You are on page 1of 26

GENERALIDADES

PROCESO DE SELECCIÓN A.D.P. Nº 002-2013-MPC


OBRA MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y
ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE -
PROVINCIA CAÑETE - LIMA
UBICACIÓN DISTRITO: SAN VICENTE - PROVINCIA: CAÑETE - DEPARTAMENTO: LIMA

ENTIDAD CONTRATANTE MUNICIPALIDAD PROVINCIAL DE CAÑETE


COORDINADOR DE OBRA
SUPERVISOR DE OBRA CONSORCIO SAN JOSÉ
CONTRATISTA CONIESA E.I.R.L
RESIDENTE DE OBRA ING. DANILO JORGE VEGA MIGONE

CONTRATO DE OBRA N° S/N


SISTEMA DE CONTRATACION SUMA ALZADA
FECHA FIRMA DEL CONTRATO 12-Mar-2013 S/IGV

VALOR REFERENCIAL S/. 1,616,949.14 (C/IGV 18%) con precios a AGO.2012


MONTO CONTRATADO S/. 1,616,949.14 (C/IGV 18%) C/IGV
SISTEMA DE AGUA POTABLE 211,260.83
SISTEMA DE ALCANTARILLADO 222,242.34
PAVIMENTOS 1,183,445.97

PRESUPUESTO ADICIONAL DE OBRA N° 01 95,840.30 (C/IGV 18%) con precios a AGO.2012


SISTEMA DE ALCANTARILLADO #REF!
PAVIMENTOS #REF!

COSTO TOTAL DE OBRA S/. 1,732,080.15 (C/IGV 18%)

GASTOS GENERALES DEL VALOR REFERENCIAL 114,191.32


GASTOS GENERALES VARIABLES 97,062.62
GASTOS GENERALES FIJOS 17,128.70

ADELANTO DIRECTO OTORGADO S/. 323,389.83 (C/IGV 18%)


FECHA PAGO ADELANTO DIRECTO 19-Mar-2013

ADELANTO MATERIALES S/. 646,779.65 (C/IGV 18%)


