You are on page 1of 62

DECEMBER 2017

PEG Engineering & Contracting DMCC PEG Iraq


PEG HEADQUART ERS Unit 1009, Jum eirah Bay Tower X3, Basrah, Al Khaliliyah
Piazza Stia 8 Cluster X, Jum eirah Lakes Tow ers Iraq
00138 – Rom e – Italy P.O. Box 634338, Dubai – UAE
Phone: +964 780 210 2000
Phone +39 06 881741 Phone: +971 4 4205321 +964 780 1623113
Fax +39 06 88174210 Fax: +971 4 4204249 E-m ail: info@pegiraq.com
E-m ail: global@pegitaly.it
E-m ail: pegdubai@pegdubai.com

Web Site: www.pegint.com


INDEX

OUR COMPANY 3

OUR SKILLS 10

CRUDE OIL TREATMENT & GAS SEPARATION 11

CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCES 12

OIL AND GAS TRANSPORTATION AND STORAGE FACILITIES MAIN REFERENCES 17

 UPGRADING AND REVAMPING OF EXISTING FACILITIES MAIN REFERENCES 20

GAS METERING & REDUCING SYSTEMS - LIQUID METERING & FILTERING SYSTEMS 21

GAS METERING & REDUCING SYSTEMS MAIN REFERENCES 23

LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES 28

OUR WORK 32

2
OUR COMPANY

PEG is a flexible and experienced multi-sector Supplier,


that operates on behalf of Private and Public Companies in
the design and implementation of Oil & Gas plants and
Infrastructure since 1970, both in Italy and abroad.

PEG GROUP CONSOLIDATED FIGURES

 TURNOVER IN THE LAST THREE YEARS (2014 2016) 193 M €


 EXPECTED TURNOVER FOR THE YEAR 2017: 70 M €

OIL & GAS

INFRASTRUCTURE

3
OUR COMPANY

PEG experience in the “Oil & Gas Sector” has been


consolidated over more than forty years of experience in the
same field.

Progetti Europa & Global S.p.A. – Rome - Italy

MR. PAOLO TROCCA CHAIRMAN


MR. MAURIZIO MELANI VICE-CHAIRMAN

BOARD OF DIRECTORS:
 MR. PAOLO TROCCA CHAIRMAN
 MR. GUIDO BALBO DI VINADIO BOARD DIRECTOR
 MRS. FRANCESCA TROCCA BOARD DIRECTOR

PEG Engineering & Contracting DMCC – Dubai - UAE


MR. FABRIZIO POCCI MANAGING DIRECTOR

4
OUR COMPANY

ORGANIZATION CHART

PEG - ROME

5
OUR COMPANY

ORGANIZATION CHART

PEG - DUBAI

6
OUR COMPANY

CERTIFICATIONS

Progetti Europa & Global S.p.A. and PEG Engineering and Contracting DMCC are certified in
compliance with the standards ISO 9001:2008 , ISO 14001:2004 and OHSAS 18001:2007

7
OUR COMPANY

MAJOR CLIENTS

Among PEG’s major Clients it is worth mentioning:

 ABB S.p.A.  MOC – Missan Oil Company – IRAQ


 AGENZIA TORINO 2006 – ITALY  MdOC – Midland Oil Company – IRAQ

 ALENIA AERONAUTICA  OGC – Oman Gas Company S.A.O.C.

 ANAS - ITALY  PDO – Petroleum Development Oman L.L.C.

