Inspected By : Kwang JC (SPC), Koo SB (PMC), Zhikai (SM), Pasupathi (SM) To : Tang Yongsheng (PM), Zhu Kai (SM), Pasupathi (SM)
Date / Time : Mon 08/01/2018, 1400hrs Reference : JIMT-C02-H-13-20001-057
Responsible
S/No Photo Observations Rectification Photo Remarks
Person/s
1 a. Muddy surfaces at the pedestrian Civil Team
crossing on Merlimau Road due to
constant rain and pedestrian usage.
Resurface the area and reinstate
prior to project completion.
6 a. The sole plate and boards are Scaffold Soil was removed from
covered (buried within the ground) Supervisor scaffold structure base to
with top-up soil (elevation of the expose the sole and base
ground at truck loading bay). plate
To confirm with scaffold supervisor
for compliance issue on regulatory
requirement.
12 a. Yellow chains are provided as fall Civil Team Hard barricade is provided
protection at exposed drainage
(depth is observed more than 1.5m).
Provisions of temporary hard
barricades for fall protection, chains
are unacceptable.
JIMT SJ-CIWE HSE Inspection Report No.57
Responsible
S/No Photo Observations Rectification Photo Remarks
Person/s
13 a. Various number of knots securing Tankage / Removed and briefing was
two ropes. Piping Team conducted to electrical
b. Usage of rope to hoist / lower team, observed by SPC
materials (3/8 inch pipe is observed Mr.Koh Wee Meng
tied with rope for hoisting purpose).
Conduct safety briefing for the
team on concerns and requirements
for manual hoisting works on the
scaffold.
JIMT SJ-CIWE HSE Inspection Report No.57
Responsible
S/No Photo Observations Rectification Photo Remarks
Person/s
14 a. Various left over materials, scrap Site Mass House Keeping has
metals, and concrete wastes around Manager been conducted on every
the site. Tuesday and specially
Provision of mass housekeeping to provided 6 workers by Site
remove all the unwanted items. Manager Mr. Kevin Zhu
Kai and HSE Supervisor
Mr.Velu had carried out
housekeeping at tank form
area on 09 JAN 2018