 1,332.76 3.00 3,998.28 0.00 0.00
0.1.07 INTERFERENCIAS CON TUBERIAS AGUA Y DESAGUE EST 1.00 2,500.00 2,500.00 - 0.00 1.00 2,500.00 - 0.00 1.00 2,500.00 0.00 0.00
02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
2.01 EXCAVACION DE ZANJAS (h=1.50) M 511.70 12.07 6,176.22 200.00 2,414.00 211.00 2,546.77 100.70 1,215.45 511.70 6,176.22 0.00 0.00
2.02 REFINE Y NIVELACION DE ZANJAS M 511.70 2.79 1,427.64 - 0.00 411.00 1,146.69 100.70 280.95 511.70 1,427.64 0.00 0.00
2.03 PREPARACION DE CAMA DE APOYO C/MAT. PRESTAMO M 511.70 11.86 6,068.76 - 0.00 411.00 4,874.46 100.70 1,194.30 511.70 6,068.76 0.00 0.00
2.04 RELLENO CON MATERIAL PROPIO SELECCIONADO M 511.70 27.96 14,307.13 - 0.00 300.00 8,388.00 211.70 5,919.13 511.70 14,307.13 0.00 0.00
2.05 ELIMINACION DE MATERIAL EXCEDENTE M3 184.21 23.34 4,299.46 - 0.00 100.00 2,334.00 84.21 1,965.46 184.21 4,299.46 0.00 0.00
2.06 PRUEBA DE DENSIDAD DE CAMPO UND 30.00 119.88 3,596.40 - 0.00 - 0.00 30.00 3,596.40 30.00 3,596.40 0.00 0.00
3 SUMINISTRO DE TUBERIAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
3.01 SUMINISTRO DE TUBERIA PVC A -7.5X110 mm ISO 4420 M 511.70 23.76 12,157.99 511.70 12,157.99 - 0.00 - 0.00 511.70 12,157.99 0.00 0.00
4 INSTALACION DE TUBERIAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
4.01 INSTALACION DE TUBERIA PVC A-7.5X110 mm UF ISO 44 M 511.70 6.77 3,464.21 - 0.00 411.00 2,782.47 100.70 681.74 511.70 3,464.21 0.00 0.00
5 SUMINISTRO E INSTALACION DE ACCESORIOS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
5.01 SUMINISTRO E INSTALACION DE ACCESORIOS PVC C10 M 1.00 3,710.26 3,710.26 - 0.00 0.50 1,855.13 0.50 1,855.13 1.00 3,710.26 0.00 0.00
5.02 CONCRETO Fc:140 kg/cm2P ANCLAJE DE ACCESORIOS UND 16.00 96.41 1,542.56 - 0.00 - 0.00 16.00 1,542.56 16.00 1,542.56 0.00 0.00
6 SUMINISTRO DE VALVULAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
6.01 SUMINISTRO DE VALVULA COMP. 110 mm - 160mm: UND 3.00 691.86 2,075.58 3.00 2,075.58 0.00 - 0.00 3.00 2,075.58 0.00 0.00
7 PRUEBA HIDRAULICA 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
PRUEBA HIDRAULICA, DESINFECCION DE TUBERIAS
7.01 M 511.70 5.69 2,911.57 - 0.00 - 0.00 511.70 2,911.57 511.70 2,911.57 0.00 0.00
CONEXIONES DOMICILIARIAS
8 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
8.01 TRAZO Y REPLANTEO PARA CONEXIONES DOMICILARIAS M 592.00 1.79 1,059.68 - 0.00 592.00 1,059.68 - 0.00 592.00 1,059.68 0.00 0.00
8.02 EXCAVACION DE ZANJAS MANUAL PARA CONEX. DOMIC. M 592.00 16.38 9,696.96 - 0.00 430.00 7,043.40 162.00 2,653.56 592.00 9,696.96 0.00 0.00
REFINE Y NIVELACION DE DE ZANJA MANUAL A:0.60 M
8.03 M 592.00 1.25 740.00 - 0.00 240.00 300.00 352.00 440.00 592.00 740.00 0.00 0.00
8.04 PREPARACION DE CAMA DE APOYO CON MAT. M 592.00 13.14 7,778.88 - 0.00 240.00 3,153.60 352.00 4,625.28 592.00 7,778.88 0.00 0.00
8.05 RELLENO COMPACTADO CON PL VIB. H:0.50 M. M 592.00 27.68 16,386.56 - 0.00 100.00 2,768.00 492.00 13,618.56 592.00 16,386.56 0.00 0.00
8.06 ELIMINACION DE MATERIAL EXCEDENTE M3 213.12 23.34 4,974.22 - 0.00 150.00 3,501.00 63.12 1,473.22 213.12 4,974.22 0.00 0.00
8.07 CONEXIÓN DOMICILIARIA DE AGUA 1/2 A TUBO PVC UND 74.00 347.02 25,679.48 - 0.00 52.00 18,045.04 22.00 7,634.44 74.00 25,679.48 0.00 0.00
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01 OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.01 glb 1.00 2,550.00 2,550.00 0.50 1,275.00 0.25 637.50 0.25 637.50 1.00 2,550.00 0.00 0.00
01.02 LIMPIEZA PERMANENTE DE OBRA glb 3.00 298.37 895.11 1.00 298.37 1.00 298.37 1.00 298.37 3.00 895.11 0.00 0.00
01.03 TRAZO, NIVEL Y REPLANTEO INICIAL M 424.55 3.98 1,689.71 - 0.00 424.55 1,689.71 0.00 0.00 424.55 1,689.71 0.00 0.00
01.04 TRAZO, NIVEL Y REPLANTEO FINAL M 424.55 3.61 1,532.63 - 0.00 0.00 0.00 424.55 1,532.63 424.55 1,532.63 0.00 0.00
01.05 CONTROL TOPOGRAFICO PERMANENTE EN OBRA mes 3.00 999.21 2,997.63 - 0.00 2.00 1,998.42 1.00 999.21 3.00 2,997.63 0.00 0.00
01.06 SEGURIDAD EN OBRA mes 3.00 1,332.76 3,998.28 - 0.00 2.00 2,665.52 1.00 1,332.76 3.00 3,998.28 0.00 0.00
0.1.07 INTERFERENCIAS CON TUBERIAS DE DESAGUE EST 1.00 2,500.00 2,500.00 - 0.00 1.00 2,500.00 0.00 0.00 1.00 2,500.00 0.00 0.00
0.1.08 EQUIPO DE BOMBEO PARA DESVIAR DESAGUE glb 1.00 1,400.00 1,400.00 - 0.00 0.50 700.00 0.50 700.00 1.00 1,400.00 0.00 0.00
2.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01 EXCAVACION DE ZANJAS, RETROEEXCAVADORA H:2.00M M 424.55 18.22 7,735.30 - 0.00 424.55 7,735.30 0.00 0.00 424.55 7,735.30 0.00 0.00
2.02 REFINE DE ZANJA M 424.55 1.89 802.40 - 0.00 424.55 802.40 0.00 0.00 424.55 802.40 0.00 0.00
