COMPARISON OF PRIMARY AND SECONDARY METERED CONNECTION

Criteria Primary Metered Secondary Metered


Cost for Meralco (computed at contracted
capacity of 186.9 kW)
*This excludes loads for Comm. Hub and
1 Convention Center because Meralco do
not give services for undeveloped sites.
Estimated Project Cost Php 120,000.00 Php 750,000.00
Estimated Service Deposit Php 373,250.00 Php 398,480.00
 Customer will install and maintain the  Meralco will install and maintain the
transformer. transformers.
 Transformers may be installed  Transformers are required to be
anywhere in the property of the installed outside the property of the
customer. customer or
 UPOU may opt to re-use their existing  Within the property (additional cost for
transformers provided that they have extension of facilities) provided that
the ownership of the said item and it Meralco shall have open access 24/7 to
2 Maintenance of Transformers
will pass the electrical test results. the facilities. This means that gates are
 MSERVE may provide these services not to be closed or no gates at all. It
depending on the arrangement may follow that UPOU will put-up a
between MSERVE and UPOU, thus concrete fence (about 300m) beside
additional cost will be incurred during the said facilities.
installation and maintenance of  No charges for maintenance works by
transformers. Meralco.

 Less losses and voltage drop  More losses and voltage drop
measurements since meter will be measurements which are due to the
placed in the primary side of the transformers.
3 Voltage Drop and System Losses
transformer (before the transformer).  Higher electric charges.
 Lower electric charges than secondary
metering.
4 Project Cost at Loadside MSERVE will provide the estimates (additional cost)
Note: For reference, IRRI is Primary Metered since it is gated and Boy Scout is Secondary Metered since it has open access.

PROS AND CONS OF PRIMARY AND SECONDARY METERED CONNECTION

Primary Metered Secondary Metered


 Customer will install and maintain the transformer  Meralco will install and maintain the transformers (no
charges for maintenance works)
 Transformers may be installed anywhere in the property  Transformers are required to be installed outside the
of the customer property of the customer or
 MSERVE may provide these services depending on the  Within the property (additional cost for extension of
arrangement between MSERVE and UPOU, thus facilities) provided that Meralco shall have open access
additional cost will be incurred during installation and 24/7 to the facilities. This means that gates are not to be
maintenance of transformers closed or no gates at all. It may follow that UPOU will put-
up a concrete fence (about 300m) beside the said
facilities
 Lower project cost but UPOU will buy and install its own  Higher project cost since transformer cost is already
transformer (existing transformer(20kV) may not be incorporated in it
possible to use since Meralco primary line is now 34.5kV)
 The cost of primary wires to be used for extension is  Much expensive cost for secondary wires
cheaper
 Primary wires also offers low voltage drop than  Secondary wires voltage drop is significantly higher than
secondary wires which implies a more efficient and primary since it carry low voltage (230V)
reliable system
 System loss is lower than secondary metered but savings  Much higher system loss thus higher electric bill
in electrical bill is not that high since UPOU’s operation is
not 24/7