List of Method Statement

Revi
No. Document No Title Status
sion

Method Statement
PWTP2-IC-PR-CON- Code 1 -
1 Grouting Works for E
0008 Accepted
Post-Tensioning Works

Method Statement:
PWTP2-IC-PR-CON- Code 1 -
2 Earthworks/Site 1
0001 Accepted
Preparation
Method Statement
PWTP2-IC-PR-CON- Code 1 -
3 Precast Reinforced 5
0002 Accepted
Concrete Box Culvert
Method Statement:
PWTP2-IC-PR-CON- Code 1 -
4 Precast Concrete 3
0003 Accepted
Sheet Piling Works
METHOD
PWTP2-IC-PR-CON- STATEMENT:CONSTR Code 1 -
5 C
0004 UCTION OF PRE- Accepted
CAST FENCE
PWTP2-IC-PR-CON- Code 1 -
6 Demolition Works B
0005 Accepted
Code 2 -
PWTP2-IC-PR-CON- Method Statement: Accepted
7 B
0006 Post Tensioning Works with
Comments
METHOD Code 2 -
PWTP2-IC-PR-CON- STATEMENT: Ducts Accepted
8 B
0007 &Trumplates with
Installation Comments
Method Statement:
PWTP2-IC-PR-CON- Code 1 -
9 Steel Sheet Piling C
0010 Accepted
Works
PWTP2-IC-PR-CON- Method Statement: Code 1 -
10 B
0011 Bored Piling Works Accepted
Method Statement No.
PWTP2-IC-PR-CON- Code 1 -
11 11A Bored Piling D
0011A Accepted
Works, Pile Hacking
PWTP2-IC-PR-CON- MS Low Strain Pile Code 1 -
12 C
0012 Integrity Test Accepted
Method Statement:
PWTP2-IC-PR-CON- Fabrication and Code 1 -
13 E
0013 Installation of Pre-cast Accepted
Members
Updated 6-Mar
List of Method Statement

Revi
No. Document No Title Status
sion

METHOD
Code 2 -
STATEMENT:
PWTP2-IC-PR-CON- Accepted
14 Embedment Puddle C
0014 with
Pipes on Pre-Cast wall
Comments
panels
Method Statement:
PWTP2-IC-PR-CON- Code 4 - No
15 OSTERBERG CELL A
0015 Comments
METHOD
Method Statement:
PWTP2-IC-PR-CON- STATIC Code 1 -
16 C
0016 COMPRESSIVE LOAD Accepted
TEST

Method Statement: HI-


PWTP2-IC-PR-CON- Code 1 -
17 STRAIN PILE C
0017 Accepted
DYNAMIC LOAD TEST

MS HI-STRAIN PILE
PWTP2-IC-PR-CON- Code 1 -
18 DYNAMIC LOAD TEST B
0017 RRAA Accepted
RRAA

Method Statement:
PWTP2-IC-PR-CON- Code 1 -
19 CROSS HOLE SONIC C
0018 Accepted
LOGGING TEST

Method Statement:
PWTP2-IC-PR-CON- Code 1 -
20 Pipe Laying and E
0019 Accepted
Welding Procedure
Method
PWTP2-IC-PR-CON- Statement:Installation Code 3 - Not
21 B
0020 of 500mmØ and Approved
Smaller Pipes
METHOD
PWTP2-IC-PR-CON- STATEMENT: Ground Code 1 -
22 B
0021 Stabilization for Box Accepted
Culvert Trench
Method Statement:
PWTP2-IC-PR-CON- Concrete Sheet Pile Code 1 -
23 F
0022 Leaning Corrective Accepted
Action
Method Statement:
PWTP2-IC-PR-CON- Code 1 -
24 Backfilling works for B
0023 Accepted
PCBC Trench
PWTP2-IC-PR-CON- Pump Room Design Code 4 - No
25 A
0024 Calculation Comments
Updated 6-Mar
List of Method Statement

Revi
No. Document No Title Status
sion

Method Statement
PWTP2-IC-PR-CON- No.25 Construction of Code 3 - Not
26 A
0025 Sludge and Chemical Approved
Building 1
Code 2 -
Method Statement No.
PWTP2-IC-PR-CON- Accepted
27 26 Modification of D
0026 with
Intake Structure
Comments
Code 2 -
Method Statement No.
PWTP2-IC-PR-CON- Accepted
28 27 Construction of Fire B
0027 with
Pump Room
Comments
Code 2 -
Method Statement No.
PWTP2-IC-PR-CON- Accepted
29 28 Construction of B
0028 with
UFRO CIP
Comments

Method Statement No.


PWTP2-IC-PR-CON- 29 Installation of Code 1 -
30 F
0029 Separator Wall at Raw Accepted
Water Pump Structure

Code 2 -
Method Statement No.
PWTP2-IC-PR-CON- Accepted
31 30 Stress Relaxation B
0030 with
Tension Tests
Comments
Method Statement No.
PWTP2-IC-PR-CON- Code 3 - Not
32 31 BAF Precast Wall A
0031 Approved
Installation
Method Statement
PWTP2-IC-PR-CON- Code 3 - Not
33 No.32 Construction of A
0032 Approved
DAF Building
Method Statement
PWTP2-IC-PR-CON- No.33 Testing of Code 1 -
34 C
0033 Concrete Structures for Accepted
Water Tightness
Method Statement
No.34
RECTIFICATION OF
PWTP2-IC-PR-CON- Code 1 -
35 STRUCTURAL D
0034 Accepted
DEFECTS IN
CONCRETE
STRUCTURES
Updated 6-Mar
List of Method Statement

Revi
No. Document No Title Status
sion

Method Statement No.


35 TESTING FOR Code 2 -
PWTP2-IC-PR-CON- ANCHORAGE Accepted
36 B
0035 ASSEMBLY FOR with
PRESTRESSING Comments
TENDONS
Method Statement
PWTP2-IC-PR-CON- Code 1 -
37 No.36 Liquid Penetrant A
0036 Accepted
Test

Method Statement
PWTP2-IC-PR-CON- No.37 Ultrasonic Code 1 -
38 A
0037 Examination Procedure Accepted
of Weld Joints

Code 2 -
Method Statement
PWTP2-IC-PR-CON- Accepted
39 No.38 Grouting of Pipe A
0038 with
Sleeve
Comments
Code 2 -
FOREBAY WALL
PWTP2-IC-PR-CON- Accepted
40 CRACK C
0039 with
RECTIFICATION
Comments

Method Statement No.


PWTP2-IC-PR-CON- Code 1 -
41 40 REPAIR OF FIELD B
0040 Accepted
WELDED JOINTS

Method Statement No.


PWTP2-IC-PR-CON- 41 Tank Lining Code 1 -
42 C
0041 Application Accepted
SEALBOND
Method Statement for
PWTP2-IC-PR-CON- Code 1 -
43 Wrapping of B
0042 Accepted
Undergrpund Pipes
Method Statement for
PWTP2-IC-PR-CON- Application of Torch Code 1 -
44 C
0043 APP Waterproofing Accepted
Membrane
Code 2 -
Method Statement for
PWTP2-IC-PR-CON- Accepted
45 ERECTION OF STEEL B
0044 with
STRUCTURE
Comments
PWTP2-IC-PR-CON- Method Statement for Code 4 - No
46 A
0045 GRP Pipe Protection Comments
Updated 6-Mar
List of Method Statement

Revi
No. Document No Title Status
sion

Method Statement
PWTP2-IC-PR-CON- Code 1 -
47 Construction of B
0046 Accepted
Warerhouse