The Management Board of Construction Service comprises the Chief Executive, Heads
of Advisory and Maintenance Division and New Works Division at Director level, and
an Assistant Director responsible for Corporate Services.
New Works Division provides the full range of supporting services associated with the
design and construction of both major and minor building and civil engineering projects.
It provides a project management and design service to a wide range of public sector
customers. Comprehensive advisory services in relation to all professional disciplines
are also offered to clients especially to complement their “intelligent client” function.
Work undertaken can range in scope from the alteration or extension of a facility
costing a few thousand pounds, to major new build with costs in the millions. Contracts
Branch provides a full contracts service including advice on policy and procedures.
Quality
Advisory and Maintenance Division and New Works Division are Quality Assured in
compliance with ISO 9001, while Contracts Branch is Quality Assured to ISO 9002.
The drilling operation and soil testing service of the Geotechnical Section are also
subject to Quality Accreditation. In effect, all the operational Divisions of Construction
Service have independent third party Quality Assurance. During the course of the year
Construction Service aims to achieve QA accreditation to ISO 2000 throughout the
entire organisation.
Equality
The Strategic Objective of the Department of Finance and Personnel that relates to
Construction Service is as follows:-
Service Provision
Over the next three years the Advisory and Maintenance Division will continue to
provide a high quality and competitive service. The Advisory Sub-division will
contribute to the Government’s Policy on sustainability and energy conservation
through the programme of Building Research Establishment Environmental
Assessment Method ( BREEAM ) assessments of the Northern Ireland Civil Service (
NICS ) estate. A programme of fire risk assessments will be implemented to enable
Construction Service’s customers to comply with the requirements of the Fire
Precautions (Workplace) Regulations (NI) which came into effect in December 2001.
New Works Division will continue to refocus its activities to reflect the increase in
advisory and client support services. While traditional design services will remain a
significant output of the Division, they will be supplemented, where appropriate, by
alternative and innovative procurement strategies. In the event of peaks in demand
which in-house resources may not be able to absorb, construction consultants will be
appointed and there will be an increase in the use of Design and Build contracts.
The Division will continue to provide professional services to a broad range of public
sector customers. Examples of projects and services on which staff will be engaged
include:-
Office refurbishments
New laboratories
Public buildings
Maritime developments
Landscape advice
Quality
Efficiency
In the event of having to vacate its premises due to the proposed redevelopment of
Victoria Square, Construction Service will aim to obtain premises that will house all its
staff in one location and will strive to ensure that any move will not incur any additional
costs. The accommodation needs of the Central Procurement Body will be factored
into this.
Human Resources
Manpower planning and the achievement of IiP form the two main strands of
Construction Service’s Human Resource Strategy. A formal Manpower Plan has been
created and will be updated every six months to ensure that Construction Service
retains the correct balance of staff in the various disciplines and can continue to
provide a comprehensive professional service. The second main strand of the strategy
is to maintain IiP reaccreditation so that the skills and talents of staff will be maximised
through training and development and that we have a workforce capable of providing
the level of service expected by our customers. The introduction of new technology will
result in the provision of training to all staff in its use and application to their business
areas.
Finance
Construction Service will implement the Resource Accounting and Budgeting initiative
in line with the framework established by DFP. The Annual Reports and Financial
Statements which are audited by the NIAO will embrace all the developments in this
area. The business decision-making capabilities of Business Managers will be
improved through the provision of improved Financial Management Information. This
will be achieved through the development of a suite of reports which will utilise
NewMIS. The billing information provided to customers will continue to be developed
with a view to improving customer relations and cashflow and minimising delays in the
payment of fees. This will be achieved through the development of the invoicing
system and operated by appointed Customer Account Managers in conjunction with
our customers.
Information Systems
The new IS Strategy due for completion in 2002 will be implemented in line with the
DFP IS Strategy. E-Business is expected to be a major driver for this strategy. In
particular, the development of our Work Order and Cost Charging systems will lead to
faster, more reliable and more efficient interaction with customers and contractors.
Construction Service will continue to assist the Department to fulfil its role of sponsor of
the construction industry and to provide technical input and secretarial support to the
Construction Industry Forum for Northern Ireland and the Government Construction
Industry Group. The Northern Ireland version of the Achieving Excellence Initiative has
a three year implementation programme and Construction Service will provide support
to Departments and the wider public sector to assist them to achieve the targets and
benefits of the Initiative.
The Rethinking Construction Centre for Northern Ireland will be based at the University
of Ulster at Jordanstown and will assume responsibility in Northern Ireland for a
number of construction industry initiatives previously promoted by the Movement For
Innovation, the Client Best Practice Programme, the Construction Productivity
Programme and several other special interest groups. Construction Service has
membership of and provides the secretariat to the Centre’s Management Board and
will continue to provide support to the activities of the Centre.
QUALITY OF SERVICE
Indicator Target 2002/2003 Target 2001/2002
3. Response time from request to 85% within 7 days. 85% within 7 days.
order placement for 95% within 14 days. 95% within 14 days.
maintenance work (reactive
maintenance)
4. Response time from request to 85% within 7 days. 85% within 7 days.
order placement for supplies 95% within 14 days. 95% within 14 days.
work.
EFFICIENCY
6. Actual costs as a percentage of This target is not published This target is not published
approved target costs for project for reasons of commercial for reasons of commercial
work. confidentiality. confidentiality.
7. Costs as a percentage of spend This target is not published This target is not published
for maintenance work. for reasons of commercial for reasons of commercial
confidentiality. confidentiality.
8. Costs as a percentage of spend This target is not published This target is not published
for supplies work. for reasons of commercial for reasons of commercial
confidentiality. confidentiality.
FINANCIAL
9 Level of financial and budgetary Maintain expenditure Maintain expenditure within
control achieved. within cash limits and to cash limits and to approved
approved budgetary plans. budgetary plans.
9. Contractor Performance Appraisal by M4I Survey Complete in line with MTC renewal
Project. - April 2003
Key Task Target
14. Increase the use of Design and Build Contracts. 5 D&B Contracts
16. Train key staff for wider advisory activities. December 2002
CX 2 2 - - 4
Corporate Services 3 42 15 - 60
CX NW A&M CS TOTAL
Architects 2 44 46 2 94
Civil Engineers - 33 2 - 35
Landscape Architects - 11 - - 11
Mechanical and Electrical - 30 31 - 61
Quantity Surveyors - 13 31 - 44
Structural Engineers - 14 8 1 23
Fire Officers - - 9 - 9
Health and Safety Officers - - 3 - 3
Building Surveyors - - 7 - 7
Maintenance Technicians - - 9 - 9
Clerks of Works - 14 - - 14
Estates Superintendent - - 2 - 2
Supplies Officers - - 12 - 12
Materials Testing - 1 - - 1
Drillers (Non-industrial) - 3 - - 3
Technical Grade 1 - 2 - - 2
Administration 2 30 43 42 117
Support Grades - - - 15 15
Drillers (Industrial) - 4 - - 4
Supplies (Industrial) - - 12 - 12
Stormont Ground Staff - - - - -
Fire Mechanics - - 3 - 3
Electricians - - 5 - 5
Senior Craftsmen - - 2 - 2
Plumbers - - 2 - 2
Plant Attendants - - 3 - 3
Labourers - - 1 - 1
Expenditure £’000
Materials 577
Insurance 110
TOTAL 21,731
Income
TOTAL 21,731