2.03 PREPARACION DE CAMA DE APOYO C/MAT. PRESTAMO M 424.55 13.14 5,578.59 - 0.00 424.55 5,578.59 0.00 0.00 424.55 5,578.59 0.00 0.00
2.04 RELLENO C/MAT. PROPIO SELECCIONADO M 424.55 27.73 11,772.77 - 0.00 250.00 6,932.50 174.55 4,840.27 424.55 11,772.77 0.00 0.00
2.05 ELIMINACION DE MATERIAL EXCEDENTE M3 366.82 23.34 8,561.58 - 0.00 300.00 7,002.00 66.82 1,559.58 366.82 8,561.58 0.00 0.00
2.06 ENSAYO DE DENSIDAD DE CAMPO UND 30.00 119.88 3,596.40 - 0.00 0.00 0.00 30.00 3,596.40 30.00 3,596.40 0.00 0.00
3.00 BUZONES DE CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.01 EXCAVACION PARA BUZONES MANUAL M3 28.03 75.31 2,110.94 - 0.00 22.40 1,686.94 5.63 424.00 28.03 2,110.94 0.00 0.00
3.02 BUZON ESTÁNDAR D=1.20 M. Y H=1.50 M. UND 7.00 2,253.15 15,772.05 - 0.00 5.00 11,265.75 2.00 4,506.30 7.00 15,772.05 0.00 0.00
3.03 BUZON ESTÁNDAR D=1.20 M. Y H=2.00 M. UND 3.00 2,230.00 6,690.00 - 0.00 3.00 6,690.00 0.00 0.00 3.00 6,690.00 0.00 0.00
3.04 ELIMINACION DE MATERIAL EXCEDENTE M3 36.44 23.34 850.51 - 0.00 29.15 680.36 7.29 170.15 36.44 850.51 0.00 0.00
4.00 SUMINISTRO DE TUBERIA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01 SUMINISTRO DE TUBERIA PVC UF S-25 DN200mm M 424.55 30.48 12,940.28 424.55 12,940.28 0.00 0.00 0.00 424.55 12,940.28 0.00 0.00
5.00 INSTALACION DE TUBERIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.01 INSTALACION DE TUBERIA PVC UF S-25 DN 200 mm M 424.55 9.91 4,207.29 - 0.00 162.00 1,605.42 262.55 2,601.87 424.55 4,207.29 0.00 0.00
6.00 PRUEBA HIDRAULICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.01 PRUEBA HIDRAULICA TUBERIA PVC S-25 ALC D:200mm UND 424.55 5.69 2,415.69 - 0.00 0.00 0.00 424.55 2,415.69 424.55 2,415.69 0.00 0.00
7.00 EMPALMES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.01 DADOS DE CONCRETO, DE Fc=210 kg/cm2 UND 24.00 27.74 665.76 - 0.00 5.00 138.70 19.00 527.06 24.00 665.76 0.00 0.00
8.00 CONEXIONES DOMICILIARIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.01 TRAZO Y REPLANTEO PARA CONEXIONES DOMICILIARIAS M 481.00 1.79 860.99 - 0.00 481.00 860.99 0.00 481.00 860.99 0.00 0.00
8.02 EXCAVACION DE ZANJAS DE 0.80M M 481.00 11.27 5,420.87 - 0.00 177.18 1,996.82 481.00 5,420.87 658.18 7,417.69
8.03 REFINE DE ZANJA A=0.60 M M 481.00 2.32 1,115.92 - 0.00 0.00 0.00 481.00 1,115.92 481.00 1,115.92
8.04 PREPARACION DE CAMA DE APOYO CON MAT. PROPIO M 481.00 8.32 4,001.92 - 0.00 0.00 0.00 241.00 2,005.12 241.00 2,005.12
8.05 RELLENO COMPACTADO MANUAL C/MATERIAL PROPIO M 481.00 25.65 12,337.65 - 0.00 0.00 0.00 481.00 12,337.65 481.00 12,337.65
8.06 ELIMINACION DE MATERIAL EXCEDENTE M3 192.40 23.34 4,490.62 - 0.00 150.00 3,501.00 42.40 989.62 192.40 4,490.62
8.07 CONEXIÓN DOMICIL. DE AGUA 1/2 A TUBO PVC 110 mm UND 74.00 371.08 27,459.92 - 0.00 0.00 0.00 74.00 27,459.92 74.00 27,459.92
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALORIZACION Nº 04 VALORIZACION Nº 05 VALOR. ACUMULADA
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
1.00 OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
1.01 GLB 1.00 15,000.00 15,000.00 0.50 7,500.00 0.50 7,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 15,000.00
1.02 TRAZO Y REPLANTEO PERMANENTE EN OBRA M2 4,023.54 1.52 6,115.78 4,023.54 6,115.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,023.54 6,115.78
1.03 MANTENIMIENTO DEL TRANSITO Y SEGURIDAD VIAL MES 3.00 488.35 1,465.05 1.00 488.35 1.00 488.35 0.00 0.00 1.00 488.35 0.00 0.00 3.00 1,465.05
1.04 LIMPIEZA FINAL DE OBRA GLB 1.00 1,500.00 1,500.00 - 0.00 0.00 0.00 0.50 750.00 0.50 750.00 0.00 0.00 1.00 1,500.00
2.00 VEREDAS Y SARDINELES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01.01 DEMOLICION DE VEREDAS DE e=0.10m. M2 1,034.71 11.59 11,992.29 931.20 10,792.61 103.51 1,199.68 0.00 0.00 0.00 0.00 0.00 0.00 1,034.71 11,992.29
2.01.02 DEMOLICION DE SARDINELES PERALTADOS M3 47.14 9.01 424.73 37.14 334.63 10.00 90.10 0.00 0.00 0.00 0.00 0.00 0.00 47.14 424.73
2.01.03 DEMOLICION DE SARDINELES SUMERGIDOS M3 41.20 10.21 420.65 37.08 378.59 4.12 42.07 0.00 0.00 0.00 0.00 0.00 0.00 41.20 420.66
2.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.02.01 CORTE DE TERRENO MANUAL H=0.10 M2 1,625.99 2.87 4,666.59 1,463.39 4,199.93 162.60 466.66 0.00 0.00 0.00 0.00 0.00 0.00 1,625.99 4,666.59
2.02.02 EXCAVACION DE ZANJAS PARA SARDINEL PERALTADO M3 54.07 28.68 1,550.73 - 0.00 0.00 0.00 21.37 612.89 32.70 937.84 0.00 0.00 54.07 1,550.73
2.02.03 COMPACTACION DE SUBRASANTE M2 1,625.99 4.84 7,869.79 - 0.00 572.00 2,768.48 545.66 2,640.99 508.33 2,460.32 0.00 0.00 1,625.99 7,869.79
