VIVIENDA BIIFAMILIAR
PRESUPUESTO DE OBRA
ESTRUCTURAS
OE2 ESTRUCTURAS
OE2.1.2 EXCAVACIONES
OE2.1.4 RELLENOS
OE2.2.6 SOBRECIMIENTOS
OE2.3.2 ZAPATAS
OE2.3.7 COLUMNAS
OE2.3.8 VIGAS
PRESUPUESTO DE OBRA
ARQUITECTURA
OE.3 ARQUITECTURA
OE.3.1.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2 346.99 50.13 17,394.61
OE.3.1.1.2 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2 5.01 50.13 251.15
OE.3.4.2 PISOS
OE3.9.2.1 CERRADURA PARA EXTERIOR C/LLAVES INTER.Y EXTER. 3 GOLPES UND 4.00 43.70 174.80
OE3.9.2.2 CERRADURAS DE PERILLA LLAVE EXTE. Y BOTON INTERIOR UND 10.00 38.70 387.00
OE3.11.3.2 PINTURA DE MARCOS DE VENTANAS C/BARNIZ A DOS MANOS M 82.68 2.74 226.54
Fecha Dec-10
PRESUPUESTO DE OBRA
INSTALACIONES SANITARIAS
OE4.2.1.1 SALIDA DE AGUA FRIA DE TUBERIA DE 1/2" PTO 11.00 47.72 524.92
OE4.2.2 REDES DE DISTRIBUCION
PRESUPUESTO DE OBRA
INSTALACIONES ELECTRICAS
OE5.2.1.2 SALIDA PARA SPOT-LIGHT CON PVC UND 2.00 49.52 99.04
OE5.2.1.3 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC UND 34.00 36.28 1,233.52
OE5.2.1.4 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE UND 12.00 16.76 201.12
OE5.2.1.5 SALIDA PARA INTERRUPTOR DE CONMUTACION SIMPLE UND 1.00 16.76 16.76
OE5.2.1.6 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE UND 13.00 16.76 217.88
OE5.2.1.7 SALIDA PARA INTERRUPTOR DE CONMUTACIÓN DOBLE UND 8.00 18.26 146.08
OE5.2.3.1 CABLE PARA TECHO AWG TW-2.5 MM2.(14) M 181.00 8.29 1,500.49
OE5.2.3.2 CABLE PARA PISO AWG TW-4 MM2.(12) M 113.00 8.29 936.77
OE5.4 INSTALACIÓN DEL SISTEMA DE PUESTA A TIERRA UND 1.00 250 250
OE5.5.1 LAMPARAS
OE5.5.1.2 SPOT-LIGHT / BRAQUETES INC PANTALLA ACRILICA UND 11.00 37.15 408.65
Especialidad : ESTRUCTURAS
Fecha : JUNIO - 2010
FORMULA POLINOMICA
CALCULO DE LOS COEFICIENTES DE INCIDENCIA
INDICES UNIFICADOS
COSTO
PARTIDA DESCRIPCION UNIDAD METRADO TOTAL
UNITARIO
47 37 02 30 44 43 49 48 05 17 21 38 03 04
OE2 ESTRUCTURAS
OE2.1.1.2 NIVELACION Y APISONADO MANUAL M2 127.50 3.81 485.78 336.60 86.70 5.10 57.38
OE2.1.2 EXCAVACIONES
OE2.1.2.1 EXCAVACIONES SIMPLES M3 96.05 24.39 2,342.66 2,319.61 23.05
OE2.1.4 RELLENOS
OE2.1.4.1 RELLENO CON MATERIAL PROPIO M3 21.31 12.22 260.41 249.97 4.90 5.54
OE2.1.4.2 RELLENO CON MATERIAL DE PRESTAMO M3 18.43 64.16 1,182.47 727.62 21.75 433.11
OE2.1.5 NIVELACION INTERIOR APISONADO M2 108.71 29.77 3,236.30 286.99 8.70 226.12 82.62 2,554.69 77.18
OE2.2.1 CIMIENTOS CORRIDOS M3 10.60 120.44 1,276.66 438.63 13.14 51.09 155.61 618.19
OE2.2.3 SOLADO PARA ZAPATAS MEZCLA 1:12 CEMENTO-HORMIGON M2 6.72 69.07 464.15 366.11 10.95 50.60 36.49
OE2.2.6 SOBRECIMIENTOS
OE2.2.6.1 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 7.38 197.09 1,454.52 610.84 12.25 71.07 91.00 548.92 120.44
OE2.2.6.2 ENCOFRADO Y DESENCOFRADO M2 98.42 47.37 4,662.16 2,894.53 86.61 152.55 1,528.46
OE2.2.9 FALSO PISO DE 4" DE CONCRETO 1:10 M2 108.71 33.56 3,648.31 689.22 6.52 2,036.14 916.43
OE2.3.2 ZAPATAS
OE2.3.2.1 CONCRETO FC=175 KG/CM2 M3 18.36 347.53 6,380.65 2,521.56 75.64 743.40 3,040.05
OE2.3.2.3 ARMADURA DE ACERO KG 1,621.68 6.20 10,054.42 1,605.46 48.65 324.34 8,075.97
