EXPEDIENTE TECNICO

VIVIENDA BIIFAMILIAR

Obra VIVIENDA BIIFAMILIAR

Fecha : JULIO - 2010

PRESUPUESTO DE OBRA
ESTRUCTURAS

PRECIO PRECIO TOTAL


PARTIDA DESCRIPCION UNIDAD METRADO
UNITARIO PARCIAL S/.

OE.1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.

OE.1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES 1,151.65

OE.1.1.1.2 ALMACEN M2 6.00 73.47


440.82

OE.1.1.2 INSTALACIONES PROVISIONALES

OE.1.1.2.1 AGUA PARA LA CONSTRUCCION

OE1.1.2.1.1 OBTENCION DEL SERVICIO DE AGUA GLB 1.00 200.00


200.00

OE1.1.2.1.2 ALMACENAMIENTO Y DISTRIBUCION DE AGUA GLB 1.00 150 150.00

OE1.1.9 TRAZO, NIVELES Y REPLANTEO PRELIMINAR

OE1.1.9.1 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 127.50 2.83 360.83

OE2 ESTRUCTURAS

OE2.1 MOVIMIENTO DE TIERRAS 9,213.24

OE2.1.1 NIVELACION DE TERRENO

OE2.1.1.1 NIVELACION M2 127.50 1.34


170.85

OE2.1.1.2 NIVELACION Y APISONADO MANUAL M2 127.50 3.81


485.78

OE2.1.2 EXCAVACIONES

OE2.1.2.1 EXCAVACIONES SIMPLES M3 96.05 24.39


2,342.66

OE2.1.4 RELLENOS

OE2.1.4.1 RELLENO CON MATERIAL PROPIO M3 21.31 12.22


260.41

OE2.1.4.2 RELLENO CON MATERIAL DE PRESTAMO M3 18.43 64.16


1,182.47

OE2.1.5 NIVELACION INTERIOR APISONADO M2 108.71 29.77


3,236.30

OE2.1.6 ELIMINACION DE MATERIAL EXCEDENTE M3 86.76 17.69


1,534.78

OE2.2 OBRAS DE CONCRETO SIMPLE 11,505.80

OE2.2.1 CIMIENTOS CORRIDOS M3 10.60 120.44


1,276.66

OE2.2.3 SOLADO PARA ZAPATAS MEZCLA 1:12 CEMENTO-HORMIGON M2 6.72 69.07


464.15

OE2.2.6 SOBRECIMIENTOS

OE2.2.6.1 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 7.38 197.09


1,454.52

OE2.2.6.2 ENCOFRADO Y DESENCOFRADO M2 98.42 47.37


4,662.16

OE2.2.9 FALSO PISO DE 4" DE CONCRETO 1:10 M2 108.71 33.56


3,648.31

OE2.3 OBRAS DE CONCRETO ARMADO 107,261.07

OE2.3.2 ZAPATAS

OE2.3.2.1 CONCRETO FC=175 KG/CM2 M3 18.36 347.53


6,380.65

OE2.3.2.3 ARMADURA DE ACERO KG 1,621.68 6.20


10,054.42

OE2.3.3 VIGAS DE CIMENTACION

OE2.3.3.1 CONCRETO FC=175 KG/CM2 M3 11.03 347.53


3,833.26

OE2.3.3.2 ENCOFRADO Y DESENCOFRADO M2 88.22 47.37


4,178.98
OE2.3.3.3 ARMADURA DE ACERO KG 1,497.32 6.20
9,283.38

OE2.3.7 COLUMNAS

OE2.3.7.1 CONCRETO FC=210 KG/CM2 M3 8.75 337.46 2,952.78


OE2.3.7.2 ENCOFRADO Y DESENCOFRADO M2 137.13 47.37 6,495.85

OE2.3.7.3 ARMADURA DE ACERO KG 1,594.50 6.20 9,885.90

OE2.3.8 VIGAS

OE2.3.8.1 CONCRETO FC=210 KG/CM2 M3 5.11 337.46 1,724.42

OE2.3.8.2 ENCOFRADO Y DESENCOFRADO M2 104.40 47.37 4,945.43

OE2.3.8.3 ARMADURA DE ACERO KG 2,797.50 6.20 17,344.50

OE2.3.9 LOSAS ALIGERADAS CONVENSIONALES

OE2.3.9.21 CONCRETO FC=210 KG/CM2 M3 12.04 337.46 4,063.02


OE2.3.9.22 ENCOFRADO Y DESENCOFRADO M2 137.57 47.37 6,516.69
OE2.3.9.23 ARMADURA DE ACERO KG 1,041.60 6.20 6,457.92
OE2.3.9.24 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO UND 950.00 1.34 1,273.00
OE2.3.10 ESCALERAS
OE2.3.10.1 CONCRETO FC=175 KG/CM2 M3 9.54 347.53 3,315.44
OE2.3.10.2 ENCOFRADO Y DESENCOFRADO M2 6.97 47.37 330.17
OE2.3.10.3 ARMADURA DE ACERO KG 291.70 6.20 1,808.54
OE2.3.12 CISTERNA SUBTERRANEA
OE2.3.12.1 CONCRETO FC=175 KG/CM2 M3 4.05 347.53 1,407.50
OE2.3.12.2 ENCOFRADO Y DESENCOFRADO M2 50.71 47.37 2,402.13
OE2.3.12.3 ARMADURA DE ACERO KG 196.00 6.20 1,215.20
OE2.3.13 TANQUES ELEVADOS
OE2.3.13.1 CONCRETO FC=175 KG/CM2 M3 0.62 347.53 215.47
OE2.3.13.2 ENCOFRADO Y DESENCOFRADO M2 10.32 47.37 488.86
OE2.3.13.3 ARMADURA DE ACERO KG 110.90 6.20 687.58

COSTO DIRECTO S/.: 129,131.76


GASTOS GENERALES (10%) S/.: 12,913.18
UTILIDAD (10%) S/.: 12,913.18
SUB TOTAL S/.: 154,958.12
I.G.V. (19%) S/.: 29,442.04
VALOR REFERENCIAL S/.: 184,400.16

SON: CIENTO OCHENTA Y CUATRO MIL CUATROCIENTOS 16/100


EXPEDIENTE TECNICO
VIVIENDA BIFAMILIAR

Obra VIVIENDA BIFAMILIAR

Fecha : JULIO - 2010

PRESUPUESTO DE OBRA
ARQUITECTURA

PRECIO PRECIO TOTAL


PARTIDA DESCRIPCION UNIDAD METRADO
UNITARIO PARCIAL S/.

OE.3 ARQUITECTURA

OE.3.1 MUROS Y TABIQUES DE ALBAÑILERIA 18,758.86

OE.3.1.1 MUROS DE LADRILLO KING KONG DE ARCILLA

OE.3.1.1.1 MURO DE SOGA LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2 346.99 50.13 17,394.61