FECHA PAGO ADELANTO MATERIALES 20-Mar-2013

PLAZO CONTRATADO 90 días calendario

FECHA ENTREGA DE TERRENO 27-Mar-2013


FECHA INICIO DEL PLAZO CONTRACTUAL 28-Mar-2013
FECHA TERMINO DEL PLAZO INICIALMENTE 25-Jun-2013
AMPLIACIÓN DE PLAZO N° 01 01 días calendario.
AMPLIACIÓN DE PLAZO N° 02 40 días calendario.
AMPLIACIÓN DE PLAZO N° 03 03 días calendario.
FECHA TERMINO PLAZO CONTRACTUAL 08-Aug-2013
FECHA TERMINO PLAZO REAL 08-Aug-2013
FECHA RECEPCIÓN DE OBRA 30-Sep-2013
VALORIZACIONES RECALCULADAS
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : 0 VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ NOV - 2011 DIC - 2011 ENE - 2012 FEB - 2012 FACTOR DE RELACION 1.00000
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALORIZACION Nº 04 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
1.00 ESTRUCTURA
1.01 TRABAJOS PRELIMINARES
1.01.01 DEMOLICION DE MURO DE LADRILLO MANUAL m2 50.22 5.38 270.18 50.22 270.18 0.00 0.00 0.00 0.00 50.22 270.18 0.00 0.00
1.01.02 DEMOLICION DE SOBRECIMIENTOS EQUIPO m3 1.26 68.19 85.92 1.26 85.92 0.00 0.00 0.00 0.00 1.26 85.92 0.00 0.00
1.01.03 DEMOLICION DE CMENTACION CON EQUIPOS m3 6.70 57.65 386.26 6.70 386.26 0.00 0.00 0.00 0.00 6.70 386.26 0.00 0.00
1.01.04 DEMOLICION DE VEREDA NANUAL m2 7.30 5.38 39.27 7.30 39.27 0.00 0.00 0.00 0.00 7.30 39.27 0.00 0.00
1.01.05 TRAZO Y REPLANTEO PRILIMINAR m2 91.43 1.62 148.12 91.43 148.12 0.00 0.00 0.00 0.00 91.43 148.12 0.00 0.00
1.02 MOVIMIENTO DE TIERRA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.02.01 EXCAV.ZANJA P/ CIMIENTOS m3 248.51 30.71 7,631.74 36.47 1,119.99 0.00 184.48 5,665.38 27.56 846.37 248.51 7,631.74 0.00 0.00
1.02.02 RELLENO COMPACTADO A MANO-MAT. PROPIO m3 18.18 15.37 279.43 0.00 18.18 279.43 0.00 0.00 0.00 18.18 279.43 0.00 0.00
1.02.03 RELLENO COMPACTADO A MANO-MATERIAL DE PRESTAMO m2 53.80 10.16 546.61 0.00 53.80 546.61 0.00 0.00 0.00 53.80 546.61 0.00 0.00
1.02.04 ACARREO INTERNO.MATERIA PREOCEDENTE DE EXCAV.+DEMOL. m3 295.86 21.50 6,360.99 60.00 1,290.00 0.00 176.69 3,798.84 59.17 1,272.15 295.86 6,360.99 0.00 0.00
1.02.05 ELIMIACION DE MATERIA EXCEDENTE ACARREADO m3 295.86 33.88 10,023.74 60.00 2,032.80 0.00 87.93 2,979.07 147.93 5,011.87 295.86 10,023.74 0.00 0.00
1.02.06 NIVELACION DE TERRENO Y APISONADO m2 51.80 4.13 213.93 0.00 51.80 213.93 0.00 0.00 0.00 51.80 213.93 0.00 0.00
1.02.07 GRAVILLA m3 5.88 115.90 681.49 0.00 0.00 0.00 5.88 681.49 5.88 681.49 0.00 0.00
1.03 CONCRETO SIMPLE - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.03.01 SOLADO DEPARA ZAPATAS DE 2" NEZCLA 1:12 C:H m2 18.31 19.86 363.64 18.31 363.64 0.00 0.00 0.00 0.00 18.31 363.64 0.00 0.00
1.03.02 CONCRETO CICLOPIO 1:10(C:H)+30%P.G.-CIMIENTO CORRIDOS m3 20.36 132.27 2,693.02 20.36 2,693.02 0.00 0.00 0.00 0.00 20.36 2,693.02 0.00 0.00
1.03.03 CONCRETO CICLOPIO 1:8(C:H)+25%P.M.-SOBRECIMIENTO m3 0.56 144.49 80.91 0.00 0.56 80.91 0.00 0.00 0.00 0.56 80.91 0.00 0.00
1.03.04 ENCOFRADO Y DESCENCOFRADO NORMAL SOBRECIMIENTO m2 7.52 54.21 407.66 0.00 7.52 407.66 0.00 0.00 0.00 7.52 407.66 0.00 0.00
1.03.05 FALSO PISO DE 4" CON MEZC. 1:8 C:H. m2 33.00 22.17 731.61 0.00 33.00 731.61 0.00 0.00 0.00 33.00 731.61 0.00 0.00
1.04 CONCRETO ARMADO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.01 ZAPATA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.02 CONCRETOFC'=210 Kg/Cm2; ZAPATA m3 1.54 281.92 434.16 1.54 434.16 0.00 0.00 0.00 0.00 1.54 434.16 0.00 0.00
1.04.03 ACERO CORRUGADO FY´=4200 KG/CM2 kg 36.70 4.31 158.18 36.70 158.18 0.00 0.00 0.00 0.00 36.70 158.18 0.00 0.00
1.04.02 VIGA DE CIMENTACION - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.02.01 CONCRETOFC'=210 Kg/Cm2; VIGA DE CIMENTACION m3 4.29 295.25 1,266.62 4.29 1,266.62 0.00 0.00 0.00 0.00 4.29 1,266.62 0.00 0.00
1.04.02.02 ENCOFRADO Y DESCENCOFRADO NORMAL VIGA DE CIMENTACION m2 42.25 50.00 2,112.50 42.25 2,112.50 0.00 0.00 0.00 0.00 42.25 2,112.50 0.00 0.00
1.04.02.03 ACERO CORRUGADO FY´=4200 KG/CM2 kg 404.10 4.31 1,741.67 404.10 1,741.67 0.00 0.00 0.00 0.00 404.10 1,741.67 0.00 0.00
1.04.03 CISTERNA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.03.01 CONCRETOFC'=210 Kg/Cm2; CISTERNA m3 16.79 377.11 6,331.68 0.00 16.79 6,331.68 0.00 0.00 0.00 16.79 6,331.68 0.00 0.00
1.04.03.02 ENCOFRADO Y DESCENCOFRADO NORMAL CISTERNA m2 90.32 46.69 4,217.04 0.00 90.32 4,217.04 0.00 0.00 0.00 90.32 4,217.04 0.00 0.00
1.04.03.03 ACERO CORRUGADO FY´=4200 KG/CM2 kg 1,122.60 4.31 4,838.41 0.00 1,122.60 4,838.41 0.00 0.00 0.00 1,122.60 4,838.41 0.00 0.00
1.04.04 COLUMNAS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.04.01 CONCRETOFC'=210 Kg/Cm2; COLUMNA m3 2.48 382.37 948.28 0.00 2.48 948.28 0.00 0.00 0.00 2.48 948.28 0.00 0.00
1.04.04.02 ENCOFRADO Y DESCENCOFRADO NORMAL COLUMNAS m2 33.93 48.69 1,652.05 0.00 33.93 1,652.05 0.00 0.00 0.00 33.93 1,652.05 0.00 0.00
1.04.04.03 ACERO CORRUGADO FY´=4200 KG/CM2 kg 470.80 4.31 2,029.15 470.80 2,029.15 0.00 0.00 0.00 0.00 470.80 2,029.15 0.00 0.00
1.04.05 VIGA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.05.01 CONCRETOFC'=210 Kg/Cm2; COLUMNA m3 2.79 295.30 823.89 0.00 2.79 823.89 0.00 0.00 0.00 2.79 823.89 0.00 0.00
1.04.05.02 ENCOFRADO Y DESCENCOFRADO NORMAL COLUMNAS m2 20.75 58.15 1,206.61 0.00 20.75 1,206.61 0.00 0.00 0.00 20.75 1,206.61 0.00 0.00
1.04.05.03 ACERO CORRUGADO FY´=4200 KG/CM2 kg 439.10 4.31 1,892.52 0.00 439.10 1,892.52 0.00 0.00 0.00 439.10 1,892.52 0.00 0.00
1.04.06 LOSAS ALIGERADA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.06.01 CONCRETOFC'=210 Kg/Cm2; LOSAS ALIGERADA m3 2.67 297.83 795.21 0.00 2.67 795.21 0.00 0.00 0.00 2.67 795.21 0.00 0.00
1.04.06.02 ENCOFRADO Y DESCENCOFRADO NORMAL LOSAS ALIGERADA m2 30.54 39.74 1,213.66 0.00 30.54 1,213.66 0.00 0.00 0.00 30.54 1,213.66 0.00 0.00
1.04.06.03 ACERO CORRUGADO FY´=4200 KG/CM2 kg 159.80 4.31 688.74 0.00 159.80 688.74 0.00 0.00 0.00 159.80 688.74 0.00 0.00
1.04.06.04 LADRILLO DE ARCILLA PARA TECHO 15X15X30 CM 254.49 2.40 610.78 0.00 254.49 610.78 0.00 0.00 0.00 254.49 610.78 0.00 0.00
1.04.07 TANQUE ELEVADO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.07.01 CONCRETOFC'=210 Kg/Cm2; TANQUE ELEVADO m3 5.37 377.11 2,025.08 0.00 0.00 4.56 1,719.62 0.81 305.46 5.37 2,025.08 0.00 0.00
1.04.07.02 ENCOFRADO Y DESCENCOFRADO NORMAL TANQUE ELEVADO m2 42.24 43.31 1,829.41 0.00 0.00 38.02 1,646.65 4.22 182.76 42.24 1,829.41 0.00 0.00
1.04.07.03 ACERO CORRUGADO FY´=4200 KG/CM2 kg 257.40 4.31 1,109.39 0.00 257.40 1,109.39 0.00 0.00 0.00 257.40 1,109.39 0.00 0.00
1.05 MUROS Y TABIQUERIA DE ALBAÑILERIA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.05.01 MURO LAD.KK DE CABEZA MEZC. C:A 1:4 TIPO IV.P.TARRAJ. m2 9.15 94.87 868.06 0.00 9.15 868.06 0.00 0.00 0.00 9.15 868.06 0.00 0.00
1.05.02 MURO LAD.KK DE SOGA MEZC. C:A 1:4 TIPO IV.P.TARRAJ. m2 74.82 58.77 4,397.17 0.00 74.82 4,397.17 0.00 0.00 0.00 74.82 4,397.17 0.00 0.00
- 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.00.00 ARQUITECTURA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01 REVOQUES , ENLUCIDO Y MOLDURAS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01.01 TARRAJEO MUROS INT. Y EST. FROTACHADO MEC. C:A. 1:4E=1,5CM m2 215.65 19.89 4,289.28 0.00 0.00 194.09 3,860.45 21.56 428.83 215.65 4,289.28 0.00 0.00
2.01.02 TARRAJEO DE COLUNAS MEZ. C:A 1:5 E= 1,5 CM m2 2.16 27.07 58.47 0.00 0.00 2.16 58.47 0.00 0.00 2.16 58.47 0.00 0.00
2.01.03 TARRAJEO CON IMPERMEABILIZANTE m2 44.68 21.96 981.17 0.00 0.00 0.00 44.68 981.17 44.68 981.17 0.00 0.00
2.01.04 VESTIDURA Y DERRAME m2 25.06 11.08 277.66 0.00 0.00 0.00 25.06 277.66 25.06 277.66 0.00 0.00
2.02 CIELORRASOS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.02.01 CIELORRASO CON MEZ. C:A. 1:4 E=1,5 CM. m2 30.54 28.94 883.83 0.00 0.00 30.54 883.83 0.00 0.00 30.54 883.83 0.00 0.00
2.03 PISOS Y PAVIMENTOS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.03.01 PISO DE CERAMICO DE COLOR CLARO DE 30X30 NACIONAL m2 34.29 44.17 1,514.59 0.00 0.00 0.00 34.29 1,514.59 34.29 1,514.59 0.00 0.00
2.03.02 VEREDA DE CONCRETO 4" m2 19.12 35.71 682.78 0.00 0.00 17.21 614.57 1.91 68.21 19.12 682.78 0.00 0.00
2.03.03 SARDINEL F`C=175 KG/CM2 50CM m2 19.12 42.93 820.82 0.00 0.00 17.21 738.83 1.91 81.99 19.12 820.82 0.00 0.00
2.03.04 ENCOFRADO Y DESCENCOFRADO NORMAL SARDINEL m2 7.65 18.57 142.06 0.00 0.00 6.89 127.95 0.76 14.11 7.65 142.06 0.00 0.00
VALORIZACIONES RECALCULADAS
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : 0 VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ NOV - 2011 DIC - 2011 ENE - 2012 FEB - 2012 FACTOR DE RELACION 1.00000
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALORIZACION Nº 04 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
2.04. CONTRAZOCALO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.04.01 CONTRAZOCALO DE CEMENTO FROTACHADO H=0,20 M MEZ 1:5 m 22.52 15.72 354.01 0.00 0.00 0.00 22.52 354.01 22.52 354.01 0.00 0.00
2.05. ZOCALO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.05.01 ZOCALO DE CERAMICO COLOR CLARO DE 30X30 m2 73.25 45.52 3,334.34 0.00 0.00 0.00 73.25 3,334.34 73.25 3,334.34 0.00 0.00
2.06. CUBIERTAS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.06.01 CUBIERTA LADRILLO PASTELERO ASENTADO CON MEZCLA m2 34.42 30.26 1,041.55 0.00 0.00 0.00 34.42 1,041.55 34.42 1,041.55 0.00 0.00
2.07 CARPINTERIA DE MADERA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.07.01 PUERTA DE MADERA DE CEDRO m2 7.98 496.68 3,963.51 0.00 0.00 0.00 7.98 3,963.51 7.98 3,963.51 0.00 0.00
2.07.02 PUERTA CONTRAPLACADO DE MADERA m2 7.68 255.59 1,962.93 0.00 0.00 0.00 7.68 1,962.93 7.68 1,962.93 0.00 0.00
2.07.03 VENTANA DE MADERA CEDRO; C/SEG.F.LISO 1/2" m2 4.77 212.51 1,013.67 0.00 0.00 0.00 4.77 1,013.67 4.77 1,013.67 0.00 0.00
2.08 CARPINTERIA METALICA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.08.01 ESCALERA TIPO GATO m 4.50 70.60 317.70 0.00 0.00 0.00 4.50 317.70 4.50 317.70 0.00 0.00
2.08.02 CERRAJERIA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.08.03 BISAGRA DE ALUMINO DE 4" PESADA pza 16.00 17.59 281.44 0.00 0.00 0.00 16.00 281.44 16.00 281.44 0.00 0.00
2.09 CERRADURA DE 2 GOLPES pza 4.00 55.89 223.56 0.00 0.00 0.00 4.00 223.56 4.00 223.56 0.00 0.00
2.09.01 CERRJO DE 2"ALUMINIZADA PAR PUERTA INTERIOS pza 8.00 14.99 119.92 0.00 0.00 0.00 8.00 119.92 8.00 119.92 0.00 0.00
2.10. VIDRIO, CRISTAL Y SIMILARES - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.10.01 VIDIRO SEMIDOBLE p2 51.28 4.77 244.61 0.00 0.00 0.00 51.28 244.61 51.28 244.61 0.00 0.00
2.11 PINTURA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.11.01 PINTURA CIELORRASO C/ LATEX ( 2 MANO) m2 30.50 7.58 231.19 0.00 0.00 0.00 30.50 231.19 30.50 231.19 0.00 0.00
2.11.02 PINTURA MUROS INTERIOES Y EXTERIORES C/ LATEX ( 2 MANOS) m2 221.07 7.44 1,644.76 0.00 0.00 0.00 221.07 1,644.76 221.07 1,644.76 0.00 0.00
2.11.03 PINTURA CARPINTERIA DE MADERA C/BARNOZ m2 25.50 12.95 330.23 0.00 0.00 0.00 25.50 330.23 25.50 330.23 0.00 0.00
2.11.04 PINTURA ANTICORROSIVA Y ESM. EN CARPINTERIA METALICA m2 1.20 13.55 16.26 0.00 0.00 0.00 1.20 16.26 1.20 16.26 0.00 0.00
2.11.05 PINTURA CONTRAZOCALO C/ ESMALTE ( 2 MANO) m2 4.50 8.88 39.96 0.00 0.00 0.00 4.50 39.96 4.50 39.96 0.00 0.00
2.12 VARIOS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.12.01 JUNTA DE DILATACION EN PISO C/RELLENO ASFALTICO E=1" m 16.60 7.71 127.99 0.00 0.00 0.00 16.60 127.99 16.60 127.99 0.00 0.00
3.00.00 INSTALACIONES ELECTRICAS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.01 SALIDA PARA ALUMBRADO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.01.01 SALIDA DE TECHO C/PVC SAP 20 MM (TW 2,5 MM2) pto 8.00 124.32 994.56 0.00 0.00 8.00 994.56 0.00 0.00 8.00 994.56 0.00 0.00
3.02 SALIDA PARA TOMACORRIENTE - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.02.01 TOMACORRIENTE BIPOLAR DOBLE 16 A C/TIERRA PVC SAP 20MM, pto 2.00 104.13 208.26 0.00 0.00 2.00 208.26 0.00 0.00 2.00 208.26 0.00 0.00
3.03 TABLEROS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.03.01 TABLERO DE DISTRIBUCION CAJA METALICA 12 POLOS INTERRUP. pza 1.00 1,138.53 1,138.53 0.00 0.00 0.00 1.00 1,138.53 1.00 1,138.53 0.00 0.00
3.04 CABLES Y CONDUCTORES - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.04.01 CABLE ELECTRICO TW4,0 MM2 m 10.00 2.15 21.50 0.00 0.00 0.00 10.00 21.50 10.00 21.50 0.00 0.00
3.04.02 CABLE NYY 3-1X185MM2 m 115.75 232.08 26,863.26 0.00 0.00 0.00 115.75 26,863.26 115.75 26,863.26 0.00 0.00
3.05 CONDUCTORES - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.05.01 TUBERIA PVC ( Electricas) D=25 MM m 10.00 11.67 116.70 0.00 0.00 0.00 10.00 116.70 10.00 116.70 0.00 0.00
3.05.02 TUBERIA PVC ( Electricas) D=80 MM m 115.75 15.57 1,802.23 0.00 0.00 0.00 115.75 1,802.23 115.75 1,802.23 0.00 0.00
3.06 PRUEBAS ELECTRICAS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.06.01 PRUEBA DE AISLAMIENTO Y RESISTIVIDAD und 1.00 1,000.00 1,000.00 0.00 0.00 0.00 1.00 1,000.00 1.00 1,000.00 0.00 0.00
3.07 ARETFACTO DE ALUMBRADO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.07.01 ARTEFACTO BE 3X36 ADOSADO pza 2.00 79.83 159.66 0.00 0.00 0.00 2.00 159.66 2.00 159.66 0.00 0.00
3.07.02 ARTEFACTO BE 2X36 ADOSADO pza 2.00 65.25 130.50 0.00 0.00 0.00 2.00 130.50 2.00 130.50 0.00 0.00
3.07.03 ARTEFACTO BE 1X36 ADOSADO pza 2.00 29.32 58.64 0.00 0.00 0.00 2.00 58.64 2.00 58.64 0.00 0.00
3.07.04 COLOCACION DE ATEFACTOS DE ALIMBRADO pza 6.00 38.27 229.62 0.00 0.00 0.00 6.00 229.62 6.00 229.62 0.00 0.00
3.08 SISTEMA A PUESTA A TERRA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.08.01 POZO DE PROTECCIOA TIERRA C/3 DOSIS THOR-GEL (5/8") und 1.00 931.93 931.93 0.00 0.00 0.00 1.00 931.93 1.00 931.93 0.00 0.00
4.00 INSTALAC IONES SANITARIAS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01 SALIDA DE DESAGUE Y VENTILACION - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01.01 SALIDA DE DESAGUE PVC SAL 2" pto 4.00 78.51 314.04 0.00 0.00 4.00 314.04 0.00 0.00 4.00 314.04 0.00 0.00
4.01.01.02 SALIDA DE DESAGUE PVC SAL 3" pto 2.00 101.91 203.82 0.00 0.00 2.00 203.82 0.00 0.00 2.00 203.82 0.00 0.00
4.01.01.03 SALIDA DE DESAGUE PVC SAL 4" pto 10.00 103.20 1,032.00 0.00 0.00 10.00 1,032.00 0.00 0.00 10.00 1,032.00 0.00 0.00
4.01.01.04 SALIDA DE VENTILACION PVC SAL 2" pto 7.00 100.25 701.75 0.00 0.00 7.00 701.75 0.00 0.00 7.00 701.75 0.00 0.00
4.01.01.05 REDES DE DISTRIBUCION DE DESAGUE - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01.02 TUBERIA PVC SAL 4"DESAGUE m 15.30 24.76 378.83 0.00 0.00 0.00 15.30 378.83 15.30 378.83 0.00 0.00
4.01.02.01 TUBERIA PVC SAL 3" DESGUE m 8.80 21.54 189.55 0.00 0.00 0.00 8.80 189.55 8.80 189.55 0.00 0.00
4.01.02.02 ADITAMIENTOS VARIOS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01.03 REGISTRO DE BRONCE 2" PROVISION Y COLOCACION pza 2.00 48.74 97.48 0.00 0.00 0.00 2.00 97.48 2.00 97.48 0.00 0.00
4.01.03.01 REGISTRO DE BRONCE 3" PROVISION Y COLOCACION pza 2.00 52.54 105.08 0.00 0.00 0.00 2.00 105.08 2.00 105.08 0.00 0.00
4.01.03.02 REGISTRO DE BRONCE 6" PROVISION Y COLOCACION pza 2.00 75.54 151.08 0.00 0.00 0.00 2.00 151.08 2.00 151.08 0.00 0.00
4.01.03.03 REJILLA EN PISO 0.1.0x0.10M pza 2.00 48.87 97.74 0.00 0.00 0.00 2.00 97.74 2.00 97.74 0.00 0.00
4.01.03.04 SOMBRERO DE VENTILACION PVC DE 2" pza 5.00 17.22 86.10 0.00 0.00 0.00 5.00 86.10 5.00 86.10 0.00 0.00
4.01.03.05 SUMINISTRO Y COLOCACION DE BOMBA HIDRAULICA pza 2.00 435.21 870.42 0.00 0.00 0.00 2.00 870.42 2.00 870.42 0.00 0.00
4.01.03.06 CAJAS DE REGISTRO DE CONCRETO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01.04 CAJAS DE REGISTRO DE CONCRETO DE 12" x12" pza 3.00 214.30 642.90 0.00 0.00 1.00 214.30 2.00 428.60 3.00 642.90 0.00 0.00
4.01.04.01 PRUEBAS HIDRAULICAS Y DESINFECCION - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
VALORIZACIONES RECALCULADAS
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : 0 VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ NOV - 2011 DIC - 2011 ENE - 2012 FEB - 2012 FACTOR DE RELACION 1.00000
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALORIZACION Nº 04 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
4.01.05 PRUEBA HIDRAILICA DE SISTEMA DE DESAGUE gbl 1.00 500.00 500.00 0.00 0.00 0.50 250.00 0.50 250.00 1.00 500.00 0.00 0.00
4.01.05.01 SISTEMA DE AGUA FRIA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.02 SALIDA DE AGUA FRIA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.02.01 SALIDA DE AGUA FRIA CON TUBERIA PVC SAP ½" pto 15.00 100.11 1,501.65 0.00 0.00 15.00 1,501.65 0.00 0.00 15.00 1,501.65 0.00 0.00
4.02.01.01 REDES DE DISTRIBUCIN DE AGUA FRIA - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.02.02 REDES DE DISTRIBUCION TUBERIA PVC-SAP C/R D= 1/2" m 3.90 13.30 51.87 0.00 0.00 0.00 3.90 51.87 3.90 51.87 0.00 0.00
4.02.02.01 REDES DE DISTRIBUCION TUBERIA DE 3/4"PVC-SAP m 17.00 12.68 215.56 0.00 0.00 0.00 17.00 215.56 17.00 215.56 0.00 0.00
4.02.02.02 REDES DE DISTRIBUCION TUBERIA PVC-SAP C/R D= 1" m 99.10 15.94 1,579.65 0.00 0.00 0.00 99.10 1,579.65 99.10 1,579.65 0.00 0.00
4.02.02.03 LLAVES Y VALVULAS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.02.03 VALVULA TIPO GLOBO DE 1/2" pza 3.00 85.37 256.11 0.00 0.00 0.00 3.00 256.11 3.00 256.11 0.00 0.00
4.02.03.01 VALVULA DE COMPUERTA DE BRONCE DE 3/4" pza 4.00 82.28 329.12 0.00 0.00 0.00 4.00 329.12 4.00 329.12 0.00 0.00
4.02.03.02 VALVULA CHECK DE 1" und 1.00 117.68 117.68 0.00 0.00 0.00 1.00 117.68 1.00 117.68 0.00 0.00
4.02.03.03 CAJA P/VALV.TIPO NICHO und 7.00 24.91 174.37 0.00 0.00 0.00 7.00 174.37 7.00 174.37 0.00 0.00
4.02.03.04 PRUEBS HIDRAULICAS Y DESINFECCION - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.02.04 PRUEBA HIDRAILICA Y DESINFECCION DE SIST. AGUA FRIA gbl 1.00 600.00 600.00 0.00 0.00 0.50 300.00 0.50 300.00 1.00 600.00 0.00 0.00
4.02.04.01 APARATOS Y ACCESORIO SANITARIO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.03 APARATOS SANITARIO - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.03.01 INODORO TANQUE ALTO BLANCO ACCESORIO Y SOPORTE pza 8.00 222.47 1,779.76 0.00 0.00 0.00 8.00 1,779.76 8.00 1,779.76 0.00 0.00
4.03.1.01 INODORO TANQUE BAJO BLANCO CON ACCESORIO pza 2.00 348.47 696.94 0.00 0.00 0.00 2.00 696.94 2.00 696.94 0.00 0.00
4.03.1.02 LAVATORIO CON PEDESTAL Y GRIFERIA Y ACCESORIO pza 2.00 117.83 235.66 0.00 0.00 0.00 2.00 235.66 2.00 235.66 0.00 0.00
4.03.1.03 URINRIO CORRIDO REVESTIDO CON CERAMICO m 2.35 136.34 320.40 0.00 0.00 0.00 2.35 320.40 2.35 320.40 0.00 0.00
4.03.1.04 BEBEDERO CORRIDO REVESTIDO CON CERAMICO m 6.00 273.82 1,642.92 0.00 0.00 0.00 6.00 1,642.92 6.00 1,642.92 0.00 0.00
4.03.1.05 BIODIGESTOR DE PVC CON ACCESORIOS Y INSTALACION pza 1.00 7,773.10 7,773.10 0.00 0.00 1.00 7,773.10 0.00 0.00 1.00 7,773.10 0.00 0.00
4.03.1.06 COLOCACION DE APARATOS Y ACCESORIOS SANITARIOS - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.03.02 COLOCACION DE APARATOS SANITARIO pza 12.00 89.28 1,071.36 0.00 0.00 0.00 12.00 1,071.36 12.00 1,071.36 0.00 0.00
4.03.02.01 COLOCACION DE ACCESORIOS SANITARIO pza 12.00 28.23 338.76 0.00 0.00 0.00 12.00 338.76 12.00 338.76 0.00 0.00

