BEAP Site:

Inspection Date: / /

Communications Room Checklist


Preliminary Details

Building Number

Room Number

DEMS number

ROMAN number

Location / Coordinates

Photos start at No.

Security Rating Checklist

Highest classification cabling / network equipment in  UNCLAS


room
 RESTRICTED

 SECRET

Security rating requirement  Intruder Resistant

 Secure Area

Intruder Resistant Area Checklist Secure Area Checklist

Walls extend from base of  Yes Is the space wholly located  Yes
floor to underside of slab within the perimeter of a
or secured roof structure?  No building which meets  No
Intruder Resistant
requirements? (attach
assessment sheet)

If No, is an additional  Yes Walls extend from base of  Yes


barrier installed which floor to underside of slab
reaches the underside of  No or secured roof structure?  No
slab or secured roof
structure?

If No, is an additional  Yes


barrier installed which
reaches the underside of  No
slab or secured roof
structure?

Base Engineering Assessment Program Checklist Template


388733434.doc Page 1 of 9
BEAP Site:
Inspection Date: / /

Intruder Resistant Area Checklist Secure Area Checklist

What type of additional  Stud/plasterboard What type of additional  Stud / plasterboard /


barrier is installed? barrier is installed? plywood
 Mesh, installed to
security standard  Mesh, installed to
security standard
 Other (specify)
 Other (specify)

Wall construction  Concrete Wall construction  Concrete

 Brickwork  Brickwork

 Stud/Plasterboard  Stud / plasterboard /


plywood
 Other (specify)
 Stud / plasterboard /
steel plate

 Other (specify)

Roof construction  Concrete If the wall construction is  Yes


stud/plasterboard/plywood
 Sheet metal , is the plywood on the  No
external wall face?
 Other (specify)  Unable to check

Are windows or glazing  Yes Are joins in plywood at  Yes


installed in walls? studs / noggins only?
 No  No

 Unable to check

If yes, is the glazing  Yes Do joins in plasterboard  Yes


secured to the frame in a line up with joins in
tamper evident fashion?  No plywood?  No

 Unable to check

Are blinds or drapes  Yes Roof construction  Concrete


installed over glazed
areas?  No  Sheet metal

 Other (specify)

What level of the building If the roof construction is  Yes


is the room in? concrete, is the slab
thickness >100mm with  No
F82 wire mesh
reinforcement?  Unable to check

Base Engineering Assessment Program Checklist Template


388733434.doc Page 2 of 9
BEAP Site:
Inspection Date: / /

Intruder Resistant Area Checklist Secure Area Checklist

Is there additional  Yes (specify) If the roof construction is  Yes


protection installed to sheet metal or other, is
glazing?  No F82 welded wire mesh  No
installed on the roof as per
the security standard?

How many doors are Are windows or glazing  Yes


there to the space? installed in walls?
 No

Are all door thicknesses  Yes If yes, is the glazing  Yes


>38mm? secured to the frame in a
 No tamper evident fashion?  No

Are all doors constructed  Yes Are blinds or drapes  Yes


from flush panel, block installed over glazed
timber and have a solid  No areas?  No
core?

Do all doors (excluding  Yes What level of the building


fire exits) have a double is the room in?
cylinder mortice lock?  No

Do all fire exit doors have  Yes Is there additional  Yes (specify)
either a double cylinder protection installed to
mortice lock or external  No glazing?  No
cylinder and internal
manual turn knob?

Are deadbolts installed to  Yes How many doors are there


all doors? to the space?
 No

Are door hinges internal  Yes Are all door thicknesses  Yes
to the space and have >45mm?
security hinge bolts and  No  No
lock bolts protectors
fitted?

Are door closers fitted to  Yes Are all doors constructed  Yes
all doors? from flush panel, block
 No timber and have a solid  No
core?

If double doors are  Yes Do all doors (excluding fire  Yes


installed, is the inactive exits) have a double
leaf secured with  No cylinder mortice lock?  No
flushbolts or locking
padbolts?  N/A

Base Engineering Assessment Program Checklist Template


388733434.doc Page 3 of 9
BEAP Site:
Inspection Date: / /

Intruder Resistant Area Checklist Secure Area Checklist

Does the locking scheme  Yes Do all fire exit doors have  Yes
comply with egress either a double cylinder
requirements of the BCA?  No mortice lock or external  No
cylinder and internal
manual turn knob?

Are there any  Yes Are deadbolts installed to  Yes


penetrations over 280mm all doors?
diameter or 280mm side  No  No
length into the space?