2.02.04 BASE GRAN. COMPAC. PARA VEREDAS e=0.10 m. M2 1,625.99 20.94 34,048.23 - 0.00 572.00 11,977.68 545.66 11,426.12 508.33 10,644.43 0.00 0.00 1,625.99 34,048.23
2.02.05 ACARREO DE MATERIAL A VEREDAS M3 162.60 9.94 1,616.24 - 0.00 62.60 622.24 54.57 542.39 45.43 451.61 0.00 0.00 162.60 1,616.24
2.02.06 ELIMINACION DE MATERIAL EXCEDENTE M3 195.12 23.34 4,554.10 175.60 4,098.50 19.52 455.60 0.00 0.00 0.00 0.00 0.00 0.00 195.12 4,554.10
0.2.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.03.01 CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.01.01 CONCRETO PARA VEREDAS Y RAMPAS Fc=175 kg/cm2 M3 1,625.99 51.60 83,901.08 - 0.00 485.20 25,036.32 545.66 28,156.06 595.13 30,708.71 0.00 0.00 1,625.99 83,901.09
02.03.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.01 ENCOFRADO Y DESENCOF.NORMAL EN VEREDAS Y RAMPAS M2 291.54 35.92 10,472.12 - 0.00 139.72 5,018.62 75.00 2,694.00 76.82 2,759.50 0.00 0.00 291.54 10,472.12
2.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01 CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01.01 CONCRETO PARA SARDINEL PERALTADO Fc: 175 kg/cm2 M3 1,029.25 30.12 31,001.01 - 0.00 0.00 0.00 405.57 12,215.77 623.68 18,785.24 0.00 0.00 1,029.25 31,001.01
02.04.01.02 ENCOFRADO Y DESENCOF.DE SARDINEL PERALTADO M2 308.99 47.75 14,754.27 - 0.00 0.00 0.00 121.67 5,809.74 187.32 8,944.53 0.00 0.00 308.99 14,754.27
2.05 ACERO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.05.01 ACERO Fy 4200 kg/cm2 GRADO 60 KG. 1,156.09 5.32 6,150.40 - 0.00 0.00 0.00 457.19 2,432.25 698.90 3,718.15 0.00 0.00 1,156.09 6,150.40
2.06 VARIOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06.01 BRUÑADO Y PULIDO 1.2X1.5 CM. DE ESPESOR PARA VEREDAS M2 1,235.94 18.68 23,087.36 - 0.00 450.00 8,406.00 429.28 8,018.95 356.66 6,662.41 0.00 0.00 1,235.94 23,087.36
02.06.02 JUNTAS DE DILATACION PARA ASFALTO m 411.98 5.61 2,311.21 - 0.00 0.00 0.00 0.00 0.00 411.98 2,311.21 0.00 0.00 411.98 2,311.21
02.06.03 PRUEBAS DE DENSIDAD DE CAMPO UND 24.00 119.88 2,877.12 - 0.00 10.00 1,198.80 10.00 1,198.80 4.00 479.52 0.00 0.00 24.00 2,877.12
02.06.04 PRUEBA DE CALIDAD DEL CONCRETO UND 25.00 25.48 637.00 - 0.00 16.00 407.68 6.00 152.88 3.00 76.44 0.00 0.00 25.00 637.00
02.06.05 PINTADO DE SARDINELES PERALTADOS Y VEREDAS M 2,059.90 11.39 23,462.26 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,059.90 23,462.26 2,059.90 23,462.26
3.00 PAVIMENTO FLEXIBLE EN CLIENTE e=2 pulg. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.3.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.01 DEMOLIVION DE PAVIMENTO ASFALTICO DE 2 pulg. M2 638.57 6.17 3,939.98 638.57 3,939.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 638.57 3,939.98
3.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.01 CORTE DE TERRENO NAT. A NIVEL DE SUBRASANTE M3 1,810.59 37.55 67,987.65 1,629.53 61,188.85 181.06 6,798.80 0.00 0.00 0.00 0.00 0.00 0.00 1,810.59 67,987.65
03.02.02 NIVELACION COMPACT. Y CONFORM. SUB RASANTE C/EQUIPO M2 4,023.54 5.85 23,537.71 - 0.00 815.25 4,769.21 2,448.29 14,322.50 760.00 4,446.00 0.00 0.00 4,023.54 23,537.71
03.02.03 SUB-BASE GRANULAR e=0.20 m. M3 804.71 68.32 54,977.79 - 0.00 163.00 11,136.16 489.71 33,456.85 152.00 10,384.78 0.00 0.00 804.71 54,977.79
03.02.04 BASE GRANULAR e=0.20 m. M3 804.71 78.05 62,807.62 - 0.00 163.00 12,722.15 489.71 38,221.71 152.00 11,863.76 0.00 0.00 804.71 62,807.62
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE M3 2,263.24 23.34 52,824.02 2,036.92 47,541.71 226.32 5,282.31 0.00 0.00 0.00 0.00 0.00 0.00 2,263.24 52,824.02
03.02.06 ENSAYO DE CALIDAD DE COMPACT. BASE Y SUB BASE UND 60.00 119.88 7,192.80 - 0.00 2.00 239.76 47.00 5,634.36 11.00 1,318.68 0.00 0.00 60.00 7,192.80
PAVIMENTO ASFALTICO
3.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.01 IMPRIMAVION ASFALTICA M2 4,023.54 4.81 19,353.23 - 0.00 0.00 0.00 0.00 0.00 4,023.54 19,353.23 0.00 0.00 4,023.54 19,353.23
03.03.02 CARPETA ASFALTICA EN CALIENTE DE 2" M2 4,023.54 31.52 126,821.98 - 0.00 0.00 0.00 0.00 0.00 4,023.54 126,821.98 0.00 0.00 4,023.54 126,821.98
03.03.03 TRANSPORTE DE MEZCLA ASFALT. LIMA - CAÑETE M3 245.27 194.72 47,758.97 - 0.00 0.00 0.00 0.00 0.00 245.27 47,758.97 0.00 0.00 245.27 47,758.97
0.4.00 SEÑALIZACION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01 PINTURA DE PAVIMENTOS LÍNEA CONTÍNUA M 1,341.18 8.25 11,064.74 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,341.18 11,064.74 1,341.18 11,064.74
4.02 PINTURA DE PAVIMENTOS LÍNEA DISCONTÍNUA M 419.12 6.00 2,514.72 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.12 2,514.72 419.12 2,514.72