 ANESRIF – ALGERIA  PETROJET – EGYPT


 ARAMCO  RASCO – LYBIA

 BP IRAQ NV / ROO  RAS EJDYER -EMSSAD EXPRESSWAY MONITORING


 DALEEL PETROLEUM LLC - OMAN PROJECT MANAGEMENT COMMITTEE - LYBIA

 ENI  SAIPEM – ITALY

 EXXON  SATORP - SAUDI ARABIA

 EDISON – ITALY  SHELL


 ENEL – ITALY  SCOP - IRAQ

 GASCO – EGYPT  SOC – IRAQ

 GTCL – BANGLADESH  SONATRACH – ALGERIA

 INTERPORTO CAMPANO – ITALY  TITAS – BANGLADESH


 ITALFERR – ITALY  TECHNIP
 IRAQI MINISTRY OF TRANSPORTATION  UNIVERSITY OF NAPLES – ITALY

 MOTOR OIL HELLAS – GREECE  WEATHERFORD


 ZUETINA OIL COMPANY – LIBYA
8
OUR COMPANY

CLIENT QUALIFICATION

PEG has obtained a suitable qualification from the following worldwide Companies:
CLIENT QUALIFICATION NUMBER
 SAUDI ARAMCO - KSA 10042498
 ENI - ITALY 393095
 SAIPEM - ITALY 50780
 SATORP - KSA 10540
 PDO – Petroleum Development Oman L.L.C. - OMAN 100594
 ADGAS – Abu Dhabi Gas Liquefaction Company Ltd. - UAE 101895
 GASCO – Abu Dhabi Gas Industries – UAE 027610
 TAKREER - Abu Dhabi Oil Refining Company – UAE 027610
 ADCO – Abu Dhabi Company – UAE 9874
 DOLPHIN ENERGY – QATAR 102903
 KURDISTAN MNR – Ministry of Natural Resources 001068
 SOC – South Oil Company - IRAQ 131
 OGC – Oman Gas Company S.A.O.C. - OMAN
 SULTANATE OF OMAN – Ministry of Oil & Gas
 KUWAIT OIL COMPANY – KUWAIT
 SONATRACH – ALGAERIA
 EGAS – Egyptian Natural Gas Holding Company – EGYPT 24030

9
OUR SKILLS

OIL & GAS


PEG is active in the national and international market as an Engineering & Contracting Company for EPC contracts
in the field of oil & gas facilities, petrochemical and energy production plants.
MAIN AREAS OF SPECIALIZATION
PEG has a high level of experience and capability in the implementation of:

 Process Units for upstream and downstream plants


 Utilities & Offsite Facilities
 Transportation facilities as Pumping and Compression Stations, Tank Farms, Metering Systems
for Gas & Liquids, Pressure Reducing Stations, etc.

PEG also has a wide experience in designing and building pre-assembled skid-mounted units.

PRODUCTS AND SERVICES PROVIDED

 Pre – investments studies


 Basic and detailed engineering services
 Services for procurement
 Project & Construction management
 Works supervision
 Start - up services
 Pre-assembled units on skids

10
OIL & GAS

CRUDE OIL TREATMENT & GAS SEPARATION

PROCESS UNITS FOR UPSTREAM AND DOWNSTREAM PLANTS

 For Upstream Plants PEG has more than 20 years worldwide experience making
complete Gas & Oil Separation Plants (G.O.S.P.) starting from the Manifolds and
including Dehydration and Desalting.

 For Downstream Plants PEG experience includes Crude Distillation Units


(Topping), Hydrodesulphurization, Reforming Units and others.

UTILITIES AND OFFSITE FACILITIES

 PEG experience includes Steam Generation, Compressed Air, Water Treatment, Hot
Oil, Truck Loading, Pumping Stations, Gas Compression Units and complete Tank
Farms.

11
CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCES
CONTRACT VALUE VALUE PERIOD
CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

SHELL IRAQ
N 1 Manifold Skid for Crude Oil EP 2.197 2015-2016

SHELL IRAQ
N°1 Manifold Skid for Crude Oil EP 2.256 2015-2016

B.P. IRAQ NV / ROO IRAQ Free Water Knock Out EPC 98.700 2015 – u.w .

B.P. IRAQ NV / ROO IRAQ FEED w ork for Free Water Knock Out E 476 2015 – 2015

Dehydration and Desalting Unit for


SOC IRAQ EP 12.150 2014 - u.w .
Nassiryia Degassing Station

ENI Iraq BV IRAQ Supply of Well Manifolds EP 9.900 2013 - 2015

MdOC-Midland
IRAQ Gas Oil Separation Plant EPC 63.850 2013 - 2016
Oil Com pany

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

12
CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCES
CONTRACT VALUE VALUE PERIOD
CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

EXXON MOBIL IRAQ Manifolds EP 4.087 2013- 2014

Crude Oil Processing Trains


WEATHERFORD IRAQ EPSC 82.000 2012 – 2014
Zubair Project (6X50.000 BOPD)

BP Iraq N.V / ROO FEED for Separation Train 200 K BPD


(Rum aila Operating IRAQ E 468 2012 – 2012
(2X100 KBODP)
Organization)

BP Iraq N.V / ROO


Provision of Design and Fabrication of
(Rum aila Operating IRAQ EP 14.500 2012 – 2013
Organization) Crude Oil Manifolds

SHELL IRAQ Supply of Flare System s EPSC 586 2011 – 2012

West Qurna 2 – Early Production Facilities


Oil Train Package
TECHNIP ITALY IRAQ E 660 2011 – 2011
Front End Engineering for
Oil Train Package

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

13
CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCES
CONTRACT VALUE VALUE PERIOD
CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

HP Manifold (Skid Mounted)


SHELL IRAQ EPC 1.735 2011 – 2012

DS4 Production Crude Oil Manifold for


BP IRAQ NV IRAQ EPC 4.925 2009 – 2012
North Rum alia

Crude Oil Process Plants (DS1 and DS2)


PETROFAC IRAQ E 1.256 2010 –2011
Re-Habilitation of Majnoon Oil Field

SOC North Rum alia & West Qurna Oil Field


IRAQ EP 11.535 2008 - 2009
SOUTH OIL CO. Manifolds (Skid Mounted)