If yes, are security grilles  Yes Are door hinges internal to  Yes
fitted to the applicable the space and have
penetrations?  No security hinge bolts and  No
lock bolts protectors fitted?

Are there at least 3 hinges  Yes


per door?
 No

Are the door frames made  Yes


or cold formed steel with
minimum thickness  No
1.6mm?

Are door closers fitted to  Yes


all doors?
 No

If double doors are  Yes


installed, is the inactive
leaf secured with  No
flushbolts or locking
padbolts?  N/A

If locking padbolts are  Yes


installed, do they have
SCEC endorsed locking  No
cylinders?

Does the locking scheme  Yes


comply with egress
requirements of the BCA?  No

Are there any penetrations  Yes


over 150mm diameter or
150mm side length into  No
the space?

If yes, are security grilles  Yes


fitted to the applicable
penetrations?  No

Base Engineering Assessment Program Checklist Template


388733434.doc Page 4 of 9
BEAP Site:
Inspection Date: / /

Intruder Resistant Area Checklist Secure Area Checklist

Additional Notes

Sketch of Room
Include internal dimensions, racks, rack dimensions, frames, entrances, penetrations and any other relevant
details

Base Engineering Assessment Program Checklist Template


388733434.doc Page 5 of 9
BEAP Site:
Inspection Date: / /

Room Checklist

Room internal dimensions (mm) Length (mm):


Width (mm):

Is there at least 900mm clear space at the front and  Yes


rear of all racks?
 No

Internal dimensions Length (mm):


Width (mm):

Does the room have anti-static flooring installed as per  Yes


AS 2834?
 No

Is there a building Entrance Facility within the room?  Yes

 No

If yes, where do conduits turn up?  Within rack

 Within room

 Through wall

 Other (specify)

How many conduits enter the room?

What % spare capacity is there within the entrance


facility conduits?

Is the lead-in cabling correctly secured to a tray,  Yes


basket, ladder or conduit?
 No

What type of cable containment exists to/from racks?  Conduit

 Basket

 Tray

 Ladder

 Other (specify)

What % spare capacity is there in the most full cable


containment?

Is all cable containment readily accessible (i.e. access  Yes


to lay in trays, conduits have draw wire installed)?
 No

Base Engineering Assessment Program Checklist Template


388733434.doc Page 6 of 9
BEAP Site:
Inspection Date: / /

Are cables protected from sharp edges at all times?  Yes

 No

What condition is the cabling within the room in?  Good

 Fair

 Poor

 Other / mixture (specify)

Are cable bending radii observed for all cables within  Yes
the room?
 No

Are appropriate separation distances maintained  Yes


between power and communications cables?
 No

Are appropriate separation distances maintained  Yes


between cables of different security classification?
 No

Are all cable sheath colours as per the ISM?  Yes

 No

Is all labelling installed within the room as per the  Yes


DCCS?
 No

Is there 24/7 air conditioning installed to the room?  Yes

 No

If yes, what is the capacity of the air conditioning


unit(s), in kW?

If the air conditioning unit(s) is labelled, what is the


designation of the unit?

Is there a distribution board installed within the room?  Yes

 No

What is the label on the distribution board serving the


room?

Base Engineering Assessment Program Checklist Template


388733434.doc Page 7 of 9
BEAP Site:
Inspection Date: / /

How many spare ways are there in the distribution


board serving the room?

Does each rack have at least 2x20A captive single  Yes


phase outlets?
 No

Is there a Communications Earthing System link bar  Yes


installed within the room?
 No

Is there an individual earth cable installed from each  Yes


rack to either a CES link bar or to the earth bar of the
nearest distribution board?  No

If the racks are powdercoated, has the connection point  Yes


of the earth cable been stripped back to bare metal?
 No

What type of fire detection is installed in the room?  Smoke detectors

 VESDA

 None

 Other (specify)

What type of fire suppression is installed in the room?  Sprinklers

 Other (specify)

Are all penetrations to the room firestopped?  Yes

 No

What method of firestopping is used? Specify:

How many racks are there in the room?

What are the attached rack checklist numbers?

How many telephone frames are there in the room?

What are the attached telephone frame checklist


numbers?

Base Engineering Assessment Program Checklist Template


388733434.doc Page 8 of 9
BEAP Site:
Inspection Date: / /

Additional Notes
Provide a description of any floor standing equipment not covered above, along with any additional observations.