JABATAN KERJA RAYA
MALAYSIA
CAWANAGN KEJURUTERAAN CERUN
LALAUN FT 068
SEKSYEN 34.90
DAERAH GOMBAK
NEGERI SELANGOR
DATE : 19/02/2018
1. INVESTIGATION
3. IMMEDIATE WORK
4. SUBSURFACE CONDITION
5. STABILITY OF SITE
7. METHOD OF IMPLEMENTATION
8. WORK PROGRAMME
9. SCOPE OF WORKS
10. CONCLUSION
13. APPENDIX
i) SITE PHOTO
o�.... ,,,
1. INVESTIGATION
i) Process of Investigation
Sutracom Sein Bhd was called in by JKR to come up with remedial work proposal to the
failed slope. Sulracom Sdn Bhd had carried out a site inspection on (elate) to investigate the
extent of the current earth slope failure. The extent of the affected earth slope is assessed by
visual inspection on 29
January 2018.
i) Topograhpy
Tho current earth utopc face is moslly vegetoted wrth grass, shrubs, durtan trees and other
fruit tree except at Ille slope failure area where tho vegetation has been washed down the slope
and therefore leaves behind a barren earth slope.
ii) Drainage
J. IMMEDIATE WORKS
Temporary measures had been done on the site, such as laying plastic canvas to cover the
failed areas at this barren slope surface. This is to prevent further water intrusion into the
failed area that may trigger bigger slope failure.
New Jersey Barrier (NJB) and Sand bags had also been placed al the edge of pavement
to prevent water flow to downslope failure area.
4. SUBSURFACE CONDITION
i) Subsoil
The slope is comprised of SILTY soil material with traces of sand and grnvel There is NO Soil
Investigation (SI) done on this site to date after the stope failure occurs.
iii) Existing Utilities I Services a Electric cublu on electric pipe b. A Pipe Water Uno
c. A New ducting pipe for Telekom cable
5. ST ABILITY OF SITE
i) Failure Description
The reported failure leaves behind a steep barren expose surface, which are highly prone lo
erosion, and surface water seepage that may trigger bigger problem.
Based on site observation, the present distress slopes were probably initiated by a combination of
the following factors.
a. In term of risk, the failure slope poses Higl1 Threat to the road users and also to the existing
electrical pylon and sate
o...... nr
6. METHOD OF IMPLEMENTATION
a. GUNITING
Guniting is one of method implemented for surface protection syslem. Guniting was
proposed in combinalion of the slope protection measures at the site Gun1ting is the process
of spraying dry mix cemenl/sand mortar pneumatically at high velocity on soil surface of slope.
i. Preparation Of Surface
1. Slope to receive soils nails shall be excavated ancl trimmed lo grade.
2. [xcavalion and trimming shnll be limited to maximum 3m
height to allow for 2 rows of soils nails lo be drilled and grouted
hefore procAnfling to the nP.xl 2 rows
3. Set out the positions of soil nails accordinq to ctrnwinn
"--- _,
3. Install galvanised steel bearing plate of 200mm x 200rnm x
20mm thick and lock the nail head with washer and two numbers of galvanised nuts after
completion of gurnting works.
4. Construction the nail head cappinq as per drawing.
c. SLOPE STABILIZATION
1. Slope stabilizalion measures are usually implemented together with methods 10 control
drainage and seepage. Horizontal drain has been proposed as one of the subsurface drainage
measures in this project
d. HORIZONTAL DRAIN
I. Preparation Of Surface
1. Slope to receive horizontal drain shall be excavated and trimmed to the required
grade.
2. SP.I out the posi1ions of honzonlal drain accordmq to drawinq.
ii. Fabrication Of Perforated PVC Pipe
1. PVC pipe Class 'D' shall be pre cut to the requned slotted as per drawing and speoucanon
wilh 2 slotted perforations for top section of PVC pipe at 30mm centres throughoul length of
except Ior 75001111 rrom outlet point where no perforation tequirod.
2. Tho pro cut slotted perforuled PVC pipe shall be wrap with one
tayer filter Gectextite. The fllter qectexnlc shaU be NON WOVER Geotextile Po1yfelt TS30
or. technically equivalent
iii. Drilling Of Borehole
1. Hydraunc Rotary Onlhng Machine with drag biVOTH down the hammer shall be use.
2. Position machine al the required inclination and drill 125mm
diameter boreholes lo the depth required.