(SOC)
Test Banks in South Rum alia Field
EES - Energy IRAQ EP 6.000 2008 – 2010
(Skid Mounted)
Engineering & Services

Package n°1-Crude Oil Process Plant


SOC
IRAQ Developm ent of Naher Ben Um ar Oil Field EP 63.240 2008 – 2010
SOUTH OIL CO. Yam ana Form ation (Skid Mounted)

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

14
CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCES
CONTRACT VALUE VALUE PERIOD
CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

SOC West Qurna Production Manifolds 900#


IRAQ EP 9.920 2007 - 2009
SOUTH OIL CO. (Skid Mounted)

West Qurna Crude Oil Manifolds


SOC
IRAQ (Skid Mounted) EP 8.550 2007 – 2009
SOUTH OIL CO.

SOC
IRAQ Crude Oil Manifold 600# EPC 5.120 2007 – 2008
SOUTH OIL CO.

Crude Oil Process Plant Package for


Sham ya Mushrif Qurainat Mushrif &
SOC Tuba Degassing Station 16.470
IRAQ EP 2007 – 2009
SOUTH OIL CO. (50.000 BOPD)

SOC N° 4 Water Injection Manifolds


IRAQ EP 3.980 2006 – 2007
SOUTH OIL CO. for Zubair Field

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

15
CRUDE OIL TREATMENT & GAS SEPARATION MAIN REFERENCES
CONTRACT VALUE VALUE PERIOD
CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

SCOP N. 5 Water Injection Manifolds


State Com pany for Oil IRAQ EP 2.487 2006- 2006
(Skid Mounted)
Projects

N. 3 Hydrocarbon Manifolds
SOC
IRAQ (Skid Mounted) EP 1.254 2005 - 2006
SOUTH OIL CO.

SCOP N. 7 Oil Manifolds for West Qurna


State Com pany for Oil IRAQ (Skid Mounted) EPC 1.837 2005 – 2006
Projects

SOC Crude Oil Processing Plant


IRAQ EP 18.800 2001 – 2004
SOUTH OIL CO. at Majnoon Field

SOC
IRAQ N. 3 Crude Oil Manifolds Skid Mounted EPC 1.800 2001 – 2002
SOUTH OIL CO.

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

16
OIL & GAS TRANSPORTATION AND STORAGE FACILITIES MAIN REFERENCES
CONTRACT VALUE VALUE PERIOD
CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

4 Additional Gas Turbine Pum ps


SCOP/RUHRPUMPEN IRAQ EPC 108.398 2014 - u.w .
for FAO Depot Pum ping Station

10 Gas Turbine Pum ps for


SCOP/RUHRPUMPEN IRAQ EP 25.000 2013 - u.w .
FAO Depot Pum ping Station

BIN LADIN GROUP /


New Jeddah Airport Tank Farm
AL ASWAD ELECTRO SAUDI ARABIA E 1.500 2012 – 2015
Consultancy and Assistance Services
MECHANICAL

SCOP
Fuel Oil P/L from 1st June Depot
State Com pany for Oil IRAQ EPSC 20.419 2012 – 2014
to new Dibbs Pow er Station
Projects

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

17
OIL & GAS TRANSPORTATION AND STORAGE FACILITIES MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

SCOP Engineering, Procurem ent and


State Com pany for IRAQ Construction for the New Pum ping EPC 71.907 2011 – u.w .
Oil Projects Station PS4 at Al Habaneya

MOC
IRAQ Pum ps at Noor Field EPSC 3.520 2011 – 2013
Missan Oil Com pany

SCOP
Expansion of LPG Loading/Unloading and
State Com pany for Oil IRAQ EP 5.250 2011– 2014
Storage Facilities at Sum aw a
Projects

Line Pipes, Pipe Fittings & Valves,


SCOP
Wrapping Materials & Crossing
State Com pany for Oil IRAQ EP 6.443 2008 – 2009
Materials for Karbala Oil Products
Projects
Storage Depot

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

18
OIL & GAS TRANSPORTATION AND STORAGE FACILITIES MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

SCOP Supply of Scraper Trap Skid Mounted and


State Com pany for Oil IRAQ Valves for Shuaiba - Khor Al Zubair EP 1.360 2008 – 2009
Projects Product Pipeline

SCOP Valve Stations, Pig Launchers &


State Com pany for Oil IRAQ EP 14.530 2006 - 2007
Receivers
Projects

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

19
UPGRADING AND REVAMPING OF EXISTING FACILITIES - MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

Study for the clim atization of three


CORAF REFINERY CONGO E 24 2015 - 2015
electrical sub-stations

Design and Supply of New Flare System


SHELL IRAQ EP 1.215 2014 - 2015
for CPF and DS02

Engineering Studies for Partial Shell


HELLENIC PETROLEUM GREECE Replacem ent of Atm ospheric E 95 2011 – 2011
Pipestill Colum n T-101

Topping Colum n C1101, Radiant Section


MOTOR OIL HELLAS GREECE of Furnace Revam ping and Transfer Line EPC 1.295 2005 - 2006
Replac.

