Professional Documents
Culture Documents
FLOWCHART
( Flow Process of Project ) ( Investigation ) (Objective of Investigation) (Main Items of Investigation)
Investigations for
Review of vasic design and method of Data Survey:
Basic/Feasibility Design
construction: Hydro-meteorologic, topographic, and
Location, type of canal and geologic and local conditions
Preparation of appurtenant facilities Field Survey:
Basic/Feasibility Design Decision of location of canal routes Topographic canal route survey,
Estimate of project cost geological/soil test etc.
Commencement of Project
Investigations for Detailed Data Survey:
-Final decision of canal alignment
Design Hydrologic, meteorologic,
-Decision for detailed design and
Preparation of Detailed topographic, and geologic features.
construction plan
Design Field Survey:
-Estimate of project cost and
Surface/geological survey,
implementation schedule
canal/drainage system, etc.
Execution of Construction
Works
Supplementary Feedback to design/construction Investigations for Basic/Feasibility
Investigations Modification of design, etc. Design
Completion of Construction
Works