COSTO DIRECTO 156,744.16 16,171.48 33,853.64 35,587.14 71,131.90 156,744.16 0.00

GASTOS GENERALES 10.00% 15,674.42 1,617.15 3,385.36 3,558.71 7,113.20 15,674.42 0.00
0.00%
UTILIDAD 10.00% 15,674.42 1,617.15 3,385.36 3,558.71 7,113.20 15,674.42 0.00

COSTO PARCIAL 188,093.00 19,405.78 40,624.36 42,704.56 85,358.30 188,093.00 0.00

FACTOR DE RELACION 1.00000 188,093.01 19,405.78 40,624.36 42,704.56 85,358.31 188,093.01 0.00

MONTO BRUTO VALORIZADO 0.00 0.00 0.00 0.00 0.00


PORCENTAJE DE AVANCE DE OBRA 10.32% 21.60% 22.70% 45.38% 100.00% 0.00%
VALORIZACIONES RECALCULADAS
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : 0 VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ NOV - 2011 DIC - 2011 ENE - 2012 FEB - 2012 FACTOR DE RELACION 1.00000
ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALORIZACION Nº 04 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
1.00 ESTRUCTURA
1.01 TRABAJOS PRELIMINARES m2 130.57 1.62 211.52 130.57 211.52 0.00 0.00 0.00 0.00 130.57 211.52 0.00 0.00
1.01.01 TRAZOS, NIVEL Y REPLANTEO PRELIMINAR 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.02 MOVIMIENTO DE TIERRA m3 378.09 31.31 11,838.00 359.18 11,245.93 0.00 18.91 592.07 0.00 0.00 378.09 11,838.00 0.00 0.00
1.02.01 EXCAVACION DE ZANJAS PARA CIMENTACION m3 108.10 15.37 1,661.50 0.00 0.00 64.86 996.90 43.24 664.60 108.10 1,661.50 0.00 0.00
1.02.02 RELLENO COMPACTADO A MANO-MAT.PROPIO m3 323.99 21.50 6,965.79 250.00 5,375.00 70.00 1,505.00 0.00 3.99 85.79 323.99 6,965.79 0.00 0.00
1.02.03 ACARRERO INTERNO, MATERIAL PROCEDENTE DE EXCAV. + DEMOL. m3 323.99 33.88 10,976.78 250.00 8,470.00 70.00 2,371.60 0.00 3.99 135.18 323.99 10,976.78 0.00 0.00
1.02.04 ELIMINACION DE MATERIAL EXCEDENTE ACARREO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.03 OBRA DE CONCRETO SIMPLE m2 4.09 19.86 81.23 3.88 77.06 0.21 4.17 0.00 0.00 0.00 4.09 81.23 0.00 0.00
1.03.01 SOLADOPARA ZAPATA DE 2"MEZCLA 1:12 C.H m3 247.94 132.27 32,795.02 225.00 29,760.75 22.94 3,034.27 0.00 0.00 0.00 247.94 32,795.02 0.00 0.00
1.03.02 CONCRETO CICLOPIO 1:10(C.H) + 30% P.G.-CIMIENTOS CORRIDOS m3 26.03 144.49 3,761.07 18.00 2,600.82 8.03 1,160.25 0.00 0.00 0.00 26.03 3,761.07 0.00 0.00
1.03.03 CONCRETO CICLOPIO 1:8(C.H) + 25% P.M.-SOBRECIMIENTOS m2 347.12 54.21 18,817.38 250.00 13,552.50 97.12 5,264.88 0.00 0.00 0.00 347.12 18,817.38 0.00 0.00
1.03.04 ENCOFRADO Y DESENCOFRADO NORMAL SOBRECIMIENTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04 CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.01 ZAPATA m3 2.09 281.92 589.21 0.00 2.09 589.21 0.00 0.00 0.00 2.09 589.21 0.00 0.00
1.04.01.01 CONCRETO F´C=210 KG/CM2,ZAPATA kg 56.00 4.31 241.36 0.00 56.00 241.36 0.00 0.00 0.00 56.00 241.36 0.00 0.00
1.04.01.02 ACERO CORRUGADO F´Y=420 KG/CM2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.02 VIGA DE CIMENTACION m3 0.59 295.25 174.20 0.00 0.59 174.20 0.00 0.00 0.00 0.59 174.20 0.00 0.00
1.04.02.01 CONCRETO F´C=210 KG/CM2,VIGA DE CIMENTACION m2 4.75 50.00 237.50 0.00 4.75 237.50 0.00 0.00 0.00 4.75 237.50 0.00 0.00
1.04.02.02 ENCOFRADO Y DESENCOFRADO NORMAL ,VIGA DE CIMENTACION kg 56.10 4.31 241.79 0.00 56.10 241.79 0.00 0.00 0.00 56.10 241.79 0.00 0.00
1.04.02.03 ACERO CORRUGADO F´Y=420 KG/CM2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.03 COLUMNAS m3 20.43 382.27 7,809.78 0.00 0.00 18.39 7,029.95 2.04 779.83 20.43 7,809.78 0.00 0.00
1.04.03.01 CONCRETO F´C=210 KG/CM2,COLUMNAS m2 231.35 48.69 11,264.43 0.00 0.00 208.22 10,138.23 23.13 1,126.20 231.35 11,264.43 0.00 0.00
1.04.03.02 ENCOFRADO Y DESENCOFRADO NORMAL ,COLUMNAS kg 2,847.40 4.31 12,272.29 2,847.40 12,272.29 0.00 0.00 0.00 0.00 2,847.40 12,272.29 0.00 0.00
1.04.03.03 ACERO CORRUGADO F´Y=420 KG/CM2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.04 VIGAS m3 5.74 295.30 1,695.02 0.00 0.00 4.59 1,355.43 1.15 339.59 5.74 1,695.02 0.00 0.00
1.04.04.01 CONCRETO F´C=210 KG/CM2,VIGA m2 84.79 58.15 4,930.54 0.00 0.00 72.07 4,190.87 12.72 739.67 84.79 4,930.54 0.00 0.00
1.04.04.02 ENCOFRADO Y DESENCOFRADO NORMAL VIGA kg 474.20 4.31 2,043.80 0.00 0.00 0.00 474.20 2,043.80 474.20 2,043.80 0.00 0.00
1.04.04.03 ACERO CORRUGADO F´Y=420 KG/CM2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
1.04.05 MUROS Y TABIQUERIA DE ALBAÑILERIA m2 639.28 69.74 44,583.39 0.00 450.00 31,383.00 182.89 12,754.75 6.39 445.64 639.28 44,583.39 0.00 0.00
1.04.05.01 MURO DE LADR.KKDE SOGA MEZC.1:4, TIPO IV,P.TARRAJ. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.00.00 ARQUITECTURA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01 REVOQUES Y ENLICIDOS Y MOLDEADURAS m2 229.43 27.07 6,210.67 0.00 0.00 101.50 2,747.61 127.93 3,463.06 229.43 6,210.67 0.00 0.00
2.01.01 TARRAJEO DE COLUMNAS MEZCLA 1:5E= 1.5 CM m2 110.64 32.21 3,563.71 0.00 0.00 41.00 1,320.61 69.64 2,243.10 110.64 3,563.71 0.00 0.00
2.01.02 TARRAJEO DE VIGAS MEZCLA 1:5E= 1.5 CM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.02 COTRAZOCALO m2 247.36 7.79 1,926.93 0.00 0.00 0.00 247.36 1,926.93 247.36 1,926.93 0.00 0.00
2.02.01 CONTRAZOCALO CEMENTO FROTACHADO H= 0.10M MEZ.1:5 m2 247.36 15.72 3,888.50 0.00 0.00 0.00 247.36 3,888.50 247.36 3,888.50 0.00 0.00
2.02.02 CONTRAZOCALO CEMENTO FROTACHADO H= 0.20M MEZ.1:5 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.03 CARPINTERIA
SUMINISTO DEDE METALICA DE PUERTA METALICA PARA
COLOCACION gbl 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.03.01 PORTON DE INGRESO CON CHAPAS Y ACCESORIO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.04. PINTURAS m2 358.00 7.44 2,665.82 0.00 0.00 0.00 358.00 2,665.82 358.00 2,665.82 0.00 0.00
2.04.01 PINTURA MUROS INTERIORES Y EXTERIORES C/LATEX ( 2 MANOS) m2 74.21 8.88 658.98 0.00 0.00 0.00 74.21 658.98 74.21 658.98 0.00 0.00
2.04.02 PINTURA DE CONTRAZOCALO C/ESMALTE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.00.00 INSTALACIONES ELECTRICAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.01 SALIDA PARA ALUMBRADO pto 2.00 98.89 197.78 0.00 0.00 0.00 2.00 197.78 2.00 197.78 0.00 0.00
3.01.01 SALIDA DE BRAQUETE C/PVC SAP 20MM(TW2.5MM2)Ç 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.02 CABLES Y CONDUCTORES m 96.00 9.32 894.72 0.00 0.00 0.00 96.00 894.72 96.00 894.72 0.00 0.00
3.02.01 CABLE ELCTRICO TW2.5MM2 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.03 CONDUCTORES m 48.00 11.67 560.16 0.00 0.00 0.00 48.00 560.16 48.00 560.16 0.00 0.00
3.03.01 TUBERIA PVC SAP(ELECTRICAS ) D= 25 MM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.04 CAJA DE PASE pza 2.00 27.84 55.68 0.00 0.00 0.00 2.00 55.68 2.00 55.68 0.00 0.00
3.03.01 CAJA DE PASE 150 x 150 x 75 MM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.05 ARETFACTOS DE ALUMBRADO pza 2.00 124.50 249.00 0.00 0.00 0.00 2.00 249.00 2.00 249.00 0.00 0.00
3.05.01 ARTEFACTO BRAQUETE BE 1x36 TIPO BRAQUETE pza 2.00 38.14 76.28 0.00 0.00 0.00 2.00 76.28 2.00 76.28 0.00 0.00

COSTO DIRECTO 194,139.83 83,565.87 46,207.23 41,126.42 23,240.31 194,139.83 0.00

GASTOS GENERALES 10.00% 19,413.98 8,356.59 4,620.72 4,112.64 2,324.03 19,413.98 0.00

UTILIDAD 10.00% 19,413.98 8,356.59 4,620.72 4,112.64 2,324.03 19,413.98 0.00

COSTO PARCIAL 232,967.79 100,279.05 55,448.67 49,351.70 27,888.37 232,967.79 0.00

FACTOR DE RELACION 1.00000 232,967.79 100,279.05 55,448.67 49,351.70 27,888.36 232,967.78 0.01

MONTO BRUTO VALORIZADO 0.00 0.00 0.00 0.00 0.00


PORCENTAJE DE AVANCE DE OBRA 43.04% 23.80% 21.18% 11.98% 100.00% 0.00%
RESUMEN DE VALORIZACIONES DEL SISTEMA DE AGUA POTABL E
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : SISTEMA DE AGUA POTABLE VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ ABR - 2013 MAY - 2013 JUN - 2013 FACTOR DE RELACION 1.00000

ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01 OBRAS PRELIMINARES
01.01 CARTEL DE IDENTIFICACION DE LA OBRA UND 1.00 1,255.19 1,255.19 1.00 1,255.19 - 0.00 - 0.00 1.00 1,255.19 0.00 0.00
01.02 CAMPAMENTO PROVISIONAL DE LA OBRA GLB 3.00 850.00 2,550.00 1.00 850.00 1.00 850.00 1.00 850.00 3.00 2,550.00 0.00 0.00
01.03 TRANSPORTES DE MATERIALES Y EQUIPO GLB 1.00 8,500.00 8,500.00 1.00 8,500.00 - 0.00 - 0.00 1.00 8,500.00 0.00 0.00
01.04 TRAZO, NIVEL Y REPLANTEO INICIAL M 511.70 3.52 1,801.18 511.70 1,801.18 - 0.00 - 0.00 511.70 1,801.18 0.00 0.00
01.05 TRAZO, NIVEL Y REPLANTEO FINAL M 511.70 1.05 537.29 - 0.00 - 0.00 511.70 537.29 511.70 537.29 0.00 0.00
01.06 SEGURIDAD EN OBRA MES 3.00 1,332.76 3,998.28 - 0.00 2.00 2,665.52 1.00 1,332.76 3.00 3,998.28 0.00 0.00
0.1.07 INTERFERENCIAS CON TUBERIAS AGUA Y DESAGUE EST 1.00 2,500.00 2,500.00 - 0.00 1.00 2,500.00 - 0.00 1.00 2,500.00 0.00 0.00
02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
2.01 EXCAVACION DE ZANJAS (h=1.50) M 511.70 12.07 6,176.22 200.00 2,414.00 211.00 2,546.77 100.70 1,215.45 511.70 6,176.22 0.00 0.00
2.02 REFINE Y NIVELACION DE ZANJAS M 511.70 2.79 1,427.64 - 0.00 411.00 1,146.69 100.70 280.95 511.70 1,427.64 0.00 0.00
2.03 PREPARACION DE CAMA DE APOYO C/MAT. PRESTAMO M 511.70 11.86 6,068.76 - 0.00 411.00 4,874.46 100.70 1,194.30 511.70 6,068.76 0.00 0.00
2.04 RELLENO CON MATERIAL PROPIO SELECCIONADO M 511.70 27.96 14,307.13 - 0.00 300.00 8,388.00 211.70 5,919.13 511.70 14,307.13 0.00 0.00
2.05 ELIMINACION DE MATERIAL EXCEDENTE M3 184.21 23.34 4,299.46 - 0.00 100.00 2,334.00 84.21 1,965.46 184.21 4,299.46 0.00 0.00
2.06 PRUEBA DE DENSIDAD DE CAMPO UND 30.00 119.88 3,596.40 - 0.00 - 0.00 30.00 3,596.40 30.00 3,596.40 0.00 0.00
3 SUMINISTRO DE TUBERIAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
3.01 SUMINISTRO DE TUBERIA PVC A -7.5X110 mm ISO 4420 M 511.70 23.76 12,157.99 511.70 12,157.99 - 0.00 - 0.00 511.70 12,157.99 0.00 0.00
4 INSTALACION DE TUBERIAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
4.01 INSTALACION DE TUBERIA PVC A-7.5X110 mm UF ISO 44 M 511.70 6.77 3,464.21 - 0.00 411.00 2,782.47 100.70 681.74 511.70 3,464.21 0.00 0.00
5 SUMINISTRO E INSTALACION DE ACCESORIOS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
5.01 SUMINISTRO E INSTALACION DE ACCESORIOS PVC C10 M 1.00 3,710.26 3,710.26 - 0.00 0.50 1,855.13 0.50 1,855.13 1.00 3,710.26 0.00 0.00
5.02 CONCRETO Fc:140 kg/cm2P ANCLAJE DE ACCESORIOS UND 16.00 96.41 1,542.56 - 0.00 - 0.00 16.00 1,542.56 16.00 1,542.56 0.00 0.00
6 SUMINISTRO DE VALVULAS 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
6.01 SUMINISTRO DE VALVULA COMP. 110 mm - 160mm: UND 3.00 691.86 2,075.58 3.00 2,075.58 0.00 - 0.00 3.00 2,075.58 0.00 0.00
7 PRUEBA HIDRAULICA 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
PRUEBA HIDRAULICA, DESINFECCION DE TUBERIAS
7.01 M 511.70 5.69 2,911.57 - 0.00 - 0.00 511.70 2,911.57 511.70 2,911.57 0.00 0.00
CONEXIONES DOMICILIARIAS
8 0.00 0.00 0.00 - 0.00 0.00 0.00 0.00 0.00
8.01 TRAZO Y REPLANTEO PARA CONEXIONES DOMICILARIAS M 592.00 1.79 1,059.68 - 0.00 592.00 1,059.68 - 0.00 592.00 1,059.68 0.00 0.00
8.02 EXCAVACION DE ZANJAS MANUAL PARA CONEX. DOMIC. M 592.00 16.38 9,696.96 - 0.00 430.00 7,043.40 162.00 2,653.56 592.00 9,696.96 0.00 0.00
REFINE Y NIVELACION DE DE ZANJA MANUAL A:0.60 M
8.03 M 592.00 1.25 740.00 - 0.00 240.00 300.00 352.00 440.00 592.00 740.00 0.00 0.00
8.04 PREPARACION DE CAMA DE APOYO CON MAT. M 592.00 13.14 7,778.88 - 0.00 240.00 3,153.60 352.00 4,625.28 592.00 7,778.88 0.00 0.00
8.05 RELLENO COMPACTADO CON PL VIB. H:0.50 M. M 592.00 27.68 16,386.56 - 0.00 100.00 2,768.00 492.00 13,618.56 592.00 16,386.56 0.00 0.00
8.06 ELIMINACION DE MATERIAL EXCEDENTE M3 213.12 23.34 4,974.22 - 0.00 150.00 3,501.00 63.12 1,473.22 213.12 4,974.22 0.00 0.00
8.07 CONEXIÓN DOMICILIARIA DE AGUA 1/2 A TUBO PVC UND 74.00 347.02 25,679.48 - 0.00 52.00 18,045.04 22.00 7,634.44 74.00 25,679.48 0.00 0.00

COSTO DIRECTO 149,195.50 29,053.94 65,813.76 54,327.80 149,195.50 0.00

GASTOS GENERALES 10.00% 14,919.55 2,905.39 6,581.38 5,432.78 14,919.55 0.00


UTILIDAD 10.00% 14,919.55 2,905.39 6,581.38 5,432.78 14,919.55 0.00
COSTO PARCIAL 179,034.60 34,864.72 78,976.52 65,193.36 179,034.60 0.00
FACTOR DE RELACION 1.00000 179,034.60 34,864.72 78,976.52 65,193.36 179,034.60 0.00
PORCENTAJE DE AVANCE DE OBRA 19.47% 44.11% 36.41% 100.00% 0.00%
R E S U ME N D E VALOR IZAC ION E S D E L S IS T E MA D E ALCAN TAR ILLAD O
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : SISTEMA DE ALCANTARILLADO VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ ABR - 2013 MAY - 2013 JUN - 2013 FACTOR DE RELACION 1.00000

ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01 OBRAS PROVISIONALES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
01.01 glb 1.00 2,550.00 2,550.00 0.50 1,275.00 0.25 637.50 0.25 637.50 1.00 2,550.00 0.00 0.00
01.02 LIMPIEZA PERMANENTE DE OBRA glb 3.00 298.37 895.11 1.00 298.37 1.00 298.37 1.00 298.37 3.00 895.11 0.00 0.00
01.03 TRAZO, NIVEL Y REPLANTEO INICIAL M 424.55 3.98 1,689.71 - 0.00 424.55 1,689.71 0.00 0.00 424.55 1,689.71 0.00 0.00
01.04 TRAZO, NIVEL Y REPLANTEO FINAL M 424.55 3.61 1,532.63 - 0.00 0.00 0.00 424.55 1,532.63 424.55 1,532.63 0.00 0.00
01.05 CONTROL TOPOGRAFICO PERMANENTE EN OBRA mes 3.00 999.21 2,997.63 - 0.00 2.00 1,998.42 1.00 999.21 3.00 2,997.63 0.00 0.00
01.06 SEGURIDAD EN OBRA mes 3.00 1,332.76 3,998.28 - 0.00 2.00 2,665.52 1.00 1,332.76 3.00 3,998.28 0.00 0.00
0.1.07 INTERFERENCIAS CON TUBERIAS DE DESAGUE EST 1.00 2,500.00 2,500.00 - 0.00 1.00 2,500.00 0.00 0.00 1.00 2,500.00 0.00 0.00
0.1.08 EQUIPO DE BOMBEO PARA DESVIAR DESAGUE glb 1.00 1,400.00 1,400.00 - 0.00 0.50 700.00 0.50 700.00 1.00 1,400.00 0.00 0.00
2.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01 EXCAVACION DE ZANJAS, RETROEEXCAVADORA H:2.00M M 424.55 18.22 7,735.30 - 0.00 424.55 7,735.30 0.00 0.00 424.55 7,735.30 0.00 0.00
2.02 REFINE DE ZANJA M 424.55 1.89 802.40 - 0.00 424.55 802.40 0.00 0.00 424.55 802.40 0.00 0.00
2.03 PREPARACION DE CAMA DE APOYO C/MAT. PRESTAMO M 424.55 13.14 5,578.59 - 0.00 424.55 5,578.59 0.00 0.00 424.55 5,578.59 0.00 0.00
2.04 RELLENO C/MAT. PROPIO SELECCIONADO M 424.55 27.73 11,772.77 - 0.00 250.00 6,932.50 174.55 4,840.27 424.55 11,772.77 0.00 0.00
2.05 ELIMINACION DE MATERIAL EXCEDENTE M3 366.82 23.34 8,561.58 - 0.00 300.00 7,002.00 66.82 1,559.58 366.82 8,561.58 0.00 0.00
2.06 ENSAYO DE DENSIDAD DE CAMPO UND 30.00 119.88 3,596.40 - 0.00 0.00 0.00 30.00 3,596.40 30.00 3,596.40 0.00 0.00
3.00 BUZONES DE CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
3.01 EXCAVACION PARA BUZONES MANUAL M3 28.03 75.31 2,110.94 - 0.00 22.40 1,686.94 5.63 424.00 28.03 2,110.94 0.00 0.00
3.02 BUZON ESTÁNDAR D=1.20 M. Y H=1.50 M. UND 7.00 2,253.15 15,772.05 - 0.00 5.00 11,265.75 2.00 4,506.30 7.00 15,772.05 0.00 0.00
3.03 BUZON ESTÁNDAR D=1.20 M. Y H=2.00 M. UND 3.00 2,230.00 6,690.00 - 0.00 3.00 6,690.00 0.00 0.00 3.00 6,690.00 0.00 0.00
3.04 ELIMINACION DE MATERIAL EXCEDENTE M3 36.44 23.34 850.51 - 0.00 29.15 680.36 7.29 170.15 36.44 850.51 0.00 0.00
4.00 SUMINISTRO DE TUBERIA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01 SUMINISTRO DE TUBERIA PVC UF S-25 DN200mm M 424.55 30.48 12,940.28 424.55 12,940.28 0.00 0.00 0.00 424.55 12,940.28 0.00 0.00
5.00 INSTALACION DE TUBERIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.01 INSTALACION DE TUBERIA PVC UF S-25 DN 200 mm M 424.55 9.91 4,207.29 - 0.00 162.00 1,605.42 262.55 2,601.87 424.55 4,207.29 0.00 0.00
6.00 PRUEBA HIDRAULICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.01 PRUEBA HIDRAULICA TUBERIA PVC S-25 ALC D:200mm UND 424.55 5.69 2,415.69 - 0.00 0.00 0.00 424.55 2,415.69 424.55 2,415.69 0.00 0.00
7.00 EMPALMES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
7.01 DADOS DE CONCRETO, DE Fc=210 kg/cm2 UND 24.00 27.74 665.76 - 0.00 5.00 138.70 19.00 527.06 24.00 665.76 0.00 0.00
8.00 CONEXIONES DOMICILIARIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.01 TRAZO Y REPLANTEO PARA CONEXIONES DOMICILIARIAS M 481.00 1.79 860.99 - 0.00 481.00 860.99 0.00 481.00 860.99 0.00 0.00
8.02 EXCAVACION DE ZANJAS DE 0.80M M 481.00 11.27 5,420.87 - 0.00 177.18 1,996.82 481.00 5,420.87 658.18 7,417.69
8.03 REFINE DE ZANJA A=0.60 M M 481.00 2.32 1,115.92 - 0.00 0.00 0.00 481.00 1,115.92 481.00 1,115.92
8.04 PREPARACION DE CAMA DE APOYO CON MAT. PROPIO M 481.00 8.32 4,001.92 - 0.00 0.00 0.00 241.00 2,005.12 241.00 2,005.12
8.05 RELLENO COMPACTADO MANUAL C/MATERIAL PROPIO M 481.00 25.65 12,337.65 - 0.00 0.00 0.00 481.00 12,337.65 481.00 12,337.65
8.06 ELIMINACION DE MATERIAL EXCEDENTE M3 192.40 23.34 4,490.62 - 0.00 150.00 3,501.00 42.40 989.62 192.40 4,490.62
8.07 CONEXIÓN DOMICIL. DE AGUA 1/2 A TUBO PVC 110 mm UND 74.00 371.08 27,459.92 - 0.00 0.00 0.00 74.00 27,459.92 74.00 27,459.92

COSTO DIRECTO 156,950.81 14,513.65 66,966.29 75,470.89 156,950.83


GASTOS GENERALES 10.00% 15,695.08 1,451.37 6,696.63 7,547.08 15,695.08

UTILIDAD 10.00% 15,695.08 1,451.37 6,696.63 7,547.08 15,695.08


COSTO PARCIAL 188,340.97 17,416.39 80,359.55 90,565.05 188,340.99
FACTOR DE RELACION 1.00000 188,340.97 17,416.39 80,359.55 90,565.05 188,340.99
PORCENTAJE DE AVANCE DE OBRA 9.25% 42.67% 48.09% 100.00%
RESUMEN DE VALORIZACIONES DE PAV I M E N T O S
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : PAVIMENTOS VALOR REFERENCIAL
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO
SUPERVISOR : CONSORCIO SAN JOSÉ ABR - 2013 MAY - 2013 JUN - 2013 JUL - 2013 AGO - 2013 FACTOR DE RELACION

ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALORIZACION Nº 04 VALORIZACION Nº 05 VALOR. ACUMULADA
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
1.00 OBRAS PRELIMINARES
MOVILIZACION Y DESMOVILIZACION DE EQUIPO
1.01 GLB 1.00 15,000.00 15,000.00 0.50 7,500.00 0.50 7,500.00 0.00 0.00 0.00 0.00 0.00 0.00 1.00 15,000.00
1.02 TRAZO Y REPLANTEO PERMANENTE EN OBRA M2 4,023.54 1.52 6,115.78 4,023.54 6,115.78 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 4,023.54 6,115.78
1.03 MANTENIMIENTO DEL TRANSITO Y SEGURIDAD VIAL MES 3.00 488.35 1,465.05 1.00 488.35 1.00 488.35 0.00 0.00 1.00 488.35 0.00 0.00 3.00 1,465.05
1.04 LIMPIEZA FINAL DE OBRA GLB 1.00 1,500.00 1,500.00 - 0.00 0.00 0.00 0.50 750.00 0.50 750.00 0.00 0.00 1.00 1,500.00
2.00 VEREDAS Y SARDINELES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.01.01 DEMOLICION DE VEREDAS DE e=0.10m. M2 1,034.71 11.59 11,992.29 931.20 10,792.61 103.51 1,199.68 0.00 0.00 0.00 0.00 0.00 0.00 1,034.71 11,992.29
2.01.02 DEMOLICION DE SARDINELES PERALTADOS M3 47.14 9.01 424.73 37.14 334.63 10.00 90.10 0.00 0.00 0.00 0.00 0.00 0.00 47.14 424.73
2.01.03 DEMOLICION DE SARDINELES SUMERGIDOS M3 41.20 10.21 420.65 37.08 378.59 4.12 42.07 0.00 0.00 0.00 0.00 0.00 0.00 41.20 420.66
2.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.02.01 CORTE DE TERRENO MANUAL H=0.10 M2 1,625.99 2.87 4,666.59 1,463.39 4,199.93 162.60 466.66 0.00 0.00 0.00 0.00 0.00 0.00 1,625.99 4,666.59
2.02.02 EXCAVACION DE ZANJAS PARA SARDINEL PERALTADO M3 54.07 28.68 1,550.73 - 0.00 0.00 0.00 21.37 612.89 32.70 937.84 0.00 0.00 54.07 1,550.73
2.02.03 COMPACTACION DE SUBRASANTE M2 1,625.99 4.84 7,869.79 - 0.00 572.00 2,768.48 545.66 2,640.99 508.33 2,460.32 0.00 0.00 1,625.99 7,869.79
2.02.04 BASE GRAN. COMPAC. PARA VEREDAS e=0.10 m. M2 1,625.99 20.94 34,048.23 - 0.00 572.00 11,977.68 545.66 11,426.12 508.33 10,644.43 0.00 0.00 1,625.99 34,048.23
2.02.05 ACARREO DE MATERIAL A VEREDAS M3 162.60 9.94 1,616.24 - 0.00 62.60 622.24 54.57 542.39 45.43 451.61 0.00 0.00 162.60 1,616.24
2.02.06 ELIMINACION DE MATERIAL EXCEDENTE M3 195.12 23.34 4,554.10 175.60 4,098.50 19.52 455.60 0.00 0.00 0.00 0.00 0.00 0.00 195.12 4,554.10
0.2.03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
2.03.01 CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.01.01 CONCRETO PARA VEREDAS Y RAMPAS Fc=175 kg/cm2 M3 1,625.99 51.60 83,901.08 - 0.00 485.20 25,036.32 545.66 28,156.06 595.13 30,708.71 0.00 0.00 1,625.99 83,901.09
02.03.02 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.03.02.01 ENCOFRADO Y DESENCOF.NORMAL EN VEREDAS Y RAMPAS M2 291.54 35.92 10,472.12 - 0.00 139.72 5,018.62 75.00 2,694.00 76.82 2,759.50 0.00 0.00 291.54 10,472.12
2.04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01 CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.04.01.01 CONCRETO PARA SARDINEL PERALTADO Fc: 175 kg/cm2 M3 1,029.25 30.12 31,001.01 - 0.00 0.00 0.00 405.57 12,215.77 623.68 18,785.24 0.00 0.00 1,029.25 31,001.01
02.04.01.02 ENCOFRADO Y DESENCOF.DE SARDINEL PERALTADO M2 308.99 47.75 14,754.27 - 0.00 0.00 0.00 121.67 5,809.74 187.32 8,944.53 0.00 0.00 308.99 14,754.27
2.05 ACERO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.05.01 ACERO Fy 4200 kg/cm2 GRADO 60 KG. 1,156.09 5.32 6,150.40 - 0.00 0.00 0.00 457.19 2,432.25 698.90 3,718.15 0.00 0.00 1,156.09 6,150.40
2.06 VARIOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.06.01 BRUÑADO Y PULIDO 1.2X1.5 CM. DE ESPESOR PARA VEREDAS M2 1,235.94 18.68 23,087.36 - 0.00 450.00 8,406.00 429.28 8,018.95 356.66 6,662.41 0.00 0.00 1,235.94 23,087.36
02.06.02 JUNTAS DE DILATACION PARA ASFALTO m 411.98 5.61 2,311.21 - 0.00 0.00 0.00 0.00 0.00 411.98 2,311.21 0.00 0.00 411.98 2,311.21
02.06.03 PRUEBAS DE DENSIDAD DE CAMPO UND 24.00 119.88 2,877.12 - 0.00 10.00 1,198.80 10.00 1,198.80 4.00 479.52 0.00 0.00 24.00 2,877.12
02.06.04 PRUEBA DE CALIDAD DEL CONCRETO UND 25.00 25.48 637.00 - 0.00 16.00 407.68 6.00 152.88 3.00 76.44 0.00 0.00 25.00 637.00
02.06.05 PINTADO DE SARDINELES PERALTADOS Y VEREDAS M 2,059.90 11.39 23,462.26 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2,059.90 23,462.26 2,059.90 23,462.26
3.00 PAVIMENTO FLEXIBLE EN CLIENTE e=2 pulg. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
0.3.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.01 DEMOLIVION DE PAVIMENTO ASFALTICO DE 2 pulg. M2 638.57 6.17 3,939.98 638.57 3,939.98 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 638.57 3,939.98
3.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02.01 CORTE DE TERRENO NAT. A NIVEL DE SUBRASANTE M3 1,810.59 37.55 67,987.65 1,629.53 61,188.85 181.06 6,798.80 0.00 0.00 0.00 0.00 0.00 0.00 1,810.59 67,987.65
03.02.02 NIVELACION COMPACT. Y CONFORM. SUB RASANTE C/EQUIPO M2 4,023.54 5.85 23,537.71 - 0.00 815.25 4,769.21 2,448.29 14,322.50 760.00 4,446.00 0.00 0.00 4,023.54 23,537.71
03.02.03 SUB-BASE GRANULAR e=0.20 m. M3 804.71 68.32 54,977.79 - 0.00 163.00 11,136.16 489.71 33,456.85 152.00 10,384.78 0.00 0.00 804.71 54,977.79
03.02.04 BASE GRANULAR e=0.20 m. M3 804.71 78.05 62,807.62 - 0.00 163.00 12,722.15 489.71 38,221.71 152.00 11,863.76 0.00 0.00 804.71 62,807.62
03.02.05 ELIMINACION DE MATERIAL EXCEDENTE M3 2,263.24 23.34 52,824.02 2,036.92 47,541.71 226.32 5,282.31 0.00 0.00 0.00 0.00 0.00 0.00 2,263.24 52,824.02
03.02.06 ENSAYO DE CALIDAD DE COMPACT. BASE Y SUB BASE UND 60.00 119.88 7,192.80 - 0.00 2.00 239.76 47.00 5,634.36 11.00 1,318.68 0.00 0.00 60.00 7,192.80
PAVIMENTO ASFALTICO
3.03 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.03.01 IMPRIMAVION ASFALTICA M2 4,023.54 4.81 19,353.23 - 0.00 0.00 0.00 0.00 0.00 4,023.54 19,353.23 0.00 0.00 4,023.54 19,353.23
03.03.02 CARPETA ASFALTICA EN CALIENTE DE 2" M2 4,023.54 31.52 126,821.98 - 0.00 0.00 0.00 0.00 0.00 4,023.54 126,821.98 0.00 0.00 4,023.54 126,821.98
03.03.03 TRANSPORTE DE MEZCLA ASFALT. LIMA - CAÑETE M3 245.27 194.72 47,758.97 - 0.00 0.00 0.00 0.00 0.00 245.27 47,758.97 0.00 0.00 245.27 47,758.97
0.4.00 SEÑALIZACION 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01 PINTURA DE PAVIMENTOS LÍNEA CONTÍNUA M 1,341.18 8.25 11,064.74 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 1,341.18 11,064.74 1,341.18 11,064.74
4.02 PINTURA DE PAVIMENTOS LÍNEA DISCONTÍNUA M 419.12 6.00 2,514.72 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 419.12 2,514.72 419.12 2,514.72
4.03 MARCAS SOBRE EL PAVIMENTO M2 92.40 26.03 2,405.17 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 92.40 2,405.17 92.40 2,405.17
5.00 OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5.01 NIVELACION DE TAPAS DE BUZONES und 11.00 138.09 1,518.99 - 0.00 8.00 1,104.72 3.00 414.27 0.00 0.00 0.00 0.00 11.00 1,518.99
6.00 AREAS VERDES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
6.01 ESCARIFICADO DE TERRENO M2 2,699.18 1.13 3,050.07 - 0.00 0.00 0.00 0.00 0.00 2,699.18 3,050.07 0.00 0.00 2,699.18 3,050.07
6.02 SUMINISTRO Y COLOCACION DE GRASS AMERICANO M2 2,699.18 20.15 54,388.48 - 0.00 0.00 0.00 0.00 0.00 1,825.00 36,773.75 874.18 17,614.70 2,699.18 54,388.45
6.03 SEMBRADO DE ARBUSTO CROTO DE COLORES UND 250.00 14.98 3,745.00 - 0.00 0.00 0.00 0.00 0.00 250.00 3,745.00 0.00 0.00 250.00 3,745.00

COSTO DIRECTO 835,766.93 146,578.93 107,731.39 168,700.53 355,694.48 57,061.59 835,766.92


GASTOS GENERALES 10.00% 83,576.69 14,657.89 10,773.14 16,870.05 35,569.45 5,706.17 83,576.70

UTILIDAD 10.00% 83,576.69 14,657.89 10,773.14 16,870.05 35,569.45 5,706.17 83,576.70

COSTO PARCIAL 1,002,920.31 175,894.71 129,277.67 202,440.63 426,833.38 68,473.93 1,002,920.32


FACTOR DE RELACION 1.00000 1,002,920.31 175,894.71 129,277.67 202,440.63 426,833.38 68,473.93 1,002,920.32
PORCENTAJE DE AVANCE DE OBRA 17.54% 12.89% 20.19% 42.56% 6.83% 100.00%
RESUMEN DE VALORIZACIONES DEL SISTEMA DE AGUA POTABL E ADICIONAL 001
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : SISTEMA DE ALCANTARILLADO VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ JUN - 2013 JUL - 2013 FACTOR DE RELACION 1.00000

ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01.00 TRABAJOS PRELIMINARES PARA TODA LA OBRA
01.00.00 OBRAS PROVISIONALES 0.00 0.00 0.00 0.00 0.00 0.00 0.00
01.03 TRAZO NIVELES Y REPLANTEO INICIAL m 140.00 3.98 557.20 140.00 557.20 - 0.00 0.00 140.00 557.20 0.00 0.00
01.04 TRAZO NIVELES Y REPLANTEO FINAL m 140.00 3.61 505.40 - 0.00 140.00 505.40 0.00 140.00 505.40 0.00 0.00
01.05 CONTROL TOPOGRAFICO PERMANENTE mes 1.00 999.21 999.21 - 0.00 1.00 999.21 0.00 1.00 999.21 0.00 0.00
01.06 SEGURIDAD EN OBRA mes 1.00 1,332.76 1,332.76 - 0.00 1.00 1,332.76 0.00 1.00 1,332.76 0.00 0.00
02.00.00 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01 EXCAVACION DE ZANJA CON RETROEXCAVADORA m 140.00 18.22 2,550.80 - 0.00 140.00 2,550.80 0.00 140.00 2,550.80 0.00 0.00
02.02 REFINE DE ZANJA INCLUYE A=0.8 M m 140.00 1.89 264.60 - 0.00 140.00 264.60 0.00 140.00 264.60 0.00 0.00
02.03 PREPARACION DE CAMA DE APOYO C/MAT PREST. m 140.00 13.14 1,839.60 - 0.00 140.00 1,839.60 0.00 140.00 1,839.60 0.00 0.00
02.04 RELLENO CON PATERIA PROPIO SELECIONANDO m 140.00 27.73 3,882.20 - 0.00 140.00 3,882.20 0.00 140.00 3,882.20 0.00 0.00
02.05 ELIMINACION DE MATERIAL EXCEDENTE m 123.00 23.34 2,870.82 - 0.00 123.00 2,870.82 0.00 123.00 2,870.82 0.00 0.00
2.06 PRUEBA DE DENSIDAD DE CAMPO und 10.00 119.88 1,198.80 - 0.00 10.00 1,198.80 0.00 10.00 1,198.80 0.00 0.00
03.00.00 BUZONES DE CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01 EXCAVACION PARA BUZONES m3 6.11 75.31 460.14 - 0.00 6.11 460.14 0.00 6.11 460.14 0.00 0.00
03.02 Buzón estándar d=1.20 m h<2.00 m. und 2.00 2,253.15 4,506.30 - 0.00 2.00 4,506.30 0.00 2.00 4,506.30 0.00 0.00
03.04 Eliminación de material excedente con equipo hasta 15 Km. m3 7.94 23.34 185.32 - 0.00 7.94 185.32 0.00 7.94 185.32 0.00 0.00
04.00 SUMINISTRO E INSTALACION DE TUBERIAS ALC PVC S:25 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01 Suministro de tubería PVC UF S-25 DN 200 mm. m 140.00 30.48 4,267.20 140.00 4,267.20 - 0.00 0.00 140.00 4,267.20 0.00 0.00
05.00 INSTALACION DE TUBERIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.01.00 Instalación de tubería PVC UF S-25 DN 200 mm m 140.00 9.91 1,387.40 - 0.00 140.00 1,387.40 0.00 140.00 1,387.40 0.00 0.00
06.00.00 PRUEBA HIDRAULICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01.09.01.0Prueba hidráulica P/Tub Desague DN 200 mm Alca m 140.00 5.69 796.60 - 0.00 140.00 796.60 0.00 140.00 796.60 0.00 0.00
07.00.00 EMPALMES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.01.00 Dados de concreto f’c=140 Kg/ cm2 und 9.00 27.74 249.66 - 0.00 9.00 249.66 0.00 9.00 249.66 0.00 0.00
08.00.00 CONEXIONES DOMICILIARIAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
8.01 Trazo y replanteo de conexiones domiciliarias alc m 123.50 1.79 221.07 - 0.00 123.50 221.07 0.00 123.50 221.07 0.00 0.00
8.02 Excavación de Zanja manual h=0.8 m m 123.50 11.27 1,391.85 - 0.00 123.50 1,391.85 0.00 123.50 1,391.85 0.00 0.00
8.03 Refine de zanja A=0.8 m m 123.50 2.32 286.52 - 0.00 123.50 286.52 0.00 123.50 286.52 0.00 0.00
8.04 Preparación de cama de apoyo c/mat propio m 123.50 8.32 1,027.52 - 0.00 123.50 1,027.52 0.00 123.50 1,027.52 0.00 0.00
8.05 Relleno con material propio seleccionado. m 123.50 25.65 3,167.78 - 0.00 123.50 3,167.78 0.00 123.50 3,167.78 0.00 0.00
8.06 Eliminación de material excedente m 49.40 23.34 1,153.00 - 0.00 49.40 1,153.00 0.00 49.40 1,153.00 0.00 0.00
8.07 L=6.00 m und 19.00 371.08 7,050.52 - 0.00 19.00 7,050.52 0.00 19.00 7,050.52 0.00 0.00