OE.3.1.1.2 MURO DE CABEZA LADRILLO KING-KONG CON CEMENTO-CAL-ARENA M2 5.01 50.13 251.15

OE.3.1.15 BARANDAS Y PARAPETOS M 16.20 68.71 1,113.10

OE.3.2 REVOQUES Y REVESTIMIENTO 9,687.32

OE.3.2.2 TARRAJEO EN INTERIORES M2 382.61 11.84 4,530.10

OE.3.2.3 TARRAJEO EN EXTERIORES M2 154.17 19.30 2,975.48

OE.3.2.5 TARRAJEO EN COLUMNAS M2 35.23 22.52 793.38

OE.3.2.6 TARRAJEO EN SUPERFICIE DE VIGAS M2 27.48 29.71 816.43

OE.3.2.15 TARRAJEO EN DUCTOS M2 13.14 16.62 218.39

OE.3.2.20 TARRAJEO EN FONDO DE ESCALERA M2 5.74 21.64 124.21

OE.3.2.21 PREPARACION EN GRADAS DE CONCRETO M 6.60 7.81 51.55

OE.3.2.22 PREPARACION EN DESCANSOS M2 2.00 17.62 35.24

OE.3.2.222 GRADAS M 6.60 12.63 83.36

OE.3.2.23 DESCANSOS M2 2.00 29.59 59.18

OE.3.3 CIELORRASOS 4,721.65

OE.3.3.3 CIELORRASOS CON MEZCLA DE CEMENTO-ARENA M2 172.26 27.41 4,721.65

OE.3.4 PISOS Y PAVIMENTOS 19,802.20

OE.3.4.1 CONTRAPISO M2 257.71 19.79 5,100.08

OE.3.4.2 PISOS

OE.3.4.2.1 PISO DE LOSETA CORRIENTE 25X25 CM. M2 23.40 119.34 2,792.56

OE3.4.2.21 PISO DE CERAMICO M2 151.48 67.39 10,208.24

OE3.4.2.23 OTROS M2 82.83 20.54 1,701.33

OE3.5 ZOCALOS Y CONTRAZOCALOS

OE3.5.1 ZOCALOS 1,467.60

OE3.5.1.11 ZOCALO DE CERAMICO M2 23.61 62.16 1,467.60

OE3.7 CARPINTERIA DE MADERA 2,617.56

OE3.7.1 PUERTAS UND 17.00 145.42 2,472.14

OE3.7.14 CLOSET UND 1.00 145.42 145.42

OE3.8 CARPINTERIA METALICA Y HERRERIA 1,488.63

OE3.8.16 CERCO DE FIERRO M 16.00 45.11 721.76

OE3.8.4 VENTANAS UND 17.00 45.11 766.87

OE3.9 CERRAJERIA 1,483.19

OE3.9.1 BISAGRA DE FIERRO PARA PUERTA UND 49.00 18.35 899.15


OE3.9.2 CERRADURA

OE3.9.2.1 CERRADURA PARA EXTERIOR C/LLAVES INTER.Y EXTER. 3 GOLPES UND 4.00 43.70 174.80

OE3.9.2.2 CERRADURAS DE PERILLA LLAVE EXTE. Y BOTON INTERIOR UND 10.00 38.70 387.00

OE3.9.4 ACCESORIOS DE CIERRE

OE3.9.4.1 PICAPORTE DE FIERRO UND 4.00 5.56 22.24

OE3.10 VIDRIOS, CRISTALES Y SIMILARES 1,428.78

OE3.10.1 VIDRIOS SIMPLE INCOLORO M2 41.33 34.57 1,428.78

OE3.11 PINTURA 11,784.71

OE3.11.1 PINTURA DE CIELO RASOS, VIGAS, COLUMNAS Y PAREDES

OE3.11.1.1 PINTURA IMPRIMANTE

OE3.11.1.2 PINTURA LATEX

OE3.11.111 PINTURA IMPRIMANTE EN MUROS M2 538.03 7.38 3,970.66

OE3.11.112 PINTURA IMPRIMANTE EN CIELORASO, COLUMNAS Y VIGAS M2 191.85 7.78 1,492.59

OE3.11.121 PINTURA EN MUROS INTERIORES M2 438.68 6.87 3,013.73

OE3.11.122 PINTURA EN MUROS EXTERIORES M2 99.35 6.87 682.53

OE3.11.123 PINTURA EN CIELO RASO COLUMNAS Y VIGAS M2 191.85 11.58 2,221.62

OE3.11.2 PINTURA PARA PUERTAS

OE3.11.2.1 PINTURA DE PUERTAS C/BARNIZ A DOS MANOS M2 38.83 3.43 133.19

OE3.11.3 PINTURA PARA VENTANAS

OE3.11.3.2 PINTURA DE MARCOS DE VENTANAS C/BARNIZ A DOS MANOS M 82.68 2.74 226.54

OE3.11.3.3 PINTURA DE BARANDAS M 16.00 2.74 43.84

OE3.12 VARIOS ,LIMPIEZA Y JARDINERIA 1,266.80

OE3.12.1 LIMPIEZA PERMANENTE DE OBRA GLB 1.00 90.64 90.64

OE3.12.2 LIMPIEZA FINAL DE LA OBRA GLB 1.00 90.64 90.64

OE3.12.3 LIMPIEZA DE VIDRIOS M2 41.33 3.63 150.03

OE3.12.4 ENCERADOS DE PISOS M2 257.71 3.63 935.49

COSTO DIRECTO S/.: 74,507.29


GASTOS GENERALES (10%) S/.: 7,450.73
UTILIDAD (10%) S/.: 7,450.73
SUB TOTAL S/.: 89,408.75
I.G.V. (19%) S/.: 16,987.66
VALOR REFERENCIAL S/.: 106,396.41

SON: CIENTO SEIS MIL TRECIENTOS NOVENTA Y SEIS 41/100


Obra VIVIENDA BIFAMILIAR

Fecha Dec-10

PRESUPUESTO DE OBRA
INSTALACIONES SANITARIAS

PRECIO PRECIO TOTAL


PARTIDA DESCRIPCION UNIDAD METRADO
UNITARIO PARCIAL S/.

