A. PIPING ITEMS.
7 W/R P X Material identification and review of manufacturer's test certificates / check test report
B. ROTARY EQUIPMENT.
16 W/R P X Performance test, run test , Noise level test with job motors/ divers etc.
21 W/R P X Material identification and review of manufacturer's test certificates / check test report
___________
MMCI
FORMAT NO:MMCI/INSP/FORMAT/008 R0 IITP
Mott MacDonald Consultants (India) Pvt. Ltd, Mumbai
SHEET 2 OF 2
Oil , Gas & Petrochemical Division, Inspection Dept.
40 H P X Pneumatic / Hydro test , Load test , Functional / Performance test of complete system as per procedure .
41 I H H X Final documentation/ Inspection Report at site after erection , commissioning & testing.
LEGENDS: H - Hold Point :- An activity , which requires inspection / Verification and acceptance by HPCL/MMCI /TPIA before any further
processing is permitted. The vendor shall not process activity/item beyond a hold point without written approval.,
W- Witness:- An activity, which requires witnessing by HPCL/ MMCI/ TPIA with prior notification of the same inspection agency. Vendor
is not obliged to hold further processing. Basis of acceptance shall be as per relevant technical specification/ drawings/PR/MR.
R - Review :-To examine the inspection records for confirming compliance to requirements.; A- Approval : -To approve the inspection
documents for conforming compliance to requirements.; P- Perform/Prepare; W/R- Witness or Review; I- Information; X- Submit,
PWHT- Post weld Heat Treatment, PO- Purchase Order,MR/PR- Material /Purchase Requisition, PS- Purchase Specification,
NDT- Non destructive Testing, TPIA - Third Party Inspection Agency, MMCI - Mott MacDonald Consultants (India) Pvt. Ltd
Note: This is an Indicative Inspection & Test Plan identifying scope of inspection & review of documents by MMCI / TPI Agency / HPCL
as a minimum requirement. Detailed Quality Assurance/Control Plan indicating all specified requirements after issue of PO/PR/MR / PS
to be generated by Vendor & same duly approved by MMCI / TPI agency to be submitted to HPCL for information.