COSTO DIRECTO 42,152.25 4,824.40 37,327.85 0.00 42,152.25 0.00


GASTOS GENERALES 10.00% 4,215.23 482.44 3,732.79 0.00 4,215.23 0.00
UTILIDAD 10.00% 4,215.23 482.44 3,732.79 0.00 4,215.23 0.00
COSTO PARCIAL 50,582.71 5,789.28 44,793.43 0.00 50,582.71 0.00
FACTOR DE RELACION 1.00000 50,582.71 5,789.28 44,793.43 0.00 50,582.71 0.00
PORCENTAJE DE AVANCE DE OBRA 11.45% 88.55% 0.00% 100.00% 0.00%
RESUMEN DE VALORIZACIONES DE PAVIMENTOS ADICIONAL 001
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
ESPECIALIDAD : PAVIMENTOS VALOR REFERENCIAL 1,616,949.14
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATADO 1,616,949.14
SUPERVISOR : CONSORCIO SAN JOSÉ JUN - 2013 JUL - 2013 FACTOR DE RELACION 1.00000

ITEM DESCRIPCION UND. METRADO PRECIO PRESUP. VALORIZACION Nº 01 VALORIZACION Nº 02 VALORIZACION Nº 03 VALOR. ACUMULADA SALDO x VALORIZAR
UNITARIO PARCIAL METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO METRADO MONTO
01.00 OBRAS PRELIMINARES
01.01 TRAZO Y REPLANTEO PERMANENTE EN OBRA m3 392.70 1.52 596.90 392.70 596.90 - 0.00 0.00 392.70 596.90 0.00 0.00
01.02 MANTENIMIENTO DEL TRANSITO Y SEGURIDAD VIAL mes 1.00 488.35 488.35 0.50 244.18 0.50 244.17 0.00 1.00 488.35 0.00 0.00
02.00 CONCRETO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01 CONCRETO PARA SARDINEL PERALTADO F´C=140 Kg /cm2 m3 15.20 30.12 457.82 8.00 240.96 7.20 216.86 0.00 15.20 457.82 0.00 0.00
02.02 ENCOFRADO Y DESENCOFRADO DE SARDINEL PERALTADO m2 78.79 47.75 3,762.22 - 0.00 78.79 3,762.22 0.00 78.79 3,762.22 0.00 0.00
03.00 ACERO 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01 ACERO F´= 4800 Kg /cm2 GRADO 60 kg 350.50 5.32 1,864.66 350.50 1,864.66 - 0.00 0.00 350.50 1,864.66 0.00 0.00
04.00 VARIOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01 JUNTA DE DILATACION PARA ASFALTO m 7.99 5.61 44.82 - 0.00 7.99 44.82 0.00 7.99 44.82 0.00 0.00
04.02 PRUEBA DE DENSIDAD DE CAMPO und 6.00 119.88 719.28 6.00 719.28 - 0.00 0.00 6.00 719.28 0.00 0.00
04.03 PRUEBA DE CALIDAD DEL CONCRETO und 2.00 25.48 50.96 1.00 25.48 1.00 25.48 0.00 2.00 50.96 0.00 0.00
04.04 PINTADO DE SARDINEL PERALTADO Y VEREDAS m 51.00 11.39 580.89 - 0.00 51.00 580.89 0.00 51.00 580.89 0.00 0.00
03.00 PAVIMENTO FLEXIBLE EN CLIENTE E = 2 PULG. 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01 OBRAS PRELIMINARES 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01.01 CORTE DE TERRENO NAT. A NIVEL DE SUB RAZANTE m3 103.90 37.55 3,901.45 - 0.00 103.90 3,901.45 0.00 103.90 3,901.45 0.00 0.00
03.01.02 NIVELACION COMP. Y CONFORMACION DE SUB RAZANTE m2 392.70 5.85 2,297.30 - 0.00 392.70 2,297.30 0.00 392.70 2,297.30 0.00 0.00
03.01.03 SUB BASE GRANULAR E=0.2 M m3 103.90 68.32 7,098.45 - 0.00 103.90 7,098.45 0.00 103.90 7,098.45 0.00 0.00
03.01.04 ELIMINACION DE MATERIAL EXCEDENTE m3 135.07 23.34 3,152.53 - 0.00 135.07 3,152.53 0.00 135.07 3,152.53 0.00 0.00
03.01.05 ENSAYO DE CALIDAD DE COMP. BASE Y SU BASE und 2.00 119.88 239.76 - 0.00 2.00 239.76 0.00 2.00 239.76 0.00 0.00
04.00 OTROS 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4.01 NIVELACION DE TAPAS DE BUZONES und 2.00 138.09 276.18 - 0.00 2.00 276.18 0.00 2.00 276.18 0.00 0.00

COSTO DIRECTO 25,531.56 3,691.46 21,840.10 0.00 25,531.56 0.00


GASTOS GENERALES 10.00% 2,553.16 369.15 2,184.01 0.00 2,553.16 0.00
UTILIDAD 10.00% 2,553.16 369.15 2,184.01 0.00 2,553.16 0.00
COSTO PARCIAL 30,637.88 4,429.76 26,208.12 0.00 30,637.88 0.00
FACTOR DE RELACION 1.00000 30,637.88 4,429.76 26,208.12 0.00 30,637.88 0.00
PORCENTAJE DE AVANCE DE OBRA 14.46% 85.54% 0.00% 100.00% 0.00%
CALCULO DEL COEFICIENTE DE REAJUSTE (K)

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
ESPECIALIDAD : SISTEMA DE AGUA POTABLE

IND. DESCRIPCION SIMB INCID. COEF. VALOR


% INCID. REFER.
March - 2013 April - 2013 May - 2013 June - 2013 July - 2013 August - 2013
Aug-12 INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF.

47 MANO DE OBRA M 100.000 0.238 470.79 471.44 0.238 471.44 0.238 471.44 0.238 471.44 0.238 497.55 0.252

43 MADERA NACIONAL P/ENCOFRADO Y CARPINTERÍA APM 1.818 0.110 561.58 570.05 0.111 571.49 0.111 572.29 0.111 565.10 0.111 568.17 0.111

5 AGREGADO GRUESO 96.364 214.90 216.91 216.28 216.26 216.78 217.68

53 PETRÓLEO DIESSEL 1.818 868.93 893.43 891.45 851.05 849.06 879.53


72 TUBERÍA DE PVC TAA 87.023 0.131 346.50 358.85 0.135 359.18 0.136 359.22 0.136 364.70 0.138 369.01 0.139

10 APARATO SANITARIO CON GRIFERÍA 10.687 345.45 354.80 355.92 357.66 362.95 363.36

2 ACERO CONSTRUCCIÓN LISO 2.290 437.12 442.79 444.90 454.58 471.93 475.70
21 CEMENTO PORTLAND TIPO I MC 29.714 0.175 339.42 339.42 0.174 339.42 0.175 339.42 0.177 339.42 0.181 339.42 0.182

49 MAQUINARIA Y EQUIPO IMPORTADO 70.286 230.11 228.85 229.46 233.87 243.07 245.72

39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 100.000 0.346 379.42 384.88 0.351 385.85 0.352 386.60 0.353 387.61 0.353 389.74 0.355
500.000 1.000 K= 1.009 K= 1.012 K= 1.015 K= 1.021 1.039
CALCULO DEL COEFICIENTE DE REAJUSTE (K)

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
ESPECIALIDAD : SISTEMA DE ALCANTARILLADO

IND. DESCRIPCION SIMB INCID. COEF. VALOR


March - 2013 April - 2013 May - 2013 June - 2013 July - 2013 August - 2013
% INCID. REFER.
Aug-12 INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF.

47 MANO DE OBRA M 100.000 0.218 470.79 471.44 0.218 471.44 0.218 471.44 0.218 471.44 0.218 497.55 0.230 497.55 0.230

49 MAQUINARIA Y EQUIPO IMPORTADO MPA 97.838 0.185 230.11 228.85 0.184 229.46 0.185 233.87 0.188 243.07 0.195 245.72 0.197 248.02 0.199

53 PETRÓLEO DIESSEL 1.081 868.93 893.43 891.45 851.05 849.06 879.53 879.53

1 ACEITE 1.081 792.43 797.66 798.11 806.01 828.77 833.82 837.67

5 AGREGADO GRUESO CAF 26.772 0.139 214.90 216.91 0.140 216.28 0.140 216.26 0.140 216.78 0.140 217.68 0.140 218.28 0.140

21 CEMENTO PORTLAND TIPO I 48.819 339.42 339.42 339.42 339.42 339.42 339.42 339.42

32 FLETE TERRESTRE 24.409 449.56 455.86 455.86 455.86 455.72 455.72 455.72
10 APARATO SANITARIO CON GRIFERÍA TA 9.848 0.132 345.45 354.80 0.137 355.92 0.137 357.66 0.137 362.95 0.139 363.36 0.140 364.40 0.142

72 TUBERÍA DE PVC 90.152 346.50 358.85 359.18 359.22 364.70 369.01 372.48

39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 100.000 0.326 379.42 384.88 0.331 385.85 0.332 386.60 0.332 387.61 0.333 389.74 0.335 391.85 0.337
500.000 1.000 K= 1.010 K= 1.012 K= 1.015 K= 1.025 K= 1.042 K= 1.048
CALCULO DEL COEFICIENTE DE REAJUSTE (K)

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
ESPECIALIDAD : PAVIMENTOS

IND. DESCRIPCION SIMB INCID. COEF. VALOR


% INCID. REFER.
March - 2013 April - 2013 May - 2013 June - 2013 July - 2013 August - 2013 September - 2013
Aug-12 INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF. INDICE COEF.

47 MANO DE OBRA M 100.000 0.124 470.79 471.44 0.124 471.44 0.124 471.44 0.124 471.44 0.124 497.55 0.131 497.55 0.131 497.55 0.131

3 ACERO DE CONSTRUCCIÓN CORRUGADO AA 5.469 0.128 431.43 438.01 0.129 436.72 0.129 446.97 0.129 463.77 0.130 469.79 0.131 473.58 0.131 469.34 0.131

5 AGREGADO GRUESO 94.531 214.90 216.91 216.28 216.26 216.78 217.68 218.28 218.23

13 ASFALTO AP 95.783 0.166 1,697.48 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166 1,697.48 0.166

53 PETRÓLEO DIESSEL 4.217 868.93 893.43 891.45 851.05 849.06 879.53 879.53 923.90

49 MAQUINARIA Y EQUIPO IMPORTADO MM 94.677 0.263 230.11 228.85 0.262 229.46 0.262 233.87 0.267 243.07 0.277 245.72 0.280 248.02 0.282 246.08 0.280

45 MADERA TERCIADA PARA ENCOFRADO 5.323 311.81 314.32 314.32 314.48 311.57 311.60 311.97 311.97

39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR I 100.000 0.319 379.42 384.88 0.324 385.85 0.324 386.60 0.325 387.61 0.326 389.74 0.328 391.85 0.329 392.28 0.330
500.000 1.000 K= 1.005 K= 1.005 K= 1.011 K= 1.023 K= 1.036 K= 1.039 K= 1.038
DEDUCCION POR REINTEGRO QUE NO CORRESPONDE POR ADELANTO DE MATERIALES 01
OBRA MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA CONIESA E.I.R.L
SUPERVISOR CONSORCIO SAN JOSÉ  
MATERIAL MONTO MES VAL. MES MONTO COEF. % ADEL. POR Io Ia Ir ADELANTO ADELANTO ADELANTO ADELANTO DEDUCCION
(I.U.) ADELANTO ADEL. No. VAL. VALORIZADO INC. INC. UTILIZAR OCT.2011 DIC.2011 DEFLACTADO SALDO UTILIZADO SALDO (D)
(A) (V) (I) (%) (Au) ANTERIOR (M) ACTUAL
VxIx% A x Io / Ia (S) ( Au ó S) S-M Mx(Ir-Ia)/Io
ASFALTO 0.00 20-Mar-2013 01 30.ABR.2013 34,864.72 0.131 87.02 3,974.58 346.50 359.18 359.22 0.00 0.00 0.00 0.00 0.00
02 31.MAY.2013 78,976.52 9,003.33 364.70 0.00 0.00 0.00 0.00
(13) 03 30.JUN.2013 65,193.36 7,432.05 369.01 0.00 0.00 0.00 0.00
04 31.JUL.2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00

1
AGREGADO 0.00 20-Mar-2013 01 30.ABR.2013 34,864.72 0.110 1.82 69.72 561.58 571.49 572.29 0.00 0.00 0.00 0.00 0.00
GRUESO 02 31.MAY.2013 78,976.52 157.94 565.10 0.00 0.00 0.00 0.00
(05) 03 30.JUN.2013 65,193.36 130.37 568.17 0.00 0.00 0.00 0.00
04 31.JUL.2013 0.00 0.00 0.00 0.00 0.00 0.00 0.00

2
MADERA 0.00 20-Mar-2013 01 30.ABR.2013 34,864.72 #REF! 0.00 #REF! 0.00 0.00 0.00 #DIV/0! #DIV/0! #REF! #DIV/0! #REF!
TORNILLO 02 31.MAY.2013 78,976.52 #REF! 0.00 #DIV/0! #REF! #DIV/0! #REF!
(43) 03 30.JUN.2013 65,193.36 #REF! 0.00 #DIV/0! #REF! #DIV/0! #REF!
04 31.JUL.2013 0.00 #REF! 0.00 #DIV/0! #DIV/0! #DIV/0! #DIV/0!