OE.4 INSTALACIONES SANITARIAS

OE.4.1 APARATOS SANITARIOS Y ACCESORIOS 6,089.19


OE.4.1.1 SUMINISTRO DE APARATOS SANITARIOS

OE.4.1.1.1 INODORO TANQUE BAJO COLOR UND 3.00 613.35 1,840.05


OE.4.1.1.2 LAVATORIO DE PARED DE COLOR 1 LLAVE UND 3.00 514.38 1,543.14
OE.4.1.1.3 DUCHAS CROMADAS DE CABEZA GIRATORIA UND 3.00 99.00 297.00
OE.4.1.1.5 LAVADERO DE ACERO INOXIDABLE UND 4.00 600.00 2,400.00
OE.4.1.1.6 GRIFO DE RIEGO UND 1.00 9.00 9.00
OE.4.1.2 SUMINISTRO DE ACCESORIOS 209.25
OE.4.1.2.1 TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA, COLOR BLANCO UND 3.00 45.00 135.00
OE.4.1.2.2 JABONERA DE LOSA COLOR BLANCO UND 3.00 24.75 74.25
OE.4.1.3 INSTALACION DE APARATOS SANITARIOS 833.75
OE4.1.3.1 INSTALACION DE INODORO TANQUE BAJO COLOR UND 3.00 62.22 186.66
OE4.1.3.2 INSTALACION DE LAVATORIO DE PARED DE COLOR UND 3.00 62.22 186.66
OE4.1.3.3 INSTALACION DE DUCHA CROMADA DE CABEZA GIRATORIA UND 3.00 62.22 186.66
OE4.1.3.5 INSTALACION DE LAVATORIO DE ACERO INOXIDABLE UND 4.00 62.22 248.88
OE4.1.3.6 INSTALACION DE GRIFO DE RIEGO UND 1.00 24.89 24.89
OE4.1.4 INSTALACION DE ACCESORIOS 373.32
OE4.1.4.1 INSTALACION DE TOALLERA C/SOPORTE DE LOSA Y BARRA PLASTICA UND 3.00 62.22 186.66
OE4.1.4.2 INSTALACION DE JABONERA DE LOSA UND 3.00 62.22 186.66
OE4.2 SISTEMA DE AGUA FRIA 7,988.98
OE4.2.1 SALIDA DE AGUA FRIA

OE4.2.1.1 SALIDA DE AGUA FRIA DE TUBERIA DE 1/2" PTO 11.00 47.72 524.92
OE4.2.2 REDES DE DISTRIBUCION

OE4.2.2.1 TUBERIA PVC SAP 1/2" M 27.00 33.81 912.87


OE4.2.2.2 TUBERIA PVC SAP3/4" M 58.00 45.64 2,647.12
OE4.2.3 REDES DE ALIMENTACION

OE4.2.3.2 TUBERIA PVC SAP 1" M 29.00 60.97 1,768.13


OE4.2.4 ACCESORIOS DE REDES DE AGUA

OE4.2.4.1 CODO PVC-SAP 3/4" * 90 UND 23.00 18.71 430.33


OE4.2.4.2 CODO PVC-SAP 1/2" * 90 UND 25.00 18.71 467.75
OE4.2.4.3 TEE PVC-SAP 1/2"* 1/*2" UND 3.00 22.52 67.56
OE4.2.4.4 TEE PVC-SAP 3/4"* 3/4" UND 4.00 22.52 90.08
OE4.2.4.5 REDUCCION DE PVC SAP DE 3/4"-1/2" UND 5.00 13.72 68.60
OE4.2.5 VALVULAS

OE4.2.5.1 VALVULA DE COMPUERTA 1/2" UND 4.00 54.99 219.96


OE4.2.5.2 VALVULA DE COMPUERTA 3/4" UND 4.00 54.99 219.96
OE4.2.5.3 VALVULA CHECK DE BRONCE 3/4" UND 1.00 11.70 11.70
OE4.2.6 ALMACENAMIENTO DE AGUA

OE4.2.6.1 CISTERNAS 4.00 M3 GLB 1.00 200.00 200.00


OE4.2.6.2 TANQUE ELEVADO 1.00 M3 GLB 1.00 360.00 360.00
OE4.6 DESAGUE Y VENTILACION 3,391.30
OE4.6.1 SALIDA DE DESAGUE EN PVC PTO 11.00 126.06 1,386.66
OE4.6.2 REDES DE DERIVACION

OE4.6.2.1 TUBERIA PVC SAL 4" M 22.00 29.60 651.20


OE4.6.2.2 TUBERIA PVC SAL 2" M 32.00 2.47 79.04
OE4.6.3 REDES COLECTORAS

OE4.6.3.1 TUBERIA PVC SAL 4" M 14.00 29.60 414.40


OE4.6.3.2 TUBERIA PVC SAL 2" M 6.00 2.47 14.82
OE4.6.4 ACCESORIOS DE REDES COLECTORAS

OE4.6.4.1 CODO PVC SAL 2"X45° UND 5.00 18.59 92.95


OE4.6.4.2 CODO PVC SAL 4"X45° UND 5.00 25.39 126.95
OE4.6.4.3 YEE PVC SAL 4" x 2" UND 6.00 20.58 123.48
OE4.6.4.4 TEE SANITARIAS PVC-SAP 4"* 4" UND 14.00 23.26 325.64
OE4.6.5 CAMARA DE INSPECCIÓN

OE4.6.5.1 CAJA DE REGISTRO UND 4.00 44.04 176.16

COSTO DIRECTO S/.: 18,885.79


GASTOS GENERALES (10%) S/.: 1,888.58
UTILIDAD (10%) S/.: 1,888.58
SUB TOTAL S/.: 22,662.95
I.G.V. (19%) S/.: 4,305.96
VALOR REFERENCIAL S/.: 26,968.91

SON: VEINTISEIS MIL NOVECIENTOS SESENTA Y OCHO 91/100 NUEVOS SOLES


EXPEDIENTE TECNICO
VIVIENDA BIFAMILIAR

Obra : VIVIENDA BIFAMILIAR

Fecha : JUNIO - 2010

PRESUPUESTO DE OBRA
INSTALACIONES ELECTRICAS

PRECIO PRECIO TOTAL


PARTIDA DESCRIPCION UNIDAD METRADO
UNITARIO PARCIAL S/.

OE.5 INSTALACIONES ELECTRICAS Y MECANICAS 150.00

OE.5.1 CONEXIÓN A LA RED EXTERNA DE MEDIDORES GLB 1.00 150 150.00

OE.5.2 SALIDA DE ALUMBRADO, TOMACORRIENTES, FUERZAS Y SEÑALES DÉBILES

OE.5.2.1 SALIDAS 4,094.94

OE5.2.1.1 SALIDA PARA CENTROS DE LUZ UND 26.00 73.50 1,911.00

OE5.2.1.10 SALIDA PARA INTERCOMUNICADOR Y TIMBRE UND 1.00 151.28 151.28

OE5.2.1.2 SALIDA PARA SPOT-LIGHT CON PVC UND 2.00 49.52 99.04

OE5.2.1.3 SALIDA PARA TOMACORRIENTES BIPOLARES SIMPLES CON PVC UND 34.00 36.28 1,233.52

OE5.2.1.4 SALIDA PARA INTERRUPTOR UNIPOLAR SIMPLE UND 12.00 16.76 201.12

OE5.2.1.5 SALIDA PARA INTERRUPTOR DE CONMUTACION SIMPLE UND 1.00 16.76 16.76

OE5.2.1.6 SALIDA PARA INTERRUPTOR UNIPOLAR DOBLE UND 13.00 16.76 217.88

OE5.2.1.7 SALIDA PARA INTERRUPTOR DE CONMUTACIÓN DOBLE UND 8.00 18.26 146.08

OE5.2.1.8 SALIDA PARA ELECTROBOMBA UND 1.00 43.63 43.63

OE5.2.1.9 CAJA DE PASE UND 1.00 74.63 74.63

OE5.2.2 CANALIZACIÓN CONDUCTOS Y TUBERÍAS 3,074.68

OE5.2.2.1 TUBERIAS PVC SAP (ELECTRICAS) D=3/4" M 316.00 9.73 3,074.68

OE5.2.3 CONDUCTORES Y CABLES DE ENERGÍA EN TUBERIAS 2,437.26

OE5.2.3.1 CABLE PARA TECHO AWG TW-2.5 MM2.(14) M 181.00 8.29 1,500.49

OE5.2.3.2 CABLE PARA PISO AWG TW-4 MM2.(12) M 113.00 8.29 936.77

OE5.2.7 TABLERO DISTRIBUCION UND 2.00 25.56 51.12 51.12

OE5.2.8 DISPOSITIVOS DE MANIOBRA Y PROTECCIÓN

OE5.2.8.1 DISPOSITIVOS BIPOLARES 344.64

OE5.2.8.11 INTERRUPTOR THERMOMAGNETICO MONOFASICA 2 X 30A UND 4.00 23.66 94.64

OE5.4 INSTALACIÓN DEL SISTEMA DE PUESTA A TIERRA UND 1.00 250 250

OE5.5 ARTEFACTOS 1300.45

OE5.5.1 LAMPARAS

OE5.5.1.1 FLUORESCENTE CIRCULAR UND 28.00 31.85 891.8

OE5.5.1.2 SPOT-LIGHT / BRAQUETES INC PANTALLA ACRILICA UND 11.00 37.15 408.65

OE5.6 EQUIPOS ELECTRICOS Y MECANICOS 48.5

OE5.6.1 BOMBA DE AGUA UND 1.00 48.5 48.5

COSTO DIRECTO S/.: 11,501.59

GASTOS GENERALES (10%) S/.: 1,150.16

UTILIDAD (10%) S/.: 1,150.16

SUB TOTAL S/.: 13,801.91

I.G.V. (19%) S/.: 2,622.36

VALOR REFERENCIAL S/.: 16,424.27

SON: DIECISEIS MIL CUATROCIENTOS VEINTICUATRO CON 27/100 NUEVOS SOLES


EXPEDIENTE TECNICO
CONSTRUCCION VIVIENDA BIFAMILIAR

Obra : CONSTRUCCION VIVIENDA BIFAMILIAR

Especialidad : ESTRUCTURAS
Fecha : JUNIO - 2010

FORMULA POLINOMICA
CALCULO DE LOS COEFICIENTES DE INCIDENCIA

INDICES UNIFICADOS
COSTO
PARTIDA DESCRIPCION UNIDAD METRADO TOTAL
UNITARIO
47 37 02 30 44 43 49 48 05 17 21 38 03 04

OE.1 OBRAS PROVISIONALES, TRABAJOS PRELIMINARES, SEGURIDAD Y SALUD.

OE.1.1 OBRAS PROVISIONALES Y TRABAJOS PRELIMINARES


OE.1.1.1.2 ALMACEN M2 6.00 73.47 440.82 109.98 6.84 324.00

OE.1.1.2 INSTALACIONES PROVISIONALES


OE.1.1.2.1 AGUA PARA LA CONSTRUCCION
OE1.1.2.1.1 OBTENCION DEL SERVICIO DE AGUA GLB 1.00 200.00 200.00

OE1.1.2.1.2 ALMACENAMIENTO Y DISTRIBUCION DE AGUA GLB 1.00 150.00 150.00

OE1.1.9 TRAZO, NIVELES Y REPLANTEO PRELIMINAR


OE1.1.9.1 TRAZO NIVELES Y REPLANTEO PRELIMINAR M2 127.50 2.83 360.83 211.65 19.13 65.03 3.83 39.53 16.58

OE2 ESTRUCTURAS

OE2.1 MOVIMIENTO DE TIERRAS


OE2.1.1 NIVELACION DE TERRENO
OE2.1.1.1 NIVELACION M2 127.50 1.34 170.85 169.58 1.28

OE2.1.1.2 NIVELACION Y APISONADO MANUAL M2 127.50 3.81 485.78 336.60 86.70 5.10 57.38

OE2.1.2 EXCAVACIONES
OE2.1.2.1 EXCAVACIONES SIMPLES M3 96.05 24.39 2,342.66 2,319.61 23.05

OE2.1.4 RELLENOS

OE2.1.4.1 RELLENO CON MATERIAL PROPIO M3 21.31 12.22 260.41 249.97 4.90 5.54

OE2.1.4.2 RELLENO CON MATERIAL DE PRESTAMO M3 18.43 64.16 1,182.47 727.62 21.75 433.11

OE2.1.5 NIVELACION INTERIOR APISONADO M2 108.71 29.77 3,236.30 286.99 8.70 226.12 82.62 2,554.69 77.18

OE2.1.6 ELIMINACION DE MATERIAL EXCEDENTE M3 86.76 17.69 1,534.78 1,461.91 72.88

OE2.2 OBRAS DE CONCRETO SIMPLE

OE2.2.1 CIMIENTOS CORRIDOS M3 10.60 120.44 1,276.66 438.63 13.14 51.09 155.61 618.19

OE2.2.3 SOLADO PARA ZAPATAS MEZCLA 1:12 CEMENTO-HORMIGON M2 6.72 69.07 464.15 366.11 10.95 50.60 36.49

OE2.2.6 SOBRECIMIENTOS
OE2.2.6.1 CONCRETO 1:8+25% P.M. PARA SOBRECIMIENTOS M3 7.38 197.09 1,454.52 610.84 12.25 71.07 91.00 548.92 120.44