4.03 MARCAS SOBRE EL PAVIMENTO M2 92.40 26.03 2,405.17 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.40 2,405.17 92.40 2,405.17
5.00 OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.01 NIVELACION DE TAPAS DE BUZONES und 11.00 138.09 1,518.99 - 0.00 8.00 1,104.72 3.00 414.27 0.00 0.00 0.00 0.00 11.00 1,518.99
6.00 AREAS VERDES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.01 ESCARIFICADO DE TERRENO M2 2,699.18 1.13 3,050.07 - 0.00 0.00 0.00 0.00 0.00 2,699.18 3,050.07 0.00 0.00 2,699.18 3,050.07
6.02 SUMINISTRO Y COLOCACION DE GRASS AMERICANO M2 2,699.18 20.15 54,388.48 - 0.00 0.00 0.00 0.00 0.00 1,825.00 36,773.75 874.18 17,614.70 2,699.18 54,388.45
6.03 SEMBRADO DE ARBUSTO CROTO DE COLORES UND 250.00 14.98 3,745.00 - 0.00 0.00 0.00 0.00 0.00 250.00 3,745.00 0.00 0.00 250.00 3,745.00
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01.00 TRABAJOS PRELIMINARES PARA TODA LA OBRA
01.00.00 OBRAS PROVISIONALES 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03 TRAZO NIVELES Y REPLANTEO INICIAL m 140.00 3.98 557.20 140.00 557.20 - 0.00 0.00 140.00 557.20 0.00 0.00
01.04 TRAZO NIVELES Y REPLANTEO FINAL m 140.00 3.61 505.40 - 0.00 140.00 505.40 0.00 140.00 505.40 0.00 0.00
01.05 CONTROL TOPOGRAFICO PERMANENTE mes 1.00 999.21 999.21 - 0.00 1.00 999.21 0.00 1.00 999.21 0.00 0.00
01.06 SEGURIDAD EN OBRA mes 1.00 1,332.76 1,332.76 - 0.00 1.00 1,332.76 0.00 1.00 1,332.76 0.00 0.00
02.00.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01 EXCAVACION DE ZANJA CON RETROEXCAVADORA m 140.00 18.22 2,550.80 - 0.00 140.00 2,550.80 0.00 140.00 2,550.80 0.00 0.00
02.02 REFINE DE ZANJA INCLUYE A=0.8 M m 140.00 1.89 264.60 - 0.00 140.00 264.60 0.00 140.00 264.60 0.00 0.00
02.03 PREPARACION DE CAMA DE APOYO C/MAT PREST. m 140.00 13.14 1,839.60 - 0.00 140.00 1,839.60 0.00 140.00 1,839.60 0.00 0.00
02.04 RELLENO CON PATERIA PROPIO SELECIONANDO m 140.00 27.73 3,882.20 - 0.00 140.00 3,882.20 0.00 140.00 3,882.20 0.00 0.00
02.05 ELIMINACION DE MATERIAL EXCEDENTE m 123.00 23.34 2,870.82 - 0.00 123.00 2,870.82 0.00 123.00 2,870.82 0.00 0.00
2.06 PRUEBA DE DENSIDAD DE CAMPO und 10.00 119.88 1,198.80 - 0.00 10.00 1,198.80 0.00 10.00 1,198.80 0.00 0.00
03.00.00 BUZONES DE CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01 EXCAVACION PARA BUZONES m3 6.11 75.31 460.14 - 0.00 6.11 460.14 0.00 6.11 460.14 0.00 0.00
03.02 Buzón estándar d=1.20 m h<2.00 m. und 2.00 2,253.15 4,506.30 - 0.00 2.00 4,506.30 0.00 2.00 4,506.30 0.00 0.00
03.04 Eliminación de material excedente con equipo hasta 15 Km. m3 7.94 23.34 185.32 - 0.00 7.94 185.32 0.00 7.94 185.32 0.00 0.00
04.00 SUMINISTRO E INSTALACION DE TUBERIAS ALC PVC S:25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01 Suministro de tubería PVC UF S-25 DN 200 mm. m 140.00 30.48 4,267.20 140.00 4,267.20 - 0.00 0.00 140.00 4,267.20 0.00 0.00
05.00 INSTALACION DE TUBERIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.01.00 Instalación de tubería PVC UF S-25 DN 200 mm m 140.00 9.91 1,387.40 - 0.00 140.00 1,387.40 0.00 140.00 1,387.40 0.00 0.00
06.00.00 PRUEBA HIDRAULICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.09.01.0Prueba hidráulica P/Tub Desague DN 200 mm Alca m 140.00 5.69 796.60 - 0.00 140.00 796.60 0.00 140.00 796.60 0.00 0.00
07.00.00 EMPALMES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.01.00 Dados de concreto f’c=140 Kg/ cm2 und 9.00 27.74 249.66 - 0.00 9.00 249.66 0.00 9.00 249.66 0.00 0.00
08.00.00 CONEXIONES DOMICILIARIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.01 Trazo y replanteo de conexiones domiciliarias alc m 123.50 1.79 221.07 - 0.00 123.50 221.07 0.00 123.50 221.07 0.00 0.00
8.02 Excavación de Zanja manual h=0.8 m m 123.50 11.27 1,391.85 - 0.00 123.50 1,391.85 0.00 123.50 1,391.85 0.00 0.00
8.03 Refine de zanja A=0.8 m m 123.50 2.32 286.52 - 0.00 123.50 286.52 0.00 123.50 286.52 0.00 0.00
8.04 Preparación de cama de apoyo c/mat propio m 123.50 8.32 1,027.52 - 0.00 123.50 1,027.52 0.00 123.50 1,027.52 0.00 0.00
8.05 Relleno con material propio seleccionado. m 123.50 25.65 3,167.78 - 0.00 123.50 3,167.78 0.00 123.50 3,167.78 0.00 0.00
8.06 Eliminación de material excedente m 49.40 23.34 1,153.00 - 0.00 49.40 1,153.00 0.00 49.40 1,153.00 0.00 0.00
8.07 L=6.00 m und 19.00 371.08 7,050.52 - 0.00 19.00 7,050.52 0.00 19.00 7,050.52 0.00 0.00
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01.00 OBRAS PRELIMINARES
01.01 TRAZO Y REPLANTEO PERMANENTE EN OBRA m3 392.70 1.52 596.90 392.70 596.90 - 0.00 0.00 392.70 596.90 0.00 0.00
