You are on page 1of 9

FACULTY OF CIVIL ENGINEERING AND ENVIRONMENT

BFC10403
MECHANIC FLUID
SEM 2 2016/2017
SECTION : 2
GROUP : 11
PROJECT TITLE : PRESSURE ON BENDING PIPE
LECTURER NAME : DR. HAIRUL BIN KHAMIDUN

GROUP MEMBERS
NAME MATRIC NO.

AHMAD NASHMAN BIN MD IDRIS AF160108

MOHAMAD IMRAN BIN MOHD AMINUDDIN AF160011

MOHAMAD AMIR ASRAFF BIN ASUKI AF160024

MOHAMAD KHAIRUL DANIAL BIN MOHD KASIM AF160028

MOHAMAD FITRI BIN MAH HASSAN AF160187

MUHAMAD LUKMAN BIN IBRAHIM CF160017


Table and Content

Content Page

1.0 Problem statement 1

1.0 Calculation 2-3


2.1 Discussion 4
2.2 Conclusion 5

3.0 References 6

4.0 Appendix 7
1.0 PROBLEM STATEMENT

Leakage of water caused by the over pressure in the pipe


FILA TABLE

Fact Ideas Learning Issues Resources need


There is  Too much pressure on the pipe  What is the  Understanding the
leakage  Leakage occur max conservation of energy
occur on the  Bernouli equation pressure of  Search from the internet
pipe caused water in the  Finding information from
by the pipe that books
excess can be  Determine the constants
pressure stand by http://www.engineeringtoolbox.co
 Mass conservation pipe? m/steel-pipes-flow-capacities-
d_640.html
Q1 = Q2  Determined the max
pressure
Q = VA http://www.atlassteels.com.au/doc
uments/C_St_A106_GrB_Pipe_Press
ure_Rating_Charts_rev_Dec_2012.p
df

The exceed  Understanding the


force on the  Application of momentum equation  What is the conservation of energy
pipe at the resultant  Search from the internet
certain force?  Finding information from
angle cause Fx=P1A1-P2A2cos𝜽- 𝝆Q(V2cos𝜽-V1)  What is books
the leakage angle at the  Determine the constants
Fy= P1A1-P2A2sin𝜽- 𝝆Q(V2sin𝜽-V1) force?

1
3.0 References

3.1 http://www.engineeringtoolbox.com/steel-pipes-flow-capacities-d_640.html

3.2 http://www.atlassteels.com.au/documents/C_St_A106_GrB_Pipe_Pressure_
Rating_Charts_rev_Dec_2012.pdf

3.3 http://www.pipeflowcalculations.com/pipe-valve-fitting-flow/flow-in-pipes.php

3.4 http://www.sswm.info/content/water-distribution-pipes

6
4.0 Appendix

Figure 1 Figure 2

Figure 3

7
Minutes of meeting
Session 1 (Finding Problem)

DATE & TIME: 10/4/2017 , 3 :00 p.m

PLACE :G3 Uthm

Session 2 (View site)

DATE & TIME : 15/4/2017 ,10 : 00 a.m

PLACE : UTHM area

Session 3(Calculation discussion)

DATE & TIME :1 /5/2017 ,2:00 p.m

PLACE : Kolej Kediaman Tsn


Project task among members

Name Task

1-AHMAD NASHMAN BIN MD IDRIS -Making calculation


-Making discussion

2-MOHAMAD IMRAN BIN MOHD AMINUDDIN -Finding problem


-Finding references
3-MOHAMAD AMIR ASRAFF BIN ASUKI -Making conclusion
-Making complete report

4-MOHAMAD KHAIRUL DANIAL BIN MOHD -Making conclusion


KASIM -Making complete report

5-MOHAMAD FITRI BIN MAH HASSAN -Make calculation


-Making discussion

6-MUHAMAD LUKMAN BIN IBRAHIM -Finding problem


-Finding references
Plenary Session

Name Completing plenary session

1-AHMAD NASHMAN BIN MD IDRIS 1,2,9

2-MOHAMAD IMRAN BIN MOHD AMINUDDIN 5,6,11

3-MOHAMAD AMIR ASRAFF BIN ASUKI 3,4,10

4-MOHAMAD KHAIRUL DANIAL BIN MOHD 7,8,12


KASIM

5-MOHAMAD FITRI BIN MAH HASSAN 13,14,15

6-MUHAMAD LUKMAN BIN IBRAHIM 16,17,18


1