OE2.2.6.2 ENCOFRADO Y DESENCOFRADO M2 98.42 47.37 4,662.16 2,894.53 86.61 152.55 1,528.46

OE2.2.9 FALSO PISO DE 4" DE CONCRETO 1:10 M2 108.71 33.56 3,648.31 689.22 6.52 2,036.14 916.43

OE2.3 OBRAS DE CONCRETO ARMADO

OE2.3.2 ZAPATAS

OE2.3.2.1 CONCRETO FC=175 KG/CM2 M3 18.36 347.53 6,380.65 2,521.56 75.64 743.40 3,040.05

OE2.3.2.3 ARMADURA DE ACERO KG 1,621.68 6.20 10,054.42 1,605.46 48.65 324.34 8,075.97

OE2.3.3 VIGAS DE CIMENTACION


OE2.3.3.1 CONCRETO FC=175 KG/CM2 M3 11.03 347.53 3,833.26 1,514.86 45.44 446.60 1,826.35

OE2.3.3.2 ENCOFRADO Y DESENCOFRADO M2 88.22 47.37 4,178.98 2,594.55 77.63 136.74 1,370.06

OE2.3.3.3 ARMADURA DE ACERO KG 1,497.32 6.20 9,283.38 1,482.35 44.92 299.46 7,456.65

OE2.3.7 COLUMNAS
OE2.3.7.1 CONCRETO FC=210 KG/CM2 M3 8.75 337.46 2,952.78 1,031.28 30.98 87.76 334.69 1,338.40 129.68

OE2.3.7.2 ENCOFRADO Y DESENCOFRADO M2 137.13 47.37 6,495.85 4,032.99 120.67 212.55 2,129.63

OE2.3.7.3 ARMADURA DE ACERO KG 1,594.50 6.20 9,885.90 1,578.56 47.84 318.90 7,940.61

OE2.3.8 VIGAS

OE2.3.8.1 CONCRETO FC=210 KG/CM2 M3 5.11 337.46 1,724.42 602.26 18.09 51.25 195.46 781.63 75.73

OE2.3.8.2 ENCOFRADO Y DESENCOFRADO M2 104.40 47.37 4,945.43 3,070.40 91.87 161.82 1,621.33

OE2.3.8.3 ARMADURA DE ACERO KG 2,797.50 6.20 17,344.50 2,769.53 83.93 559.50 13,931.55

OE2.3.9 LOSAS ALIGERADAS CONVENSIONALES

OE2.3.9.21 CONCRETO FC=210 KG/CM2 M3 12.04 337.46 4,063.02 1,419.03 42.62 120.76 460.53 1,841.64 178.43

OE2.3.9.22 ENCOFRADO Y DESENCOFRADO M2 137.57 47.37 6,516.69 4,045.93 121.06 213.23 2,136.46

OE2.3.9.23 ARMADURA DE ACERO KG 1,041.60 6.20 6,457.92 1,031.18 31.25 208.32 5,187.17

OE2.3.9.24 LADRILLO DE ARCILLA HUECO 15X30X30 PROV.Y COLOCADO UND 950.00 1.34 1,273.00 484.50 788.50

OE2.3.10 ESCALERAS

OE2.3.10.1 CONCRETO FC=175 KG/CM2 M3 9.54 347.53 3,315.44 1,310.22 39.30 386.27 1,579.63

OE2.3.10.2 ENCOFRADO Y DESENCOFRADO M2 6.97 47.37 330.17 204.99 6.13 10.80 108.24

OE2.3.10.3 ARMADURA DE ACERO KG 291.70 6.20 1,808.54 288.78 8.75 58.34 1,452.67

OE2.3.12 CISTERNA SUBTERRANEA

OE2.3.12.1 CONCRETO FC=175 KG/CM2 M3 4.05 347.53 1,407.50 556.23 16.69 163.98 670.60

OE2.3.12.2 ENCOFRADO Y DESENCOFRADO M2 50.71 47.37 2,402.13 1,491.38 44.62 78.60 787.53

OE2.3.12.3 ARMADURA DE ACERO KG 196.00 6.20 1,215.20 194.04 5.88 39.20 976.08