3
ACUMULADO ACTUAL #REF!
ACUMULADO ANTERIOR
SALDO ACTUAL #REF!
DEDUCCION POR REINTEGRO QUE NO CORRESPONDE POR ADELANTO DE MATERIALES 01
OBRA MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA CONIESA E.I.R.L
SUPERVISOR CONSORCIO SAN JOSÉ  
MATERIAL MONTO MES VAL. MES MONTO COEF. % ADEL. POR Io Ia Ir ADELANTO ADELANTO ADELANTO ADELANTO DEDUCCION
(I.U.) ADELANTO ADEL. No. VAL. VALORIZADO INC. INC. UTILIZAR OCT.2011 DIC.2011 DEFLACTADO SALDO UTILIZADO SALDO (D)
(A) (V) (I) (%) (Au) ANTERIOR (M) ACTUAL
VxIx% A x Io / Ia (S) ( Au ó S) S-M Mx(Ir-Ia)/Io

TOTAL ACUMULADO ACTUAL #REF!


TOTAL ACUMULADO ANTERIOR 0.00
MONTO MAXIMO DE ADELANTO DE MATERIALES A OTORGAR

COEFICIENTE DE MONTO MONTO


INCIDENCIA CONTRATO MAXIMO
IU DESCRIPCION DEL MATERIAL
% MONOMIO S/IGV (contractual)
1 2 3 4=1X2X3
formula 1
47 MANO DE OBRA 100 0.238 179034.6 42,610.23
43 MADERA NACIONAL P/ENCOFRADO Y CARPINTERÍA 1.818 0.11 179034.6 358.03
5 AGREGADO GRUESO 96.364 0.11 179034.6 18,977.74
53 PETRÓLEO DIESSEL 1.818 0.11 179034.6 358.03
72 TUBERÍA DE PVC 87.023 0.131 179034.6 20,409.97
10 APARATO SANITARIO CON GRIFERÍA 10.687 0.131 179034.6 2,506.48
2 ACERO CONSTRUCCIÓN LISO 2.29 0.131 179034.6 537.09
21 CEMENTO PORTLAND TIPO I 29.714 0.175 179034.6 9,309.71
49 MAQUINARIA Y EQUIPO IMPORTADO 70.29 0.175 179034.6 22,021.35
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100 0.346 179034.6 61,945.97

formula 2
47 MANO DE OBRA 100.000 0.218 188340.97 41,058.33
49 MAQUINARIA Y EQUIPO IMPORTADO 97.838 0.185 188340.97 34,089.77
53 PETRÓLEO DIESSEL 1.081 0.185 188340.97 376.65
1 ACEITE 1.081 0.185 188340.97 376.65
5 AGREGADO GRUESO 26.772 0.139 188340.97 7008.7476
21 CEMENTO PORTLAND TIPO I 48.819 0.139 188340.97 12,780.52
32 FLETE TERRESTRE 24.409 0.139 188340.97 6,390.13
10 APARATO SANITARIO CON GRIFERÍA 9.848 0.132 188340.97 2,448.31
72 TUBERÍA DE PVC 90.152 0.132 188340.97 22,412.70
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100.000 0.326 188340.97 61,399.16

formula 3
47 MANO DE OBRA 100 0.124 1002920.31 124,362.12
3 ACERO DE CONSTRUCCIÓN CORRUGADO 5.469 0.128 1002920.31 7,020.76
5 AGREGADO GRUESO 94.531 0.128 1002920.31 121,353.04
13 ASFALTO 95.783 0.166 1002920.31 159,464.11
53 PETRÓLEO DIESSEL 4.217 0.166 1002920.31 7,020.66
49 MAQUINARIA Y EQUIPO IMPORTADO 94.677 0.263 1002920.31 249,727.67
45 MADERA TERCIADA PARA ENCOFRADO 5.323 0.263 1002920.31 14,040.37
39 INDICE GENERAL DE PRECIOS AL CONSUMIDOR 100 0.319 1002920.31 319,931.58

MONTO MAXIMO DE ADELANTO DE MATERIALES A OTORGAR 562,267.22

MONTO MAXIMO DE ADELANTO DE MATERIALES SOLICITADO 548,118.35


DEDUCCION POR REINTEGRO QUE NO CORRESPONDE POR ADELANTO DE MATERIALES

OBRA MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA CONIESA E.I.R.L
SUPERVISOR CONSORCIO SAN JOSÉ  
MATERIAL MONTO MES VAL. MES MONTO COEF. % ADEL. POR Io Ia Ir ADELANTO ADELANTO ADELANTO ADELANTO DEDUCCION
(I.U.) ADELANTO ADEL. No. VAL. VALORIZADO INC. INC. UTILIZAR AGO.12 MAR.12 DEFLACTADO SALDO UTILIZADO SALDO (D)
(A) (V) (I) (%) (Au) ANTERIOR (M) ACTUAL
VxIx% A x Io / Ia (S) ( Au ó S) S-M Mx(Ir-Ia)/Io
CEMENTO 22,090.23 MAR.13 0.175 29.714 0.00 339.42 339.42 22,090.23 0.00 0.00 0.00 0.00
TIPO I 01 30.ABR.08 34,864.72 1,812.95 339.42 22,090.23 1,812.95 20,277.28 0.00
(21) 02 31.MAY.08 78,976.52 4,106.74 339.42 20,277.28 4,106.74 16,170.54 0.00
03 30.JUN.08 65,193.36 3,390.02 339.42 16,170.54 16,170.54 0.00 0.00
04 31.JUL.08
05 31.AGO.08
1
TUBERÍA 42,822.66 MAR.13 0.132 90.152 0.00 346.50 358.85 41,348.90 0.00 0.00 0.00 0.00
PVC 01 30.ABR.08 17,416.39 2,072.56 359.18 41,348.90 2,072.56 39,276.33 1.97
(72) 02 31.MAY.08 80,359.55 9,562.84 359.22 39,276.33 9,562.84 29,713.49 10.21
03 30.JUN.08 90,565.05 10,777.30 364.70 29,713.49 29,713.49 0.00 501.66
04 31.JUL.08
05 31.AGO.08
2
AGREGADO 121,353.04 MAR.13 0.128 94.531 0.00 214.90 216.91 120,228.52 0.00 0.00 0.00 0.00
GRUESO 01 30.ABR.08 175,894.71 21,283.20 216.28 120,228.52 21,283.20 98,945.32 -62.39
(05) 02 31.MAY.08 129,277.67 15,642.56 216.26 98,945.32 15,642.56 83,302.76 -47.31
03 30.JUN.08 202,440.63 24,495.25 216.78 83,302.76 24,495.25 58,807.51 -14.82
04 31.JUL.08 426,833.38 51,646.70 217.68 58,807.51 51,646.70 7,160.81 185.05
05 31.AGO.08 68,473.93 8,285.32 218.28 7,160.81 7,160.81 0.00 45.65
3
ASFALTO 159,464.11 0.166 95.783 0.00 1,697.48 1,697.48 159,464.11 159,464.11 0.00 159,464.11 0.00
01 30.ABR.08 175,894.71 27,967.22 1,697.48 159,464.11 27,967.22 131,496.89 0.00
(13) 02 31.MAY.08 129,277.67 20,555.12 1,697.48 131,496.89 20,555.12 110,941.77 0.00
03 30.JUN.08 202,440.63 32,188.02 1,697.48 110,941.77 32,188.02 78,753.75 0.00
04 31.JUL.08 426,833.38 67,866.41 1,697.48 78,753.75 67,866.41 10,887.34 0.00
05 31.AGO.08 68,473.93 10,887.34 1,697.48 10,887.34 10,887.34 0.00 0.00

EQUIPO 202,388.32 0.263 94.677 0.00 230.11 228.85 203,502.62 203,502.62 0.00 203,502.62 0.00
IMPORTADO 01 30.ABR.08 175,894.71 43,797.87 229.46 203,502.62 43,797.87 159,704.75 116.10
(49) 02 31.MAY.08 129,277.67 32,190.21 233.87 159,704.75 32,190.21 127,514.54 702.25
03 30.JUN.08 202,440.63 50,407.82 243.07 127,514.54 50,407.82 77,106.72 3,115.03
04 31.JUL.08 426,833.38 106,281.73 245.72 77,106.72 77,106.72 0.00 5,652.91
05 31.AGO.08 68,473.93 17,050.04 248.02 0.00 0.00 0.00 0.00

Adelanto S/IGV: 548,118.35 TOTAL ACUMULADO 10,206.31

I.G.V (18%) 98,661.30


Adelanto Materia 646,779.65 Fecha : 3/20/2013
CALCULO DEL REAJUSTE VALORIZADO CONTRATO PRINCIPAL

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
Monto Contratado (C) = 1,616,949.14
D = A x V (K/Ka - 1) / C Monto Adelanto (A) = 323,389.83
Fecha Adelanto = 19-Mar-2013
ESPECIALIDAD : SISTEMA DE AGUA POTABLE Coef. Adelanto (Ka) = 1.009
PROGRAMADO EJECUTADO REAJUSTE
VAL. FECHA COEF. VALORIZACION DEDUCC. REAJUSTE VALORIZACION DEDUCC. REAJUSTE RECONOCIDO
REAJ. PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADO
(K) (V) D V x (K-1) - D (V) D V x (K-1) - D
01 30.ABR.2013 1.015 28,995.09 28,995.09 434.93 434.93 34,864.72 34,864.72 41.46 481.51 481.51 481.51 481.51
02 31.MAY.2013 1.021 49,651.63 78,646.72 1,042.68 1,477.61 78,976.52 113,841.24 187.85 1,470.66 1,952.17 1,470.66 1,952.17
03 30.JUN.2013 1.039 100,387.88 179,034.60 3,915.13 5,392.74 65,193.36 179,034.60 387.67 2,154.87 4,107.04 2,154.87 4,107.04 (1)
04 31.JUL.2013
05 31.AGO.2013

616.98
Deductivo que no Corresponde por Adelanto Directo 616.98
Deductivo que no Corresponde por Adelanto de Materiales 0.00 (2)
Reajuste Acumulado Neto 3,490.06 (1) - (2)

ESPECIALIDAD : SISTEMA DE ALCANTARILLADO Coef. Adelanto (Ka) = 1.010


PROGRAMADO EJECUTADO REAJUSTE
VAL. FECHA COEF. VALORIZACION DEDUCC. REAJUSTE VALORIZACION DEDUCC. REAJUSTE RECONOCIDO
REAJ. PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADO
(K) (V) D V x (K-1) - D (V) D V x (K-1) - D
01 30.ABR.2013 1.015 45,167.81 45,167.81 53.72 623.80 623.80 17,416.39 17,416.39 17.24 244.01 244.01 244.01 244.01
02 31.MAY.2013 1.025 143,173.16 188,340.97 454.07 3,125.26 3,749.06 80,359.55 97,775.94 254.86 1,754.13 1,998.14 1,754.13 1,998.14
03 30.JUN.2013 1.042 0.00 188,340.97 0.00 0.00 3,749.06 90,565.05 188,340.99 592.40 3,211.33 5,209.47 1,750.92 3,749.06 (1)
04 31.JUL.2013
05 31.AGO.2013

864.50
Deductivo que no Corresponde por Adelanto Directo 864.50
Deductivo que no Corresponde por Adelanto de Materiales 513.84 (2)
Reajuste Acumulado Neto 2,370.72 (1) - (2)
1147.66
CALCULO DEL REAJUSTE VALORIZADO CONTRATO PRINCIPAL

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ
Monto Contratado (C) = 1,616,949.14
D = A x V (K/Ka - 1) / C Monto Adelanto (A) = 323,389.83
Fecha Adelanto = 19-Mar-2013
ESPECIALIDAD : PAVIMENTOS Coef. Adelanto (Ka) = 1.005
PROGRAMADO EJECUTADO REAJUSTE
VAL. FECHA COEF. VALORIZACION DEDUCC. REAJUSTE VALORIZACION DEDUCC. REAJUSTE RECONOCIDO
REAJ. PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADA ADEL. PARCIAL ACUMULADO PARCIAL ACUMULADO
(K) (V) D V x (K-1) - D (V) D V x (K-1) - D
01 30.ABR.2013 1.011 143,954.50 143,954.50 171.89 1,411.61 1,411.61 175,894.71 175,894.71 210.02 1,724.82 1,724.82 1,724.82 1,724.82
02 31.MAY.2013 1.023 233,450.01 377,404.51 836.24 4,533.11 5,944.72 129,277.67 305,172.38 463.08 2,510.31 4,235.13 4,219.90 5,944.72
03 30.JUN.2013 1.036 208,505.30 585,909.81 1,286.30 6,219.89 12,164.61 202,440.63 507,613.01 1,248.89 6,038.97 10,274.10 6,038.97 11,983.69
04 31.JUL.2013 1.039 208,505.30 794,415.11 1,410.78 6,720.93 18,885.54 426,833.38 934,446.39 2,888.03 13,758.47 24,032.57 13,758.47 25,742.16
05 31.AGO.2013 1.038 208,505.20 1,002,920.31 1,369.29 6,553.91 25,439.45 68,473.93 1,002,920.32 449.68 2,152.33 26,184.90 (302.71) 25,439.45 (1)

5,259.70
Deductivo que no Corresponde por Adelanto Directo 5,259.70
Deductivo que no Corresponde por Adelanto de Materiales 9,692.47 (2)
Reajuste Acumulado Neto 10,487.28 (1) - (2)
FACTOR DE LIQUIDACION "F"

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y


ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA
CAÑETE - LIMA

CONTRATISTA : CONIESA E.I.R.L


SUPERVISOR : CONSORCIO SAN JOSÉ

FACTOR DE LIQUIDACION "F"

Mediante Resolución Nº 033-90-VC de 26.JUL.90, se creó el Factor "F" para el cálculo de la


Compensación por Tiempo de Servicios de los trabajadores del régimen de construcción civil; en
razón, a que ésta se pagará con el último jornal vigente a la fecha de cese del trabajador; la misma,
que se calcula mediante la siguiente fórmula:

F
R = i x ---- x Vc
Io

Donde:
R = Reintegro por pago de compensación por tiempo de servicios.
F = Factor de liquidación correspondiente al mes de pago de la valorización.
i = Incidencia de mano de obra en la fórmula polinómica.
Io = Indice de mano de obra correspondiente al mes del presupuesto base.
Vc = Valorización Contractual (V1 +V2 + V3 + V4 + V5 + V6 + V7 + V8)

CAPITULO : SISTEMA DE AGUA POTABLE


1.39
R1 = 0.238 x ---------- x 0.00
470.79
R1 = 0.00

CAPITULO : SISTEMA DE ALCANTARILLADO


1.39
R2 = 0.218 x ---------- x 0.00
470.79
R2 = 0.00

CAPITULO : PAVIMENTOS
1.39
R3 = 0.124 x ---------- x 0.00
470.79
R3 = 0.00

CAPITULO : #REF!

1.39
R4 = #REF! x ---------- x #REF!
#REF!
R4 = #REF!

CAPITULO : #REF!
1.39
R5 = #REF! x ---------- x #REF!
#REF!
R5 = #REF!

TOTAL :
R = R1 + R2 + R3 + R4 + R5

R = 0.00 + 0.00 + 0.00 + #REF! + #REF!

R = #REF!
FACTOR DE LIQUIDACION "V"

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y


ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA
CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ

FACTOR DE LIQUIDACION "V"

Mediante Resolución Nº 022-94-VC de 18.ENE.94, se creó el Factor "V" para el cálculo de


Compensación Vacacional de los trabajadores del régimen de construcción civil; en razón, a que
ésta se pagará con el último jornal vigente a la fecha de cese del trabajador; la misma, que se
calcula mediante la siguiente fórmula:

V
R = i x ---- x Vc
Io

Donde:
R = Reintegro por pago de compensación vacacional.
V = Factor de liquidación correspondiente al mes de pago de la valorización.
(Este factor son publicados por INEI anualmente en setiembre, por lo que,
conservadoramente, se ha considerado el valor publicado el año 2011).
i = Incidencia de mano de obra en la fórmula polinómica.
Io = Indice de mano de obra correspondiente al mes del presupuesto base.
Vc = Valorización Contractual (V1 +V2 + V3 + V4 + V5 + V6 + V7 + V8)

CAPITULO : SISTEMA DE AGUA POTABLE


1.06
R1 = 0.238 x ---------- x 0.00
470.79
R1 = 0.00

CAPITULO : SISTEMA DE ALCANTARILLADO


1.06
R2 = 0.218 x ---------- x 0.00
470.79
R2 = 0.00

CAPITULO : PAVIMENTOS
1.06
R3 = 0.124 x ---------- x 0.00
470.79
R3 = 0.00

CAPITULO : #REF!

1.06
R4 = #REF! x ---------- x #REF!
470.79
R4 = #REF!

CAPITULO : #REF!

1.06
R5 = #REF! x ---------- x #REF!
470.79
R5 = #REF!

TOTAL :
R = R1 + R2 + R3 + R4 + R5

R = 0.00 + 0.00 + 0.00 + #REF! + #REF!

R = #REF!
RESUMEN DE VALORIZACION Y REAJUSTES RECALCULADOS
DEL CONTRATO PRINCIPAL

OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE -
DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L MONTO CONTRATO 1,370,295.88 (Sin I.G.V.)
SUPERVISION : CONSORCIO SAN JOSÉ PLAZO EJECUCION 90 días calendario

ITEM DESCRIPCION MONTO VALOR IZAC ION REAJUSTE


CONTRATADO ACUMULADA SALDO ACUMULADO
SIN I.G.V.
(1) (2) (5) = (1) - (2) (6)

01 SISTEMA DE AGUA POTABLE 179,034.60 179,034.60 0.00 3,490.06

02 SISTEMA DE ALCANTARILLADO 188,340.97 188,340.99 -0.02 2,370.72

03 PAVIMENTACIÓN 1,002,920.31 1,002,920.32 -0.01 10,487.28

TOTAL 1,370,295.88 1,370,295.91 -0.03 16,348.06

PORCENTAJE DE AVANCE EJECUTADO 100.00% 0.00%


CÁLCULO DE MAYORES GASTOS GENERALES
(Artículo 202 y 203 del Reglamento)

Mayores Gastos Generales Variables (MGGV) Las Ampliaciones de Plazo en los contratos de obra, darán lugar al pago de
Mayores Gastos Generales Variables iguales al número de días
correspondientes a la ampliación multiplicados por el gasto general variable
diario, salvo en los casos de obras adicionales que cuentan con
presupuestos específicos.

= # días ampliación X GGVD

Gasto General Variable Diario (GGVD) En los contratos de obra a suma alzada, el Gasto General Diario, se calcula
dividiendo los Gastos Generales Variables del Presupuesto que sustenta el
Valor Referencial entre el número de días del plazo contractual, ajustado por
el factor de relación y por el coeficiente “Ip/Io”, en donde “Ip” es el Índice
General de Precios al Consumidor (Código 39) aprobado por el Instituto
Nacional de Estadística e Informática - INEI correspondiente al mes
calendario en que ocurre la causal de ampliación del plazo contractual, e
“Io” es el mismo índice de precios correspondiente al mes del valor
referencial.

= (GGV(vr) / # días plazo contractual) x Fr x Ip/Io

Donde GGV(vr): Gastos Generales Variables del Valor Referencial


Fr: Factor de Relación
Ip: Índice General Precio al Consumidor (Código 39) del mes ocurre causal de
Ampliación de Plazo
Io: Índice General Precio al Consumidor (Código 39) del mes Valor Referencial

Mayores Gastos Generales Variables Ampliación de Plazo N° 01 :

Gasto General Variable Diario (GGVD) 97,062.62 X 1.00000 X 387.61


90 379.42
= 1,101.75

Mayores Gastos Generales Variables (MGGV) 0 X 1,101.75


= 0.00 (1)

Mayores Gastos Generales Variables Ampliación de Plazo N° 02 :

Gasto General Variable Diario (GGVD) 97,062.62 X 1.00000 X 391.85


90 379.42
= 1,113.80

Mayores Gastos Generales Variables (MGGV) 0 X 1,113.80


= 0.00 (2)

Mayores Gastos Generales Variables Ampliación de Plazo N° 06 :

Gasto General Variable Diario (GGVD) 97,062.62 X 1.00000 X 391.85


90 379.42
= 1,113.80

Mayores Gastos Generales Variables (MGGV) 0 X 1,113.80


= 0.00 (3)

AYORES GASTOS GENERALES VARIABLES TOTAL S/. 0.00 (1) + (2) + (3)
VALORIZACIONES TRAMITADAS Y PAGADAS CONTRATO PRINCIPAL
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ Contrato Principal C/IGV 1,616,949.14

CONCEPTO MES MONTO AMORTIZACION Y/O DEDUCCION VALORIZACIÓN TRAMITADA VALORIZACIÓN PAGADA MES DE MONTO TOTAL COBRADO

VALORIZADO VALORIZAC. REAJUSTE TOTAL ADEL ADEL SUB VALORIZAC. I.G.V. MONTO MONTO DETRACCIÓN GFC MONTO FACTURA PAGO NETO IGV TOTAL

SUB DIRECTO MATERIAL TOTAL NETA TOTAL CHEQUE 5% 10% TOTAL


ADEL DIRECTO 0.00 0.00 274,059.18 49,330.65 323,389.83 307,220.33 16,169.50 323,389.83 003-001804 04-Apr-2013 274,059.18 49,330.65 323,389.83
ADEL MATERIAL 0.00 0.00 548,118.35 98,661.30 646,779.65 614,440.67 32,338.98 646,779.65 003-001805 04-Apr-2013 548,118.35 98,661.30 646,779.65
VALORIZAC. 01 30-Apr-2013 269,247.47 269,247.47 53,849.49 107,698.99 161,548.48 91,270.33 16,428.66 107,698.99 87,967.18 5,384.95 14,346.86 107,698.99 003-001821 21-May-2013 91,270.33 16,428.66 107,698.99
VALORIZAC. 02 31-May-2013 340,564.17 340,564.17 68,112.83 136,225.67 204,338.50 115,445.48 20,780.19 136,225.67 82,780.08 6,811.28 46,634.31 136,225.67 003-001836 11-Jun-2013 115,445.48 20,780.19 136,225.67
VALORIZAC. 03 30-Jun-2013 422,674.88 422,674.88 84,534.98 169,069.95 253,604.93 143,279.62 25,790.33 169,069.95 59,902.71 8,453.50 100,713.74 169,069.95 003-001844 17-Jul-2013 143,279.62 25,790.33 169,069.95
VALORIZAC. 04 31-Jul-2013 503,663.39 503,663.39 116,892.62 233,785.04 350,677.66 129,648.92 23,336.81 152,985.73 145,336.54 7,649.29 0.00 152,985.83 003-001856 29-Aug-2013 129,649.01 23,336.82 152,985.83
VALORIZAC. 05 08-Aug-2013 80,799.08 80,799.08 0.00 68,473.80 12,325.28 80,799.08 76,759.13 4,039.95 0.00 80,799.08 003-001858 31-Aug-2013 68,473.80 12,325.28 80,799.08

T O TAL 1,616,948.99 0.00 1,616,948.99 323,389.92 646,779.65 970,169.57 1,370,295.68 246,653.22 1,616,948.90 1,374,406.63 80,847.45 161,694.91 1,616,949.00 1,370,295.77 246,653.23 1,616,949.00

VALORIZACIONES TRAMITADAS Y PAGADAS ADICIONAL DE OBRA


OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE - PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ Adicional de Obra C/IGV 95,840.30

CONCEPTO MES MONTO AMORTIZACION Y/O DEDUCCION VALORIZACIÓN TRAMITADA VALORIZACIÓN PAGADA MES DE MONTO TOTAL COBRADO
VALORIZADO VALORIZAC. REAJUSTE TOTAL ADELANTO ADELANTO SUB VALORIZAC. I.G.V. MONTO MONTO DETRACCIÓN OTROS MONTO FACTURA PAGO NETO IGV TOTAL
SUB DIRECTO MATERIAL TOTAL NETA TOTAL CHEQUE 5% TOTAL
VALORIZAC. 01 30-Jun-2013 12,058.47 12,058.47 0.00 0.00 0.00 10,219.04 1,839.43 12,058.47 11,455.55 602.92 12,058.47 003-001845 17-Jul-2013 10,219.04 1,839.43 12,058.47
VALORIZAC. 02 31-Jul-2013 83,781.88 83,781.88 0.00 0.00 0.00 71,001.59 12,780.29 83,781.88 79,592.79 4,189.09 83,781.88 003-001853 11-Jun-2012 71,001.59 12,780.29 83,781.88

T O TAL 95,840.35 0.00 95,840.35 0.00 0.00 0.00 81,220.63 14,619.72 95,840.35 91,048.33 4,792.02 0.00 95,840.35 81,220.64 14,619.72 95,840.36
RESUMEN DE LIQUIDACION DEL CONTRATO DE OBRA
OBRA : MEJORAMIENTO DE PISTAS, VEREDAS Y REDES DE AGUA POTABLE Y
ALCANTARILLADO DE LA URB. SAN JOSE - DISTRITO SAN VICENTE -
PROVINCIA CAÑETE - LIMA
CONTRATISTA : CONIESA E.I.R.L
SUPERVISOR : CONSORCIO SAN JOSÉ

CONCEPTO OTORGADO AMORTIZADO SALDO


A.1 ADELANTOS (S/IGV)
- Directo 323,389.83 323,389.83 0.00
- Materiales 646,779.65 646,779.65 0.00
(A) SALDO POR AMORTIZAR 970,169.48 970,169.48 0.00

CONCEPTO AUTORIZADO PAGADO SALDO


B.1 VALORIZACION
- Contrato Principal 1,370,295.88 1,370,295.77 0.11
- Presupuesto Adicional N° 01 81,220.59 81,220.64 -0.05

B.2 REAJUSTES
- Contrato Principal 16,348.06 0.00 16,348.06

B.3 COSTO TOTAL SIN I.G.V. 1,467,864.53 1,451,516.41 16,348.12


B.4 I.G.V. (18%) 264,215.62 261,272.95 2,942.67
(B) COSTO TOTAL DE OBRA CON I.G.V. 1,732,080.15 1,712,789.36 19,290.79

(C) OTROS 0.00 0.00 0.00

(D) MONTO FINAL DE LIQUIDACION CON I.G.V. ( A + B + C ) 19,290.79

(E) DEVOLUCIÓN GARANTÍA FIEL CUMPLIMIENTO CONTRATO 161,694.91


1,370,295.88
81,220.59
16,348.06
1,467,864.53
264,215.62
1,732,080.15