01.02 MANTENIMIENTO DEL TRANSITO Y SEGURIDAD VIAL mes 1.00 488.35 488.35 0.50 244.18 0.50 244.17 0.00 1.00 488.35 0.00 0.00
02.00 CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01 CONCRETO PARA SARDINEL PERALTADO F´C=140 Kg /cm2 m3 15.20 30.12 457.82 8.00 240.96 7.20 216.86 0.00 15.20 457.82 0.00 0.00
02.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL PERALTADO m2 78.79 47.75 3,762.22 - 0.00 78.79 3,762.22 0.00 78.79 3,762.22 0.00 0.00
03.00 ACERO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01 ACERO F´= 4800 Kg /cm2 GRADO 60 kg 350.50 5.32 1,864.66 350.50 1,864.66 - 0.00 0.00 350.50 1,864.66 0.00 0.00
04.00 VARIOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01 JUNTA DE DILATACION PARA ASFALTO m 7.99 5.61 44.82 - 0.00 7.99 44.82 0.00 7.99 44.82 0.00 0.00
04.02 PRUEBA DE DENSIDAD DE CAMPO und 6.00 119.88 719.28 6.00 719.28 - 0.00 0.00 6.00 719.28 0.00 0.00
04.03 PRUEBA DE CALIDAD DEL CONCRETO und 2.00 25.48 50.96 1.00 25.48 1.00 25.48 0.00 2.00 50.96 0.00 0.00
04.04 PINTADO DE SARDINEL PERALTADO Y VEREDAS m 51.00 11.39 580.89 - 0.00 51.00 580.89 0.00 51.00 580.89 0.00 0.00
03.00 PAVIMENTO FLEXIBLE EN CLIENTE E = 2 PULG. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.01 CORTE DE TERRENO NAT. A NIVEL DE SUB RAZANTE m3 103.90 37.55 3,901.45 - 0.00 103.90 3,901.45 0.00 103.90 3,901.45 0.00 0.00
03.01.02 NIVELACION COMP. Y CONFORMACION DE SUB RAZANTE m2 392.70 5.85 2,297.30 - 0.00 392.70 2,297.30 0.00 392.70 2,297.30 0.00 0.00
03.01.03 SUB BASE GRANULAR E=0.2 M m3 103.90 68.32 7,098.45 - 0.00 103.90 7,098.45 0.00 103.90 7,098.45 0.00 0.00
03.01.04 ELIMINACION DE MATERIAL EXCEDENTE m3 135.07 23.34 3,152.53 - 0.00 135.07 3,152.53 0.00 135.07 3,152.53 0.00 0.00
03.01.05 ENSAYO DE CALIDAD DE COMP. BASE Y SU BASE und 2.00 119.88 239.76 - 0.00 2.00 239.76 0.00 2.00 239.76 0.00 0.00
04.00 OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01 NIVELACION DE TAPAS DE BUZONES und 2.00 138.09 276.18 - 0.00 2.00 276.18 0.00 2.00 276.18 0.00 0.00
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
ESPECIALIDAD : SISTEMA DE AGUA POTABLE
47 MANO DE OBRA M 100.000 0.238 470.79 471.44 0.238 471.44 0.238 471.44 0.238 471.44 0.238 497.55 0.252
43 MADERA NACIONAL P/ENCOFRADO Y CARPINTERÍA APM 1.818 0.110 561.58 570.05 0.111 571.49 0.111 572.29 0.111 565.10 0.111 568.17 0.111
10 APARATO SANITARIO CON GRIFERÍA 10.687 345.45 354.80 355.92 357.66 362.95 363.36
2 ACERO CONSTRUCCIÓN LISO 2.290 437.12 442.79 444.90 454.58 471.93 475.70
21 CEMENTO PORTLAND TIPO I MC 29.714 0.175 339.42 339.42 0.174 339.42 0.175 339.42 0.177 339.42 0.181 339.42 0.182
49 MAQUINARIA Y EQUIPO IMPORTADO 70.286 230.11 228.85 229.46 233.87 243.07 245.72
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 100.000 0.346 379.42 384.88 0.351 385.85 0.352 386.60 0.353 387.61 0.353 389.74 0.355
500.000 1.000 K= 1.009 K= 1.012 K= 1.015 K= 1.021 1.039
CALCULO DEL COEFICIENTE DE REAJUSTE (K)
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
ESPECIALIDAD : SISTEMA DE ALCANTARILLADO
47 MANO DE OBRA M 100.000 0.218 470.79 471.44 0.218 471.44 0.218 471.44 0.218 471.44 0.218 497.55 0.230 497.55 0.230
49 MAQUINARIA Y EQUIPO IMPORTADO MPA 97.838 0.185 230.11 228.85 0.184 229.46 0.185 233.87 0.188 243.07 0.195 245.72 0.197 248.02 0.199
53 PETRÓLEO DIESSEL 1.081 868.93 893.43 891.45 851.05 849.06 879.53 879.53
5 AGREGADO GRUESO CAF 26.772 0.139 214.90 216.91 0.140 216.28 0.140 216.26 0.140 216.78 0.140 217.68 0.140 218.28 0.140
21 CEMENTO PORTLAND TIPO I 48.819 339.42 339.42 339.42 339.42 339.42 339.42 339.42
32 FLETE TERRESTRE 24.409 449.56 455.86 455.86 455.86 455.72 455.72 455.72
10 APARATO SANITARIO CON GRIFERÍA TA 9.848 0.132 345.45 354.80 0.137 355.92 0.137 357.66 0.137 362.95 0.139 363.36 0.140 364.40 0.142
72 TUBERÍA DE PVC 90.152 346.50 358.85 359.18 359.22 364.70 369.01 372.48
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 100.000 0.326 379.42 384.88 0.331 385.85 0.332 386.60 0.332 387.61 0.333 389.74 0.335 391.85 0.337
500.000 1.000 K= 1.010 K= 1.012 K= 1.015 K= 1.025 K= 1.042 K= 1.048
CALCULO DEL COEFICIENTE DE REAJUSTE (K)
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
ESPECIALIDAD : PAVIMENTOS
47 MANO DE OBRA M 100.000 0.124 470.79 471.44 0.124 471.44 0.124 471.44 0.124 471.44 0.124 497.55 0.131 497.55 0.131 497.55 0.131
3 ACERO DE CONSTRUCCIÓN CORRUGADO AA 5.469 0.128 431.43 438.01 0.129 436.72 0.129 446.97 0.129 463.77 0.130 469.79 0.131 473.58 0.131 469.34 0.131
5 AGREGADO GRUESO 94.531 214.90 216.91 216.28 216.26 216.78 217.68 218.28 218.23