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

20
OIL & GAS

GAS METERING & REDUCING SYSTEMS


LIQUID METERING & FILTERING SYSTEMS

 In the field of Gas Metering and Reducing Systems PEG has more than forty years of
worldwide experience, making measurements through the use of well-known
methods: orifice fittings, turbines and ultrasonic, in accordance with widely
recognized measurement codes such as AGA 3, AGA 7, AGA 9, ISO 5167 and
5168, applied to all pertinent fields, including custody transfer.

 In this sector PEG does act not only as a system integrator but has developed its own
Supervisory Control System that can be integrated with Kelton validation software for
custody application.
A simulator is available in our offices to give clients the opportunity to test and feel
confident about the capability of our Supervisory Control System, in a comfortable
place.

21
OIL & GAS

GAS METERING & REDUCING SYSTEMS


LIQUID METERING & FILTERING SYSTEMS

 PEG has developed a fully equipped, wired and tested sheltered control room that
can be delivered as a single container ready for field installation anywhere in the world.

 PEG is among the few companies able to produce bidirectional or unidirectional


Meter Provers, giving clients the possibility to count on a single-source supplier for
Metering and Test Prover Systems.

 For all components and services not included in its production activity, PEG has
acquired a wide experience making it possible to get first class components at the best
possible prices, which means that clients are offered top quality metering and
reducing stations at excellent commercial conditions.

22
GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

CLIENT LOCATION DESCRIPTION CONTRACT VALUE VALUE PERIOD


TYPE €000 $000 START- END

ENI S.p.A. Provision of Materials and/or services for


ITALY renew al of Fiscal Gas Metering system EP+S 3.000* 2017 – u.w .
certification

*estim ated value: this contract is a 3 years fram ework agreement with no m inim um/maxim um am ount granted

SCOP
No 1 Dry Gas Metering Skid for
State Com pany for Oil IRAQ EP 2.070 2013 – 2014
Dew anyia Pow er Plant
Projects

SCOP
No 2 Dry Gas Metering Skids for Taza and
State Com pany for Oil IRAQ EP 2.587 2012 – 2014
Haydareia Pow er Plants
Projects

No 6 Custody Transfer Fuel


SOC IRAQ EP 1.050 2012 – 2014
Gas Metering System s
SOUTH OIL CO.

PETROL EUM
Fiscal Gas Flow Metering System s
DEVELOPM ENT OMAN - OMAN EP 2.085 2011 – 2013
Spurline & GSS for IPP at Sur
PDO

Sales Gas & Ethane Gas Custody


Metering Systems with Gas
SAUDI ARAMCO SAUDI ARABIA Chrom atograph Analyzer and Associated EP 2.410 2011 – 2012
Appurtenances

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

23
GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

KTI EGYPT Revam ping of n 2 Gas Metering Stations P 1.785 2009 – 2010

GULF PETROCHEMICAL Fiscal Gas Flow Metering System for


SERVICES &TRADING OMAN Spurline & Gss for IWPP At Salalah EP 506 2009 - 2009
LLC (Taqa) & Salalah GSS for Methanol Facility

SNAMPROGETTI S.p.A. ALGERIA Ultrasonic Metering Skid System - Arzew EP 2.084 2008 - 2009

TECHINT EGYPT Gas Filtering and Metering Station EP 1.160 2008 - 2009

Natural Gas & Hydrogen Reducing and


ENEL ITALY Metering System EP 572 2008 - 2009

SONATRACH ALGERIA Natural Gas, Metering System and EPC 1.050 2008 - 2009
Analyzers

Supply of Metering Skid for Alkyl Benzene


GASCO EGYPT ELAB EP 247 2008 - 2009

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

24
GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

Supply of Control Room and Meter Run


GASCO EGYPT EP 390 2008 - 2009

OMAN GAS COMPANY Supply of Fiscal Metering Skid for Rusayl


OMAN Pow er Plant PRT EPC 931 2008 - 2009
(OGC)

MOPCO Dam ietta Gas Reducing and EP 2.012 2006 - 2007


EGYPT
Metering Station

TECHNIP / KTI EGYPT N 2 Gas Custody Metering Stations EP 1.700 2006 – 2007

SCOP Trans Iraq Dry Gas Netw ork


State Com pany for Oil IRAQ N. 5 Metering Stations EP 2006 - 2007
Projects

ERG Nuove Centrali N 1 Gas Reducing and Metering Station


ITALY EPC 796 10.764 2006 - 2007
S.p.A. SNAMPROGETTI Priolo Gargallo (SR)

N 3 Control Room s & Meter Runs for Gas


GASCO EGYPT EPC 1.000 2006- 2006
Stations

SNAMPROGETTI
ITALY N 1 Gas Reducing and Metering Station EPC 620 2005 - 2006
ENI S.E.F.
CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

25
GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

DANIEL/ENI. LYBIA Gas Metering Station EPC 88 2005 - 2006

N 4 Sheltered Control Room s & and


GASCO EGYPT EP 725 2005 - 2005
N. 12 Meter Runs for Gas Stations

N° 2 Gas Metering and Reducing Stations


PETROJET EGYPT EPC 1.650 2003 - 2005
at El Sharkaw ia and North Cairo P.S.

