You are on page 1of 1

Please furnish the head calculation.

Level?

Level?
Level?
s 10.10.17
mlc
10.10.17

Level?

No of tanks to be marked.
interchange valve location,PG as marked in BRM
Overflow

Level? Pipe specification shall be


as per approved pipe
Level? schedule.

Level?

interchange valve location,PG as marked in BRM Overflow

Level?

Level?

Level?

interchange valve location,PG as marked in BRM Overflow

PROJECTS LIMITED
H. NO.1-7-80 TO 87, "MITHONA TOWERS - 1"
PRENDERGHAST ROAD, SECUNDERABAD - 500003.

BALANCE WORKS OF EXTERNAL WATER SUPPLY


SYSTEM FOR MILLS & FIRE FIGHTING PUMPHOUSES
(PACKAGE NO.077-02)
FOR REV 0 ISSUES ONLY

? URM

You might also like