13 ASFALTO AP 95.783 0.166 1,697.48 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166
53 PETRÓLEO DIESSEL 4.217 868.93 893.43 891.45 851.05 849.06 879.53 879.53 923.90
49 MAQUINARIA Y EQUIPO IMPORTADO MM 94.677 0.263 230.11 228.85 0.262 229.46 0.262 233.87 0.267 243.07 0.277 245.72 0.280 248.02 0.282 246.08 0.280
45 MADERA TERCIADA PARA ENCOFRADO 5.323 311.81 314.32 314.32 314.48 311.57 311.60 311.97 311.97
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 100.000 0.319 379.42 384.88 0.324 385.85 0.324 386.60 0.325 387.61 0.326 389.74 0.328 391.85 0.329 392.28 0.330
500.000 1.000 K= 1.005 K= 1.005 K= 1.011 K= 1.023 K= 1.036 K= 1.039 K= 1.038
DEDUCCION POR REINTEGRO QUE NO CORRESPONDE POR ADELANTO DE MATERIALES 01
OBRA MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA CONIESA E.I.R.L
SUPERVISOR CONSORCIO SAN JOSÉ
MATERIAL MONTO MES VAL. MES MONTO COEF. % ADEL. POR Io Ia Ir ADELANTO ADELANTO ADELANTO ADELANTO DEDUCCION
(I.U.) ADELANTO ADEL. No. VAL. VALORIZADO INC. INC. UTILIZAR OCT.2011 DIC.2011 DEFLACTADO SALDO UTILIZADO SALDO (D)
(A) (V) (I) (%) (Au) ANTERIOR (M) ACTUAL
VxIx% A x Io / Ia (S) ( Au ó S) S-M Mx(Ir-Ia)/Io
ASFALTO 0.00 20-Mar-2013 01 30.ABR.2013 34,864.72 0.131 87.02 3,974.58 346.50 359.18 359.22 0.00 0.00 0.00 0.00 0.00
02 31.MAY.2013 78,976.52 9,003.33 364.70 0.00 0.00 0.00 0.00
(13) 03 30.JUN.2013 65,193.36 7,432.05 369.01 0.00 0.00 0.00 0.00
04 31.JUL.2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1
AGREGADO 0.00 20-Mar-2013 01 30.ABR.2013 34,864.72 0.110 1.82 69.72 561.58 571.49 572.29 0.00 0.00 0.00 0.00 0.00
GRUESO 02 31.MAY.2013 78,976.52 157.94 565.10 0.00 0.00 0.00 0.00
(05) 03 30.JUN.2013 65,193.36 130.37 568.17 0.00 0.00 0.00 0.00
04 31.JUL.2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2
MADERA 0.00 20-Mar-2013 01 30.ABR.2013 34,864.72 #REF! 0.00 #REF! 0.00 0.00 0.00 #DIV/0! #DIV/0! #REF! #DIV/0! #REF!
TORNILLO 02 31.MAY.2013 78,976.52 #REF! 0.00 #DIV/0! #REF! #DIV/0! #REF!
(43) 03 30.JUN.2013 65,193.36 #REF! 0.00 #DIV/0! #REF! #DIV/0! #REF!
04 31.JUL.2013 0.00 #REF! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!
3
ACUMULADO ACTUAL #REF!
ACUMULADO ANTERIOR
SALDO ACTUAL #REF!
DEDUCCION POR REINTEGRO QUE NO CORRESPONDE POR ADELANTO DE MATERIALES 01
OBRA MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA CONIESA E.I.R.L
SUPERVISOR CONSORCIO SAN JOSÉ
MATERIAL MONTO MES VAL. MES MONTO COEF. % ADEL. POR Io Ia Ir ADELANTO ADELANTO ADELANTO ADELANTO DEDUCCION
(I.U.) ADELANTO ADEL. No. VAL. VALORIZADO INC. INC. UTILIZAR OCT.2011 DIC.2011 DEFLACTADO SALDO UTILIZADO SALDO (D)
(A) (V) (I) (%) (Au) ANTERIOR (M) ACTUAL
VxIx% A x Io / Ia (S) ( Au ó S) S-M Mx(Ir-Ia)/Io
formula 2
47 MANO DE OBRA 100.000 0.218 188340.97 41,058.33
49 MAQUINARIA Y EQUIPO IMPORTADO 97.838 0.185 188340.97 34,089.77
53 PETRÓLEO DIESSEL 1.081 0.185 188340.97 376.65
1 ACEITE 1.081 0.185 188340.97 376.65
5 AGREGADO GRUESO 26.772 0.139 188340.97 7008.7476
21 CEMENTO PORTLAND TIPO I 48.819 0.139 188340.97 12,780.52
32 FLETE TERRESTRE 24.409 0.139 188340.97 6,390.13
10 APARATO SANITARIO CON GRIFERÍA 9.848 0.132 188340.97 2,448.31
72 TUBERÍA DE PVC 90.152 0.132 188340.97 22,412.70
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100.000 0.326 188340.97 61,399.16
formula 3
47 MANO DE OBRA 100 0.124 1002920.31 124,362.12
3 ACERO DE CONSTRUCCIÓN CORRUGADO 5.469 0.128 1002920.31 7,020.76
5 AGREGADO GRUESO 94.531 0.128 1002920.31 121,353.04
13 ASFALTO 95.783 0.166 1002920.31 159,464.11
53 PETRÓLEO DIESSEL 4.217 0.166 1002920.31 7,020.66
49 MAQUINARIA Y EQUIPO IMPORTADO 94.677 0.263 1002920.31 249,727.67
45 MADERA TERCIADA PARA ENCOFRADO 5.323 0.263 1002920.31 14,040.37
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100 0.319 1002920.31 319,931.58
OBRA MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA CONIESA E.I.R.L
SUPERVISOR CONSORCIO SAN JOSÉ
MATERIAL MONTO MES VAL. MES MONTO COEF. % ADEL. POR Io Ia Ir ADELANTO ADELANTO ADELANTO ADELANTO DEDUCCION
(I.U.) ADELANTO ADEL. No. VAL. VALORIZADO INC. INC. UTILIZAR AGO.12 MAR.12 DEFLACTADO SALDO UTILIZADO SALDO (D)
(A) (V) (I) (%) (Au) ANTERIOR (M) ACTUAL
VxIx% A x Io / Ia (S) ( Au ó S) S-M Mx(Ir-Ia)/Io
CEMENTO 22,090.23 MAR.13 0.175 29.714 0.00 339.42 339.42 22,090.23 0.00 0.00 0.00 0.00
TIPO I 01 30.ABR.08 34,864.72 1,812.95 339.42 22,090.23 1,812.95 20,277.28 0.00
(21) 02 31.MAY.08 78,976.52 4,106.74 339.42 20,277.28 4,106.74 16,170.54 0.00
03 30.JUN.08 65,193.36 3,390.02 339.42 16,170.54 16,170.54 0.00 0.00
04 31.JUL.08