Gas Filtering and Metering Station at Kafr


TRANSGAS EGYPT EPC 412 2003 - 2005
el Sheikh

State Com pany for Oil N° 3 Gas Metering and Reducing Stations
Projects IRAQ at Doura P.S., Yousifiya P.S. EP 3.600 2001 – 2002
SCOP and Al Bader Plant

N° 1 new Gas Metering and Reducing


GASCO EGYPT Station at Kafr el Daw ar P.S. and EPC 2.187 2000 - 2003
Revam ping of N° 6 existing RMS

Revam ping of n° 71 Gas Pipeline


GASCO EGYPT EPC 1.197 2000- 2003
Sectionalisinig Valves Sites

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

26
GAS METERING & REDUCING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

TITAS GAS N° 1 Gas Metering and Reducing Station


TRANSMISSION & BANGLADESH at Haripur P.S. EPC 1.650 2000 - 2001
DISTRIBUTION Co. Ltd.

Revam ping of Metering Runs, Control


GASCO EGYPT Room s and Field Instrum entation of N° 8 EP 1.100 2000 - 2001
Gas Metering Stations

N° 1 Gas Metering and Reducing Station


GAS TRANSMISSION &
BANGLADESH at Baghabari Pow er Station. EPC 600 1998 - 2000
DISTRIBUTION Co. Ltd

N° 1 Gas Metering and Reducing Station


ENEL ITALY EPC 1.450 1993 - 1997
at Term ini Im erese P.S.

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

27
LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

SOC
IRAQ Spare Parts for ZR-1, PS-1 and EP 840 2014-2016
SOUTH OIL CO.
Al-Om aya Custody

Spare Parts-Custody Metering


SATORP SAUDI ARABIA System and Provers EP 23 2013-2014

DLPS- Diversified Lines Metering System Revam ping


SAUDI ARABIA EP 450 2013-2013
Petroleum Services Est

Daleel LACT Unit – Crude Oil


DALEEL PETROLEUM
OMAN Metering Upgrade EPSC 1.353 2013 – 2015
LLC

Design and supply of n° 1 Condensate


ABB S.P.A / PETROLEUM
Metering and provers for SNCP: Saih
DEVELOPM ENT OMAN OMAN Nihayda Condensate Stabilization Plant EP 1.282 2013- 2015
(PDO)

Supply of n°2 Metering System s for the


PETROJET EGYPT new Multi-Product Storage and EP 282 2011- 2013
Transportation Project

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

28
LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

Custody Crude Metering Station, Bi-


directional Proving Skid, Densitom eter
SAUDI ARAMCO SAUDI ARABIA Skid, Redundant Flow Com puters and EP 1.215 2011- 2012
Redundant Metering Supervisory
Com puters

DALEEL PETROLEUM Upgrade of existing LACT Unit up to the


OMAN EP 42 2011 – 2012
LLC capacity of 45,000 BPD

PETROJET EGYPT N 2 Metering Skids EP 972 2010 – 2013

DAYIM PUNJ LLOYD SAUDI ARABIA Custody Metering Skids and Prover’s EP 7.740 2010-2013

ZUETINA OIL COMPANY LIBYA Metering System Upgrade at Hakim Plant EPC 418 2010-2011

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

29
LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

PPC- PETROL EUM Flow Metering System


EGYPT EPC 1.420 2008 - 2009
PIPELINE Co.

SONATRACH
ALGERIA Supply of 24" 600# Meter Run EPC 7,5 2008 – 2009
EMERSON

AGIBA EGYPT Crude Oil Metering System & Prover EP 778 2008 – 2009

Arabian Engineering
Supply of Ultrasonic Metering System for
Services
OMAN Sahm a additional Pum p Station, Upgrade EPC 612 2008 – 2009
Petroleum Developm ent Project
Om an

SOC Metering System and Control Room for


IRAQ EP 5.050 2007 - 2008
South Oil Com pany Off-Shore Al-Am aya Term inal

SOC
IRAQ Crude Oil Custody Transfer Metering EP 4.885 2007 - 2008
South Oil Com pany
System for PS1 & ZR1 Depots

CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

30
LIQUID METERING & FILTERING SYSTEMS MAIN REFERENCES

CONTRACT VALUE VALUE PERIOD


CLIENT LOCATION DESCRIPTION
TYPE €000 $000 START- END

N° 2 Skid Mounted Custody


BONATTI / SONATRACH ALGERIA EP 820 2006 - 2007
Metering Systems

DALEEL OMAN N°1 LACT Unit and Shelter Control Room EPC 768 2006 - 2007

DANIEL N° 3 Skid Mounted Custody Metering


LYBIA EP 970 2005 - 2006
AGIP LYBIA System s and N° 2 Bi-Di Meter Provers

Revam ping of n 18 Hydrocarbon


P.P.C. EGYPT Metering Stations EPC 1.082 2005 – 2006

N° 3 Skid Mounted Custody Metering


NAFTAL / BENTINI ALGERIA EP 534 2004 – 2005
System s and Meter Provers

N.G.C. Skid Mounted LPG Metering System and


IRAQ EP 480 2002 - 2004
NORTH GAS CO. Meter Prover

SOC
IRAQ N° 3 Crude Oil Manifold Skid Mounted EP 1.800 2001 - 2002
SOUTH OIL CO.

Oil Metering Systems and Meter Prover


DISMA S.R.L. ITALY EPC 6.700 1997- 1998
for the Oil Depot at Malpensa Airport
CONTRACT TYPE
E Engineering S Supervis ion
P Procurement C Cons t ruct ion

31
OUR WORK

OIL & GAS


PE15002D – FREE WATER KNOCK OUT SEPARATION TRAINS

2015 – u.w. CRUDE OIL TREATMENT & GAS SEPARATION

PE15002D – CLIENT: BP IRAQ NV – RUMAILA OIL FIELD - IRAQ


FREE WATER KNOCK OUT PROCESSING TRAINS

CONTRACT VALUE: 98.700.000 USD

CONTRACT TYPE: ENGINEERING, PROCUREMENT,


CONSTRUCTION

33
PE11070R – GAS OIL SEPARATION PLANT - 30.000 BOPD

2013 - 2016 CRUDE OIL TREATMENT & GAS SEPARATION

PE11070R – CLIENT: MDOC – MIDLAND OIL COMPANY - IRAQ


Gas Oil Separation Plant - 30.000 BOPD

CONTRACT VALUE: 63.850.000 USD

CONTRACT TYPE: ENGINEERING, PROCUREM ENT,


CONSTRUCTION

33
PE12015R – CRUDE OIL PROCESSING TRAINS- ZUBAIR PROJECT

2012- 2014 CRUDE OIL TREATMENT & GAS SEPARATION

PE12015R –CLIENT – WEATHERFORD - IRAQ


Crude Oil Processing Trains

CONTRACT VALUE: 82.000.000 USD

CONTRACT TYPE: Engineering, Procurement,


Supervision, Construction

35
PE11054R – NEW PUMPING STATION PS4 AT AL HABANEYA

2013- u.w CRUDE OIL TREATMENT & GAS SEPARATION

PE11054R –CLIENT – SOC - IRAQ


New Pumping Station PS4 at Al Habaneya

CONTRACT VALUE: 71.907.000 Euros

CONTRACT TYPE: Engineering, Procurem ent, Construction

36
PE6093R – CRUDE OIL PROCESS PLANT

2008- 2010 CRUDE OIL TREATMENT & GAS SEPARATION

PE6093R –SOUTH OIL COMPANY – SOC - IRAQ


Package n° 1 Crude Oil Process Plant (50.000BOPD)
Development of Naher Ben Ummar Oil Field – Yamana
Formation

CONTRACT VALUE: 63.240.000 Euros

CONTRACT TYPE: Engineering, Procurement This image shows the first stage separator unit, the dehydration and desalter unit and the crude stabilizer column.

37
PE7087R – NORTH RUMALIA & WEST QURNA OIL FIELD MANIFOLDS

2008- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE7087R –SOUTH OIL COMPANY – SOC - IRAQ


North Rumaila & West Qurna Oil Field Manifolds

CONTRACT VALUE: 11.535.000 Euros

CONTRACT TYPE: Engineering, Procurement

38
PE7030R – WEST QURNA PRODUCTION MANIFOLDS 900#

2007- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE7030R –SOUTH OIL COMPANY – SOC - IRAQ


West Qurna Production Manifolds 900#

CONTRACT VALUE: 6.740.000 Euros

CONTRACT TYPE: Engineering, Procurement

39
PE7029R – WEST QURNA CRUDE OIL PRODUCTION MANIFOLDS

2007- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE7029R – SOUTH OIL COMPANY – SOC - IRAQ