OE2.3.13 TANQUES ELEVADOS

OE2.3.13.1 CONCRETO FC=175 KG/CM2 M3 0.62 347.53 215.47 85.15 2.55 25.10 102.66

OE2.3.13.2 ENCOFRADO Y DESENCOFRADO M2 10.32 47.37 488.86 303.51 9.08 16.00 160.27

OE2.3.13.3 ARMADURA DE ACERO KG 110.90 6.20 687.58 109.79 3.33 22.18 552.28
COSTO DIRECTO 129,131.76
GASTOS GENERALES Y UTILIDAD GLB 25,826.36

TOTALES 4,179.77 154,958.12 45,201.77 1,365.67 2,843.60 65.03 324.00 9,903.18 438.08 0.00 5,264.90 13,423.13 3,124.81 45,572.98 461.02
COEFICIENTE DE INCIDENCIA 0.292 0.009 0.018 0.000 0.002 0.064 0.003 0.034 0.087 0.020 0.294 0.003

Agrupacion Definitiva 0.292 0.030 0.069 0.144 0.294

Coeficiente de Incidencia Finales 0.292 0.100 0.352


EXPEDIENTE TECNICO
ONSTRUCCION VIVIENDA BIFAMILIAR

FORMULA POLINOMICA
LO DE LOS COEFICIENTES DE INCIDENCIA

INDICES UNIFICADOS

39

200.00
150.00

0.00
0.00

350.00
0.256

0.256

0.256
EXPEDIENTE TECNICO
CONSTRUCCION CASA HABITACION

Obra : CONSTRUCCION CASA HABITACION


Fecha : JUNIO - 2010

FORMULA POLINOMICA
CALCULO DE LOS COEFICIENTES DE INCIDENCIA

INDICES UNIFICADOS 47 37 02 30 43 49 48 05 21 38 03 04 39

COEFICIENTE DE
0.292 0.009 0.018 0.000 0.064 0.003 0.000 0.034 0.087 0.020 0.294 0.003 0.256
INCIDENCIA

Participación
I.U. C.I. Porcentual
Nomenclatura

47 0.29170314 100.00% J

39 0.29409869 100.00% GU

21 0.087 100.00% C

03 0.256 100.00% A

Participación
I.U. C.I. I.U. C.I. Porcentual
Nomenclatura

02 0.01835076 02 0.01835076 24.32%

05 0.03397628 05 0.0369514 48.96%

04 0.00297513
38 0.02016551 38 0.020 26.72% HMA

0.075 100.00%

Participación
I.U. C.I. I.U. C.I. Porcentual

43 0.064 43 0.064 84.59%

49 0.003 48 0.003 3.74%

48 0

37 0.009 37 0.009 11.67%

0.076 100.00% EE

FORMULA POLINOMICA
ESTRUCTURAS

K = 0.299 Jr + 0.122 Cr + 0.300 Ar + 0.051 HMAr + 0.016 EEr + 0.094 GUr


Jo Co Ao HMAo Eeo GUo

PARTICIPACION COEFICIENTE DE
NOMENCLATURA DESCRPCION I.U.
PORCENTUAL INCIDENCIA

J Mano de Obra (inc. Leyes Sociales) 100.00% 47 0.299

C Cemento Portland Tipo I 100.00% 21 0.122

A Acero de Construcción Corrugado 100.00% 03 0.300

Acero de Construcción Liso 45.10% 02

HMA Agregado Grueso 45.10% 05 0.051

Hormigón 9.80% 38

Madera Nacional para Enc. y Carp. 82.98% 43

EE Maquinaria y Equipo Nacional 7.45% 48 0.094

Herramientas Manuales 9.57% 37

GU Gastos Generales y Utilidad 100.00% 39 0.134