05 31.AGO.08
1
TUBERÍA 42,822.66 MAR.13 0.132 90.152 0.00 346.50 358.85 41,348.90 0.00 0.00 0.00 0.00
PVC 01 30.ABR.08 17,416.39 2,072.56 359.18 41,348.90 2,072.56 39,276.33 1.97
(72) 02 31.MAY.08 80,359.55 9,562.84 359.22 39,276.33 9,562.84 29,713.49 10.21
03 30.JUN.08 90,565.05 10,777.30 364.70 29,713.49 29,713.49 0.00 501.66
04 31.JUL.08
05 31.AGO.08
2
AGREGADO 121,353.04 MAR.13 0.128 94.531 0.00 214.90 216.91 120,228.52 0.00 0.00 0.00 0.00
GRUESO 01 30.ABR.08 175,894.71 21,283.20 216.28 120,228.52 21,283.20 98,945.32 -62.39
(05) 02 31.MAY.08 129,277.67 15,642.56 216.26 98,945.32 15,642.56 83,302.76 -47.31
03 30.JUN.08 202,440.63 24,495.25 216.78 83,302.76 24,495.25 58,807.51 -14.82
04 31.JUL.08 426,833.38 51,646.70 217.68 58,807.51 51,646.70 7,160.81 185.05
05 31.AGO.08 68,473.93 8,285.32 218.28 7,160.81 7,160.81 0.00 45.65
3
ASFALTO 159,464.11 0.166 95.783 0.00 1,697.48 1,697.48 159,464.11 159,464.11 0.00 159,464.11 0.00
01 30.ABR.08 175,894.71 27,967.22 1,697.48 159,464.11 27,967.22 131,496.89 0.00
(13) 02 31.MAY.08 129,277.67 20,555.12 1,697.48 131,496.89 20,555.12 110,941.77 0.00
03 30.JUN.08 202,440.63 32,188.02 1,697.48 110,941.77 32,188.02 78,753.75 0.00
04 31.JUL.08 426,833.38 67,866.41 1,697.48 78,753.75 67,866.41 10,887.34 0.00
05 31.AGO.08 68,473.93 10,887.34 1,697.48 10,887.34 10,887.34 0.00 0.00
EQUIPO 202,388.32 0.263 94.677 0.00 230.11 228.85 203,502.62 203,502.62 0.00 203,502.62 0.00
IMPORTADO 01 30.ABR.08 175,894.71 43,797.87 229.46 203,502.62 43,797.87 159,704.75 116.10
(49) 02 31.MAY.08 129,277.67 32,190.21 233.87 159,704.75 32,190.21 127,514.54 702.25
03 30.JUN.08 202,440.63 50,407.82 243.07 127,514.54 50,407.82 77,106.72 3,115.03
04 31.JUL.08 426,833.38 106,281.73 245.72 77,106.72 77,106.72 0.00 5,652.91
05 31.AGO.08 68,473.93 17,050.04 248.02 0.00 0.00 0.00 0.00
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
Monto Contratado (C) = 1,616,949.14
D = A x V (K/Ka - 1) / C Monto Adelanto (A) = 323,389.83
Fecha Adelanto = 19-Mar-2013
ESPECIALIDAD : SISTEMA DE AGUA POTABLE Coef. Adelanto (Ka) = 1.009
PROGRAMADO EJECUTADO REAJUSTE
VAL. FECHA COEF. VALORIZACION DEDUCC. REAJUSTE VALORIZACION DEDUCC. REAJUSTE RECONOCIDO
REAJ. PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADO
(K) (V) D V x (K-1) - D (V) D V x (K-1) - D
01 30.ABR.2013 1.015 28,995.09 28,995.09 434.93 434.93 34,864.72 34,864.72 41.46 481.51 481.51 481.51 481.51
02 31.MAY.2013 1.021 49,651.63 78,646.72 1,042.68 1,477.61 78,976.52 113,841.24 187.85 1,470.66 1,952.17 1,470.66 1,952.17
03 30.JUN.2013 1.039 100,387.88 179,034.60 3,915.13 5,392.74 65,193.36 179,034.60 387.67 2,154.87 4,107.04 2,154.87 4,107.04 (1)
04 31.JUL.2013
05 31.AGO.2013
616.98
Deductivo que no Corresponde por Adelanto Directo 616.98
Deductivo que no Corresponde por Adelanto de Materiales 0.00 (2)
Reajuste Acumulado Neto 3,490.06 (1) - (2)
864.50
Deductivo que no Corresponde por Adelanto Directo 864.50
Deductivo que no Corresponde por Adelanto de Materiales 513.84 (2)
Reajuste Acumulado Neto 2,370.72 (1) - (2)
1147.66
CALCULO DEL REAJUSTE VALORIZADO CONTRATO PRINCIPAL
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
Monto Contratado (C) = 1,616,949.14
D = A x V (K/Ka - 1) / C Monto Adelanto (A) = 323,389.83
Fecha Adelanto = 19-Mar-2013
ESPECIALIDAD : PAVIMENTOS Coef. Adelanto (Ka) = 1.005
PROGRAMADO EJECUTADO REAJUSTE
VAL. FECHA COEF. VALORIZACION DEDUCC. REAJUSTE VALORIZACION DEDUCC. REAJUSTE RECONOCIDO
REAJ. PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADO
(K) (V) D V x (K-1) - D (V) D V x (K-1) - D
01 30.ABR.2013 1.011 143,954.50 143,954.50 171.89 1,411.61 1,411.61 175,894.71 175,894.71 210.02 1,724.82 1,724.82 1,724.82 1,724.82
02 31.MAY.2013 1.023 233,450.01 377,404.51 836.24 4,533.11 5,944.72 129,277.67 305,172.38 463.08 2,510.31 4,235.13 4,219.90 5,944.72
03 30.JUN.2013 1.036 208,505.30 585,909.81 1,286.30 6,219.89 12,164.61 202,440.63 507,613.01 1,248.89 6,038.97 10,274.10 6,038.97 11,983.69
04 31.JUL.2013 1.039 208,505.30 794,415.11 1,410.78 6,720.93 18,885.54 426,833.38 934,446.39 2,888.03 13,758.47 24,032.57 13,758.47 25,742.16
05 31.AGO.2013 1.038 208,505.20 1,002,920.31 1,369.29 6,553.91 25,439.45 68,473.93 1,002,920.32 449.68 2,152.33 26,184.90 (302.71) 25,439.45 (1)
5,259.70
Deductivo que no Corresponde por Adelanto Directo 5,259.70
Deductivo que no Corresponde por Adelanto de Materiales 9,692.47 (2)
Reajuste Acumulado Neto 10,487.28 (1) - (2)
FACTOR DE LIQUIDACION "F"
F
R = i x ---- x Vc
Io
Donde:
R = Reintegro por pago de compensación por tiempo de servicios.
