LEVEL CALCULATION OF CT BASIN & PUMP SUMP

EL. 0.0 M

F.G.L Max. WL 0.3


EL. -0.3 M

NWL 0.5
EL. -0.8 M

Min.WL 0.5
EL. -1.3 M

0.5
EL. -1.8 M Stoplog gate

Bottm. of Basin 0.5


EL. -2.3 M Max. WL
ha = 0.0260193 EL. -0.326

NWL 0.50
INDUCED DRAFT COOLING TOWER BASIN L = 304 EL. -0.826
Min.WL
0.50 EL. -1.326

4.15
5.37

Bottm. of Pump Sump 1.22


L = 54.56 EL. -6.698

CW PUMP SUMP

Note: All dimensions & elevations are given in meter. Max. WL


EL. -0.326

NWL
EL. -0.826

Min.WL 0.0
EL. -1.326

1.36
1.79

Bottm. of Pump Sump 0.43


EL. -3.119

ACW PUMP SUMP


Pump Sump_CW system
PUMP INSTALLATION DIAGRAM ( ALL DIMENSION ARE IN M)
Q = PUMP CAPACITY = 38500 M3/HR

2.90 =W/2 W= 5.80


SINGLE Flow
PUMP
5.80 =W

W/2= 2.90 Screen Stopgate


5.80 =W
Optional partial
dividers (increase Flow
dimension"W"by
divider thickness )

2.8979 =B Y = 12.07

A = 14.81

Screen

A = 14.81
2.8979 =B
Y = 12.07

Min.Water Level

Page 2
4.15 =S Pump Sump_CW Stopgate
system

10 O or less preffered with 1 ft/sec velocity max.


1.22 =C at screen location shown.15 O max. with velocity
reduced to 0.5 ft/sec

Page 3
Pump Sump_ACW system
PUMP INSTALLATION DIAGRAM ( ALL DIMENSION ARE IN M)
Q = PUMP CAPACITY = 2970 M3/HR

0.88 =W/2 W= 1.75


SINGLE Flow
PUMP
1.75 =W

W/2= 0.88 Screen Stopgate


1.75 =W
Optional partial
dividers (increase Flow
dimension"W"by
divider thickness )

0.7526 =B Y = 3.80

A = 4.56

Screen

A = 4.56
0.7526 =B
Y = 3.80

Min.Water Level

Page 4
1.36 =S Pump Sump_ACWStopgate
system

10 O or less preffered with 1 ft/sec velocity max.


0.43 =C at screen location shown.15 O max. with velocity
reduced to 0.5 ft/sec

Page 5
Flow through CW channel to CW & ACW pump sump

For gravity flow in open channel , Mannings Formula has been used

Mannings Formula V = 1.486/n X R 2/3H a1/2

Where, V = Velocity
n = Constant ( assumed for concrete channel)
R = Hydraulic Radius = Area/ Wetted perimeter
=by/(b+2y) (b = width, y = depth)
Ha = Energy Gradient b=
= ha/L, where ha = head difference & L = channel length

Calculation:

1. CT 1B to mixing with CT 2B:


This will be the slope if the velocity is accepted as 0.3 m/s, which may not be acceptable.
Inputs:

V = 3.28 ft/s Flow (Q) = 10.6944 m3/s y= 4.87 m R= 6.8439136


= 1 m/s
L = 84 m Area (A) = 35.56 m2 b= 7.30 m
n = 0.013
b/y = 1.5/1 Hence, b = 1.5 y Velocity = 0.30078 m/s = 0.986565434 ft/s

To maintain this velocity at the outlet of CT basin Ha = 3.0558027E-07


ha = 8.4193477E-05
This ha will drop when total run will be = 3272462.54657 ft
Maximum flow of CW & ACW in one CT (Q) = 38500 m3/hr

From continuitity equationb, Q = A x V

Area of the cross section (i.e. b x y = A) of the channel = 10.69 m2

Therefore, depth (y) of the channel = 2.67 m


& width (b) of the channel = 4.01 m

Hence, R = 1.14 m
= 3.7534492074 ft

and Ha = 0.0001411528

Therefore, ha = 0.0118568321 m

2. After mixing of CT 2B:

Inputs:

V = 3.28 ft/s
= 1 m/s
L = 94 m
n = 0.013
b/y = 1.5/1 Hence, b = 1.5 y
Maximum flow of CW & ACW in one CT (Q) = 77000 m3/hr

From continuitity equationb, Q = A x V

Area of the cross section (i.e. b x y = A) of the channel = 21.39 m2

Therefore, depth (y) of the channel = 3.78 m


& width (b) of the channel = 5.66 m

Hence, R = 1.62 m
= 5.3081787748 ft

and Ha = 8.8920668E-05

Therefore, ha = 0.0083585428 m

3. After mixing of CT 1A:

Inputs:

V = 3.28 ft/s
= 1 m/s
L = 36 m
n = 0.013
b/y = 1.5/1 Hence, b = 1.5 y

Maximum flow of CW & ACW in one CT (Q) = 115500 m3/hr


From continuitity equationb, Q = A x V

Area of the cross section (i.e. b x y = A) of the channel = 32.08 m2

Therefore, depth (y) of the channel = 4.62 m


& width (b) of the channel = 6.94 m

Hence, R = 1.98 m
= 6.5011647308 ft

and Ha = 6.785917E-05

Therefore, ha = 0.0024429301 m

4. After mixing of CT 2A:

Inputs:

V = 3.28 ft/s
= 1 m/s
L = 60 m
n = 0.013
b/y = 1.5/1 Hence, b = 1.5 y

Maximum flow of CW & ACW in one CT (Q) = 154000 m3/hr


From continuitity equationb, Q = A x V

Area of the cross section (i.e. b x y = A) of the channel = 42.78 m2

Therefore, depth (y) of the channel = 5.34 m


& width (b) of the channel = 8.01 m

Hence, R = 2.29 m
= 7.5068984148 ft

and Ha = 5.6016511E-05

Therefore, ha = 0.0033609907 m

Hence, total h a for the entire run of channel = 0.0260193 m