8. SCOPE OF WORl{S
a. Site clearing
b. Soil nailing work c. Gunitelgrid beam d. Dtaiuaqe work
o. Rand work
n ..... ,.r
9. CONCLUSION
1lNl\tNAGI WUHKS
I 32,350 00
RO/\DWOHKS 22,800 00
From tne our observation, we proposed the total amount is RM 479,800.00 for slope
I ectilication wor ks at Jalan Gombak - Bentong, Daerah Gombak. Selangor
n ..... ..,
-·ILL OF
QUANTITY
CADANGAN KERJA-KERJA PEMBAIKAN CERUN DI SEKSVEN 34.20 LALUAN FT68,
JALAN GOMBAK � BENTONG, OAERAH GOMBAK, SELANGOR
Grid Beam
TOTAL 479,800,00
Cl\lll\NGIIN H(Hll\·KF.Htl\ PEMIIIIIKI\N (tRUN [)I SU(Htr4 34.2D lAlUAN I f68, JALAN GOMIIAK · BENTON Ci, UAfRAII CiOMB!\K,
SEtANGOR
Dill NO l · PRHIMINARIE5
AMOIJtll
CODE no ITEM urm QTY RATE
!RMl
1 NIELIMINAIIIES
,. ,
!:11:n1,asl!!i!I f!�!l!!!r!rn1�n11
1.1.1 Allol'I f1Jr thl' p1ovi,i1Jn or f•c,rurmdnc� Bond in lh� lu,m of .oppr�d Bank/ ncm
lnsur�ncc/ Finance Guar,mtce equ,:,l 10 five (51 percent of the cont1.1Ct sum
for cue pe,fo,manc, an(! ohse1v.ill{I! of thi; contract
l 1.2 Allow 1he provision ol lnsu,ance as 11e1 Con(l,tion ol conlr11cl :-
11 Insurance of Wo,�s lnclud,nc acalnst pe,sonat injuri,s .ind d.imag, Item
,,000.00
prupe,lie\,
ii) \'lorkrnen'� Compesltlon ;md/or SOCSO. Item
!A! Allow for the p11•1111�t,uu of J\ huill llrd1·,u11.:\ dull wr11pl1!11un re1101 l dulv nern
(C1lilieJ I.>� P,u1� ssio11,1I fu�ince,s JS p�, ,equllemcnts ot the wecltiutlons ·I.IKXl.00
"'
Allow lor \UIJmlS\k"il'I of P•ar.r.imt (11 Work� r,r1N IO rornmPl'l(P"1�nt of
·,·1urk) Ououl(huul the (011l1,,a 11erioJ.
lttm
1.�00 00
1.10 Mli,cellaneo�i,
I.In 2 Supply, lay and m&inlaln tt'mporaiy sheet pile for slo11l' 11rolt'tliur1 durirlK llt'ltl
construction worh alone effected as directed by the SO. 50000
l.ll.3 Allow for the ,emovJI of the Contr.:iuo1's site office upon completion ol Item wo,ks.
S.000.00
---
TOTAL lUIINKEY ElEM�NT CAkRIEO TO SUMMARY 70,00P.00
Cfll>ANGflN KERIA-KERJ(I PEMBfllKAN CERUN DI SEKSV{N 17.0 1/\UJAN FT611, Jiil/iN GOMIIAK - IIENTONG, DA[RAH GOMBAK, SCLANGOlt
3.1 Sltl!Clori11K
3.1 I S,te deilfirlll for consttu(tion slope repair and LS
7,500.00
(11 ainal(e I'll.II X',
312 (;!,.,n �11<1 ll!rHtlvl! from site all obstildas over the areas for U•P c un\l! 11, 1iu11 of slope
.. ,
tCEW S, nrctecnon works ;,mt dra n, 1ndud.11g shrubs
Ni[! ront�. Pxl,11ng ,1rutture�, ,md d1spos�I of ,111
rn.olcriJh IU LOlllrM Lu,\ U�III h1111ini,: �ile
"''
4SO 12.00 S,I\COOO
.., FJtr�viltion
.I 2.l l.<<,watc unsu1toble motc,IJI to l)(CpJr<.> the m7
,1u1•c �1111.,u: tu ,�"(ei,e lhe 1ep;ilr w()(h as
,I, ected by the Cn11inccr's rccrescoteuve �mt 4',0 l� ca 11,250.00
t1,�11osc su,plus trorn site to Con11ac1ors's own
(t(W8, [CEW 9 & rcrw 10
d1au11 site
"
[NOIF: Tht> quanliti,., d'" 1110,,.,iondl anJ LS
