ETAP

Project: Page: 1
12.6.0H
Location: Date: 17-10-2017
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: UNIT_2 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 16.500 100.000 0.0 258.262 90.328 0 0 Bus4 258.262 90.328 9573.6 94.4

Bus 2 18.000 87.978 -26.2 0 0 0 0 Bus7 0.000 0.000 0.0 0.0

Bus 3 13.800 90.707 -22.3 0 0 0 0 Bus9 0.000 0.000 0.0 0.0

Bus4 230.000 95.351 -9.7 0 0 0 0 Bus6 124.439 12.973 329.4 99.5

Bus5 132.783 30.581 358.7 97.4

Bus1 -257.223 -43.553 686.8 98.6

Bus5 230.000 87.772 -23.7 0 0 96.301 38.514 Bus7 32.423 -14.831 102.0 -90.9

Bus4 -128.724 -23.682 374.3 98.3

Bus6 230.000 91.106 -18.8 0 0 74.704 24.897 Bus9 46.007 -14.992 133.3 -95.1

Bus4 -120.712 -9.905 333.7 99.7

Bus7 230.000 87.978 -26.2 0 0 0 0 Bus5 -32.132 1.660 91.8 -99.9

Bus8 32.132 -1.660 91.8 -99.9

Bus 2 0.000 0.000 0.0 0.0

Bus8 230.000 87.701 -27.3 0 0 76.918 26.911 Bus7 -32.061 -4.878 92.8 98.9

Bus9 -44.857 -22.033 143.0 89.8

Bus9 230.000 90.707 -22.3 0 0 0 0 Bus6 -45.367 -0.534 125.6 100.0

Bus8 45.367 0.534 125.6 100.0

Bus 3 0.000 0.000 0.0 0.0


* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA