You are on page 1of 37

REV 1

JKR
JABATAN KERJA RAYA
MALAYSIA
CAWANAGN KEJURUTERAAN CERUN

PROJEK PENYELENGGARAAN CERUN DI JALAN


PERSEKUTUUAN SEMENANJUNG MALAYSIA MELALUI
KONTRAK JANGKA PANJANG MULAI 2017

LALAUN FT 068

SEKSYEN 34.90

DAERAH GOMBAK

NEGERI SELANGOR

DATE : 19/02/2018

PINTAS UTAMA SDN.BHD. (30152-V) ZAQ ENGINEERING SERVICES SDN BHD

NO. 2A JALAN ANGGERIK MOKARA 31/52,


NO.21,JALAN SUNGAI BURUNG W32/W, SEKSYEN 31,
BUKIT RIMAU, KOTA KEMUNING,
40460 SHAH ALAM, 40460 SHAH ALAM,
SELANGOR DARUL EHSAN. SELANGOR DARUL EHSAN
TEL : 03-51247020 TEL : 03-51224686
FAX : 0351248020 FAX :03-51224686
CONTENT

ITEM CONTENT PAGE NO

1. INVESTIGATION

2. EXISTING SITE CONDITION

3. IMMEDIATE WORK

4. SUBSURFACE CONDITION

5. STABILITY OF SITE

6. ANALYSIS AND DESIGN

7. METHOD OF IMPLEMENTATION

8. WORK PROGRAMME

9. SCOPE OF WORKS

10. CONCLUSION

11. DETAIL DRAWING

12.. BILL OF QUANTITY

13. APPENDIX

i) SITE PHOTO
o�.... ,,,
1. INVESTIGATION

i) Process of Investigation

Sutracom Sein Bhd was called in by JKR to come up with remedial work proposal to the
failed slope. Sulracom Sdn Bhd had carried out a site inspection on (elate) to investigate the
extent of the current earth slope failure. The extent of the affected earth slope is assessed by
visual inspection on 29
January 2018.

From site observation, the current failed slope condition is serrous


progressive failure may occur especially after heavy rain.

2. EXISTING SITE CONDITION

i) Topograhpy

Tho current earth utopc face is moslly vegetoted wrth grass, shrubs, durtan trees and other
fruit tree except at Ille slope failure area where tho vegetation has been washed down the slope
and therefore leaves behind a barren earth slope.

ii) Drainage

There is no berm drain and subsoil drains observed on site.

iii) Existing Stabilization Works

There is no stabilization work done on site

J. IMMEDIATE WORKS

Temporary measures had been done on the site, such as laying plastic canvas to cover the
failed areas at this barren slope surface. This is to prevent further water intrusion into the
failed area that may trigger bigger slope failure.

New Jersey Barrier (NJB) and Sand bags had also been placed al the edge of pavement
to prevent water flow to downslope failure area.
4. SUBSURFACE CONDITION

i) Subsoil

The slope is comprised of SILTY soil material with traces of sand and grnvel There is NO Soil
Investigation (SI) done on this site to date after the stope failure occurs.

ii) Ground Water Profile

There is no piozometer installed on site to indicate the ground water table.

iii) Existing Utilities I Services a Electric cublu on electric pipe b. A Pipe Water Uno
c. A New ducting pipe for Telekom cable

5. ST ABILITY OF SITE

i) Failure Description

The reported failure leaves behind a steep barren expose surface, which are highly prone lo
erosion, and surface water seepage that may trigger bigger problem.

ii) Likely Causes

Based on site observation, the present distress slopes were probably initiated by a combination of
the following factors.

a) Current heavy rainfall.


b) Water Seepage from the top.
c) Deterioration of slope material.

iii) Risk Assesment

a. In term of risk, the failure slope poses Higl1 Threat to the road users and also to the existing
electrical pylon and sate

o...... nr
6. METHOD OF IMPLEMENTATION
a. GUNITING
Guniting is one of method implemented for surface protection syslem. Guniting was
proposed in combinalion of the slope protection measures at the site Gun1ting is the process
of spraying dry mix cemenl/sand mortar pneumatically at high velocity on soil surface of slope.

b. SOIL NAILING WORKS

i. Preparation Of Surface
1. Slope to receive soils nails shall be excavated ancl trimmed lo grade.
2. [xcavalion and trimming shnll be limited to maximum 3m
height to allow for 2 rows of soils nails lo be drilled and grouted
hefore procAnfling to the nP.xl 2 rows
3. Set out the positions of soil nails accordinq to ctrnwinn

ii. Fabrication or T25 Rebar Reinforcement


1. High T ensilo steel bar T?S wrth single corrosion protecncn shall be used. Length or the
1Ja1 shall be si11gle length as specified. Bar length exceeding 12rn shall be joined with
MOMENl steel Coupler.
2. l hread1ny al one end of steel bar shall 00 willl th,eacling
machine. Thread length
3. shall be 100mm Thread another end for joining of robar exceedrng 12m
4. PVC centralisers shall be installed at spacing of 2.5m
throughout Hie lenglh of tho high tensile T25 bar.
iii. Drilling Of Borehole
1. Hydraulic Rotary Drilling Machine with drag bi!IDTH down the hammer shall be use
2. Position machine at the required inclination and drill 125mrn
diameter boreholes lo lhe depth required.
3. Flushing of culling shall be with High Pressure Air
Compressor.
4. Should drilling encounter rock, a Down-The-Hote-Harumer shall be used.
5. Where working platform is not available, temporary staging
shall be erected for silling of portable drill rig.
6. Drilling recorcl shall be kept each soil nail. iv. Grouting Of Borehole
1. Upon completion of Drilling, insert the fabricated steel bar into
the drilled hole.grout tube will lower together wilh the steel reinforcement to the bottom of the
borehole.
2. Prepare neat cement groul of water cement ratio Grade 30 (G30) with a grout mixer.
Pumping grout through the inner of the 25mm diameter grout tube until clean grout is
discharges from the top of borehole. Drilled holes left more than z-thrs.shalt be cleaned
before lowering steel bar.

"--- _,
3. Install galvanised steel bearing plate of 200mm x 200rnm x
20mm thick and lock the nail head with washer and two numbers of galvanised nuts after
completion of gurnting works.
4. Construction the nail head cappinq as per drawing.

c. SLOPE STABILIZATION
1. Slope stabilizalion measures are usually implemented together with methods 10 control
drainage and seepage. Horizontal drain has been proposed as one of the subsurface drainage
measures in this project

d. HORIZONTAL DRAIN
I. Preparation Of Surface
1. Slope to receive horizontal drain shall be excavated and trimmed to the required
grade.
2. SP.I out the posi1ions of honzonlal drain accordmq to drawinq.
ii. Fabrication Of Perforated PVC Pipe
1. PVC pipe Class 'D' shall be pre cut to the requned slotted as per drawing and speoucanon
wilh 2 slotted perforations for top section of PVC pipe at 30mm centres throughoul length of
except Ior 75001111 rrom outlet point where no perforation tequirod.
2. Tho pro cut slotted perforuled PVC pipe shall be wrap with one
tayer filter Gectextite. The fllter qectexnlc shaU be NON WOVER Geotextile Po1yfelt TS30
or. technically equivalent
iii. Drilling Of Borehole
1. Hydraunc Rotary Onlhng Machine with drag biVOTH down the hammer shall be use.
2. Position machine al the required inclination and drill 125mm
diameter boreholes lo the depth required.

3. Flushing of cutting shall be with l ligh Pressure Air


Compressor.
4. Where working platforrn is not available, temporary staging shall be erecled for silting of
portable drill rig.
5. Drilling record shall be kepi for each horizontal drain installed.
7. WORK PROGRAMME
(see al/achme111)

8. SCOPE OF WORl{S

a. Site clearing
b. Soil nailing work c. Gunitelgrid beam d. Dtaiuaqe work
o. Rand work
n ..... ,.r
9. CONCLUSION

CONTRACT SUM (RM)


DESCRIPTION
GRID BEAM
I

PRELIMINARIES • 82,500.00

TURNKEY ELEMENTS 70,000 00


24,15000
srrr CL[ARING /\ND Cl rANING

SLOPF RFMEDI/\! WORl<S ?48,000 00

1lNl\tNAGI WUHKS
I 32,350 00

RO/\DWOHKS 22,800 00

TOTAL AMOUNT 479,800.00


-

From tne our observation, we proposed the total amount is RM 479,800.00 for slope
I ectilication wor ks at Jalan Gombak - Bentong, Daerah Gombak. Selangor
n ..... ..,
-·ILL OF
QUANTITY
CADANGAN KERJA-KERJA PEMBAIKAN CERUN DI SEKSVEN 34.20 LALUAN FT68,
JALAN GOMBAK � BENTONG, OAERAH GOMBAK, SELANGOR

Grid Beam

SUMMARY OF OILS OF QUANTITIES

BIL DESCRIPTION PRICE (RM)

J.O l'RELIMINARIFS 82,500 00

70 rurtNKI-Y FlfMENl<; 70,000.00

J.O SI IC CllARING AND CL(/\NING M, 1 ',0 Oil

4.0 51.0PF REMEDIAL WORKS 7tl8,000.0fl

s.o OHJ\INAGt- WORKS 32,350.00

6.0 HOAU WOHKS 22,800.00

TOTAL 479,800,00
Cl\lll\NGIIN H(Hll\·KF.Htl\ PEMIIIIIKI\N (tRUN [)I SU(Htr4 34.2D lAlUAN I f68, JALAN GOMIIAK · BENTON Ci, UAfRAII CiOMB!\K,
SEtANGOR
Dill NO l · PRHIMINARIE5
AMOIJtll
CODE no ITEM urm QTY RATE
!RMl

1 NIELIMINAIIIES
,. ,
!:11:n1,asl!!i!I f!�!l!!!r!rn1�n11
1.1.1 Allol'I f1Jr thl' p1ovi,i1Jn or f•c,rurmdnc� Bond in lh� lu,m of .oppr�d Bank/ ncm
lnsur�ncc/ Finance Guar,mtce equ,:,l 10 five (51 percent of the cont1.1Ct sum
for cue pe,fo,manc, an(! ohse1v.ill{I! of thi; contract
l 1.2 Allow 1he provision ol lnsu,ance as 11e1 Con(l,tion ol conlr11cl :-
11 Insurance of Wo,�s lnclud,nc acalnst pe,sonat injuri,s .ind d.imag, Item
,,000.00
prupe,lie\,
ii) \'lorkrnen'� Compesltlon ;md/or SOCSO. Item

,. , J.lll1,1uU1m, Tc>\inK & Labu••\opy


'"
All quality control ;md 1estine 1cqulrcmcnt lncludlne prepa1atlon ol 1eporl,
t('S\ l('COl(IS (OmplPt•· with re'onr 11h,uu;,p1•h\ th!<JUkht>UI th•· fCUlt,ll I
item
S,000.00
penotl.
13 l'•uk"'" 1te11u1\
' 3' Prepi1.1t!on �nd �uh1,lss rtn ol mi,nthly proc,ess rl"f"IO•t inrlutllnc 1,athr 11Pm
mlna�i'rrl'fll lfPOll corrunete v.oth c°'our pl.o1o�r�Pll ll,roo"hoJI the J,f)JOIJO
ron11<1ct pP,iod.

,,, �1-fl1•III flo"j!wlnr.

!A! Allow for the p11•1111�t,uu of J\ huill llrd1·,u11.:\ dull wr11pl1!11un re1101 l dulv nern
(C1lilieJ I.>� P,u1� ssio11,1I fu�ince,s JS p�, ,equllemcnts ot the wecltiutlons ·I.IKXl.00

,., Work 1'101:rJmmc

"'
Allow lor \UIJmlS\k"il'I of P•ar.r.imt (11 Work� r,r1N IO rornmPl'l(P"1�nt of
·,·1urk) Ououl(huul the (011l1,,a 11erioJ.
lttm
1.�00 00

1.6 �i� �l!l�!ll'!ll i•ll! �ljl,lnlnr,


l (, I llllm'I tor ,ill' cll'domg ;md t l"dllilli; of 1on,lr11clron debm tt11uul(hu11l lhe llem
con<.;ltuction �nd u1ion lOmplcllon or wo,h iocludlng ei,istlng rubb,st1 ,1od l,!.00.00
dis1>0..e swplus f,om sit I' to ron1rac1nr own tip.
,.,
Mol!lll,11tlon rllld oemubilis,tion
1.7 1 Allow 101 the mobllh,11ion of all labour. plant. equlpm,nt and Incidentals 11e�, Z0,00000
IIPCP\,�,y to ,dh,trl, lmily JJ"rfu1m u,,. 1onl1dcl w111k, rlr11l dtmubili'><llion
ol th" ,.imc on cu111ple1io11 of Wo1b.
,.,
Surv�y ,ind Sf'tllnH Oul Wo1ks
18.l P,ov><Je $etllo>g out levelling and chcc�ing or const,uction ol .Jll ..,orks unde• Item 10,00000
the cont,;ict hy lirense w,veyor