linal rreasurerncot 11p0n completlonl
... Moblll111tlon
SLST{
llllow for moving and ham.llmg of d1ill;ng �nd gt outing 1,/1,().00
4.U
equipment etc "
a.z �oil N�lllnH
'2 I Sopvlv and install loOI! nall. ,elnto,ce,1 hy one !]'. Gldtt" oo, ,0 l,lSS 00 t4,8SO.CO
460 1elnlOfr�mPnl hd, a, p,-1 dr.,v,inl( ••111 �,,e,,licaloon
)t)l •I mrloct1ng tl11ll ,1,:1,,,,u 11:,,n.,. J ,uncle• Hole l 9m knglh
h·to ,wv 11,�1�. accc1sr.>1,c1 �r>d ., 111,·,P�'·"Y 1•l�·,1
4.3 1,stin11
(11rryoul fHIII011l IP\! for ,.,,,.tinf,! ,nil 11�il In I.� li111�\ 3 ,.sc<i.oo
"' ,•,orki1•R lodd i,1clu1ive of mobih1iltion, machineries. all
110\ 1,900.00
,u 200.00 75,00000
4 S1,pply nll nPCP\i1lfYV Pi)ulrm1Pnt. mateuat and labom 10
(Orl\llllLl n .. w KC. 11ritl beam 300rnrn � 300,nm with "' '"
4112ilndRIO 180
llOIILOl'ltal Drain
" 4.5.l Supply .:md llm�ll 9.0n, lcnc1h h0fi10n111lrlr�ln1 with nu� JO �0.00 S,400 00
RIST 59 fJ;>tlO<�l+>d pv( 1>11,P w,�ppl',I \Sith nun wu,1111',L'Oh��lile
all •� per drawinr. and spccilicatioo
.. ,
�.b.1
Closed Turfi11g
C:low 1111fi11g pegged 011 frll slope smlacer. lnclud!n.:? m1 TM 12.0U /,20000
SUl'K 1 SQnim hed ol bl.1ck e;,flh 11, �pt>tlUPd In the drawing or
M di,erll'<l hy !hi' S.O.
,., Sandllll
4.7 1 Supply and batkfill wi1a1JI� 1•ntl/1trdnUIJr mJIC1i.1ls lo ml 200 12000 74,lkJ0.00
baL�fitl sinkhole area behind 1hc e!stlne RC wall
ORNG
5.2.1 SupJ)ly and costrvrt 600 x ,1�0 l<1�\ i11 ,,tu \J SIMpl'
J'.;0,00 'i,1�,0.00 cascade dr;iln
"' "
9
'i.2.2 '.>up11I)' and COSlfUCI YUUXYOO casl 111 suu U·')h.. jlt' IS
"'
450.00 6,750.00
, "" ,uh· dr,1i,1
Sllflplt ;11Y111Jlflly 11 t11m IIOU'> tack r.oal un forrnly "11 ludiny m> '40 5.00 l,2UO.OO
ROAl) A
" eetan ll!J Hie surface of pa11eme111 pnm lo up1� r..iliou
SJ StlJifo!y :irYI !riy f,Omm lh r.k A.<1phal1,r CrnV'Jftla Oimle1 C'..(lu1su rn2 '40 ss.oo 8 400.00
ROA07
Supply and lny 50mm 1h ck /\sphJhC COncre1e Wearing cco-se ml '40 10, on R,400.00
"
I
�'.:;;
�!<I
:;:, _J
;,
.;;.;_.., L
I <! w co
-
0
0::
I
u, ' I
o,,
u
I 1-
g�
n
3
0.,
•
'•o un z
<• <!
--,'
o
1-
:=J
0
>•
<!
_J
\ w
Vl
\ 0
o,
0
0::
o,
"<
•
u
·�
"o •
•• � 3!.
,u
0.
o•a
o
•.
•u
• n
• u
\
�\
�
��
o)
z
0
1-
L.J
w
(/)
(/)
(/) ::E
0 <(
z a w
(I)
0
t• : 0
L.J
.,,
w
w
0:::
l.'.:l
<( .,, (/)
�
0 -c
.,, 0 :c
o: a. 1-
t-- u
,u,: . 3
0 <( w (0 0
u a
'
le>
••""
•
O•<
•o
:
a..
00£
CROSS
SECT ON
"�o
"' "
-"
·c
-
:a",';
r-, N LO
c
"c' '6 0
(!)0
::";', LJD
ll'
�
J1J
"' jl>
·.":::': = c:
ro (0./') o0
Q)
:. DD
_,
A ·ENDIX
SITE
PHOTO
P!C"IURL I
PICTURE 2
P1c·1uRE 3
PICTUHL 4
PICTURE 5
PICTURE 6
PICTURE 7
·-
_,_
:;
"
:i
. ,_
• .J l
ii-:;! ••
14
--,,
•
"•s:
•'
11 I
.,. • •• .._ .._ l _ . _
!
I
[[
•
.
5
'
'"!"' (').., ...
-! "! '..:! ri r« -r "'! "! "! "! �