West Qurna Crude Oil Manifolds

CONTRACT VALUE: 8.550.000 Euros

CONTRACT TYPE: Engineering, Procurement

40
PE6092R – SHAMYA MUSHRIF, QURAINAT MUSHRIF & TUBA DEGASSING STATION

2007- 2009 CRUDE OIL TREATMENT & GAS SEPARATION

PE6092R –SOUTH OIL COMPANY – SOC - IRAQ


Crude Oil Process Plant Package for Shamya Mushrif,
Qurainat Mushrif & Tuba Degassing Station

CONTRACT VALUE: 12.000.000 Euros

CONTRACT TYPE: Engineering, Procurement

41
PE5026R – WATER INJECTION MANIFOLDS FOR ZUBAIR FIELD

2006- 2007 CRUDE OIL TREATMENT & GAS SEPARATION

PE5026R –SOUTH OIL COMPANY – SOC - IRAQ


N° 4 Water Injection Manifolds for Zubair Field

CONTRACT VALUE: 3.980.000 Euros

CONTRACT TYPE: Engineering, Procurement

42
PE4046R – SKID MOUNTED OIL MANIFOLDS FOR WEST QURNA

2005 - 2006 CRUDE OIL TREATMENT & GAS SEPARATION

PE4046R – STATE COMPANY FOR OIL PROJECT – SCOP - IRAQ


N° 7 Skid Mounted Oil Manifolds for West Qurna

CONTRACT VALUE: 1.837.000 Euros

CONTRACT TYPE: Engineering, Procurement, Construction

43
PE1058R – CRUDE OIL PROCESS PLANT AT MAJNOON FIELD

2001 - 2004 CRUDE OIL TREATMENT & GAS SEPARATION

PE1058R –SOUTH OIL COMPANY – SOC - IRAQ


Crude Oil Process Plant at Majnoon Field

CONTRACT VALUE: 18.800.000 Euros

CONTRACT TYPE: Engineering, Procurement

44
PE11046R – No. 1 Dry Gas Metering Skid dor Dewanyia Power Plant

2013 – 2014 GAS METERING & REDUCING SYSTEMS

PE11046R – SCOP – State Company for Oil Projects - IRAQ


NO. 1 DRY GAS METERING SKID DOR DEWANYIA POWER PLANT
CONTRACT VALUE: 2.070.000 Euro

CONTRACT TYPE: Engineering, Procurement

45
PE11066R – No. 2 Gas Metering Skids for Taza and Haydareia Power Plants

2012 – 2014 GAS METERING & REDUCING SYSTEMS

PE11066R – SCOP - State Company for Oil Projects - Iraq


NO. 2 GAS METERING SKIDS FOR TAZA AND HAYDAREIA POWER
PLANTS
CONTRACT VALUE: 2.587.000 Euro
CONTRACT TYPE: Engineering, Procurement

46
PE11055R – No. 6 Custody Transfer Fuel Gas Metering System

2012 – 2014 GAS METERING & REDUCING SYSTEMS

PE11055R – SOC – South Oil Company - Iraq


NO. 6 CUSTODY TRANSFER FUEL GAS METERING SYSTEM
CONTRACT VALUE: 1.050.000 Euro
CONTRACT TYPE: Engineering, Procurement

47
PE11027R – Fiscal Gas Flow Metering Systems Spurline & GSS for IPP at Sur

2012 – 2014 GAS METERING & REDUCING SYSTEMS

PE11027R – PDO – Petroleum Development Oman


FISCAL GAS FLOW METERING SYSTEMS SPURLINE & GSS FOR IPP AT
SUR - OMAN
CONTRACT VALUE: 2.587.000 Euro
CONTRACT TYPE: Engineering, Procurement

48
PE9049R – REVAMPING OF N 2 GAS METERING STATIONS

2009-u.w. GAS METERING & REDUCING SYSTEMS

PE9049R – KTI – EGYPT


REVAMPING OF N° 2 GAS METERING STATIONS

CONTRACT VALUE: 1.700.000 Euro

CONTRACT TYPE: Engineering, Procurement

49
PE8013R – ULTRASONIC METERING SKID SYSTEM

2008-2009 GAS METERING & REDUCING SYSTEMS

PE8013R – SNAMPROGETTI S.p.A. - ALGERIE


ULTRASONIC METERING SKID SYSTEM
Oléoduc LZ2 24” GPL Hassi R’Mel – Arzew

CONTRACT VALUE: 1.970.000 Euros

CONTRACT TYPE: Engineering, Procurement

50
PE7092R – NATURAL GAS & HYDROGEN REDUCING AND METERING SYSTEM

2008-2009 GAS METERING & REDUCING SYSTEMS

PE7092R – ENEL S.p.A. - ITALY


NATURAL GAS & HYDROGEN REDUCING AND METERING
SYSTEM

CONTRACT VALUE: 572.000 Euros

CONTRACT TYPE: Engineering, Procurement

51
PE7091R – NATURAL GAS, METERING SYSTEM AND ANALYZERS

2008-2009 GAS METERING & REDUCING SYSTEMS

PE7091R – SONATRACH - ALGERIE


NATURAL GAS, METERING SYSTEM & ANALYZERS

CONTRACT VALUE: 1.050.000 Euros

CONTRACT TYPE: Engineering, Procurement, Construction

52
PE6056R – DAMIETTA GAS REDUCING AND METERING STATION

2006-2007 GAS METERING & REDUCING SYSTEMS

PE6056R – MOPCO - Misr Oil Processing Company - EGYPT SENIOR ORIFICE METERING SYSTEM SKID
N°1 GAS, REDUCING & METERING STATION