,., Soll ln\·e�11r.�11on wo,h (SI)


l.'.J.1Ca,ryoul soil 111�estigation works to dete,mlnc soil prope,tics lor design of 15.00000 the propOied
remedlal works

1.10 Mli,cellaneo�i,
I.In 2 Supply, lay and m&inlaln tt'mporaiy sheet pile for slo11l' 11rolt'tliur1 durirlK llt'ltl
construction worh alone effected as directed by the SO. 50000

1.1] Conlril<tor's Site Orfice anti Accomodallon


I 11.1 Allow for the est.iblishment of the contractor's site omce .:and workmen's Item
acccrnmcnaucn. 10.000.00

l.ll 2 Allow tor maintenance nl th,. Contraclor's omce th11111i;hmn con\tmctl(ln It Pm


5,00000
p,.,,c;,l.

l.ll.3 Allow for the ,emovJI of the Contr.:iuo1's site office upon completion ol Item wo,ks.
S.000.00

TOT/IL PRUIMINARl(S CAflRIEO TO SUMMARY 81,SOO.OO


(I\DflNGIIN KERll\·KfflJA PfMDIIIKIIN CE RUN DI SEKSVCN 17.0 I/ILUI\N R6R, JI\I/IN GOMUIIK · UtNrot.6, l>AERAlt UOMIJAK, SE LANGOR
IIILLNO : l URN KEV HEMENTS
COUC NO IUM UNIT QUANlll't AMOUNT
--- "'"

a.c [)[SIGN & DUILO /TUltNKEY EL0,1tNIS


u S,000.00
,.1 P1@p,1rato1y ano t arnns \'IOrh for s11bml�1lon of
Cen1r,�1or·� rropo;al

" 1Nk.Y I ,., C<.>nt••d•u's Consultant


Con1ul1a,1cy Ser.l<IH �s ;pedl ed In Che rnpe<liW
Mc11rnrd111lum ,;,I A,i,eement {MUAl mdudln11 ;t,,mpmg
of Mofl !Clause 35) .>nd � ot fl;sl,::nment ICl.iuse 361
I) CM1 ;md S1111ct11tJ1f1.>1;
(11Ch1eer �u.000.00
I) MNhanical & Cleterl(dl (nl(lll�t>, l ii Ou�111:1v Su,vL\U
t,t se« rfl!y C"on�•,llanl

,. ' SupPrvlilon rees


" 15,00000

---
TOTAL lUIINKEY ElEM�NT CAkRIEO TO SUMMARY 70,00P.00
Cfll>ANGflN KERIA-KERJ(I PEMBfllKAN CERUN DI SEKSV{N 17.0 1/\UJAN FT611, Jiil/iN GOMIIAK - IIENTONG, DA[RAH GOMBAK, SCLANGOlt

OILLNO 3 : SITE CL"• RIN� ANO EARTIIWORKS


COUE NO ITEM UNlr QUANTITY RATE - ...
(NOTE : The qu)ntltles :ire provisional �nd subje<:I to lloJI me,nurement upon completion)

3.1 Sltl!Clori11K
3.1 I S,te deilfirlll for consttu(tion slope repair and LS
7,500.00
(11 ainal(e I'll.II X',

312 (;!,.,n �11<1 ll!rHtlvl! from site all obstildas over the areas for U•P c un\l! 11, 1iu11 of slope

.. ,
tCEW S, nrctecnon works ;,mt dra n, 1ndud.11g shrubs
Ni[! ront�. Pxl,11ng ,1rutture�, ,md d1spos�I of ,111
rn.olcriJh IU LOlllrM Lu,\ U�III h1111ini,: �ile
"''
4SO 12.00 S,I\COOO

.., FJtr�viltion
.I 2.l l.<<,watc unsu1toble motc,IJI to l)(CpJr<.> the m7
,1u1•c �1111.,u: tu ,�"(ei,e lhe 1ep;ilr w()(h as
,I, ected by the Cn11inccr's rccrescoteuve �mt 4',0 l� ca 11,250.00
t1,�11osc su,plus trorn site to Con11ac1ors's own
(t(W8, [CEW 9 & rcrw 10
d1au11 site

TOTAL SI TE CLEARING AND EARTHWORKS CARRICO TO SUMM/UtY 24,150.00


CADANGJ\N 1<£Rlfl·ICEIU,\ P(MOAIKJ\N CE HUN Ill SE KS YEN 17.0 lAlUAN FT68, JAWI GOMBAK - BENTONG, DJ\ERJ\11 GOMllAK, SUANGOR
Bill "'0 4: SLOPE IUMEUIAL WOJIKS
UNIT
CODf NO ITEM Q<Y AMOUNT
�11t.;eu 10 "' .