F = Factor de liquidación correspondiente al mes de pago de la valorización.
i = Incidencia de mano de obra en la fórmula polinómica.
Io = Indice de mano de obra correspondiente al mes del presupuesto base.
Vc = Valorización Contractual (V1 +V2 + V3 + V4 + V5 + V6 + V7 + V8)
CAPITULO : PAVIMENTOS
1.39
R3 = 0.124 x ---------- x 0.00
470.79
R3 = 0.00
CAPITULO : #REF!
1.39
R4 = #REF! x ---------- x #REF!
#REF!
R4 = #REF!
CAPITULO : #REF!
1.39
R5 = #REF! x ---------- x #REF!
#REF!
R5 = #REF!
TOTAL :
R = R1 + R2 + R3 + R4 + R5
R = #REF!
FACTOR DE LIQUIDACION "V"
V
R = i x ---- x Vc
Io
Donde:
R = Reintegro por pago de compensación vacacional.
V = Factor de liquidación correspondiente al mes de pago de la valorización.
(Este factor son publicados por INEI anualmente en setiembre, por lo que,
conservadoramente, se ha considerado el valor publicado el año 2011).
i = Incidencia de mano de obra en la fórmula polinómica.
Io = Indice de mano de obra correspondiente al mes del presupuesto base.
Vc = Valorización Contractual (V1 +V2 + V3 + V4 + V5 + V6 + V7 + V8)
CAPITULO : PAVIMENTOS
1.06
R3 = 0.124 x ---------- x 0.00
470.79
R3 = 0.00
CAPITULO : #REF!
1.06
R4 = #REF! x ---------- x #REF!
470.79
R4 = #REF!
CAPITULO : #REF!
1.06
R5 = #REF! x ---------- x #REF!
470.79
R5 = #REF!
TOTAL :
R = R1 + R2 + R3 + R4 + R5
R = #REF!
RESUMEN DE VALORIZACION Y REAJUSTES RECALCULADOS
DEL CONTRATO PRINCIPAL
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE -
DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATO 1,370,295.88 (Sin I.G.V.)
SUPERVISION : CONSORCIO SAN JOSÉ PLAZO EJECUCION 90 días calendario
Mayores Gastos Generales Variables (MGGV) Las Ampliaciones de Plazo en los contratos de obra, darán lugar al pago de
Mayores Gastos Generales Variables iguales al número de días
correspondientes a la ampliación multiplicados por el gasto general variable
diario, salvo en los casos de obras adicionales que cuentan con
presupuestos específicos.
Gasto General Variable Diario (GGVD) En los contratos de obra a suma alzada, el Gasto General Diario, se calcula
dividiendo los Gastos Generales Variables del Presupuesto que sustenta el
Valor Referencial entre el número de días del plazo contractual, ajustado por
el factor de relación y por el coeficiente “Ip/Io”, en donde “Ip” es el Índice
General de Precios al Consumidor (Código 39) aprobado por el Instituto
Nacional de Estadística e Informática - INEI correspondiente al mes
calendario en que ocurre la causal de ampliación del plazo contractual, e
“Io” es el mismo índice de precios correspondiente al mes del valor
referencial.
AYORES GASTOS GENERALES VARIABLES TOTAL S/. 0.00 (1) + (2) + (3)
VALORIZACIONES TRAMITADAS Y PAGADAS CONTRATO PRINCIPAL
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ Contrato Principal C/IGV 1,616,949.14
CONCEPTO MES MONTO AMORTIZACION Y/O DEDUCCION VALORIZACIÓN TRAMITADA VALORIZACIÓN PAGADA MES DE MONTO TOTAL COBRADO
VALORIZADO VALORIZAC. REAJUSTE TOTAL ADEL ADEL SUB VALORIZAC. I.G.V. MONTO MONTO DETRACCIÓN GFC MONTO FACTURA PAGO NETO IGV TOTAL
T O TAL 1,616,948.99 0.00 1,616,948.99 323,389.92 646,779.65 970,169.57 1,370,295.68 246,653.22 1,616,948.90 1,374,406.63 80,847.45 161,694.91 1,616,949.00 1,370,295.77 246,653.23 1,616,949.00
CONCEPTO MES MONTO AMORTIZACION Y/O DEDUCCION VALORIZACIÓN TRAMITADA VALORIZACIÓN PAGADA MES DE MONTO TOTAL COBRADO
VALORIZADO VALORIZAC. REAJUSTE TOTAL ADELANTO ADELANTO SUB VALORIZAC. I.G.V. MONTO MONTO DETRACCIÓN OTROS MONTO FACTURA PAGO NETO IGV TOTAL
SUB DIRECTO MATERIAL TOTAL NETA TOTAL CHEQUE 5% TOTAL
VALORIZAC. 01 30-Jun-2013 12,058.47 12,058.47 0.00 0.00 0.00 10,219.04 1,839.43 12,058.47 11,455.55 602.92 12,058.47 003-001845 17-Jul-2013 10,219.04 1,839.43 12,058.47
VALORIZAC. 02 31-Jul-2013 83,781.88 83,781.88 0.00 0.00 0.00 71,001.59 12,780.29 83,781.88 79,592.79 4,189.09 83,781.88 003-001853 11-Jun-2012 71,001.59 12,780.29 83,781.88
T O TAL 95,840.35 0.00 95,840.35 0.00 0.00 0.00 81,220.63 14,619.72 95,840.35 91,048.33 4,792.02 0.00 95,840.35 81,220.64 14,619.72 95,840.36
RESUMEN DE LIQUIDACION DEL CONTRATO DE OBRA
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y
ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE -
PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
B.2 REAJUSTES
- Contrato Principal 16,348.06 0.00 16,348.06