CONTRACT VALUE: 1.700.000 Euros

CONTRACT TYPE: Engineering, Procurement

53
NATURAL GAS REDUCING AND METERING PLANT

1993-1997 GAS METERING & REDUCING SYSTEMS

ENEL - TERMINI IMERESE - ITALY PRESSURE REGULATOR AND ORIFICE METERING SKID
NATURAL GAS REDUCING & METERING PLANT

CONTRACT VALUE: 1.450.000 Euros

CONTRACT TYPE: Engineering, Procurement, Construction

54
PE12049R – No. 1 Condensate Metering and Provers

2013 – u.w. LIQUID METERING & FILTERING SYSTEMS

PE12049R – ABB S.p.A. for PDO – Petroleum Development Oman


DESIGN AND SUPPLY OF N° 1 CONDENSATE METERING AND PR OVERS
FOR SNCP- SAIH NIHAYDA CONDENSATE STABILIZATION PLANT
CONTRACT VALUE: 1.070.000 Euro
CONTRACT TYPE: Engineering, Procurement

55
PE11066R – Custody Metering Systems and Provers

2010 – 2013 LIQUID METERING & FILTERING SYSTEMS

PE10006R – Dayim Punj Lloyd – End User Satorp – Saudi Arabia


CUSTODY METERING SYSTEMS AND PROVERS
CONTRACT VALUE: 5.600.000 Euro
CONTRACT TYPE: Engineering, Procurement

56
PE7034R – SUPPLY OF 24” 600# METER RUN

2008-2009 LIQUID METERING & FILTERING SYSTEMS

PE7034R – SONATRACH/EMERSON - ALGERIE


SUPPLY OF 24” 600# METER RUN

CONTRACT VALUE: 74.500 Euros

CONTRACT TYPE: Engineering, Procurement, Construction

57
PE7106R – CRUDE OIL METERING SYSTEM & PROVER

2008-2009 LIQUID METERING & FILTERING SYSTEMS

PE7106R – AGIBA - EGYPT


CRUDE OIL METERING SYSTEM & PROVER

CONTRACT VALUE: 778.000 Euros

CONTRACT TYPE: Engineering, Procurement

58
PE7054R – SUPPLY OF ULTRASONIC FLOW METERING SYSTEM

2008-2009 LIQUID METERING & FILTERING SYSTEMS

PE7054R – ARABIAN ENGINEERING CO / PDO - OMAN


SUPPLY OF ULTRASONIC FLOW METERING SYSTEM FOR SAHMA ADDITIONAL
PUMP STATION – UPGRADE PROJECT

CONTRACT VALUE: 474.000 Euros

CONTRACT TYPE: Engineering, Procurement, Construction

59
PE6072R – METERING SYSTEM AND CONTROL ROOM

2007-2008 LIQUID METERING & FILTERING SYSTEMS

PE6072R – SOUTH OIL COMPANY (SOC) - IRAQ


METERING SYSTEM AND CONTROL ROOM
FOR OFF-SHORE AL-AMAYA TERMINAL

CONTRACT VALUE: 3.173.000 Euros

CONTRACT TYPE: Engineering, Procurement

60
PE6077R – CRUDE OIL CUSTODY TRANSFER METERING SYSTEM

2007-2008 LIQUID METERING & FILTERING SYSTEMS

PE6077R – SOUTH OIL COMPANY (SOC) - IRAQ


CRUDE OIL CUSTODY TRANSFER METERING SYSTEM
FOR PS1 & ZR1 DEPOTS

CONTRACT VALUE: 3.600.000 Euros

CONTRACT TYPE: Engineering, Procurement

61
PE4058R – SKID MOUNTED CUSTODY METERING SYSTEMS AND BI-DI METER PROVERS

2005-2006 LIQUID METERING & FILTERING SYSTEMS

BI-DIRECTIONAL METER PROVER SKID

TURBINE METERING SKID

PE4058R – DANIEL/AGIP LYBIA - MELLITAH LYBIA


N° 3 Skid Mounted Custody Metering Systems and
N° 2 Bi-Di Meter Provers

CONTRACT VALUE: 970.000 Euros

CONTRACT TYPE: Engineering, Procurement

62

You might also like