Arlington BRT Bus Priority Pilot Project
Proposed features
• Mass Ave Eastbound - evaluating from Lake Street to Alewife Brook Parkway (ABP)
• Mass Ave - evaluating signal priority from Mystic Street to ABP
• Bus queue jump lanes - evaluating at 15 intersections along Mass Ave
• Bus stop relocations - evaluating from Lake Street to ABP
Outreach / Implementation / Evaluation Timeline
April-June: Field Work and Data Collection, including stakeholder meetings
Nairobi
Using road space efficiently
Passenger capacity:
3-lane carriageway
3,000 passengers per
hour per direction
4,700
12,000+
Why Buses for Boston?
• The region is growing economically and regional traffic is increasing
• Public transit is the most efficient way to capture and serve that
growth in a sustainable way, reduce congestion, relieve demand for
parking
Rail Rail
Rail 14% 21%
46%
Bus
54% Bus Bus
86% 79%
• High capacity
• High speed
• Customer oriented
• Not an old bus running in a bus
lane!
Dar es Salaam
Bus Rapid Transit The only solution is public transport, not just for
those with lower incomes, but for everybody.
The BRT Basics
Dedicated right-of-way
Busway alignment
Platform-level boarding
Intersection treatments
1 BRT Basics: Dedicated right-of-way
Dedicated right-of-way Dedicated BRT lanes are critical to
system speed & capacity
Dar es Salaam
2 BRT Basics: Busway alignment
3 BRT Basics: Platform-level Boarding
Platform-level boarding at stations
Station-bus interface
170
partial roof cover
over bus
42
57
Minimal gap for
easy boarding
(< 125 mm) Platform extension
210
Platform and bus (200 mm) to ensure
floor at same level safe distance
(e.g. 900 mm) between bus and
75
station
4 BRT Basics: Off-board fare
5 BRT Basics: Intersection treatments
Summary: the BRT Basics
Dedicated right-of-way
Busway alignment
Intersection treatments
Platform-level boarding
Passenger Access Good walking and cycling facilities to access the
BRT system
Dar es Salaam
Compact transit-oriented development
The BRT Standard
BRT in the U.S.
Route 77
Peak: 8 min
Off-Peak: 12 min
Route 79
Peak: 20 min
Off-Peak: 45 min
Route 350
Peak: 20 min
Off-Peak: 60 min
Peak Hour
• 13-14 buses/hr
• Bus every 4-5
minutes
Route 77 – Arlington Heights – Harvard Station
Arlington – MBTA Ridership Route 79 – Arlington Heights – Alewife Station
Route 350 – North Burlington – Alewife Station
Route 77
7,600+ riders/day
Route 79
1,200+ riders/day
Route 350
1,600+ riders/day
Over 10,000
riders/day
Arlington – On Time Performance and Ridership
Average Reliability / On Time Performance
7:00 am – 9:00 am
10 minutes
35
minutes
4:00 am-6:00 pm
7 minutes
30
minutes
Travel Time Variance Inbound minutes between
scheduled and actual
departure times
Causes
• Overcrowding
90 Percentile
th 10-20 minutes
behind schedule
• Bus Bunching
Evaluation Measures: Perception
• User Satisfaction
•
•