"
[NOIF: Tht> quanliti,., d'" 1110,,.,iondl anJ LS
linal rreasurerncot 11p0n completlonl

... Moblll111tlon

4.1.1 Mob,h�cion "ml demoblllsatlon of �II nijlllnc plJnts 15.000.00


�nd equipment

SLST{
llllow for moving and ham.llmg of d1ill;ng �nd gt outing 1,/1,().00
4.U
equipment etc "
a.z �oil N�lllnH
'2 I Sopvlv and install loOI! nall. ,elnto,ce,1 hy one !]'. Gldtt" oo, ,0 l,lSS 00 t4,8SO.CO
460 1elnlOfr�mPnl hd, a, p,-1 dr.,v,inl( ••111 �,,e,,licaloon
)t)l •I mrloct1ng tl11ll ,1,:1,,,,u 11:,,n.,. J ,uncle• Hole l 9m knglh
h·to ,wv 11,�1�. accc1sr.>1,c1 �r>d ., 111,·,P�'·"Y 1•l�·,1

equipment and ere

•I)) �up11:y ,md co,11lruct sv,I nJ1I hl,ltl w,i�tmc nt arrirm·rrl


I !01100 11,000.C(l
llO\
'"
100,mn K 200,nm � 12mm !thkJ M:, Pl.UP w lh 1,g1u�n,•d nut and 1•:,"h�, d\ �pe<ified ,n the d1dwm,1 and
:.L:.1 � ,,.._,,.ficJ1\on

4.3 1,stin11
(11rryoul fHIII011l IP\! for ,.,,,.tinf,! ,nil 11�il In I.� li111�\ 3 ,.sc<i.oo
"' ,•,orki1•R lodd i,1clu1ive of mobih1iltion, machineries. all
110\ 1,900.00

ncctHJ•V anti 1epo,t p1epa,;,tion .

••• Grid lledm

,u 200.00 75,00000
4 S1,pply nll nPCP\i1lfYV Pi)ulrm1Pnt. mateuat and labom 10
(Orl\llllLl n .. w KC. 11ritl beam 300rnrn � 300,nm with "' '"
4112ilndRIO 180

llOIILOl'ltal Drain
" 4.5.l Supply .:md llm�ll 9.0n, lcnc1h h0fi10n111lrlr�ln1 with nu� JO �0.00 S,400 00
RIST 59 fJ;>tlO<�l+>d pv( 1>11,P w,�ppl',I \Sith nun wu,1111',L'Oh��lile
all •� per drawinr. and spccilicatioo

.. ,
�.b.1
Closed Turfi11g
C:low 1111fi11g pegged 011 frll slope smlacer. lnclud!n.:? m1 TM 12.0U /,20000
SUl'K 1 SQnim hed ol bl.1ck e;,flh 11, �pt>tlUPd In the drawing or
M di,erll'<l hy !hi' S.O.

,., Sandllll
4.7 1 Supply and batkfill wi1a1JI� 1•ntl/1trdnUIJr mJIC1i.1ls lo ml 200 12000 74,lkJ0.00
baL�fitl sinkhole area behind 1hc e!stlne RC wall

TOT At SlOH REMEDIAl WORKS CARRlfD TO SUMMARY 248,000.00


CADANGAN l<ERIA-l<ERJA PEMBAll<AN CEHUN 01 SEl<SYEN 17.0 LALUAN FT68, JALAN
GOMBAI< • BENTONG, DAERAII GOMUAK, SELANGOII
Bill NO 5 • DRAINAGE
' WOlll<S
CODE NO llEM UNIT AMOUNT
QTY 111\l F.
(RMl
(NOTE: The quantities are provlskmal aml subject to
Hnal mf':isur�mcnt upon completion)

5.1 Roadside Oraln


!:,.11 Make �oml lhe exlsting draln to the oriR,in.il condition 30
200.00 6,000.00
"'
before failure

s.a c.isca<l" Drnln

ORNG
5.2.1 SupJ)ly and costrvrt 600 x ,1�0 l<1�\ i11 ,,tu \J SIMpl'
J'.;0,00 'i,1�,0.00 cascade dr;iln
"' "
9
'i.2.2 '.>up11I)' and COSlfUCI YUUXYOO casl 111 suu U·')h.. jlt' IS
"'
450.00 6,750.00
, "" ,uh· dr,1i,1

5.3 Tor Draln


S1111pl�· ,111rl cosvuct 900 x 600 cast in situ uo.ou J,l'..U.UO
!JI\NG
•I
!:,,J, [
U 51-tape roe d1<1i11
"' "
5.4 RC Surnv
5 ,1.1 �upp!y <1nd construct 7<in x 7'iO x 600 Ci'l\t In situ nos -, 1,00000 !:.,OOU.00
Grade 2!> reinfu,ced concrete sump
DIING4l
5.5 Control Ue11rrier Sum11 nos 1 R00.00 800.00

,., H:mdr:ill at Cascade Drain


5.6.1 '.>upply and install 50111 dia111ele1 G.l Pipe handrail m JO HIU.00 '>/100.00
cor11p\cte with anti-rust paint un la�lade d,ain and RC
Pcrimclcr W.ill
TOTAL DRAINAGE WORKS CARRIED TO SUMMARY 32,350.00
Cf\UANGAN KEIUA·KEIIJA PEMBI\IKIIN CERUN 1)1 SEKSVEN 17.0 LALUAN FTG8, JALAN GOMOAK -1.\ENfONG, UAEl!f\H
GOMRAI<, SELANGOR
lllll NO 6 ·ROADWORKS
AMOUNT
coer NO ITEM UNIT rrnr Mii.TE [RM)

!NOTF : Thr •111,111titlrs arr prnvi�lmMl and subject to final


measurement upo11 rom,}lction)

,., Hnad_Hu11rfadn1 Work,

,., Supp1y,lay,sprcad ,level and compact roadbase material tu ml

zooo the required formation level


4,R00.00
'40

Sllflplt ;11Y111Jlflly 11 t11m IIOU'> tack r.oal un forrnly "11 ludiny m> '40 5.00 l,2UO.OO
ROAl) A
" eetan ll!J Hie surface of pa11eme111 pnm lo up1� r..iliou

SJ StlJifo!y :irYI !riy f,Omm lh r.k A.<1phal1,r CrnV'Jftla Oimle1 C'..(lu1su rn2 '40 ss.oo 8 400.00
ROA07
Supply and lny 50mm 1h ck /\sphJhC COncre1e Wearing cco-se ml '40 10, on R,400.00
"

TOTAL ROAD WORKS CARRIED TO SUMMARY 22,800.00


DRAWINGS
LAYOUT
PLAN
c!/
�i .•.
"
(5/

I
�'.:;;
�!<I
:;:, _J
;,
.;;.;_.., L
I <! w co

-
0
0::
I
u, ' I
o,,
u
I 1-
g�
n
3
0.,

'•o un z
<• <!
--,'
o
1-
:=J
0
>•
<!
_J

\ w
Vl

\ 0
o,
0
0::
o,

"<

u

·�
"o •
•• � 3!.

,u
0.
o•a
o
•.
•u
• n

• u
\
�\


��
o)
z
0
1-
L.J
w
(/)

(/)
(/) ::E
0 <(

z a w
(I)
0
t• : 0
L.J
.,,
w
w
0:::
l.'.:l
<( .,, (/)

0 -c
.,, 0 :c
o: a. 1-
t-- u
,u,: . 3
0 <( w (0 0
u a
'
le>
••""

O•<
•o
:
a..

00£
CROSS
SECT ON
"�o
"' "
-"
·c

-
:a",';
r-, N LO
c
"c' '6 0
(!)0
::";', LJD
ll'


J1J
"' jl>
·.":::': = c:
ro (0./') o0
Q)

:. DD
_,
A ·ENDIX
SITE
PHOTO
P!C"IURL I

PICTURE 2

P1c·1uRE 3
PICTUHL 4

PICTURE 5

PICTURE 6
PICTURE 7
·-
_,_
:;
"
:i
. ,_
• .J l
ii-:;! ••
14
--,,

"•s:
•'

11 I
.,. • •• .._ .._ l _ . _

!
I

[[

.
5
'
'"!"' (').., ...
-! "! '..:! ri r« -r "'! "! "! "! �