Career Overview:
A process engineer with success energetic drives and proficient experience in conceptual
studies; process design; process modeling & simulation; crude stabilization; gas plants and
associated processes; pipeline hydraulic studies; vessel & line sizing; PFD/PFS; P&ID; SCADA;
Aspen Hysys, Pipesim, AutoCAD and PDMS.

Organization / Work Experience:

Epic Atlantic Limited - July 2015 – Till Present

Project #1: 12 MMscfd Gas Processing Plant Conceptual Study………………………...…….2017


Client: Midwestern Oil and Gas Limited
Project Summary: Gas processing plant conceptual design; with 3 case study. Also, with
two stages gas conditioning unit to achieve a product lean gas with high methane (80 –
90%) content

Roles:
Process-path unit operations designs and PFD development for 3 case study
Gas plant modeling and simulation; for heat and material balances
Gas plant PFS development; with flow parameters (pressure, temperature, volume
flow) details

Project #2: 12 / 25 MMscfd EPF and Gas Processing Plant Conceptual Studies……………2017
Client: Summit Oil International / Suntera / SUN Group
Project Summary: Otien’s field facility development; involving gas processing plant design
with options of (12 MMscfd or 25 MMscfd production), through either an EPF or integrated
Oil & Gas processing facility. Case studied includes; 2-stage/3-stage EPF, condensate gas
plant, 2-scenario LPG gas plant.

Roles:
Process-path unit operations designs and PFD development for 5 case studied
Gas plant modeling and simulation; for heat and material balances
Gas plant PFS Development; with flow parameters (pressures, temperature, volume
flow) details

Project #3: Ebendo Flow-station As-Built Documentation…………………….....…………….2017


Client: Energia Limited
Project Summary: Involves; site data capturing, P&ID development, GA drawing drafting.

Roles:
Existing FS data capturing
P&ID development

Project #4: Pipeline Gas Gathering and Gas Processing Plant Conceptual Study………….2016
Client: Brass Fertilizer and Petrochemical Company (BFPC)
Project Summary: To study gas gathering and delivery concepts from Bobouwe, Elepa, Nun-
River, Seibou, and Opugbene fields to BFPC gas process plant at Akabel. Similarly, to study a
300 MMscfd gas processing plant for maximum products (LPG, condensates, and lean gas)
recoverable from the feed gas.

Roles:
Pipelines PFS development; detailing several possible flow route paths, wells
clustering, satellite-manifold and evacuation manifold area
Pipeline modeling & simulation; for heat and material balance, phase envelopes, and
thermo-physical properties
Pipeline design calculations; to determine velocity, momentum, Reynold’s number,
Lockhart-martinelli number, erosional velocity, and pressure-drop profiles
P&ID development; detailing valve interlocking system, pressure saving system,
pigging system, flow control system, flow indication and metering
Preparation of pipeline hydraulics simulation report
Gas plant modeling, simulation and generation of heat and material balances, phase
envelopes, and thermo-physical properties
Gas plant PFS development; with flow parameters (pressures, temperature, volume
flow) details
PDMS modeling; for manifolds platforms (equipment, piping and structure)

Project #5: OML 123 Field Development & NGL Yields Study………………………………….2016
Client: Addax Nigeria
Project Summary: To examine maximum recoverable NGL liquids from OML 123 gas feed
composition and to achieve a lean gas at 95 mol% methane content

Roles:
Calculation for absolute contents of NGL (C3+) in the feed gas composition using
Avogadro’s volume relationship
Process path designs and PFD development
Gas plant modeling and simulation; for heat and material balances

Project #6: Ebendo FS Process Performance Assessment & Debottlenecking……………...2016


Client: Energia Limited
Project Summary: To assess FS current performance, debottlenecking of indentified
constraints for improved performance, and optimization of the FS to support projected
increase in productions.

Roles:
FS (existing 2-stage Separation) modeling and simulation; for heat and material
balance
FS 3-stage Separation (optimized with XHP separator) modeling and simulation; for
heat and material balance
FS 3-stage Separation (optimized with XHP separator and condensate stabilizer)
modeling and simulation; for heat and material balance
Separators sizing and design calculations; to check for separators gas and liquid
handling capacities using Souder’s Brown approach with respect to API 12J and SHELL
DEP 31.22.05.11
Line sizing and design calculations; to check the lines compliance with velocity,
momentum, erosional velocity, and sonic velocity criterion with respect to API 14E and
SHELL DEP 31.38.01.11
FS PFS Development; with flow parameters (pressures, temperature, volume flow)
details for various cases studied
Preparation of FS simulation report

Terra Energy Services Nigeria Limited - April 2014 – May 2015

Project #1: Water-Cut Metering Campaign & As-Built Documentation……………………….2015


Client: Shell (SPDC) Nigeria
Project Summary: As-built documentation of modifications on the metering skid and export
trunk-line of 40 shell flowstations which includes; Awoba, Belema, Ekulama 1&2,Nembe 1-4,
Cawthorne Channel 1&2, Agbada, Ahia, Benisede, Imo River 1-3, Isimiri, Nkali, Obigbo,
Oguta, Opukushi, Tunu, Umuechemu, etc

Roles:
On-site data capturing
P&ID development; to incorporate newly installed equipments and line modifications

Project #2: Remote Operation Compatibility Operation (ROCI)……………………………….2015


Client: Shell (SPDC) Nigeria
Project Summary: Flow-station SCADA upgrades and line modification for Bonny FS,
Adibawa FS, Nkali FS, and Isimiri FS

Roles:
On-site data capturing
PEFS / P&ID development
Design of suitable data capturing devices and associated piping components
on process separators and lines
Develop modification drawing; with process lines modification areas mark-ups
Develop demolition drawing; with process lines demolition areas mark-ups
Equipment, line, instrument and valve tagging
Tie-in list preparation
Data sheet preparation (pressure, temperature, level, flow instrument)
Undertake independent design review (IDR)

Extra Responsibility (under supervision):


Vessels and piping general arrangement drafting
Piping isometric drafting
MTO Preparation

Engineering Software Proficiency:


Aspen HYSYS
Pipesim
AutoCAD
PDMS

Qualifications & Professional Membership:


SSCE: GOF International College, Osogbo - 2002
Degree: B. Tech – Chemical Engineering; Ladoke Akintola University of Tech - 2010
Professional: Associate Member; Chartered Institute of Project Management - 2013

Personal Profile:
Sex: Male
Date of Birth: 22nd December, 1985
Marital Status: Married
Nationality: Nigerian