OE2.3.3.2 ENCOFRADO Y DESENCOFRADO M2 88.22 47.37 4,178.98 2,594.55 77.63 136.74 1,370.06
OE2.3.3.3 ARMADURA DE ACERO KG 1,497.32 6.20 9,283.38 1,482.35 44.92 299.46 7,456.65
OE2.3.7 COLUMNAS
OE2.3.7.1 CONCRETO FC=210 KG/CM2 M3 8.75 337.46 2,952.78 1,031.28 30.98 87.76 334.69 1,338.40 129.68
OE2.3.7.2 ENCOFRADO Y DESENCOFRADO M2 137.13 47.37 6,495.85 4,032.99 120.67 212.55 2,129.63
OE2.3.7.3 ARMADURA DE ACERO KG 1,594.50 6.20 9,885.90 1,578.56 47.84 318.90 7,940.61
OE2.3.8 VIGAS
OE2.3.8.1 CONCRETO FC=210 KG/CM2 M3 5.11 337.46 1,724.42 602.26 18.09 51.25 195.46 781.63 75.73
OE2.3.8.2 ENCOFRADO Y DESENCOFRADO M2 104.40 47.37 4,945.43 3,070.40 91.87 161.82 1,621.33
OE2.3.8.3 ARMADURA DE ACERO KG 2,797.50 6.20 17,344.50 2,769.53 83.93 559.50 13,931.55
OE2.3.9.21 CONCRETO FC=210 KG/CM2 M3 12.04 337.46 4,063.02 1,419.03 42.62 120.76 460.53 1,841.64 178.43
OE2.3.9.22 ENCOFRADO Y DESENCOFRADO M2 137.57 47.37 6,516.69 4,045.93 121.06 213.23 2,136.46
OE2.3.9.23 ARMADURA DE ACERO KG 1,041.60 6.20 6,457.92 1,031.18 31.25 208.32 5,187.17
OE2.3.9.24 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO UND 950.00 1.34 1,273.00 484.50 788.50
OE2.3.10 ESCALERAS
OE2.3.10.1 CONCRETO FC=175 KG/CM2 M3 9.54 347.53 3,315.44 1,310.22 39.30 386.27 1,579.63
OE2.3.10.2 ENCOFRADO Y DESENCOFRADO M2 6.97 47.37 330.17 204.99 6.13 10.80 108.24
OE2.3.10.3 ARMADURA DE ACERO KG 291.70 6.20 1,808.54 288.78 8.75 58.34 1,452.67
OE2.3.12.1 CONCRETO FC=175 KG/CM2 M3 4.05 347.53 1,407.50 556.23 16.69 163.98 670.60
OE2.3.12.2 ENCOFRADO Y DESENCOFRADO M2 50.71 47.37 2,402.13 1,491.38 44.62 78.60 787.53
OE2.3.12.3 ARMADURA DE ACERO KG 196.00 6.20 1,215.20 194.04 5.88 39.20 976.08
OE2.3.13.1 CONCRETO FC=175 KG/CM2 M3 0.62 347.53 215.47 85.15 2.55 25.10 102.66
OE2.3.13.2 ENCOFRADO Y DESENCOFRADO M2 10.32 47.37 488.86 303.51 9.08 16.00 160.27
OE2.3.13.3 ARMADURA DE ACERO KG 110.90 6.20 687.58 109.79 3.33 22.18 552.28
COSTO DIRECTO 129,131.76
GASTOS GENERALES Y UTILIDAD GLB 25,826.36
TOTALES 4,179.77 154,958.12 45,201.77 1,365.67 2,843.60 65.03 324.00 9,903.18 438.08 0.00 5,264.90 13,423.13 3,124.81 45,572.98 461.02
COEFICIENTE DE INCIDENCIA 0.292 0.009 0.018 0.000 0.002 0.064 0.003 0.034 0.087 0.020 0.294 0.003
FORMULA POLINOMICA
LO DE LOS COEFICIENTES DE INCIDENCIA
INDICES UNIFICADOS
39
200.00
150.00
0.00
0.00
350.00
0.256
0.256
0.256
EXPEDIENTE TECNICO
CONSTRUCCION CASA HABITACION
FORMULA POLINOMICA
CALCULO DE LOS COEFICIENTES DE INCIDENCIA
INDICES UNIFICADOS 47 37 02 30 43 49 48 05 21 38 03 04 39
COEFICIENTE DE
0.292 0.009 0.018 0.000 0.064 0.003 0.000 0.034 0.087 0.020 0.294 0.003 0.256
INCIDENCIA
Participación
I.U. C.I. Porcentual
Nomenclatura
47 0.29170314 100.00% J
39 0.29409869 100.00% GU
21 0.087 100.00% C
03 0.256 100.00% A
Participación
I.U. C.I. I.U. C.I. Porcentual
Nomenclatura
04 0.00297513
38 0.02016551 38 0.020 26.72% HMA
0.075 100.00%
Participación
I.U. C.I. I.U. C.I. Porcentual
48 0
0.076 100.00% EE
FORMULA POLINOMICA
ESTRUCTURAS
PARTICIPACION COEFICIENTE DE
NOMENCLATURA DESCRPCION I.U.
PORCENTUAL INCIDENCIA
Hormigón 9.80% 38