EXPERIENCE OVERVIEW:
Over sixteen years of experience in the field of piping and plumbing in major Oil & Gas
construction and maintenance projects worldwide. A dynamic and efficient skilled worker,
always perform the assigned tasks with maximum efficiency, quality and safety.
Experienced in supervising a team of multi discipline craftsmen during the onshore
construction phase. Experienced in heavy fabrication work, mechanical & piping installation,
manpower distribution, look-ahead schedule, progress tracking and reporting, equipment,
tools & material preparation, material take-off, hydro-testing and reinstatement leak testing,
plant turnaround, piping line & equipment preservation, catalyst and chemical loading
during commissioning. Played a major role in achieving various projects completion
milestone and safety milestone.
SUMMARY OF EMPLOYMENT
Sungdo
Philippines Construction Inc.
Petron Bataan Refinery RMP-2 Project
#17 Kitang I, Limay, Bataan 2103 Phil.
Pipe Fitter
November 29, 2013 up to May 13, 2014
√ Resource Science
Araubia LTD. (RSAL)
P.O. Box 30132 Yan Bu Al Sinaiyah K.S.A.
Pipe Fitter
March 28, 1987 to January 30, 1989
√ Resource Science
Arabia LTD. (RSAL)
Power & Water P.O. Box 30108 Madinat Yan Bu Al Sinaiyah K.S.A.
Plumber
August 05, 1985 to September 05, 1987
√ Petrophil Corporation
Rosario Bulk Terminal (Rosario Cavite Phils.)
Pipe Fitter
June 22, 1984 to September 11, 1985
Sungdo
Philippines Construction Inc.
Petron Bataan Refinery RMP-2 Project
Duties and Responsibilities
√ I was hired as Pipefitter at Pre-Comm. Team performed the following Pre-Comm.
works as
Follows:
1. Water Flushing: Prepared temporary spool connector/manifold connected to fire
hydrant inlet as per P&ID. Mark up to higher elevation, Remove FCV/FV/AT.
Provide wedge at outlet &thin plate bolt loosen, open drain & vent valve to
remove air then closed.
2. Air Blowing: Just to change water hoses into air hoses change injection point
purpose of air blowing to dry pipe line to remove any traces of moisture.
3. Steam Blowing: Required to provide silencer at the end point. Open its drain
valve & vent valve to remove air and condensate water . That may cause the
hammering the pipeline. Gradually open main steam valve then closed vent valve
and drain valve per observed steam came out or no traces of any water
condensate.
4. Reinstatement: Tightening of bolts cross position using torque wrenches
change specified gaskets base on is drawing uniformity of bolts. Performed other
duties as the directed by the pre. Comm. Supervisor.
CB&I Philippines
Petron Bataan Refinery Turn Around Project
Limay, Bataan, Philippines
January 05, 2004 to March 09, 2004
Duties and Responsibilities
√ Coordinating all activities including wqt. Required NDE, plant shutdown execution
plan, heat exchangers tube bundles pulling shell and tube cleaning operation,
installation of tube bundles after cleaning follower by leak testing, column trays
dismantling and replacing. Internal cleaning of reactors and drums, demolition of old
existing lines.